CN106285002A - Cast-in-place walls difference of height tool-type hoisting die construction method - Google Patents

Cast-in-place walls difference of height tool-type hoisting die construction method Download PDF

Info

Publication number
CN106285002A
CN106285002A CN201510279472.XA CN201510279472A CN106285002A CN 106285002 A CN106285002 A CN 106285002A CN 201510279472 A CN201510279472 A CN 201510279472A CN 106285002 A CN106285002 A CN 106285002A
Authority
CN
China
Prior art keywords
pattern plate
plate bolster
mould pattern
mould
hang
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510279472.XA
Other languages
Chinese (zh)
Inventor
葛于存
刘家铭
吴波
沈明
陈素文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201510279472.XA priority Critical patent/CN106285002A/en
Publication of CN106285002A publication Critical patent/CN106285002A/en
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A kind of cast-in-place walls difference of height tool-type hoisting die construction method, it is characterised in that comprise the following steps: a. hangs mold materials and selects, what b. making was shaped hangs mould pattern plate bolster, c. on-the-spot unwrapping wire, d. hanging mould pattern plate bolster assembled, e. hangs the correction of mould pattern plate bolster and f. hangs mould pattern plate bolster and reinforces, and pours concrete.The cast-in-place walls difference of height tool-type hoisting die construction method of the present invention has hangs mould pattern plate bolster simple in construction, easy to make, efficiently solve between toilet, kitchen, balcony difference of height absolute altitude controls and provides technical guarantee for construction in later period decorations, it is to avoid the advantage that a series of remedial operations such as repairing are damaged at negative and positive angle.

Description

Cast-in-place walls difference of height tool-type hoisting die construction method
Technical field
The present invention relates to the template construction method of a kind of casting concrete, specifically, be a kind of cast-in-place walls difference of height tool-type hoisting die construction method.
Background technology
In cast-in-place building room structure construction procedure between toilet, kitchen, balcony hang mould height difference absolute altitude and control bad, can cause damaging during form removable negative and positive angle, and during form removal, there is also the badly damaged phenomenon hanging template.
The most known cast-in-place walls difference of height template construction also exists above-mentioned all inconvenience and problem.
Summary of the invention
The purpose of the present invention, is to propose a kind of cast-in-place walls difference of height tool-type hoisting die construction method improving difference of height position, plate face concrete negative and positive angle molding perception effect.
To the cast-in-place walls difference of height tool-type hoisting die construction method hanging mould damaged template when it is another object of the present invention to propose a kind of elevation control and prevent form removal.
A further object of the present invention, is to propose a kind of cast-in-place walls difference of height tool-type hoisting die construction method avoiding pouring later stage repairing.
For achieving the above object, the technical solution of the present invention is:
A kind of cast-in-place walls difference of height tool-type hoisting die construction method, it is characterised in that comprise the following steps:
A, hang mold materials select
The rectangle using 50*50*4mm angle steel to make sizing hangs mould pattern plate bolster, hangs mould pattern plate bolster corner and angle steel mounting or dismounting connecting portion both sides use diameter 18 mm reinforcing bar diagonal brace to reinforce;
What b, making were shaped hangs mould pattern plate bolster
Rectangle between each toilet, kitchen hangs mould pattern plate bolster and is processed into two, is attached forming with fixing fixture bolt time to be onstructed, and according to the model Unified number between toilet, kitchen, it is ensured that can square with in construction;
C, on-the-spot unwrapping wire
After reinforcing bar binding is complete, by surveyor according to Design Requirement Drawing, determine toilet and mould position dimension, absolute altitude are hung in kitchen, four welded corner joint spacer bars, each angular two directions respectively arrange 1 spacer bar, anti-T-shaped spacer bar is used to weld with beam stirrup, it is ensured that position dimension and absolute altitude are accurate;Spacer bar and beam stirrup, or the vertical main muscle of shear wall welds;
D, to hang mould pattern plate bolster assembled
According to Design Requirement Drawing, hang mould pattern plate bolster model and numbering according to toilet and kitchen, carry out assembly to hanging mould position, owing to each mould region of hanging uses two panels to hang mould pattern plate bolster to carry out assembly, be attached with angle bar connector time assembled;Arranging concrete bracer in the bottom hanging corner, mould position to be placed on floor bottom mould, it is ensured that hang mould pattern plate bolster during concrete placings and do not sink, impact is hung and is imitated fruit;
E, hang mould pattern plate bolster correction
Hang mould regional location size and absolute altitude according to what surveyor marked, check spacer bar, be corrected hanging mould pattern plate bolster;
F, hang mould pattern plate bolster reinforce, pour concrete
Hang mould pattern plate bolster to have corrected, utilize spacer bar to fix and hang mould pattern plate bolster, prevent casting concrete and artificial collision from causing hanging mould pattern plate bolster and moving up and down, hang the reinforcing of mould pattern plate bolster and fix after-pouring concrete.
The cast-in-place walls difference of height tool-type hoisting die construction method of the present invention can also be further achieved by the following technical measures.
Aforesaid method, wherein said pouring notes after concrete completes hanging mould pattern plate bolster striking time, and during form removal, corner angle are not destroyed dismountable, and concrete strength is not less than 1.2MPa.
Aforesaid method, wherein said hanging notes protection during mould pattern plate bolster form removal, forbids to occur to strike, pounds, falls phenomenon, it is to avoid template deformation, damage, impact is hung and imitated fruit.
Aforesaid method, the concrete residue on surface cleaned out by wherein said hang after mould pattern plate bolster has been removed in time, surface brush oil, and again numbering mark distinctness, it is simple to next time uses and can search in time.
After using technique scheme, the cast-in-place walls difference of height tool-type hoisting die construction method of the present invention has the advantage that
1, mould pattern plate bolster simple in construction, easy to make is hung;
2, efficiently solve between toilet, kitchen, balcony difference of height absolute altitude controls;
3, technical guarantee is provided for construction in later period decorations, it is to avoid a series of remedial operations such as repairing are damaged at negative and positive angle.
Accompanying drawing explanation
Fig. 1 is that mould stencil plane schematic diagram is hung in the sizing of the embodiment of the present invention;
Fig. 2 is the enlarged drawing of the angle bar mounting or dismounting connecting portion in Fig. 1;
Fig. 3 is the A-A sectional view in Fig. 1.
In figure: 1 reinforces corner reinforcing bar, and 2 reinforce diagonal brace reinforcing bar, 3 anti-T-shaped spacer bars, 4 angle bar mounting or dismounting connecting portions, 5 posts, 6 shear walls, 750*50*4 angle steel, 8 bolts, 9 beams, 10 concrete bracers, 11 Bars In Poured Concrete Slabs, 12 shear wall vertical reinforcements.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing thereof, the present invention is illustrated further.
Embodiment 1
The construction process of the cast-in-place walls difference of height tool-type hoisting die construction method of the present invention:
Hang mold materials and select → hang the correction → formwork reinforcement → concrete placings → form removable of mould template size processing → on-the-spot unwrapping wire → hang mould template splicing → hang mould template.
The cast-in-place walls difference of height tool-type hoisting die construction method of the present invention, it is characterised in that comprise the following steps:
A, hang mold materials select
Mould stencil plane schematic diagram is hung referring now to the sizing that Fig. 1, Fig. 1 are the embodiment of the present invention.
Hang mould template, corner and the angle steel mounting or dismounting connecting portion 4 both sides diagonal brace that use 50*50*4 angle steel 7 to make sizing are reinforced the reinforcing corner reinforcing bar 1 of employing diameter 18 mm and reinforce diagonal brace reinforcing bar 2.
What b, making were shaped hangs mould template
Fig. 2 is the enlarged drawing of the angle bar mounting or dismounting connecting portion in Fig. 1.
Hang mould template between each toilet, kitchen and be processed into two, be attached forming with fixing fixture bolt time to be onstructed, and according to the model Unified number between toilet, kitchen, it is ensured that can square with in construction.
C, on-the-spot unwrapping wire
Fig. 3 is the A-A sectional view in Fig. 1.
After reinforcing bar binding is complete, by surveyor according to Design Requirement Drawing, determine toilet and mould position dimension, absolute altitude are hung in kitchen, four welded corner joint spacer bars, each angular two directions respectively arrange 1 spacer bar, anti-T-shaped spacer bar 3 is used to weld with beam stirrup, it is ensured that position dimension and absolute altitude are accurate;Spacer bar welds with beam stirrup (the vertical main muscle 12 of shear wall);
D, hang mould template assembly
According to Design Requirement Drawing, hang mould template model and numbering according to toilet and kitchen, carry out assembly to hanging mould position, owing to each mould region of hanging uses two panels to hang mould to carry out assembly, be attached with angle bar connector time assembled.Arranging concrete bracer 10 in the bottom hanging corner, mould position to be placed on floor bottom mould, it is ensured that hang mould template during concrete placings and do not sink, impact is hung and is imitated fruit;
E, hang mould template correction: according to surveyor mark hang mould regional location size and absolute altitude, check spacer bar, be corrected hanging mould template;
F, hang mould formwork reinforcement, pour concrete
Hanging mould template to have corrected, utilize spacer bar to fix and hang mould template, prevent casting concrete and artificial collision from causing it to move up and down, formwork reinforcement fixes after-pouring concrete.Described concrete placings notes striking time after completing, and during form removal, corner angle are not destroyed dismountable, and concrete strength is not less than 1.2MPa.Note protection during described form removal, forbid to occur to strike, pound, the phenomenon such as fall, it is to avoid template deformation, damage, impact is hung and imitated fruit.In time the concrete residue etc. on surface is cleaned out after described form removable is complete, surface brush oil, and again numbering mark distinctness, it is simple to next time uses and can search in time.
The present invention has substantive distinguishing features and significant technological progress, the cast-in-place walls difference of height tool-type hoisting die construction method of the present invention, efficiently solve between toilet, kitchen, balcony difference of height absolute altitude controls in bad, demolishing process to damage negative and positive angle, during form removal to hanging the shortcomings such as the serious phenomenon of mould damaged template, avoid repairing to provide technical guarantee for construction in later period decorations simultaneously.
The large span light section steel structure structure roof girder hoisting method of the present invention is Central-South century flower city projects in Nantong, is two layers of basement, 33 layers on the ground, and version is to use in shear wall structure engineering, and effect is notable.Using through the invention of this construction method, effect is notable, and in work progress, difference of height position absolute altitude and negative and positive angle control to put in place, has obtained construction unit, supervisor and Quality Supervision Station abundant affirmation.
Above example is used for illustrative purposes only, rather than limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, it is also possible to make various conversion or change.Therefore, the technical scheme of all equivalents also should belong to scope of the invention, should be limited by each claim.

Claims (4)

1. a cast-in-place walls difference of height tool-type hoisting die construction method, it is characterised in that comprise the following steps:
A, hang mold materials select
The rectangle using 50*50*4mm angle steel to make sizing hangs mould pattern plate bolster, hangs mould pattern plate bolster corner and angle steel mounting or dismounting connecting portion both sides use diameter 18 mm reinforcing bar diagonal brace to reinforce;
What b, making were shaped hangs mould pattern plate bolster
Rectangle between each toilet, kitchen hangs mould pattern plate bolster and is processed into two, is attached forming with fixing fixture bolt time to be onstructed, and according to the model Unified number between toilet, kitchen, it is ensured that can square with in construction;
C, on-the-spot unwrapping wire
After reinforcing bar binding is complete, by surveyor according to Design Requirement Drawing, determine toilet and mould position dimension, absolute altitude are hung in kitchen, four welded corner joint spacer bars, each angular two directions respectively arrange 1 spacer bar, anti-T-shaped spacer bar is used to weld with beam stirrup, it is ensured that position dimension and absolute altitude are accurate;Spacer bar and beam stirrup, or the vertical main muscle of shear wall welds;
D, to hang mould pattern plate bolster assembled
According to Design Requirement Drawing, hang mould pattern plate bolster model and numbering according to toilet and kitchen, carry out assembly to hanging mould position, owing to each mould region of hanging uses two panels to hang mould pattern plate bolster to carry out assembly, be attached with angle bar connector time assembled;Arranging concrete bracer in the bottom hanging corner, mould position to be placed on floor bottom mould, it is ensured that hang mould pattern plate bolster during concrete placings and do not sink, impact is hung and is imitated fruit;
E, hang mould pattern plate bolster correction
Hang mould regional location size and absolute altitude according to what surveyor marked, check spacer bar, be corrected hanging mould pattern plate bolster;
F, hang mould pattern plate bolster reinforce, pour concrete
Hang mould pattern plate bolster to have corrected, utilize spacer bar to fix and hang mould pattern plate bolster, prevent casting concrete and artificial collision from causing hanging mould pattern plate bolster and moving up and down, hang the reinforcing of mould pattern plate bolster and fix after-pouring concrete.
2. cast-in-place walls difference of height tool-type hoisting die construction method as claimed in claim 1, it is characterised in that described in pour and note after concrete completes hanging mould pattern plate bolster striking time, during form removal, corner angle are destroyed dismountable, and concrete strength is not less than 1.2MPa.
3. cast-in-place walls difference of height tool-type hoisting die construction method as claimed in claim 1, it is characterised in that described in hang mould pattern plate bolster form removal during note protection, forbid to occur to strike, pound, fall phenomenon, it is to avoid template deformation, damage, impact is hung and imitated fruit.
4. cast-in-place walls difference of height tool-type hoisting die construction method as claimed in claim 1, it is characterized in that, described in hang after mould pattern plate bolster has been removed and in time the concrete residue on surface to be cleaned out, surface brush oil, and again numbering mark distinctness, it is simple to next time uses and can search in time.
CN201510279472.XA 2015-05-28 2015-05-28 Cast-in-place walls difference of height tool-type hoisting die construction method Pending CN106285002A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510279472.XA CN106285002A (en) 2015-05-28 2015-05-28 Cast-in-place walls difference of height tool-type hoisting die construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510279472.XA CN106285002A (en) 2015-05-28 2015-05-28 Cast-in-place walls difference of height tool-type hoisting die construction method

Publications (1)

Publication Number Publication Date
CN106285002A true CN106285002A (en) 2017-01-04

Family

ID=57635366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510279472.XA Pending CN106285002A (en) 2015-05-28 2015-05-28 Cast-in-place walls difference of height tool-type hoisting die construction method

Country Status (1)

Country Link
CN (1) CN106285002A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729673A (en) * 2018-04-12 2018-11-02 五冶集团上海有限公司 A kind of tool-typed formwork hoisting die construction method at plate face difference of height
CN108979142A (en) * 2018-08-21 2018-12-11 中冶建工集团有限公司 One kind hanging mould pouring construction structure
CN109610705A (en) * 2018-12-04 2019-04-12 江苏兴厦建设工程集团有限公司 It is a kind of control toilet ship-and-galley tile hollowing, cracking, leakage construction method
CN110067381A (en) * 2018-01-22 2019-07-30 五冶集团上海有限公司 A kind of cast-in-place plate face difference of height tool-type hangs mould and its making and use method
CN113027123A (en) * 2021-03-18 2021-06-25 山西四建集团有限公司 Suspended formwork construction method
CN116427714A (en) * 2023-03-30 2023-07-14 中国五冶集团有限公司 Method for controlling height difference of fine stone concrete ground

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202000639U (en) * 2011-03-16 2011-10-05 中国建筑第二工程局有限公司 Section steel hanging mould
CN102383593A (en) * 2011-08-29 2012-03-21 浙江城建建设集团有限公司 Support formwork device and construction method for one-step formed flange concrete in kitchens and toilets
CN202731285U (en) * 2012-07-30 2013-02-13 中建五局上海建设有限公司 Descending plate mold supporting structure
CN202787964U (en) * 2012-07-04 2013-03-13 中建三局第一建设工程有限责任公司 Concrete structure drop plate angle steel tool type combined template
CN203603465U (en) * 2013-11-21 2014-05-21 广东合迪科技有限公司 Novel descending plate lifting die
CN203626234U (en) * 2013-12-20 2014-06-04 中建四局第六建筑工程有限公司 Partially-recyclable floor slab dropping suspended-formwork device
CN203669341U (en) * 2013-12-13 2014-06-25 山西省第三建筑工程公司 Combined angle steel mold for concrete pouring faces with different elevations
CN203795840U (en) * 2014-04-25 2014-08-27 二十二冶集团第一建设有限公司 Combined die for reinforced concrete engineering floor lowered area and hole

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202000639U (en) * 2011-03-16 2011-10-05 中国建筑第二工程局有限公司 Section steel hanging mould
CN102383593A (en) * 2011-08-29 2012-03-21 浙江城建建设集团有限公司 Support formwork device and construction method for one-step formed flange concrete in kitchens and toilets
CN202787964U (en) * 2012-07-04 2013-03-13 中建三局第一建设工程有限责任公司 Concrete structure drop plate angle steel tool type combined template
CN202731285U (en) * 2012-07-30 2013-02-13 中建五局上海建设有限公司 Descending plate mold supporting structure
CN203603465U (en) * 2013-11-21 2014-05-21 广东合迪科技有限公司 Novel descending plate lifting die
CN203669341U (en) * 2013-12-13 2014-06-25 山西省第三建筑工程公司 Combined angle steel mold for concrete pouring faces with different elevations
CN203626234U (en) * 2013-12-20 2014-06-04 中建四局第六建筑工程有限公司 Partially-recyclable floor slab dropping suspended-formwork device
CN203795840U (en) * 2014-04-25 2014-08-27 二十二冶集团第一建设有限公司 Combined die for reinforced concrete engineering floor lowered area and hole

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067381A (en) * 2018-01-22 2019-07-30 五冶集团上海有限公司 A kind of cast-in-place plate face difference of height tool-type hangs mould and its making and use method
CN108729673A (en) * 2018-04-12 2018-11-02 五冶集团上海有限公司 A kind of tool-typed formwork hoisting die construction method at plate face difference of height
CN108979142A (en) * 2018-08-21 2018-12-11 中冶建工集团有限公司 One kind hanging mould pouring construction structure
CN108979142B (en) * 2018-08-21 2021-02-19 中冶建工集团有限公司 Hang mould and pour construction structures
CN109610705A (en) * 2018-12-04 2019-04-12 江苏兴厦建设工程集团有限公司 It is a kind of control toilet ship-and-galley tile hollowing, cracking, leakage construction method
CN113027123A (en) * 2021-03-18 2021-06-25 山西四建集团有限公司 Suspended formwork construction method
CN116427714A (en) * 2023-03-30 2023-07-14 中国五冶集团有限公司 Method for controlling height difference of fine stone concrete ground

Similar Documents

Publication Publication Date Title
CN106285002A (en) Cast-in-place walls difference of height tool-type hoisting die construction method
CN104594500B (en) Integrated slab column formwork structure system and construction method
CN203712840U (en) Small box girder concrete pouring mold
CN105863253A (en) Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method
CN106013455A (en) Prefabricated combination reinforcement cage member and reinforcement arrangement assembling method thereof
CN105952060A (en) Precast beam reinforcement cage component and assembling method thereof
CN103104091A (en) Sliding mold whole lifting platform and construction method
CN108104284B (en) Wall panel connection structure and assembly method with steel arm of shear wall embedded in floor slab
CN104088473A (en) Construction structure and method used for underpinning load-bearing wall
CN111997342A (en) Cantilever framework supporting structure protruding out of building and construction method thereof
CN104153573B (en) V-type cylinder concrete pour mould and construction method
CN205875520U (en) Precast beam steel reinforcement cage component and reinforced concrete roof beam
CN103758347B (en) Large-span RC girder plated construction late poured band support underpinning construction method
CN211114798U (en) Kitchen and bathroom board descending and shaping die
CN102605988B (en) Synchronous construction method for chimney lining external concrete
CN104675112A (en) Steel stair formwork and constructing method for once pouring forming of building staircase
CN101748893B (en) Method for manufacturing high-rise building balcony boards
CN111058628A (en) Construction method of post-cast strip formwork support system
CN206448272U (en) Roadbed side slope arched framework one-time-shaped mould
CN105064500A (en) Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN212176547U (en) Building floor bathroom falls board construction template device in building
KR101120588B1 (en) Vertical joint frame for improving monolithic concrete
CN108316469A (en) A kind of prefabrication system and its construction technology
CN108729673A (en) A kind of tool-typed formwork hoisting die construction method at plate face difference of height
CN107152112A (en) A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170104