CN110205943B - 预制简支小箱梁端横梁的施工方法 - Google Patents
预制简支小箱梁端横梁的施工方法 Download PDFInfo
- Publication number
- CN110205943B CN110205943B CN201910582509.4A CN201910582509A CN110205943B CN 110205943 B CN110205943 B CN 110205943B CN 201910582509 A CN201910582509 A CN 201910582509A CN 110205943 B CN110205943 B CN 110205943B
- Authority
- CN
- China
- Prior art keywords
- box girder
- end beam
- template
- steel bars
- installing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种预制简支小箱梁端横梁的施工方法,其步骤为:(1)将箱梁芯模端横梁处的模板沿圆周方向按照端横梁的尺寸切割掉;(2)将芯模端横梁处的模板的四周边沿按照钢筋间距制作成梳齿板状;(3)将端横梁钢筋按照焊接尺寸要求做成“L”型钢筋按照图纸要求进行安装和预埋;(4)将梳齿板形状的芯模安装到箱梁内部;(5)浇筑箱梁混凝土,待混凝土强度达到要求后进行张拉;(6)在端横梁内部,将钢筋按照梳齿板的距离进行补齐;(7)箱梁封端模板安装,封端混凝土浇筑。本发明将端横梁与箱梁一次浇筑成型,缩短了施工工序,降低了施工人员的工作强度,同时又能减少支座处的全断面施工缝,保证了梁板的施工质量。
Description
技术领域
本发明涉及桥梁施工的技术领域,尤其是一种预制简支小箱梁端横梁的施工方法。
背景技术
单支座简支小箱梁结构,端横隔梁钢筋密集且钢筋直径较粗,端横隔梁钢筋布置状态如附图说明中图1所示。为了便于箱梁芯模的拆除,现行的施工方法中,多采用二次浇筑的方法进行,即先浇筑横梁前箱梁混凝土,待这部分混凝土达到一定强度后,再拆除芯模模板,然后浇筑横梁部分混凝土,待横梁混凝土达到张拉强度后,进行预应力的张拉。此种施工方法,横梁与箱梁要分成两次浇筑,费时费力,并且在支座位置处形成一个全断面的施工缝,容易给箱梁受力带来一定的隐患。
发明内容
本发明为了解决上述背景技术存在的问题,提供一种改进的预制简支小箱梁端横梁的施工方法。
本发明提供的技术方案是:
一种预制简支小箱梁端横梁的施工方法,其步骤为:
第一步:将箱梁芯模端横梁处的模板沿圆周方向按照端横梁的尺寸切割掉;
第二步:将芯模端横梁处的模板的四周边沿按照钢筋间距制作成梳齿板状;
第三步:将端横梁钢筋按照焊接尺寸要求做成“L”型钢筋按照图纸要求进行安装和预埋;
第四步:将梳齿板形状的芯模安装到箱梁内部;
第五步:浇筑箱梁混凝土,待混凝土强度达到要求后进行张拉;
第六步:在端横梁内部,将钢筋按照梳齿板的距离进行补齐;
第七步:箱梁封端模板安装,封端混凝土浇筑。
本发明的有益效果是,本发明简化了传统端横梁的施工方法,将端横梁与箱梁一次浇筑成型,缩短了施工工序,降低了施工人员的工作强度,缩短了施工工期,节省了工程成本,同时又能减少支座处的全断面施工缝,保证了梁板的施工质量,具有很好的经济效益和社会效益。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是原有的单支座简支小箱梁结构图。
图2是本发明第三步的示意图。
图3是本发明第六步的示意图。
图中:1、芯模,2、端横梁钢筋,3、钢筋。
具体实施方式
现在结合附图对本发明作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式表现简支小箱梁的基本结构,因此其仅显示与本发明有关的构造。结合各附图的示意,理解本发明的施工步骤。
一种预制简支小箱梁端横梁的施工方法,其步骤为:
第一步:将箱梁芯模1端横梁处的模板沿圆周方向按照端横梁的尺寸切割掉;
第二步:将芯模1端横梁处的模板的四周边沿按照钢筋间距制作成梳齿板状;
第三步:将端横梁钢筋2按照焊接尺寸要求做成“L”型钢筋按照图纸要求进行安装和预埋,如图2所示;
第四步:将梳齿板形状的芯模1安装到箱梁内部;
第五步:浇筑箱梁混凝土,待混凝土强度达到要求后进行张拉;
第六步:在端横梁内部,将钢筋3按照梳齿板的距离进行补齐,如图3所示;
第七步:箱梁封端模板安装,封端混凝土浇筑。
最后将芯模1取出,完成施工。
芯模1内的梳齿板可以确定钢筋的位置,在后期补齐钢筋的时候,能够在插入时,使钢筋找准相应的位置。
以上述依据本发明的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项发明技术思想的范围内,进行多样的变更以及修改。本项发明的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。
Claims (1)
1.一种预制简支小箱梁端横梁的施工方法,其步骤为:
第一步:将箱梁芯模端横梁处的模板沿圆周方向按照端横梁的尺寸切割掉;
第二步:将芯模端横梁处的模板的四周边沿按照钢筋间距制作成梳齿板状;
第三步:将端横梁钢筋按照焊接尺寸要求做成“L”型钢筋,按照图纸要求进行安装和预埋;
第四步:将梳齿板形状的芯模安装到箱梁内部;
第五步:浇筑箱梁混凝土,待混凝土强度达到要求后进行张拉;
第六步:在端横梁内部,将钢筋按照梳齿板的距离进行补齐;
第七步:箱梁封端模板安装,封端混凝土浇筑。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910582509.4A CN110205943B (zh) | 2019-06-29 | 2019-06-29 | 预制简支小箱梁端横梁的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910582509.4A CN110205943B (zh) | 2019-06-29 | 2019-06-29 | 预制简支小箱梁端横梁的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110205943A CN110205943A (zh) | 2019-09-06 |
CN110205943B true CN110205943B (zh) | 2021-01-22 |
Family
ID=67795619
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910582509.4A Active CN110205943B (zh) | 2019-06-29 | 2019-06-29 | 预制简支小箱梁端横梁的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110205943B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113430941B (zh) * | 2021-06-25 | 2023-05-26 | 中铁十九局集团第五工程有限公司 | 倾斜梁端单线箱梁在标准单线箱梁模板上预制的施工方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100696646B1 (ko) * | 2004-05-31 | 2007-03-20 | 인하대학교 산학협력단 | 조립식 가로보에 정착 및 지지된 긴장재에 의한 ps 콘크리트 합성거더 교량의 외부긴장 공법 |
KR100933265B1 (ko) * | 2009-09-24 | 2009-12-22 | 태광건설주식회사 | 철근콘크리트 보강형 강관거더교 |
JP6038753B2 (ja) * | 2013-09-20 | 2016-12-07 | 川田建設株式会社 | 桁用コンクリートブロック養生装置 |
NO20141466A1 (no) * | 2014-12-04 | 2016-06-06 | Pontemar As | Rørseksjon for flytebro |
CN204703052U (zh) * | 2015-06-15 | 2015-10-14 | 许昌学院 | 一种带端横梁的空心板桥构造 |
CN108360362A (zh) * | 2018-04-12 | 2018-08-03 | 中交第公路勘察设计研究院有限公司 | 装配式简支箱梁端横梁构造 |
-
2019
- 2019-06-29 CN CN201910582509.4A patent/CN110205943B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN110205943A (zh) | 2019-09-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101793006B (zh) | 一种支架现浇连续梁快速施工的施工方法 | |
CN103215898A (zh) | 一种变截面混凝土连续梁桥施工方法 | |
CN110205943B (zh) | 预制简支小箱梁端横梁的施工方法 | |
CN105128131A (zh) | 用聚苯乙烯泡沫芯模制作预应力空心板梁的方法 | |
CN104153573B (zh) | V型圆柱混凝土的浇筑模具及施工方法 | |
CN105484421A (zh) | 圈梁模板砖及建筑物二次结构填充墙圈梁施工方法 | |
CN109267585B (zh) | 装配式棱台型基础和柱结构及装配方法 | |
CN101538899A (zh) | 一种预埋铁件的固定安装方法 | |
CN111535482A (zh) | 铝模施工混凝土结构与工装及机电预留预埋施工方法 | |
CN104015261B (zh) | 组合型、可调节预制砼构件预埋件定位胎模及其施工工艺 | |
CN111441239B (zh) | 一种预制盖梁预应力深埋锚套筒及其安装工艺 | |
KR101664165B1 (ko) | 임시보강강판에 의해 추가 프리스트레스가 도입된 프리스트레스트 강합성 거더교의 시공방법 | |
CN109208900B (zh) | 一种装配式建筑用的支模体系及其施工方法 | |
CN103161311A (zh) | 大口径钢筋混凝土管道横穿桥台的施工方法 | |
CN106087764B (zh) | 一种园林小桥弧形桥拱施工组合模具 | |
CN110331816B (zh) | 一种装配式现浇组合梁构造 | |
CN103526931A (zh) | 混凝土墙板钢塑抗裂格栅网施工方法 | |
CN216766521U (zh) | 一种基于预应力张拉槽的可早拆模的悬挑梁施工结构 | |
CN212836076U (zh) | 一种双面叠合墙窗台 | |
CN219527352U (zh) | 一种钢筋绑扎定位板和箱梁封端装置组件 | |
CN208950312U (zh) | 一种可重复使用的模板支撑组件 | |
JP2012241457A (ja) | バース床版急速施工方法 | |
CN110230399B (zh) | 一种防止剪力墙钢筋位移的施工方法 | |
KR100631031B1 (ko) | 피씨플레이트 및 그 피씨플레이트를 이용한 교량의 슬래브시공방법 | |
CN102367707A (zh) | 混凝土留槽留洞的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |