CN110205941A - 高速铁路桥梁墩柱钢筋保护层精确控制装置 - Google Patents

高速铁路桥梁墩柱钢筋保护层精确控制装置 Download PDF

Info

Publication number
CN110205941A
CN110205941A CN201910542457.8A CN201910542457A CN110205941A CN 110205941 A CN110205941 A CN 110205941A CN 201910542457 A CN201910542457 A CN 201910542457A CN 110205941 A CN110205941 A CN 110205941A
Authority
CN
China
Prior art keywords
skeleton
bridge pier
arc
reinforcement
limit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910542457.8A
Other languages
English (en)
Inventor
张志强
张宁军
冯建军
满伟德
宋鹏华
李涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 21st Bureau Group Co Ltd
Original Assignee
China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 21st Bureau Group Co Ltd filed Critical China Railway 21st Bureau Group Co Ltd
Priority to CN201910542457.8A priority Critical patent/CN110205941A/zh
Publication of CN110205941A publication Critical patent/CN110205941A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了高速铁路桥梁墩柱钢筋保护层精确控制装置,是将两截直形骨架与两截弧形骨架连接成圆弧状限位骨架,在直形骨架与弧形骨架上分别设置内外两个直形固定夹板与两个弧形固定夹板,直形骨架中部分别向内弯曲留有排水槽,在限位骨架内侧设置V型或U型限位槽,能够保证在限位骨架连接为整体后,使外围桥梁墩柱预埋钢筋完全卡入限位骨架的限位槽内达到自锁效果,在限位骨架上固定的钢丝绳、花篮螺栓及卸扣对预埋钢筋进行垂直校正,使预埋钢筋的垂直度完全达到设计标准,确保混凝土保护层厚度误差达到‑3、+5mm,钢筋间距误差达到‑3、+3mm,是一种理想的高速铁路桥梁墩柱钢筋保护层精确控制装置。

Description

高速铁路桥梁墩柱钢筋保护层精确控制装置
技术领域
本发明涉及一种高速铁路桥梁墩柱施工装置,具体是一种高速铁路桥梁墩柱钢筋保护层精确控制装置,属于路桥施工领域。
背景技术
高速铁路桥梁墩柱是传递桥梁上部荷载和列车动载的主要受力构件,既承受压力又承受剪力,属于受弯钩件;高速铁路设计寿命百年,因此桥梁墩柱钢筋保护层的控制尤为重要,将直接影响钢筋混凝土结构工程的耐久性和安全性,而桥梁墩柱钢筋保护层的控制主要依靠桥梁墩柱竖向钢筋之间的距离来保证,近几年,铁路建设部门增加对墩身实体质量检测检查项目,对铁路桥梁墩身验收标准不断提高,红线管理检查形势严峻,桥梁墩柱保护层厚度是检查重点,如果出现墩柱混凝土保护层厚度不足问题,整改难度较大,由于整改工艺复杂,从而增加施工成本,为了避免在桥梁墩柱浇筑过程中造成混凝土保护层厚度不足,必须从施工源头进行控制,制定出简便可行的保护层控制设施,以提高墩柱整体施工质量,达到设计质量目标。近几年在桥墩墩身施工过程中都采用了不同类型的钢筋定位卡具,卡具都是利用角钢加工而成,在角钢上开槽卡住钢筋,固定措施是采用钢管支撑,或者利用铁丝将卡具与钢筋进行绑扎,在浇筑混凝土前再将卡具拆除,实际施工证明这种卡具达不到钢筋精确定位的效果,而且安装步骤繁琐,拆装过程复杂,操作不简便,安装后没有明显的质量控制效果,导致很多钢筋定位装置没有实际的作用,达不到推广使用的价值,目前尚未发现一种操作简便的桥梁墩柱钢筋保护层控制装置。
发明内容
为克服目前桥墩墩身施工中混凝土保护层难以控制,影响墩柱整体施工质量的缺陷,而公开一种高速铁路桥梁墩柱钢筋保护层精确控制装置。
本发明的技术方案如下:
通过连接螺栓4将两截直形骨架1与两截弧形骨架2间隔固定连接成圆弧状限位骨架,在两截直形骨架1上设置内外两个直形固定夹板5,在两截弧形骨架2上设置内外两个弧形固定夹板5,内外固定夹板5通过加紧螺栓6固定,两截直形骨架1中部分别向内弯曲留有排水槽,在限位骨架内侧依据设计要求的钢筋间隔设置限位槽3,限位槽3为V型或U型,在限位骨架上固定钢丝绳7,钢丝绳7另一端分别连接花篮螺栓8与卸扣9。
本发明有效的解决了传统桥梁墩柱施工定位装置存在的缺陷,能够保证在施工过程中使预埋钢筋间距及保护层厚度满足规范和设计要求,在限位骨架连接为整体后,使外围桥梁墩柱预埋钢筋完全卡入限位骨架的限位槽内,将所有固定夹板处的预埋钢筋置于两个固定夹板之内,并通过两端的加紧螺栓将预埋钢筋加紧使其达到自锁效果,确保混凝土保护层厚度在允许误差范围内,保护层厚度误差达到-3、+5mm,钢筋间距误差达到-3、+3mm,通过调整钢丝绳与花篮螺栓校正预埋钢筋垂直度达到设计标准,本发明制作成本低,安装拆卸简便,定位精确,效果显著,有效的控制了桥梁墩柱预埋钢筋之间的间距,可在高速铁路桥梁墩柱工程建设中推广应用。
附图说明
附图1是本发明附视结构示意图。
附图2是本发明附图1的A部放大结构示意图。
附图3是本发明附图1的B部放大结构示意图。
附图标记说明如下:
直形骨架1,弧形骨架2,限位槽3,连接螺栓4,固定夹板5,加紧螺栓6,钢丝绳7,花篮螺栓8,卸扣9。
具体实施方式
以下结合附图对本发明做进一步详细描述:
通过连接螺栓4将两截直形骨架1与两截弧形骨架2间隔固定连接成圆弧状限位骨架,两截直形骨架1上分别在两处设置内外两个直形固定夹板5,在两截弧形骨架2上分别在一处设置内外两个弧形固定夹板5,内外固定夹板5通过加紧螺栓6固定,两截直形骨架1中部分别向内弯曲留有排水槽,在限位骨架内侧依据设计要求的钢筋间隔设置限位槽3,限位槽3为V型,在限位骨架上固定钢丝绳7,钢丝绳7另一端分别连接花篮螺栓8与卸扣9。
在使用本发明时,首先通过连接螺栓将直形骨架与弧形骨架围绕桥墩固定连接成两套圆弧状限位骨架,并根据模板高度分上下层对应布设,保证上层限位骨架不影响模板安装及混凝土浇筑,同时使外围桥墩预埋钢筋完全卡入限位骨架的限位槽内,将所有固定夹板处的预埋钢筋置于两个固定夹板之内,并通过两端的加紧螺栓将预埋钢筋加紧,使其达到自锁效果;在限位骨架连接为整体后,在限位骨架的四面分别固定钢丝绳,钢丝绳的另一端分别连结花篮螺栓,花篮螺栓另一端连接卸扣,构成校正装置,当发现预埋钢筋的垂直度不符合要求时,开始通过校正装置分别进行校正,即将预埋钢筋与偏斜反方向的卸扣进行连接,通过调整花篮螺栓使预埋钢筋达到垂直,然后固定预埋钢筋位置不动,开始进行预埋钢筋绑扎,预埋钢筋绑扎完成后报验结束,保留上层限位骨架,拆除底层限位骨架,安装模板浇筑混凝土,待混凝土凝固后拆除底层限位骨架安装到桥梁墩柱上部设定位置,开始进行下一节桥梁墩柱的施工。

Claims (3)

1.高速铁路桥梁墩柱钢筋保护层精确控制装置,其特征在于是通过以下技术方案实现的:通过连接螺栓(4)将两截直形骨架(1)与两截弧形骨架(2)间隔固定连接成圆弧状限位骨架,在两截直形骨架(1)上设置内外两个直形固定夹板(5),在两截弧形骨架(2)上设置内外两个弧形固定夹板(5),内外固定夹板(5)通过加紧螺栓(6)固定,两截直形骨架(1)中部分别向内弯曲留有排水槽,在限位骨架内侧依据设计要求的钢筋间隔设置限位槽(3),限位槽(3)为V型或U型,在限位骨架上固定钢丝绳(7),钢丝绳(7)另一端分别连接花篮螺栓(8)与卸扣(9)。
2.根据权利要求1所述的高速铁路桥梁墩柱钢筋保护层精确控制装置,其特征在于:两截直形骨架(1)上分别在两处设置内外两个直形固定夹板(5),在两截弧形骨架(2)上分别在一处设置内外两个弧形固定夹板(5)。
3.根据权利要求1所述的高速铁路桥梁墩柱钢筋保护层精确控制装置,其特征在于:限位槽(3)为V型。
CN201910542457.8A 2019-06-21 2019-06-21 高速铁路桥梁墩柱钢筋保护层精确控制装置 Pending CN110205941A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910542457.8A CN110205941A (zh) 2019-06-21 2019-06-21 高速铁路桥梁墩柱钢筋保护层精确控制装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910542457.8A CN110205941A (zh) 2019-06-21 2019-06-21 高速铁路桥梁墩柱钢筋保护层精确控制装置

Publications (1)

Publication Number Publication Date
CN110205941A true CN110205941A (zh) 2019-09-06

Family

ID=67793875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910542457.8A Pending CN110205941A (zh) 2019-06-21 2019-06-21 高速铁路桥梁墩柱钢筋保护层精确控制装置

Country Status (1)

Country Link
CN (1) CN110205941A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113279590A (zh) * 2021-04-25 2021-08-20 河南五建建设集团有限公司 一种用于固定墩身预埋钢筋的胎具
CN113430944A (zh) * 2021-06-28 2021-09-24 中交路桥建设有限公司 一种防止墩身流水槽混凝土开裂的施工方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002332750A (ja) * 2001-05-08 2002-11-22 Maeda Corp 鉄筋コンクリート支持柱の耐震補強構造
CN203229865U (zh) * 2013-04-23 2013-10-09 中交路桥华南工程有限公司 卡槽式桥梁墩身钢筋定位装置
JP2013221372A (ja) * 2012-04-19 2013-10-28 Sumitomo Mitsui Construction Co Ltd 鉄筋の継ぎ手構造及び橋脚の補強方法
CN204266115U (zh) * 2014-12-03 2015-04-15 中铁上海工程局有限公司 圆端型实体墩身护面钢筋绑扎辅助定位模具
CN106013774A (zh) * 2016-06-08 2016-10-12 中国十七冶集团有限公司 一种适合调遣的滑模柔性平台装置
CN107435439A (zh) * 2017-08-14 2017-12-05 山西太行建设开发有限公司 一种剪力墙门窗洞口定型模板固定方法
CN107974940A (zh) * 2017-11-28 2018-05-01 浙江交工路桥建设有限公司 桥梁圆形墩柱套接方形盖梁锚固钢筋骨架的方法
CN208009273U (zh) * 2018-03-29 2018-10-26 中铁十二局集团第二工程有限公司 一种铁路桥梁墩柱竖向钢筋定位固定装置
CN109457860A (zh) * 2018-10-22 2019-03-12 北京工业大学 一种装配式冷弯薄壁型钢组合减震墙体
CN210597028U (zh) * 2019-06-21 2020-05-22 中铁二十一局集团有限公司 高速铁路桥梁墩柱钢筋保护层精确控制装置

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002332750A (ja) * 2001-05-08 2002-11-22 Maeda Corp 鉄筋コンクリート支持柱の耐震補強構造
JP2013221372A (ja) * 2012-04-19 2013-10-28 Sumitomo Mitsui Construction Co Ltd 鉄筋の継ぎ手構造及び橋脚の補強方法
CN203229865U (zh) * 2013-04-23 2013-10-09 中交路桥华南工程有限公司 卡槽式桥梁墩身钢筋定位装置
CN204266115U (zh) * 2014-12-03 2015-04-15 中铁上海工程局有限公司 圆端型实体墩身护面钢筋绑扎辅助定位模具
CN106013774A (zh) * 2016-06-08 2016-10-12 中国十七冶集团有限公司 一种适合调遣的滑模柔性平台装置
CN107435439A (zh) * 2017-08-14 2017-12-05 山西太行建设开发有限公司 一种剪力墙门窗洞口定型模板固定方法
CN107974940A (zh) * 2017-11-28 2018-05-01 浙江交工路桥建设有限公司 桥梁圆形墩柱套接方形盖梁锚固钢筋骨架的方法
CN208009273U (zh) * 2018-03-29 2018-10-26 中铁十二局集团第二工程有限公司 一种铁路桥梁墩柱竖向钢筋定位固定装置
CN109457860A (zh) * 2018-10-22 2019-03-12 北京工业大学 一种装配式冷弯薄壁型钢组合减震墙体
CN210597028U (zh) * 2019-06-21 2020-05-22 中铁二十一局集团有限公司 高速铁路桥梁墩柱钢筋保护层精确控制装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113279590A (zh) * 2021-04-25 2021-08-20 河南五建建设集团有限公司 一种用于固定墩身预埋钢筋的胎具
CN113430944A (zh) * 2021-06-28 2021-09-24 中交路桥建设有限公司 一种防止墩身流水槽混凝土开裂的施工方法

Similar Documents

Publication Publication Date Title
CN110205941A (zh) 高速铁路桥梁墩柱钢筋保护层精确控制装置
CN103243649B (zh) 一种索鞍快速安装、定位的系统及方法
CN107806205B (zh) 一种无衬里钢制穹顶的安装结构及安装方法
CN105256948A (zh) 方形钢筋混凝土墩柱的施工方法和胎模架
CN107336346A (zh) 一种制梁台座
CN109440544A (zh) 一种轨道梁与盾构管片的连接结构及其连接方法
CN204920239U (zh) 用于制作方形的钢筋骨架的胎模架
CN109468954A (zh) 一种锚碇锚固系统的施工方式
CN206591832U (zh) 高层混凝土竖向输送管的加固装置
WO2020259469A1 (zh) 一种焊接连接的接触网硬横梁及其施工方法
CN210597028U (zh) 高速铁路桥梁墩柱钢筋保护层精确控制装置
CN203429556U (zh) 一种索鞍快速安装、定位系统
CN208815557U (zh) 一种信号塔基座安装系统
CN110374012A (zh) 一种t梁原位支架法预制工法
CN107419671B (zh) 一种钢桁梁下弦杆的修复方法
CN105113418A (zh) 一种支座垫石施工放样方法
CN201605528U (zh) 安装钢结构盖梁的桥墩墩柱
CN205224073U (zh) 一种接触网固定胎具
CN206982971U (zh) 一种制梁台座
CN109505247A (zh) 自锚式悬索桥合拢段施工工艺
CN107700362B (zh) 连续梁节段腹板钢筋的吊装方法
CN206667465U (zh) 一种用于装配式结构梁板连接的支撑结构
CN208251172U (zh) 双层止水带施工用限位卡
JPH11209901A (ja) 省力型軌道構造および省力型軌道構築方法
CN221346069U (zh) 一种钢筋绑扎结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination