CN110159315A - The semi-active connection tunnel of assembled and method suitable for passing through fault belt - Google Patents

The semi-active connection tunnel of assembled and method suitable for passing through fault belt Download PDF

Info

Publication number
CN110159315A
CN110159315A CN201910376767.7A CN201910376767A CN110159315A CN 110159315 A CN110159315 A CN 110159315A CN 201910376767 A CN201910376767 A CN 201910376767A CN 110159315 A CN110159315 A CN 110159315A
Authority
CN
China
Prior art keywords
section
jurisdiction
wedge
tunnel
assembled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910376767.7A
Other languages
Chinese (zh)
Other versions
CN110159315B (en
Inventor
薛翊国
傅康
邱道宏
巩立亮
赵志华
崔久华
张开
孔凡猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201910376767.7A priority Critical patent/CN110159315B/en
Publication of CN110159315A publication Critical patent/CN110159315A/en
Application granted granted Critical
Publication of CN110159315B publication Critical patent/CN110159315B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • E21D11/22Clamps or other yieldable means for interconnecting adjacent arch members either rigidly, or allowing arch member parts to slide when subjected to excessive pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/385Sealing means positioned between adjacent lining members

Abstract

The semi-active connection tunnel of the assembled that the invention discloses a kind of suitable for passing through fault belt and method, including grouting and reinforcing area, assembled tunnel duct piece, Wedge-shape connector, rubber spacer, resiliency deformable member and the key that automatically resets;Grouting and reinforcing area is using high polymer slurries pressure injection in fault belt excavation face hole week;Assembled tunnel duct piece includes being connected by resiliency deformable member with the key that automatically resets between the multistage section of jurisdiction of tunnel longitudinal direction setting, the section of jurisdiction of adjacent segment;Every section of section of jurisdiction includes multiple sections of jurisdiction, and multiple sections of jurisdiction are joined together to form structure identical with tunnel cross sectional shape by Wedge-shape connector, and rubber spacer is covered in the outer surface of each section of jurisdiction;Wedge-shape connector includes section of jurisdiction wedge-shaped impression, section of jurisdiction wedge shape tenon, room temperature shape memory alloy layer and Wedge-shape connector rubber sealant.

Description

The semi-active connection tunnel of assembled and method suitable for passing through fault belt
Technical field
The semi-active connection tunnel of the assembled that the present invention relates to a kind of suitable for passing through fault belt and construction method.
Background technique
Here statement only provides background technique related to the present invention, without inevitably constituting the prior art.
By earth plate tectonice motion control, Qinghai-Tibet Platean is constantly being swelled.Which results in the first ladder of China and The faulting of second ladder boundary area is very frequent, has manufactured huge problem to building for China's infrastructure.At this Under one geodynamic background and geological structure screen work, inevitably encounter during the infrastructure in west area in work The problem of Tunnel Engineering is built near Faults and high intensity Zone.The existing railway tunnel in China seats up to ten thousand, wherein there is nearly thousand In strong earthquake area, it is ensured that the safety for building tunnels and underground engineering near high intensity Zone or active fault seems day Benefit is important.The measure that underground and tunnel structure antidetonation error resilience are moved mainly has isolation energy dissipating design, hinged design, design etc. of backbreaking.
Inventor has found so far, although also some tunnel uses isolation energy dissipating design, hinged design, surpasses The tunneling that the related measures such as meter cross over active fault band is dug, but since mode is more single, resists fault movement Ability it is limited, it cannot be guaranteed that in the case of faulting tunnel safe operation, the trimming task in tunnel is difficult after faulting It is huge, it often to expend a large amount of manpower and material resources and time cost is repaired, influence tunnel normal pass.
Summary of the invention
The object of the invention is that the shortcomings that overcoming prior art condition and deficiency, provide a kind of disconnected suitable for passing through The semi-active connection tunnel of assembled of layer crushed zone;The tunnel applications marmem relevant nature, use are prefabricated profiled Assembled composite tunnel section of jurisdiction uses special semi-active connection between adjacent tubular segments, can play in faulting effective Dissipation energy consumption effect.
The present invention adopts the following technical solutions:
First invention purpose of the invention is to provide a kind of semi-active connection of the assembled suitable for passing through fault belt Tunnel comprising grouting and reinforcing area, assembled tunnel duct piece, Wedge-shape connector, rubber spacer, resiliency deformable member and automatic multiple Position key;
The grouting and reinforcing area is using high polymer slurries pressure injection in fault belt excavation face hole week;
The assembled tunnel duct piece include along the multistage section of jurisdiction of tunnel longitudinal direction setting, the section of jurisdiction of adjacent segment it Between be connected with the key that automatically resets by resiliency deformable member;
Every section of section of jurisdiction includes multiple sections of jurisdiction, and multiple sections of jurisdiction are joined together to form transversal with tunnel by Wedge-shape connector The identical structure of face shape, the rubber spacer are covered in the outer surface of each section of jurisdiction;The Wedge-shape connector stated includes section of jurisdiction Wedge-shaped impression, section of jurisdiction wedge shape tenon, room temperature shape memory alloy layer and Wedge-shape connector rubber sealant;Wherein room temperature shape Memory alloy layer is fixedly welded on the edge side of the wedge-shaped tenon of each section of jurisdiction, occurs to hang down with the wedge-shaped impression of next section of jurisdiction It is straight to squeeze contact;The Wedge-shape connector rubber sealant is covered in the wedge-shaped table of section of jurisdiction wedge-shaped impression, section of jurisdiction wedge shape tenon At face.
As further technical solution, the resiliency deformable member is mainly made of medal spring plate, the medal spring Plate is welded between adjacent two longitudinal pipeline sections.
As further technical solution, the key that automatically resets includes rigidly fixing head, fixing threaded hole and super-elasticity Marmem;Wherein super-elastic shape memory alloy bar is fixed on phase by fixing threaded hole by the head that rigidly fixes Near Wedge-shape connector between the longitudinal section of jurisdiction of neighbour two.
More further, the key that each automatically resets includes multiple super-elastic shape memory alloy bars, multiple superelastic shapes Memorial alloy bar takes array arrangement, prearrangement of deformation amount space between adjacent two super-elastic shape memory alloys bar.
As further technical solution, the grouting and reinforcing area is uniform in fault belt excavated section hole week in advance Injected hole is laid, using deep layer, middle layer, shallow-layer successively pressure injection mode.
As further technical solution, the assembled tunnel includes vault section of jurisdiction, leftwall section of jurisdiction, RightWall Section of jurisdiction, left bottom plate section of jurisdiction, right five part of bottom plate section of jurisdiction;Wherein vault section of jurisdiction includes vault and spandrel part, and abutment wall section of jurisdiction includes Tunnel side wall and haunch part, bottom plate section of jurisdiction include arch springing and bottom parts, and each section section of jurisdiction is arched to be convex to grouting and reinforcing Area's country rock, convenient for bearing larger pressure from surrounding rock.
As further technical solution, each section of jurisdiction in assembled tunnel uses high strength steel mold casting forming, pipe It is designed among piece using hollow grating type.
As further technical solution, the Wedge-shape connector is located at the transverse edge of each section of jurisdiction, adjacent section of jurisdiction Between Wedge-shape connector form complementation.
As further technical solution, the room temperature shape memory alloy layer is used with double-pass memory effect Nitinol, transition temperature are lower than the minimum temperature that tunnel is runed throughout the year.
Second goal of the invention of the invention is the construction method in the semi-active connection tunnel of the above-mentioned assembled of proposition, including Following steps:
A, the excavation for carrying out fault belt forms grouting and reinforcing in excavated section hole Zhou Jinhang high polymer slurries pressure injection Area;
B, tunnel duct piece is assembled, left and right bottom plate section of jurisdiction is assembled first, guarantees the Wedge-shape connector coupling between adjacent section of jurisdiction It closes;Left and right abutment wall section of jurisdiction is reassembled, section of jurisdiction is supported using certain auxiliary device at this time, prevents and topples over;Finally Vault section of jurisdiction is assembled, needs to guarantee simultaneously the coupling at the top of vault section of jurisdiction and left and right abutment wall section of jurisdiction;Complete the tunnel of the first pipeline section The assembly of deferent piece;
Alloy temperature is reduced with low-temperature airflow first when assembling section of jurisdiction, retracted configuration when it being made to restore low temperature;To adjacent Section of jurisdiction makes alloy temperature restore room temperature after the assembly is completed, with unheated air, and shape restores swelling state when room temperature.Work as alloy Vertical extrusion stress just is generated to adjacent section of jurisdiction wedge-shaped impression when expansion, so that Wedge-shape connector is fixed.
C, in the first pipeline section tail portion welding metal spring plate, the assembly in the second pipeline section assembled tunnel is carried out, after the assembly is completed This unwelded end of medal spring plate and the second pipeline section head are welded, the laying of resiliency deformable member is completed;
D, carry out automatically reseting between the first pipeline section and the second pipeline section the installation of key;
E, repeating A-D step can be completed the continuous propulsion in tunnel, until passing through fault belt.
The beneficial effects of the present invention are:
(1) present invention provides a kind of semi-active connection tunnel of assembled for Tunnel Passing fault belt, which answers With marmem relevant nature, used using prefabricated profiled assembled composite tunnel section of jurisdiction, between adjacent tubular segments special Semi-active connection can play the role of effective dissipation energy consumption in faulting, avoid faulting to the entirety in tunnel It destroys.
(2) component that the present invention uses is pre-formed, and structural strength is high, and precision is high, and scene directly lifts or pacifies Dress, connection, save the consumption of a large amount of manpowers, improve working efficiency save the cost, increase structure integral strength, improve tunnel The safety in road.
(3) present apparatus can absorb tension and compression stress, the shearing that fault belt generates tunnel in tomography generation activity A possibility that tunnel overall structure is destroyed is effectively reduced in stress, moment of flexure etc., and device itself has auto-reset function, is The repairing of tunnel structure saves a large amount of manpower and material resources and time cost after faulting occurs.
(4) ring that the key that automatically resets is fixed on each section of jurisdiction of adjacent tubular segments by fixing threaded hole using head is rigidly fixed At the close Wedge-shape connector in both sides, avoid generating biggish answer when the deformation of super-elastic shape memory alloy bar and recoverable force Power is concentrated, while guaranteeing effective connection between alloy and adjacent tubular segments.
(5) super-elastic shape memory alloy bar shows as austenitic state at normal temperature, by fault movement, tension and compression outside Moderate finite deformation occurs for power, plays the role of dissipation energy consumption, guarantees the globality of tunnel structure.After removing external force, large deformation is completely extensive It is multiple, convenient for recovery operation of the tunnel after fault movement displacement.
(6) resiliency deformable member is welded to connect adjacent two tunnel pipeline section, still can guarantee its connection under deformation and prevents It is aqueous.The energy of a part displacement changing of the relative positions can be offset after faulting occurs, the safety of protection path entirety guarantees tunnel Normal operation after road faulting.
(7) medal spring plate is welded between adjacent two longitudinal pipeline sections, using high resiliency steel die cast, allows tunnel Any radial displacement changing of the relative positions, the tensile and compress changing of the relative positions and the flecition of certain amplitude occurs;Medal spring plate surface has Antirust coat, durability are good.
(8) densification of Wedge-shape connector rubber sealant is good, and durability is good, is covered at Wedge-shape connector wedge-shaped surface, It is squeezed, friction stree when room temperature shape memory alloy layer restores room temperature shape due to the closing in effect of sphenoid, it will Densification effect is generated, guarantees waterproofness and airtightness between the transverse direction of section of jurisdiction.
(9) section of jurisdiction is cladded with rubber spacer between assembled tunnel and grouting and reinforcing area, plays bradyseism, waterproof, counteracting Fault movement displacement, the effect in coupling assembled tunnel and grouting and reinforcing area.
(10) grouting and reinforcing area is in advance in fault belt excavated section hole week uniformly distributed injected hole, using deep layer, in Successively pressure injection mode, the guarantee grouting and reinforcing area scale of construction are enough for layer, shallow-layer.The grouting and reinforcing area should have after the completion of pressure injection Concretion marginsing rock promotes Surrounding Rock Strength and certain shock insulation, damping, waterproof effect.
(11) each section of jurisdiction in assembled tunnel uses high strength steel mold casting forming, is set among section of jurisdiction using hollow grating type Meter.Weight can effectively be mitigated in the case where guaranteeing section of jurisdiction intensity, while allowing the deformation of certain amplitude, one can be offset Part faulting is directly affected caused by tunnel.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will to embodiment or Attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is this hair Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is simplified cross section view of the apparatus of the present invention in tunnel.
Fig. 2 is apparatus of the present invention Wedge-shape connector simplified cross section view.
Fig. 3 is the simple longitudinal sectional drawing of apparatus of the present invention resiliency deformable member.
Fig. 4 is that apparatus of the present invention automatically reset the simple front view of key.
Spacing with each other or size are exaggerated to show each site location, schematic diagram is only made signal and used.Wherein: 1 is disconnected Layer crushed zone country rock, 2 grouting and reinforcing areas, 3 vault sections of jurisdiction, 4 leftwall sections of jurisdiction, 5 RightWall sections of jurisdiction, 6 left bottom plate sections of jurisdiction, 7 right bottoms Plate section of jurisdiction, 8 Wedge-shape connectors, 9 automatically reset key, and 10 sections of jurisdiction are cladded with rubber spacer, 11 assembled tunnels, and 12 section of jurisdiction wedge shapes are recessed Slot, 13 section of jurisdiction wedge shape tenons, 14 room temperature shape memory alloy layers, 15 Wedge-shape connector rubber sealants, 16 longitudinally adjacent pipes Piece, 17 medal spring plates, 18 resiliency deformable members, 19 rigidly fix head, 20 fixing threaded holes, 21 super-elastic shape memory alloy bars, and 22 Prearrangement of deformation amount space.
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless Otherwise indicated, all technical and scientific terms used herein has and the application person of an ordinary skill in the technical field Normally understood identical meanings.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular shape Formula be also intended to include plural form, additionally, it should be understood that, when in the present specification use term "comprising" and/or When " comprising ", existing characteristics, step, operation, device, component and/or their combination are indicated.
Embodiment 1:
As shown in Figure 1, a kind of assembled semi-active connection tunnel suitable for passing through fault belt, including slip casting plus Gu area 2, assembled tunnel 11, Wedge-shape connector 8, section of jurisdiction overcoating rubber spacer 10, resiliency deformable member 18, automatically reset key 9; The grouting and reinforcing area 2, in fault belt excavation face hole week, reinforces fault belt country rock using high polymer slurries pressure injection 1;The grouting and reinforcing area is in advance in fault belt excavated section hole week uniformly distributed injected hole, using deep layer, middle layer, shallow Successively pressure injection mode, the guarantee grouting and reinforcing area scale of construction are enough for layer.The grouting and reinforcing area should have consolidation after the completion of pressure injection and enclose Rock promotes Surrounding Rock Strength and certain shock insulation, damping, waterproof effect.
The assembled tunnel 11 include vault section of jurisdiction 3, leftwall section of jurisdiction 4, RightWall section of jurisdiction 5, left bottom plate section of jurisdiction 6, Right 7 five part of bottom plate section of jurisdiction, it is fixed using Wedge-shape connector 8 between section of jurisdiction;Wherein vault section of jurisdiction includes vault and spandrel portion Point, abutment wall section of jurisdiction includes tunnel side wall and haunch part, and bottom plate section of jurisdiction includes arch springing and bottom parts, each section section of jurisdiction at Arch is convex to grouting and reinforcing area country rock, convenient for bearing larger pressure from surrounding rock.
The Wedge-shape connector is located at the transverse edge of each section of jurisdiction, and the Wedge-shape connector between adjacent section of jurisdiction is formed It is complementary.It assembles left and right bottom plate section of jurisdiction first when assembling section of jurisdiction, guarantees the Wedge-shape connector coupling between adjacent section of jurisdiction;It refills With left and right abutment wall section of jurisdiction, needs to be supported section of jurisdiction using certain auxiliary device at this time, prevent and topple over;Finally assemble Vault section of jurisdiction needs to guarantee simultaneously the coupling at the top of vault section of jurisdiction and left and right abutment wall section of jurisdiction.
Each section of jurisdiction in assembled tunnel uses high strength steel mold casting forming, uses hollow grating type among section of jurisdiction Design, can effectively mitigate weight in the case where guaranteeing section of jurisdiction intensity, while allowing the deformation of certain amplitude, can offset A part of faulting is directly affected caused by tunnel.
The section of jurisdiction is cladded with rubber spacer 10 and is covered in section of jurisdiction external diameter surface, has certain thickness, directly adds with slip casting Gu area 2 is in close contact.
Above-mentioned Wedge-shape connector 8 is for the connection between the adjacent section of jurisdiction on the same cross section in tunnel, resiliency deformable member 18, key 9 is automatically reset axially to be arranged along tunnel, the connection between adjacent section of jurisdiction.
As shown in Fig. 2, the Wedge-shape connector 8 includes section of jurisdiction wedge-shaped impression 12, section of jurisdiction wedge shape tenon 13, room temperature shape Shape memory alloys layer 14 and Wedge-shape connector rubber sealant 15.Wherein room temperature shape memory alloy layer 14 is fixedly welded on each The edge side of the wedge-shaped tenon 13 of section of jurisdiction occurs vertical extruding with the wedge-shaped impression 12 of next section of jurisdiction and contacts.The wedge shape Connector rubber sealant 15 is covered at the wedge-shaped surface of section of jurisdiction wedge-shaped impression, section of jurisdiction wedge shape tenon, is issued in squeezing action Wave sealing effect.
The Wedge-shape connector rubber sealant densification is good, and durability is good, is covered in Wedge-shape connector wedge-shaped surface Place is squeezed due to the closing in effect of sphenoid when room temperature shape memory alloy layer restores room temperature shape, rubs and answer Power will generate densification effect, guarantee waterproofness and airtightness between the transverse direction of section of jurisdiction.
The room temperature shape memory alloy layer uses the Nitinol with double-pass memory effect, and transition temperature is low In the minimum temperature that tunnel is runed throughout the year.Alloy temperature is reduced with low-temperature airflow first when assembling section of jurisdiction, when it being made to restore low temperature Retracted configuration;After the assembly is completed to adjacent tubes piece, alloy temperature is made to restore room temperature with unheated air, when shape restores room temperature Swelling state.Vertical extrusion stress just is generated to adjacent section of jurisdiction wedge-shaped impression when alloy expansion, so that wedge shape is even Fitting is fixed.
The section of jurisdiction is cladded with rubber spacer between assembled tunnel and grouting and reinforcing area, play bradyseism, waterproof, Offset the effect of fault movement displacement, coupling assembled tunnel and grouting and reinforcing area.
As shown in figure 3, the resiliency deformable member 18 is mainly made of the welding ends of medal spring plate 17 and spring plate two sides. The medal spring plate 17 is welded between adjacent two longitudinal pipeline sections by the welding ends of spring plate two sides, forms resiliency deformable member 18。
The medal spring plate is welded between adjacent two longitudinal pipeline sections, using high resiliency steel die cast, allows tunnel Any radial displacement changing of the relative positions, the tensile and compress changing of the relative positions and the flecition of road generation certain amplitude.Medal spring plate surface There is antirust coat, durability is good.
The flexible deformation seam welding connects adjacent two tunnel pipeline section, still can guarantee its connection under deformation And waterproofness.The energy of a part displacement changing of the relative positions can be offset after faulting occurs, the safety of protection path entirety is protected Normal operation after demonstrate,proving Faults in Tunnels activity.
As shown in figure 4, the key 9 that automatically resets includes rigidly fixing first 19, fixing threaded hole 20 and superelastic shape note Recall rod of metal alloy 21.Wherein rigidly fix first 19 by fixing threaded hole 20 super-elastic shape memory alloy bar 21 is fixed on it is adjacent Near Wedge-shape connector 8 between two longitudinal sections of jurisdiction, the super-elastic shape memory alloy bar 21 takes array structure, phase Prearrangement of deformation amount space 22 between adjacent two alloy sections.
Super-elastic shape memory alloy shows as austenitic state at normal temperature, is occurred by fault movement, tension and compression external force Moderate finite deformation plays the role of dissipation energy consumption, guarantees the globality of tunnel structure.After removing external force, large deformation restores completely, just In recovery operation of the tunnel after fault movement displacement.
The circumferential direction two that the key that automatically resets is fixed on each section of jurisdiction of adjacent tubular segments by fixing threaded hole using head is rigidly fixed While avoid generating biggish stress concentration when super-elastic shape memory alloy deformation and recoverable force at Wedge-shape connector, Guarantee effective connection between alloy and adjacent tubular segments simultaneously.
Application method of the invention is as follows:
A, the excavation for carrying out fault belt forms grouting and reinforcing in excavated section hole Zhou Jinhang high polymer slurries pressure injection Area 2;
B, tunnel duct piece is assembled, left and right bottom plate section of jurisdiction 6,7 is assembled first, reassembles left and right abutment wall section of jurisdiction 4,5, finally Vault section of jurisdiction 3 is assembled, the assembly of 11 first pipeline section of assembled tunnel is completed;
It assembles left and right bottom plate section of jurisdiction first when assembling section of jurisdiction, guarantees the Wedge-shape connector coupling between adjacent section of jurisdiction; Left and right abutment wall section of jurisdiction is reassembled, needs to be supported section of jurisdiction using certain auxiliary device at this time, prevents and topple over;Finally Vault section of jurisdiction is assembled, needs to guarantee simultaneously the coupling at the top of vault section of jurisdiction and left and right abutment wall section of jurisdiction.
Alloy temperature is reduced with low-temperature airflow first when assembling section of jurisdiction, retracted configuration when it being made to restore low temperature;To adjacent Section of jurisdiction makes alloy temperature restore room temperature after the assembly is completed, with unheated air, and shape restores swelling state when room temperature.Work as alloy Vertical extrusion stress just is generated to adjacent section of jurisdiction wedge-shaped impression when expansion, so that Wedge-shape connector is fixed.
C, in the first pipeline section tail portion welding metal spring plate 17, the assembly in the second pipeline section assembled tunnel 11 is carried out, has been assembled This unwelded end of medal spring plate 17 and the second pipeline section head are welded after, complete the laying of resiliency deformable member 18;
D, carry out automatically reseting between the first pipeline section and the second pipeline section the installation of key 9;
E, repeating A-D step can be completed the continuous propulsion in tunnel, until passing through fault belt.
It can be seen from the above description that the application the above embodiments realize following technical effect:
(1) present invention provides a kind of semi-active connection tunnel of assembled for Tunnel Passing fault belt, which answers With marmem relevant nature, used using prefabricated profiled assembled composite tunnel section of jurisdiction, between adjacent tubular segments special Semi-active connection can play the role of effective dissipation energy consumption in faulting, avoid faulting to the entirety in tunnel It destroys.
(2) component that the present invention uses is pre-formed, and structural strength is high, and precision is high, and scene directly lifts or pacifies Dress, connection, save the consumption of a large amount of manpowers, improve working efficiency save the cost, increase structure integral strength, improve tunnel The safety in road.
(3) present apparatus can absorb tension and compression stress, the shearing that fault belt generates tunnel in tomography generation activity A possibility that tunnel overall structure is destroyed is effectively reduced in stress, moment of flexure etc., and device itself has auto-reset function, is The repairing of tunnel structure saves a large amount of manpower and material resources and time cost after faulting occurs.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any Modification, equivalent replacement, improvement etc., should be included within the scope of protection of this application.

Claims (10)

1. a kind of assembled semi-active connection tunnel suitable for passing through fault belt, which is characterized in that including grouting and reinforcing Area, assembled tunnel duct piece, Wedge-shape connector, rubber spacer, resiliency deformable member and the key that automatically resets;
The grouting and reinforcing area is using high polymer slurries pressure injection in fault belt excavation face hole week;
The assembled tunnel duct piece includes passing through between the multistage section of jurisdiction of tunnel longitudinal direction setting, the section of jurisdiction of adjacent segment Resiliency deformable member is connected with the key that automatically resets;
Every section of section of jurisdiction includes multiple sections of jurisdiction, and multiple sections of jurisdiction are joined together to form and tunnel cross sectional shape by Wedge-shape connector Identical structure, the rubber spacer are covered in the outer surface of each section of jurisdiction;The Wedge-shape connector includes section of jurisdiction wedge shape Groove, section of jurisdiction wedge shape tenon, room temperature shape memory alloy layer and Wedge-shape connector rubber sealant;Wherein room temperature shape memory closes Layer gold is fixedly welded on the edge side of the wedge-shaped tenon of each section of jurisdiction, and extruding vertical with the generation of the wedge-shaped impression of next section of jurisdiction connects Touching;The Wedge-shape connector rubber sealant is covered at the wedge-shaped surface of section of jurisdiction wedge-shaped impression, section of jurisdiction wedge shape tenon.
2. the assembled semi-active connection tunnel as described in claim 1 for being suitable for passing through fault belt, which is characterized in that The resiliency deformable member is mainly made of medal spring plate, and the medal spring plate is welded between adjacent two longitudinal pipeline sections.
3. the assembled semi-active connection tunnel as described in claim 1 for being suitable for passing through fault belt, which is characterized in that The key that automatically resets includes rigidly fixing head, fixing threaded hole and super-elastic shape memory alloy bar;The wherein rigidity Super-elastic shape memory alloy bar is fixed on the Wedge-shape connector between adjacent two longitudinal sections of jurisdiction by fixing threaded hole by fixing head Near.
4. the assembled semi-active connection tunnel as claimed in claim 3 for being suitable for passing through fault belt, which is characterized in that The key that each automatically resets includes multiple super-elastic shape memory alloy bars, and multiple super-elastic shape memory alloy bars take array to arrange Cloth, prearrangement of deformation amount space between adjacent two super-elastic shape memory alloys bar.
5. the assembled semi-active connection tunnel as described in claim 1 for being suitable for passing through fault belt, which is characterized in that The grouting and reinforcing area in advance in fault belt excavated section hole week uniformly distributed injected hole, using deep layer, middle layer, shallow-layer according to Secondary pressure injection mode.
6. the assembled semi-active connection tunnel as described in claim 1 for being suitable for passing through fault belt, which is characterized in that The assembled tunnel includes vault section of jurisdiction, leftwall section of jurisdiction, RightWall section of jurisdiction, left bottom plate section of jurisdiction, right bottom plate section of jurisdiction five Point;Wherein vault section of jurisdiction includes vault and spandrel part, and abutment wall section of jurisdiction includes tunnel side wall and haunch part, and bottom plate section of jurisdiction includes Arch springing and bottom parts, each section section of jurisdiction is arched to be convex to grouting and reinforcing area country rock, convenient for bearing larger pressure from surrounding rock.
7. the assembled semi-active connection tunnel as described in claim 1 for being suitable for passing through fault belt, which is characterized in that Each section of jurisdiction in assembled tunnel uses high strength steel mold casting forming, is designed among section of jurisdiction using hollow grating type.
8. the assembled semi-active connection tunnel as described in claim 1 for being suitable for passing through fault belt, which is characterized in that The room temperature shape memory alloy layer uses the Nitinol with double-pass memory effect, and transition temperature is long-term lower than tunnel The minimum temperature of operation.
9. the construction in the assembled semi-active connection tunnel a method as claimed in any one of claims 1-8 for being suitable for passing through fault belt Method, which is characterized in that as follows:
A, the excavation for carrying out fault belt forms grouting and reinforcing area in excavated section hole Zhou Jinhang high polymer slurries pressure injection;
B, the tunnel duct piece of the first pipeline section is assembled
Left and right bottom plate section of jurisdiction is assembled first, guarantees the Wedge-shape connector coupling between adjacent section of jurisdiction;Reassemble left and right abutment wall pipe Piece is at this time supported section of jurisdiction using certain auxiliary device, prevents and topple over;Vault section of jurisdiction is finally assembled, is needed simultaneously Guarantee the coupling at the top of vault section of jurisdiction and left and right abutment wall section of jurisdiction;Complete the tunnel duct piece assembly of the first pipeline section;
C, in the first pipeline section tail portion welding metal spring plate, the assembly in the second pipeline section assembled tunnel is carried out, after the assembly is completed by this The unwelded end of medal spring plate and the second pipeline section head are welded, and the laying of resiliency deformable member is completed;
D, carry out automatically reseting between the first pipeline section and the second pipeline section the installation of key;
E, repeating A-D step can be completed the continuous propulsion in tunnel, until passing through fault belt.
10. construction method as claimed in claim 9, which is characterized in that in stepb, first with low temperature gas when assembling section of jurisdiction Stream reduces alloy temperature, retracted configuration when it being made to restore low temperature;After the assembly is completed to adjacent tubes piece, make alloy with unheated air Temperature restores room temperature, and shape restores swelling state when room temperature;Just adjacent section of jurisdiction wedge-shaped impression is generated when alloy expansion Vertical extrusion stress, so that Wedge-shape connector is fixed.
CN201910376767.7A 2019-05-07 2019-05-07 Assembled semi-movable connecting tunnel suitable for crossing fault fracture zone and method Active CN110159315B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910376767.7A CN110159315B (en) 2019-05-07 2019-05-07 Assembled semi-movable connecting tunnel suitable for crossing fault fracture zone and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910376767.7A CN110159315B (en) 2019-05-07 2019-05-07 Assembled semi-movable connecting tunnel suitable for crossing fault fracture zone and method

Publications (2)

Publication Number Publication Date
CN110159315A true CN110159315A (en) 2019-08-23
CN110159315B CN110159315B (en) 2020-08-25

Family

ID=67633615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910376767.7A Active CN110159315B (en) 2019-05-07 2019-05-07 Assembled semi-movable connecting tunnel suitable for crossing fault fracture zone and method

Country Status (1)

Country Link
CN (1) CN110159315B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114593001A (en) * 2022-03-14 2022-06-07 德阳市东方恒运电机有限公司 Assembly method between control ring and outer water distribution ring of tubular turbine
CN115182308A (en) * 2022-07-14 2022-10-14 福州大学 Self-adaptive water level pier anti-collision device and working method thereof
US11598210B1 (en) 2021-09-27 2023-03-07 Institute Of Geology And Geophysics, Chinese Academy Of Sciences Tunnel protection structure suitable for active fault areas and high ground stress areas

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204960951U (en) * 2015-08-25 2016-01-13 中铁三局集团有限公司 Tunnel is a steel bow member transverse connection device for preliminary bracing
CN106761833A (en) * 2017-01-11 2017-05-31 中铁隧道勘测设计院有限公司 A kind of antidetonation tunnel structure with rubber blanket
CN106869962A (en) * 2015-12-10 2017-06-20 中铁隧道勘测设计院有限公司 A kind of shield duct piece waterproof construction and its construction method
CN107255033A (en) * 2017-06-23 2017-10-17 乌鲁木齐城市轨道集团有限公司 The error resilience for passing through active fault moves the construction method of Tunnel Second Lining
CN108119166A (en) * 2017-12-15 2018-06-05 西南交通大学 Across the large-scale activity fracture belt tunnel prefbricated tunnel lining structure in meizoseismal area and tunnel
CN108547633A (en) * 2018-06-22 2018-09-18 西南交通大学 It is a kind of to cross over active fault anti-seismic structure and its construction method
CN108678783A (en) * 2018-06-21 2018-10-19 中铁第四勘察设计院集团有限公司 A kind of tunnel double-lining end die adapter structure with sealing device
CN109488342A (en) * 2018-10-22 2019-03-19 山东建筑大学 A kind of hoop shell perfusion type flexibility for roadway support, which allows, pressure lining cutting and applies method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204960951U (en) * 2015-08-25 2016-01-13 中铁三局集团有限公司 Tunnel is a steel bow member transverse connection device for preliminary bracing
CN106869962A (en) * 2015-12-10 2017-06-20 中铁隧道勘测设计院有限公司 A kind of shield duct piece waterproof construction and its construction method
CN106761833A (en) * 2017-01-11 2017-05-31 中铁隧道勘测设计院有限公司 A kind of antidetonation tunnel structure with rubber blanket
CN107255033A (en) * 2017-06-23 2017-10-17 乌鲁木齐城市轨道集团有限公司 The error resilience for passing through active fault moves the construction method of Tunnel Second Lining
CN108119166A (en) * 2017-12-15 2018-06-05 西南交通大学 Across the large-scale activity fracture belt tunnel prefbricated tunnel lining structure in meizoseismal area and tunnel
CN108678783A (en) * 2018-06-21 2018-10-19 中铁第四勘察设计院集团有限公司 A kind of tunnel double-lining end die adapter structure with sealing device
CN108547633A (en) * 2018-06-22 2018-09-18 西南交通大学 It is a kind of to cross over active fault anti-seismic structure and its construction method
CN109488342A (en) * 2018-10-22 2019-03-19 山东建筑大学 A kind of hoop shell perfusion type flexibility for roadway support, which allows, pressure lining cutting and applies method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11598210B1 (en) 2021-09-27 2023-03-07 Institute Of Geology And Geophysics, Chinese Academy Of Sciences Tunnel protection structure suitable for active fault areas and high ground stress areas
CN114593001A (en) * 2022-03-14 2022-06-07 德阳市东方恒运电机有限公司 Assembly method between control ring and outer water distribution ring of tubular turbine
CN114593001B (en) * 2022-03-14 2024-01-09 德阳市东方恒运电机有限公司 Assembling method between control ring and outer water distribution ring of through-flow turbine
CN115182308A (en) * 2022-07-14 2022-10-14 福州大学 Self-adaptive water level pier anti-collision device and working method thereof

Also Published As

Publication number Publication date
CN110159315B (en) 2020-08-25

Similar Documents

Publication Publication Date Title
CN110159315A (en) The semi-active connection tunnel of assembled and method suitable for passing through fault belt
CN107780951B (en) High-ground-stress soft rock large-deformation primary support system
CN102892956B (en) Use the expansion joint system of flexible moment connection part and friction spring
CN206769052U (en) A kind of New Types of Beam column Connections
CN104153792A (en) Energy-absorption yield tunnel support system and method suitable for weak broken wall rock
US20100064674A1 (en) Energy Storage Bridge
CN112324459B (en) Yielding lining structure suitable for crossing fault and soft rock large-deformation section
CN110130905A (en) A kind of shield tunnel circumferential weld shear structure of the vertical dislocation of adaptive act tomography
CN104775832A (en) Primary support structure of corrugated steel tunnel
CN216664470U (en) Self-resetting steel frame beam column joint of crawler steel energy dissipation damper
CN111021233A (en) Double-column type concrete-filled steel tube pier with replaceable energy-consuming corrugated steel connecting beam and construction method
JP5165505B2 (en) Steel slit dam and its repair method
LV13201B (en) Doubly prestressed roof-ceiling construction with grid flat-soffit for extremely large spans
CN111677523A (en) Asymmetric selective support method for tunnel with layered surrounding rock
CN210068178U (en) Tunnel supporting lining with buffering performance
GB2036829A (en) Arches for Galleries, Tunnels or the Like
CN105134249B (en) The big gradual method for protecting support in relaxation zone tunnel of mine
CN116906076A (en) High-stress soft rock tunnel supporting structure and method
CN114704288B (en) A shock attenuation is from restoring to throne tunnel structure for broken area of fault
CN111236973B (en) A toughness structure for plate movable belt tunnel
CN203114302U (en) Contractive protective support frame of roadway
CN106677809A (en) Contractible fabricated steel plate support
CN203200727U (en) Combined type elastic water channel
CN113221220A (en) Method for calculating shearing resistance and bearing capacity of grouting type mortise joint of assembled underground structure
CN109138180B (en) Replaceable part filling type combined structure frame assembly node and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant