CN204960951U - Tunnel is a steel bow member transverse connection device for preliminary bracing - Google Patents

Tunnel is a steel bow member transverse connection device for preliminary bracing Download PDF

Info

Publication number
CN204960951U
CN204960951U CN201520644138.5U CN201520644138U CN204960951U CN 204960951 U CN204960951 U CN 204960951U CN 201520644138 U CN201520644138 U CN 201520644138U CN 204960951 U CN204960951 U CN 204960951U
Authority
CN
China
Prior art keywords
steel
tunnel
bow member
iron
shelf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520644138.5U
Other languages
Chinese (zh)
Inventor
张俊兵
郑保才
宋力
孙伯乐
李达昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 3 Engineering Group Co Ltd
Original Assignee
China Railway No 3 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 3 Engineering Group Co Ltd filed Critical China Railway No 3 Engineering Group Co Ltd
Priority to CN201520644138.5U priority Critical patent/CN204960951U/en
Application granted granted Critical
Publication of CN204960951U publication Critical patent/CN204960951U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model belongs to the steel bow member is installed and connection construction field each other in the tunnel excavation preliminary bracing work progress, concretely relates to tunnel is a steel bow member transverse connection device for preliminary bracing, the utility model discloses a solve special operating modes such as gas tunnel the steel bow member connect fixed problem, strut the quality for the whole that improves the steel bow member simultaneously, provide a tunnel is a steel bow member transverse connection device for preliminary bracing, including connecting I -steel and a plurality of connecting plate, connect the I -steel and locate between the two adjacent steel bow members, in the notch at I -steel both ends is located to the connecting plate, each connecting plate pass through the bolt respectively with steel bow member body, is connected the web connection of I -steel. This connecting device has stopped the welding work progress in the hole, has solved the limited problem of connected mode under the special operating mode such as gas tunnel, and simultaneously, the bolt connection who adopts has improved the the stress effect of steel bow member, has guaranteed the intensity and the construction quality that connect.

Description

Cross-connecting apparatus between Tunnel steel arch-shelf
Technical field
The utility model belongs to steel arch-shelf in tunnel excavation preliminary bracing work progress and installs and connection construction field each other, is specifically related to cross-connecting apparatus between a kind of Tunnel steel arch-shelf.
Background technology
In Tunnel process, especially some weak surrounding rocks, gas tunnel, because Surrounding Rock Strength is low, distortion large, many employing steel arch-shelf active support schemes in preliminary bracing.In later stage tunnel surrounding stresses re-distribution process, steel arch-shelf and sprayed mortar bear sizable pressure from surrounding rock, the locations such as indivedual Swelling Rock, fault belt, the deflection of country rock is quite large, easy generation landslide, the prominent disaster such as mud, large deformation, preliminary bracing is easy to be emptied behind, and cause respective regions supporting to occur supporting vacancy, bracing members easily produces large displacement; Simultaneously the landslide body in these regions, large deformation body produce the force component of horizontal direction, and the unstability that also easily occurs collapsing, the phenomenon such as to topple, bring safely great hidden danger and threat to constructing tunnel and operating personnel.
For the problems referred to above, most way adopting between adjacent steel bow member welding H-bar or be welded to connect reinforcing bar in current tunnel steel arch frame work progress, to guarantee supporting & stablizing and the coordinative role of steel arch-shelf.These ways also create good effect in some tunnels.But in work progress, also expose some problems, such as owing to being adopt welding manner to connect at the scene, in tunnel, weld job environment is comparatively severe, welding quality is not high, and when connecting i iron near country rock face, due to working space restriction, often there is solder skip, welding the phenomenons such as not full, cause lateral connection of low quality, the integer support of steel arch-shelf fails to play its maximum efficiency.Moreover, because weld job needs to occupy the longer activity duration in tunnel, comprise weld preparation, connector cutting etc., indirectly extend the aided process time in tunnel, affect Tunnel Construction Schedule.3rd, owing to relating to fire operation, bring certain hidden danger to tunnel safety, especially in gas tunnel construction, Site Welding is prohibited to apply, and the connection of steel arch-shelf horizontal line can be limited to use, also just reduce the quality of Tunnel, cause certain hidden danger to construction safety.
Summary of the invention
The utility model is connected and fixed problem in order to the steel arch-shelf solving the special operation conditions such as gas tunnel, simultaneously in order to improve the integer support quality of steel arch-shelf, provides cross-connecting apparatus between a kind of Tunnel steel arch-shelf.
The utility model adopts following technical scheme:
Cross-connecting apparatus between a kind of Tunnel steel arch-shelf, comprise and connect i iron and some junction plates, described i iron is located between adjacent two steel arch-shelf, junction plate be located at connect i iron two ends notch in, each junction plate is connected with steel arch-shelf body, the web that is connected i iron respectively by bolt.
Described junction plate is L-type, and the long limit of junction plate and minor face all have some connecting holes, and long limit connects with the web being connected i iron, and minor face is connected with steel arch-shelf body.
The width of described junction plate is less than the width of rebate connecting i iron, and the short height of junction plate is less than 1/2 of the depth of rebate of steel arch-shelf i iron.
The utility model has following beneficial effect:
1, the utility model utilizes connection i iron to be connected adjacent two steel arch-shelf with junction plate, for full bolt or part bolt connecting mode, can play between opposing steel arch-shelf and extrude, also stretching action each other can be resisted, compared with former traditional pure welding manner, the scope of its resistance to deformation and destruction increases to some extent, improves the overall stressed effect of steel arch-shelf, ensure that intensity and the construction quality of connection;
2, connect i iron to carry out outside hole with the connection procedure (bolt is connected or welds) of junction plate, only carry out bolt in tunnel to be connected and fixed, stop the welding procedure in hole, solve the problem that connected mode under the special operation conditions such as gas tunnel is limited, widen the scope of application of cross-connecting apparatus between steel arch-shelf;
3, adopt the linkage form of i iron-junction plate, adopt in welding manner connection procedure before changing, solid near country rock face i iron junction plate not prison welding, or the situation of solder skip, quality of connection is guaranteed;
4, the connection of linkage and steel arch-shelf adopts field-installed mode, effectively can improve construction efficiency;
5, the spacing connecting i iron makes in strict accordance with design steel arch-shelf interval, effectively can ensure erected on site steel arch-shelf spacing, guarantee that preliminary bracing applies in strict accordance with design pitch;
6, this type of attachment making, install all according to standardization, programmed operation, it becomes more meticulous, standardized work degree is high, is suitable for promoting the use of in similar tunneling operation.
Accompanying drawing explanation
Fig. 1 is Construction State figure of the present utility model;
Fig. 2 is the lateral view of Fig. 1;
Fig. 3,4,5 is the three-view diagram of junction plate;
In figure: 1-steel arch-shelf, 2-connect i iron, 3-junction plate;
The long limit of 31-, 32-minor face, 33-connecting hole.
Detailed description of the invention
By reference to the accompanying drawings, detailed description of the invention of the present utility model is described further:
Cross-connecting apparatus between Tunnel steel arch-shelf as shown in Figure 1, 2, comprise and connect i iron 2 and some junction plates 3, described connection i iron 2 is located between adjacent two steel arch-shelf 1, junction plate 3 be located at connect i iron 2 two ends notch in, each junction plate 3 is connected with steel arch-shelf 1 body, the web that is connected i iron 2 respectively by bolt.It can thus be appreciated that every section of i iron should connect four connectors, and each connector is located in the notch at i iron two ends respectively.
As Fig. 3, 4, shown in 5, described junction plate 3 general employing thickness is that the steel plate of 10mm is made, Cutting Length is 15 ~ 20mm, its width should be less than the width of rebate connecting i iron 2, namely the height (two wing plate distances) of i iron is less than, connect in the notch making junction plate can be positioned over i iron, then utilize punching machine by the steel plate rolling l-shaped after cutting, the long limit of L-type junction plate and minor face all have bolt connecting hole, its long limit connects with the web being connected i iron 2, minor face is connected with steel arch-shelf body, and the height of minor face should be less than the depth of rebate of i iron, the junction plate after installing is made to be placed in the groove of i iron completely, prevent because projective structure interferes other installation components, as shown in Figure 2.
In practice of construction process, first the scope of operation is transported to after adopting bolt to be connected with the web at i iron two ends respectively on the long limit of four L-type junction plates outside hole, then two junction plates of this connection i iron one end are connected with the steel arch-shelf set up by its minor face, after excavating, follow-up adjacent steel arch-shelf is carried out frame stand, and two junction plates of the aforementioned connection i iron other end are connected with the steel arch-shelf of rear erection by its minor face.
Because L-type junction plate and the connection procedure being connected i iron carry out outside hole, except with bolts, the mode of surrounding fillet welding can also be adopted.

Claims (3)

1. cross-connecting apparatus between a Tunnel steel arch-shelf, it is characterized in that: comprise and connect i iron (2) and some junction plates (3), described connection i iron (2) is located between adjacent two steel arch-shelf (1), junction plate (3) be located at connect i iron (2) two ends notch in, each junction plate (3) is connected with steel arch-shelf (1) body, the web that is connected i iron (2) respectively by bolt.
2. cross-connecting apparatus between Tunnel steel arch-shelf according to claim 1, it is characterized in that: described junction plate (3) is L-type, the long limit (31) of junction plate (3) and minor face (32) all have some connecting holes (33), long limit (31) connects with the web being connected i iron (2), and minor face (32) is connected with steel arch-shelf (1) body.
3. cross-connecting apparatus between Tunnel steel arch-shelf according to claim 2, it is characterized in that: the width of described junction plate (3) is less than the width of rebate connecting i iron (2), the minor face (32) of junction plate (3) is highly less than the depth of rebate connecting i iron (2).
CN201520644138.5U 2015-08-25 2015-08-25 Tunnel is a steel bow member transverse connection device for preliminary bracing Active CN204960951U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520644138.5U CN204960951U (en) 2015-08-25 2015-08-25 Tunnel is a steel bow member transverse connection device for preliminary bracing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520644138.5U CN204960951U (en) 2015-08-25 2015-08-25 Tunnel is a steel bow member transverse connection device for preliminary bracing

Publications (1)

Publication Number Publication Date
CN204960951U true CN204960951U (en) 2016-01-13

Family

ID=55056023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520644138.5U Active CN204960951U (en) 2015-08-25 2015-08-25 Tunnel is a steel bow member transverse connection device for preliminary bracing

Country Status (1)

Country Link
CN (1) CN204960951U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971641A (en) * 2016-07-08 2016-09-28 山东大学 Mechanical construction and fast location longitudinal connecting device for tunnel confined concrete arch supports
CN109404006A (en) * 2018-11-13 2019-03-01 西安科技大学 A kind of assembled preliminary bracing
CN110159315A (en) * 2019-05-07 2019-08-23 山东大学 The semi-active connection tunnel of assembled and method suitable for passing through fault belt
CN111022084A (en) * 2019-11-19 2020-04-17 长安大学 Large-section loess tunnel excavation primary support arch frame single truss and method
CN111058873A (en) * 2020-01-15 2020-04-24 中国石油大学(华东) Primary support part supporting device and method for weak surrounding rock large-section tunnel
CN111577336A (en) * 2020-05-28 2020-08-25 成都理工大学 Section steel and sprayed concrete combined stiff structure tunnel supporting system and construction method
CN111706368A (en) * 2020-06-30 2020-09-25 中铁二院工程集团有限责任公司 Tunnel inner section steel frame longitudinal connection structure and construction method
CN111828053A (en) * 2020-08-17 2020-10-27 成都理工大学 Steel pipe concrete and sprayed concrete rigid combined structure tunnel supporting system and construction method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971641A (en) * 2016-07-08 2016-09-28 山东大学 Mechanical construction and fast location longitudinal connecting device for tunnel confined concrete arch supports
CN105971641B (en) * 2016-07-08 2018-06-22 山东大学 A kind of tunnel confined concrete arch mechanized construction quickly positions one-above-the-other layout
CN109404006A (en) * 2018-11-13 2019-03-01 西安科技大学 A kind of assembled preliminary bracing
CN110159315A (en) * 2019-05-07 2019-08-23 山东大学 The semi-active connection tunnel of assembled and method suitable for passing through fault belt
CN111022084A (en) * 2019-11-19 2020-04-17 长安大学 Large-section loess tunnel excavation primary support arch frame single truss and method
CN111022084B (en) * 2019-11-19 2024-04-26 长安大学 Single arch truss of primary support for excavating large-section loess tunnel and method
CN111058873A (en) * 2020-01-15 2020-04-24 中国石油大学(华东) Primary support part supporting device and method for weak surrounding rock large-section tunnel
CN111058873B (en) * 2020-01-15 2021-07-13 中国石油大学(华东) Primary support part supporting device and method for weak surrounding rock large-section tunnel
CN111577336A (en) * 2020-05-28 2020-08-25 成都理工大学 Section steel and sprayed concrete combined stiff structure tunnel supporting system and construction method
CN111706368A (en) * 2020-06-30 2020-09-25 中铁二院工程集团有限责任公司 Tunnel inner section steel frame longitudinal connection structure and construction method
CN111828053A (en) * 2020-08-17 2020-10-27 成都理工大学 Steel pipe concrete and sprayed concrete rigid combined structure tunnel supporting system and construction method

Similar Documents

Publication Publication Date Title
CN204960951U (en) Tunnel is a steel bow member transverse connection device for preliminary bracing
CN108678771B (en) Primary support and middle partition wall reinforcing support device for tunnel penetrating fault fracture zone
CN204252286U (en) A kind of rectangular steel-tube concrete column-steel beam connecting joint
CN201810323U (en) Bolt connection plate for connecting tunnel inverted arch steel frame with arch angle steel frame
CN105781593A (en) Steel grating assisted diversion tunnel preliminary bracing structure and method
CN110748349A (en) Double-molecular originating method for small-clear-distance double-line tunnel shield
CN104179362A (en) Building site guardrail fast to mount and demount
CN211924165U (en) Assembled steel sleeve structure for shield launching and receiving
CN203905009U (en) Supporting structure for internal corner of foundation pit
KR101638478B1 (en) Joint structure for perpendicular hall and horizontal hall
CN105782576B (en) Fluted tube line guard method is excavated below interim pipeline
CN102817617B (en) Novel inhaul cable type shield originating backrest substrate system
CN106050261A (en) Preliminary tunnel support structure with internal box type steel frames
CN106014457A (en) Connection application of L-shaped grille joint in tunnel initial supporting structure
CN204139577U (en) Embedment means formula wall-connecting piece after a kind of
CN209277903U (en) A kind of one-above-the-other layout between Tunnel steelframe
CN210829267U (en) Shield constructs interval back construction air shaft structure
CN114135315A (en) Advanced stress release construction method for severe large-deformation tunnel
CN102562098A (en) Tunnel steel temporary inverted arch with rapid assembly and disassembly
CN206539351U (en) A kind of grid type tunnel arch
CN216950404U (en) A assembled arched tube structure of strutting for open-type TBM
CN109113750A (en) Shield end reinforces the emergency set and its construction method of failure
CN205936662U (en) Weak surrounding rock tunnel framed bent formula initial stage supporting construction
CN218716852U (en) Longitudinal connecting device for grating arch frame
KR20130102751A (en) Apparatus for connecting lattice girders

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant