CN110080515A - For construction safety protective device - Google Patents
For construction safety protective device Download PDFInfo
- Publication number
- CN110080515A CN110080515A CN201910303973.5A CN201910303973A CN110080515A CN 110080515 A CN110080515 A CN 110080515A CN 201910303973 A CN201910303973 A CN 201910303973A CN 110080515 A CN110080515 A CN 110080515A
- Authority
- CN
- China
- Prior art keywords
- high altitude
- mobile station
- altitude platform
- protective device
- discharge hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/001—Safety or protective measures against falling down relating to scaffoldings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/003—Devices for storing material on the scaffold
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Aiming, Guidance, Guns With A Light Source, Armor, Camouflage, And Targets (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The present invention relates to technical field of building construction; specifically; it is related to a kind of for construction safety protective device; it includes high altitude platform; it is equipped with the installation cavity of opening to the right in high altitude platform, the mobile station that can be moved left and right is equipped in installation cavity, mobile station is equipped with the accommodating cavity of opening upwards; accommodating cavity bottom is equipped with the first discharge hole, and installation cavity bottom is equipped with the second discharge hole for cooperating with the first discharge hole;It is equipped with pulp-collecting box below high altitude platform, the splicing chamber of opening upwards is equipped in pulp-collecting box, the second discharge hole is corresponding up and down with splicing chamber.The present invention can improve the stability of high altitude platform, can also prevent falling object from high altitude.
Description
Technical field
The present invention relates to technical field of building construction, specifically, being related to a kind of for construction safety protective device.
Background technique
Construction refers to the production activity of engineering construction implementation phase, is the building course of all kinds of buildings, can also be with
It says it is various lines on design drawing, in specified place, becomes process in kind.It includes basic engineering construction, master
Body structure construction, roof construction, decorative engineering construction etc..The place of construction operation is known as " construction site " or cries
" construction site ", is also named building site.
During construction high altitude operation, some aerial lift devices, such as hanging basket are generally required, hanging basket is building
The building machinery of engineering high altitude operation acts on curtain wall installation, outside Wall Cleaning.Overhang mechanism rack and is set to building or structures
On, suspension platform is driven using hoisting mechanism, the construction installation run up and down by wirerope along building or structures facade,
It is also the job platform for operator's setting.But hanging basket generally directly suspends in midair in the sky, is easy to rock, stability is insufficient;
In addition, inevitably have sandstone in high altitude operation, brick falls off, to construction beneath window floor and ground cause safety
Hidden danger, and welding cleans, and safety is insufficient.
Summary of the invention
The contents of the present invention are to provide one kind for construction safety protective device, can overcome certain of the prior art
Kind or certain defects.
It is according to the present invention a kind of to be used for construction safety protective device comprising high altitude platform is set in high altitude platform
There is the installation cavity of opening to the right, the mobile station that can be moved left and right is equipped in installation cavity, mobile station is equipped with the accommodating of opening upwards
Chamber, accommodating cavity bottom are equipped with the first discharge hole, and installation cavity bottom is equipped with the second discharge hole for cooperating with the first discharge hole;It is high
It is equipped with pulp-collecting box below hollow panel, the splicing chamber of opening upwards is equipped in pulp-collecting box, the second discharge hole is corresponding up and down with splicing chamber.
Wall in the present invention, by mobile station moving left and right in installation cavity, when mobile station being allowed to be against construction
On face, in this way, high altitude platform in the air is not susceptible to shake high, to improve stability.Mobile station is equipped with accommodating cavity, works as movement
When platform is against on metope, accommodating cavity can catch the fragment fallen when construction, in this way, fragment would not fall to ground from high-altitude
On, the safety of high altitude platform following floor and ground is improved, when the fragment accumulated on accommodating cavity is excessive, high altitude platform meeting one
Head lays particular stress on disequilibrium, so being provided with the first discharge hole and the second discharge hole, the fragment in accommodating cavity can be from the first discharging
Hole and the second discharge hole drop into that the splicing in pulp-collecting box is intracavitary, since pulp-collecting box is located at the lower section of high altitude platform, so high-altitude
Platform has preferable stability.Moreover, can preferably store fragment in pulp-collecting box, fragment is dropped into pulp-collecting box and is more advantageous to
Subsequent fragment is stable to be fallen in accommodating cavity.
Preferably, being equipped with the rubber pad for buffering on the right side of mobile station.
In the present invention, rubber pad can buffer the impact force between mobile station right end and metope, to improve making for mobile station
Use the service life.
Preferably, the first discharge hole is located at accommodating cavity left part, accommodating cavity bottom of chamber from the height of export-oriented first discharge hole by
It gradually reduces, accommodating cavity bottom of chamber is in curved surface.
In the present invention, the first discharge hole is located at accommodating cavity left part, in this way, the first discharge hole is just easier and the second discharging
The height of hole alignment, accommodating cavity bottom of chamber from export-oriented first discharge hole gradually decreases, and accommodating cavity bottom of chamber is in curved surface, in this way, fragment is just
It is easy to fall from the first discharge hole.
Preferably, being equipped with sliding equipment between mobile station bottom surface and installation cavity bottom surface.
In the present invention, the setting of sliding equipment is so that the movement of mobile station is more convenient, more stable.
Preferably, being set at the top of high altitude platform there are two long hole, long hole is communicated with installation cavity, mobile countertop and long hole pair
It answers and moves countertop equipped with threaded hole, a screw rod engages after passing through long hole with threaded hole;Screw tip is equipped with handwheel.
In the present invention, since the distance between high altitude platform and metope cannot ensure every time, so mobile station to
When moving right, mobile distance is different, this just needs mobile station to be moved to suitable position, just facilitates shifting by the setting of long hole
The adjusting of the fixed position of dynamic platform, needs fixed position to improve the stability of mobile station support after the completion of adjusting, by screw rod and
Threaded hole engagement can make screw rod and the stable connection of mobile station, and handwheel can be pressed on high altitude platform by the rotation of screw rod
On, in this way, mobile station cannot move left and right, and so as to which mobile station is fixed, the more convenient construction personnel's operation of handwheel, institute
With above-mentioned fixed structure can preferably fix mobile station.
Preferably, side is respectively equipped with protrusive board before and after pulp-collecting box, protrusive board top surface is aligned with high altitude platform top surface and two top surfaces
Between be equipped with fastening device.
In the present invention, pulp-collecting box and high altitude platform can be discrete state, between the protrusive board and high altitude platform on pulp-collecting box
By fastening device, so that pulp-collecting box can easily separate and close up, in this way, when taking the fragment in pulp-collecting box away just very
It is convenient.
Preferably, mobile station left end is equipped with limited block, the baffle cooperated with limited block is equipped in installation cavity.
In the present invention, the cooperation of limited block and baffle can prevent mobile station to be detached from installation cavity, guarantee safety.
Preferably, high altitude platform top edge is equipped with fence.
In the present invention, the setting of fence can protect construction personnel.
Preferably, high altitude platform and splicing box top are respectively provided with the wirerope of oscilaltion, the wirerope
It is gone up and down by hoisting mechanism.
In the present invention, hoisting mechanism is able to achieve the lifting of high altitude platform and pulp-collecting box by wirerope, high altitude platform and connects
Magazine is respectively equipped with hoisting mechanism, in this way, can operate pulp-collecting box when the fragment in pulp-collecting box is filled and drop on ground,
It being promoted again to high altitude platform after fragment is unloaded and continues below dress fragment, this realizes being used for multiple times for pulp-collecting box, in addition,
Alleviate the load force of high altitude platform.
Detailed description of the invention
Fig. 1 is a kind of for construction safety protective device structural schematic diagram in embodiment 1;
Fig. 2 is a kind of for construction safety protective device schematic perspective view in embodiment 1;
Fig. 3 is the structural schematic diagram of mobile station in embodiment 1;
Fig. 4 is the schematic perspective view of mobile station in embodiment 1;
Fig. 5 is a kind of for construction safety protective device overlooking structure diagram in embodiment 1;
Fig. 6 is screw rod and threaded hole engaging structure schematic diagram in embodiment 1.
Specific embodiment
To further appreciate that the contents of the present invention, the present invention is described in detail in conjunction with the accompanying drawings and embodiments.It should be understood that
, embodiment be only to the present invention explain and and it is non-limiting.
Embodiment 1
As shown in figures 1 to 6, it present embodiments provides a kind of for construction safety protective device comprising high altitude platform
110, high altitude platform 110 is interior to be equipped with the installation cavity 111 of opening to the right, is equipped with the mobile station that can be moved left and right in installation cavity 111
120, mobile station 120 is equipped with the accommodating cavity 121 of opening upwards, and 121 bottom of accommodating cavity is equipped with the first discharge hole 130, installation cavity 111
Bottom is equipped with the second discharge hole 140 for cooperating with the first discharge hole 130;Pulp-collecting box 150 is equipped with below high altitude platform 110,
The splicing chamber 151 of opening upwards is equipped in pulp-collecting box 150, the second discharge hole 140 is corresponding with about 151 splicing chamber.
Wall by the moving left and right in installation cavity 111 of mobile station 120, when mobile station 120 being allowed to be against construction
On face, in this way, high altitude platform 110 in the air is not susceptible to shake high, to improve stability.Mobile station 120 is equipped with accommodating cavity
121, when mobile station 120 is against on metope, accommodating cavity 121 can catch the fragment fallen when construction, in this way, fragment would not
It is fallen on ground from high-altitude, the safety of high altitude platform 110 or less floor and ground is improved, when what is accumulated on accommodating cavity 121
When fragment is excessive, the one weighting disequilibrium of meeting of high altitude platform 110, so being provided with the first discharge hole 130 and the second discharge hole
140, the fragment in accommodating cavity 121 can drop into connecing in pulp-collecting box 150 from the first discharge hole 130 and the second discharge hole 140
Expect in chamber 151, since pulp-collecting box 150 is located at the lower section of high altitude platform 110, so high altitude platform 110 has preferable stability.
Moreover, can preferably store fragment in pulp-collecting box 150, fragment, which drops into pulp-collecting box 150, is more advantageous to subsequent fragment stabilization
Fall in accommodating cavity 121.
The rubber pad 122 for buffering is equipped in the present embodiment, on the right side of mobile station 120.
Rubber pad 122 can buffer the impact force between 120 right end of mobile station and metope, to improve making for mobile station 120
Use the service life.
In the present embodiment, the first discharge hole 130 is located at 121 left part of accommodating cavity, and 121 bottom of chamber of accommodating cavity discharges from extroversion first
The height in hole 130 gradually decreases, and 121 bottom of chamber of accommodating cavity is in curved surface.
First discharge hole 130 is located at 121 left part of accommodating cavity, in this way, the first discharge hole 130 is just easier and the second discharging
Hole 140 is aligned, and the height of 121 bottom of chamber of accommodating cavity from export-oriented first discharge hole 130 gradually decreases, and 121 bottom of chamber of accommodating cavity is in curved surface,
In this way, fragment is easy for falling from the first discharge hole 130.
In the present embodiment, sliding equipment 160 is equipped between 111 bottom surface of 120 bottom surface of mobile station and installation cavity.
The setting of sliding equipment 160 is so that the movement of mobile station 120 is more convenient, more stable.
It in the present embodiment, is set at the top of high altitude platform 110 there are two long hole 170, long hole 170 is communicated with installation cavity 111, mobile
120 top surface of platform is corresponding with long hole 170 and 120 top surface of mobile station is equipped with threaded hole 123, a screw rod 180 pass through after long hole 170 with spiral shell
Pit 123 engages;180 top of screw rod is equipped with handwheel 181.
Since the distance between high altitude platform 110 and metope cannot ensure every time, so mobile station 120 moves right
When dynamic, mobile distance is different, this just needs mobile station 120 to be moved to suitable position, is just facilitated by the setting of long hole 170
The adjusting of the fixed position of mobile station 120 needs fixed position to improve the stability of the support of mobile station 120, leads to after the completion of adjusting
Screw rod 180 and the stable connection of mobile station 120 can be made by crossing screw rod 180 and the engagement of threaded hole 123, and handwheel 181 passes through screw rod
180 rotation can be pressed in high altitude platform 110, in this way, mobile station 120 cannot move left and right, so as to by mobile station
120 is fixed, the more convenient construction personnel of handwheel 181 operation, so, above-mentioned fixed structure can preferably fix mobile station 120.
In the present embodiment, 150 front and back side of pulp-collecting box is respectively equipped with protrusive board 152, and 152 top surface of protrusive board and high altitude platform 110 are pushed up
Fastening device 190 is equipped between neat and two top surfaces.
Pulp-collecting box 150 and high altitude platform 110 can be discrete state, protrusive board 152 and high altitude platform on pulp-collecting box 150
By fastening device 190 between 110, so that pulp-collecting box 150 can easily separate and close up, in this way, taking pulp-collecting box 150 away
With regard to very convenient when interior fragment.
In the present embodiment, 120 left end of mobile station is equipped with limited block 124, is equipped in installation cavity 111 and cooperates with limited block 124
Baffle.
The cooperation of limited block 124 and baffle can prevent mobile station 120 to be detached from installation cavity 111, guarantee safety.
In the present embodiment, 110 top edge of high altitude platform is equipped with fence 112.
The setting of fence 112 can protect construction personnel.
In the present embodiment, high altitude platform 110 and 150 top surface of pulp-collecting box are respectively provided with the wirerope of oscilaltion, institute
Wirerope is stated to go up and down by hoisting mechanism.
Hoisting mechanism is able to achieve the lifting of high altitude platform 110 and pulp-collecting box 150 by wirerope, high altitude platform 110 and connects
Magazine 150 is respectively equipped with hoisting mechanism, in this way, can operate the decline of pulp-collecting box 150 when the fragment in pulp-collecting box 150 is filled
Onto ground, is promoted again to high altitude platform 110 after fragment is unloaded and continue below dress fragment, this realizes pulp-collecting box 150
It is used for multiple times, in addition, also mitigating the load force of high altitude platform 110.
In the present embodiment, the second discharge hole 140 is also long hole, when mobile station 120, which is adjusted, arrives suitable position, the second discharging
Corresponding first discharge hole 130 of 140 total energy of hole.
Schematically the present invention and embodiments thereof are described above, description is not limiting, institute in attached drawing
What is shown is also one of embodiments of the present invention, and actual structure is not limited to this.So if the common skill of this field
Art personnel are enlightened by it, without departing from the spirit of the invention, are not inventively designed and the technical solution
Similar frame mode and embodiment, are within the scope of protection of the invention.
Claims (9)
1. being used for construction safety protective device, it is characterised in that: including high altitude platform (110), set in high altitude platform (110)
There is the installation cavity (111) of opening to the right, is equipped with the mobile station (120) that can be moved left and right, mobile station in installation cavity (111)
(120) it is equipped with the accommodating cavity (121) of opening upwards, accommodating cavity (121) bottom is equipped with the first discharge hole (130), installation cavity (111)
Bottom is equipped with the second discharge hole (140) for cooperating with the first discharge hole (130);Splicing is equipped with below high altitude platform (110)
Box (150), is equipped with the splicing chamber (151) of opening upwards in pulp-collecting box (150), on the second discharge hole (140) and splicing chamber (151)
Lower correspondence.
2. according to claim 1 be used for construction safety protective device, it is characterised in that: on the right side of mobile station (120)
Equipped with the rubber pad (122) for buffering.
3. according to claim 2 be used for construction safety protective device, it is characterised in that: the first discharge hole (130)
Positioned at accommodating cavity (121) left part, the height of accommodating cavity (121) bottom of chamber from export-oriented first discharge hole (130) is gradually decreased, accommodating cavity
(121) bottom of chamber is in curved surface.
4. according to claim 3 be used for construction safety protective device, it is characterised in that: mobile station (120) bottom surface
Sliding equipment (160) are equipped between installation cavity (111) bottom surface.
5. according to claim 4 be used for construction safety protective device, it is characterised in that: high altitude platform (110) top
Portion is set there are two long hole (170), and long hole (170) is communicated with installation cavity (111), and mobile station (120) top surface is corresponding with long hole (170)
And mobile station (120) top surface is equipped with threaded hole (123), a screw rod (180) passes through long hole (170) and engages afterwards with threaded hole (123);
Screw rod (180) top is equipped with handwheel (181).
6. according to claim 5 be used for construction safety protective device, it is characterised in that: before and after pulp-collecting box (150)
Side is respectively equipped with protrusive board (152), and protrusive board (152) top surface is aligned with high altitude platform (110) top surface and is equipped with clamping between two top surfaces
Fixed device (190).
7. according to claim 6 be used for construction safety protective device, it is characterised in that: mobile station (120) left end
Equipped with limited block (124), the baffle cooperated with limited block (124) is equipped in installation cavity (111).
8. according to claim 7 be used for construction safety protective device, it is characterised in that: high altitude platform (110) top
Face edge is equipped with fence (112).
9. it is according to claim 8 be used for construction safety protective device, it is characterised in that: high altitude platform (110) and
Pulp-collecting box (150) top surface is respectively provided with the wirerope of oscilaltion, and the wirerope is gone up and down by hoisting mechanism.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910303973.5A CN110080515B (en) | 2019-04-16 | 2019-04-16 | Safety protection device for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910303973.5A CN110080515B (en) | 2019-04-16 | 2019-04-16 | Safety protection device for building construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110080515A true CN110080515A (en) | 2019-08-02 |
CN110080515B CN110080515B (en) | 2021-04-16 |
Family
ID=67415167
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910303973.5A Active CN110080515B (en) | 2019-04-16 | 2019-04-16 | Safety protection device for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110080515B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060028711A (en) * | 2006-01-27 | 2006-03-31 | 이정민 | Method of mixing heterogeneous substances in the discharge device containing heterogeneous substances |
CN205742955U (en) * | 2016-07-05 | 2016-11-30 | 洪铮铮 | A kind of hanging basket for building |
CN207131108U (en) * | 2017-07-24 | 2018-03-23 | 周婷 | A kind of fall arrest construction safety equipment |
CN108708544A (en) * | 2018-05-30 | 2018-10-26 | 田锋刚 | A kind of intelligentized multi-use architecture construction hanging basket |
CN208304060U (en) * | 2018-06-12 | 2019-01-01 | 中建七局第一建筑有限公司 | One kind being used for construction safety protective device |
CN210396075U (en) * | 2019-04-16 | 2020-04-24 | 筑邦建设集团股份有限公司 | Safety protection device for building construction |
-
2019
- 2019-04-16 CN CN201910303973.5A patent/CN110080515B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060028711A (en) * | 2006-01-27 | 2006-03-31 | 이정민 | Method of mixing heterogeneous substances in the discharge device containing heterogeneous substances |
CN205742955U (en) * | 2016-07-05 | 2016-11-30 | 洪铮铮 | A kind of hanging basket for building |
CN207131108U (en) * | 2017-07-24 | 2018-03-23 | 周婷 | A kind of fall arrest construction safety equipment |
CN108708544A (en) * | 2018-05-30 | 2018-10-26 | 田锋刚 | A kind of intelligentized multi-use architecture construction hanging basket |
CN208304060U (en) * | 2018-06-12 | 2019-01-01 | 中建七局第一建筑有限公司 | One kind being used for construction safety protective device |
CN210396075U (en) * | 2019-04-16 | 2020-04-24 | 筑邦建设集团股份有限公司 | Safety protection device for building construction |
Also Published As
Publication number | Publication date |
---|---|
CN110080515B (en) | 2021-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10807833B2 (en) | Method for erecting an elevator system, and elevator system which can be adapted to an increasing building height | |
KR101024455B1 (en) | Guide shoe and climbing system for use in the building sector | |
CN104295080A (en) | External wall hanging basket installing structure | |
CN214302808U (en) | Hanging flower basket is used in construction of green building outer wall | |
CN112627565B (en) | Suspension mechanism of building curtain wall cleaning device and using method thereof | |
CN110056177A (en) | Suspension electric hanging basket and its construction method of installation | |
CN105298103A (en) | Outwards-inclining hanging basket construction device | |
CN204823021U (en) | Sand system on spiral | |
CN104453201A (en) | Automatic ascending and descending type material platform | |
CN110080515A (en) | For construction safety protective device | |
CN117927007A (en) | Steel construction platform for construction | |
CN207727954U (en) | Compound operating platform | |
CN107165399B (en) | A kind of high-altitude external wall maintenance unit | |
CN210396075U (en) | Safety protection device for building construction | |
CN211058280U (en) | Safe firm aerial working hanging flower basket | |
CN207792625U (en) | Scalable lengthening cantilever crane structure | |
CN110980141B (en) | Heavy hammer counterweight device for belt conveyor, conveyor and using method | |
CN205617773U (en) | Extroversion formula hanging flower basket construction equipment | |
CN211313429U (en) | Construction is with platform of unloading | |
CN209740460U (en) | Protective door linkage device of material hoister | |
CN210918131U (en) | Building outer wall spraying robot | |
CN208586036U (en) | Hang bucket elevator | |
CN207110427U (en) | A kind of construction hanging basket protector | |
CN216842879U (en) | Protector for aerial working platform | |
CN220012061U (en) | House building lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |