CN214302808U - Hanging flower basket is used in construction of green building outer wall - Google Patents

Hanging flower basket is used in construction of green building outer wall Download PDF

Info

Publication number
CN214302808U
CN214302808U CN202023005552.1U CN202023005552U CN214302808U CN 214302808 U CN214302808 U CN 214302808U CN 202023005552 U CN202023005552 U CN 202023005552U CN 214302808 U CN214302808 U CN 214302808U
Authority
CN
China
Prior art keywords
basket body
hanging
wall
flower basket
hanging flower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023005552.1U
Other languages
Chinese (zh)
Inventor
王名东
殷雪辉
赵大春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Celebrity Construction Engineering Co ltd
Original Assignee
Guangdong Celebrity Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Celebrity Construction Engineering Co ltd filed Critical Guangdong Celebrity Construction Engineering Co ltd
Priority to CN202023005552.1U priority Critical patent/CN214302808U/en
Application granted granted Critical
Publication of CN214302808U publication Critical patent/CN214302808U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The application relates to a hanging flower basket is used in construction of green building outer wall, it includes: a basket body; the hanging lugs are arranged at four corners of the top of the hanging basket body; and hang the hoist cable of locating on the hangers, its characterized in that, the mounting hole has been run through to the one side level that the hanging flower basket body is close to the wall body, threaded connection has the bracing piece in the mounting hole, the bracing piece is located this internal one end of hanging flower basket and is provided with the handle, the bracing piece is located this external one end of hanging flower basket and is provided with the butt plate, hanging flower basket body bottom is provided with the reinforcement subassembly with wall body looks butt, hanging flower basket body bottom is provided with the buffing pad that is used for buffering hanging flower basket body gravity. This application has the stability that improves the hanging flower basket body in the work progress, reduces hanging flower basket body and wall body damage probably to reach the effect that reduces to overhaul the material waste, green.

Description

Hanging flower basket is used in construction of green building outer wall
Technical Field
The application relates to the technical field of building outer wall construction equipment, in particular to a hanging basket for green building outer wall construction.
Background
The hanging basket is a building device for high-altitude operation in building engineering, and is used for curtain wall installation and outer wall cleaning. The hanging basket is a novel high-altitude operation device which can replace a traditional scaffold, reduce labor intensity, improve working efficiency and be repeatedly used. The use of construction hanging baskets has gradually become a trend, and is widely accepted in high-altitude operations such as outer wall construction, curtain wall installation, heat preservation construction, outer wall maintenance and cleaning of high-rise and multi-storey buildings. Meanwhile, the method can be used for the operation of large-scale tank bodies, bridges, dams and other projects.
Currently, a general structure of a basket includes a basket body and slings. When the building needs to be constructed on the outer wall, a worker stands on the hanging basket, starts the elevator to lay down the sling, and enables the hanging basket to move to a preset working site, so that the high-altitude operation can be conveniently carried out.
With respect to the related art among the above, the inventors consider that the following drawbacks exist: in the construction process, the hanging basket is suspended, and the hanging basket is easy to shake due to operation actions and high-altitude wind force, so that the hanging basket is easy to touch the outer wall, the hanging basket and the outer wall are damaged, certain influence is exerted on the safety of constructors, and the safety is further improved.
SUMMERY OF THE UTILITY MODEL
In order to improve the stability of hanging flower basket in the work progress, this application provides a hanging flower basket is used in construction of green building outer wall.
The application provides a hanging flower basket for construction of green building outer wall adopts following technical scheme:
a hanging flower basket is used in construction of green building outer wall, includes: a basket body; the hanging lugs are arranged at four corners of the top of the hanging basket body; and hang and locate hoist cable on the hangers, its characterized in that, the mounting hole has been seted up to one side level that the hanging flower basket body is close to the wall body runs through, threaded connection has the bracing piece in the mounting hole, the bracing piece is located this internal one end of hanging flower basket is provided with the handle, the bracing piece is located this external one end of hanging flower basket is provided with the butt plate, hanging flower basket body bottom is provided with the reinforcement subassembly with wall body looks butt, hanging flower basket body bottom is provided with and is used for the buffering the buffing pad of hanging flower basket body gravity.
By adopting the technical scheme, the mounting holes, the supporting rods, the handles and the abutting plates are arranged, when hovering operation is required, the supporting rods can horizontally extend out of the hanging basket body through the mounting holes by rotating the handles, the abutting plates are attached to the wall body, and the supporting rods can provide support for the hanging basket body in the horizontal direction under the action of relative friction force, so that the stability of the hanging basket body is improved; through setting up the reinforced component, can form the stable triangular supports structure in one side between hanging flower basket body bottom and wall body lateral wall, can further improve the stability of hanging flower basket body when hovering, through setting up the buffer seat, can cushion the pressure that the hanging flower basket body descends and brings, slow down hanging flower basket body falling speed, can also make and reserve certain clearance between reinforced component and the ground, reduce the hanging flower basket body and directly fall on reinforced component and damage reinforced component's possibility. Through this scheme, compare with the correlation technique, can increase the stability of hanging flower basket body when the suspension, reduce the possibility of hanging flower basket body and wall body collision to can reduce the damage between wall body and the hanging flower basket body, reduce the material and the manpower that maintenance wall body and hanging flower basket body consumed, green.
Preferably, the reinforcing member comprises: the guide plate is obliquely arranged at the bottom of the hanging basket body; the reinforcing rod is connected to the bearing surface of the guide plate in a sliding manner; the reinforcing plate is arranged at one end, far away from the hanging basket body, of the reinforcing rod; and the driving piece is arranged on the hanging basket body and used for driving the reinforcing rod to displace along the extension direction of the reinforcing plate.
By adopting the technical scheme, through the arrangement of the reinforcing rods, when the reinforcing plate is attached to the wall body, a stable triangular framework can be formed among the bottom wall of the hanging basket body, the reinforcing rods and the wall body, the hanging basket body is supported from the bottom of the hanging basket body, the stability of the hanging basket body can be improved, the contact area between the reinforcing rods and the wall body is increased by the reinforcing plate, and the supporting effect of the reinforcing rods can be further improved.
Preferably, the driving member includes: the motor is arranged at the bottom of the hanging basket body; the gear is arranged on the output shaft of the motor; and the rack is arranged on the top wall of the reinforcing rod and meshed with the gear.
By adopting the technical scheme, through setting up motor, gear and rack, when needs supported the hanging flower basket body on the wall body, through opening the motor, can drive gear rotation, make the gear can drive the rack and shift on the deflector, because the rigidity of deflector makes the anchor strut rotate to the wall body direction and be close to reach the effect of drive anchor strut displacement.
Preferably, the mounting holes are arranged on the side wall of the hanging basket body in a quincuncial shape, and support rods are arranged in the mounting holes.
Adopt above-mentioned technical scheme, evenly distributed bracing piece all can form a stable triangle-shaped bearing structure between per three bracing pieces, can improve the stability of hanging flower basket body.
Preferably, the buffer base includes: the buffer sleeve is vertically arranged at the center of the bottom of the hanging basket body; the buffer rod is inserted in the buffer sleeve; the buffer plate is arranged at one end of the buffer rod, which is far away from the hanging basket body; and the buffer spring is arranged between the buffer rod and the buffer sleeve.
Adopt above-mentioned technical scheme, through setting up the cushion collar, the buffer beam, buffer board and buffer spring, when the hanging flower basket body descends and is close to the contact surface, the buffer board contacts with ground earlier, under the action of gravity of hanging flower basket body, the cushion collar extrudees to the direction of buffer beam, make buffer spring produce certain compression deformation, can cushion and absorb the decurrent pressure of hanging flower basket body, improve the stability that the hanging flower basket body descends, in addition, the setting up of buffing pad makes and reserves certain interval between hanging flower basket body bottom and the contact surface, reduce the anchor strut by extrusion fracture's probably.
Preferably, the top of one side of the hanging basket body, which is provided with the supporting rod, is provided with a shielding cover.
By adopting the technical scheme, the shielding cover is arranged, so that the possibility that construction materials fall to injure passerby by crashing can be reduced in the construction process, a certain distance can be kept between a worker and the supporting rod, and the influence of the supporting rod on construction operation is reduced.
Preferably, the hanging flower basket body is provided with the one side top of bracing piece and is fixed with the fixed block, shelter from the lid bottom and seted up length direction with the unanimous groove that slides of bracing piece displacement direction, wherein, the fixed block slide connect in slide the inslot.
Adopt above-mentioned technical scheme, under the fixed block mutually supported with the groove that slides, make to shelter from the lid and can remove along with the displacement of bracing piece, remain throughout to the effect of covering of bracing piece, cover with setting up a big board and compare, can save material, green.
Preferably, one side subsides that the butt joint board was kept away from the hanging flower basket body are equipped with first rubber piece, one side subsides that the gusset plate was kept away from the hanging flower basket body is equipped with the second rubber piece.
By adopting the technical scheme, the friction force between the abutting plate and the wall body, between the reinforcing plate and the wall body can be increased by arranging the first rubber sheet and the second rubber sheet, so that the stability of the hanging basket body can be improved.
In summary, the present application includes at least one of the following beneficial technical effects:
by arranging the supporting rod, the handle and the abutting plate, when hovering operation is required, the supporting rod can horizontally extend out of the hanging basket body through the mounting hole by rotating the handle, the abutting plate is attached to the wall body, and under the action of relative friction force, the supporting rod can provide support for the hanging basket body in the horizontal direction, so that the stability of the hanging basket body is improved; when the driving piece is started, the reinforcing plate can be attached to the wall body, a stable triangular structure can be formed among the bottom wall of the hanging basket body, the reinforcing rods and the wall body, the hanging basket body is supported from the bottom of the hanging basket body, and the stability of the hanging basket body can be further improved; compared with the related technology, the hanging basket has the advantages that the stability of the hanging basket body during suspension can be improved, and the possibility of collision between the hanging basket body and the wall body is reduced, so that the damage between the wall body and the hanging basket body can be reduced, the consumed materials and manpower for maintaining the wall body and the hanging basket body are reduced, and the hanging basket is green and environment-friendly;
through setting up the cushion collar, the buffer beam, buffer board and buffer spring, when the hanging flower basket body descends and is close to the contact surface, the buffer board contacts with ground earlier, under the action of gravity of hanging flower basket body, the cushion collar extrudees to the direction of buffer beam, make buffer spring produce certain compression deformation, can cushion and absorb the decurrent pressure of hanging flower basket body, improve the stability that the hanging flower basket body descends, in addition, the setting up of buffing pad makes and has certain interval between hanging flower basket body bottom and the contact surface in advance, reduce the anchor strut by extrusion fracture's probably.
Drawings
FIG. 1 is a schematic view of the overall structure of the present application;
FIG. 2 is a schematic structural diagram of a basket body in the present application;
FIG. 3 is a schematic cross-sectional view of a guide plate according to the present application;
fig. 4 is a schematic view of the structure of the blast surface of the cushion socket in the present application.
Description of reference numerals: 1. a basket body; 11. hanging a lug; 12. a sling; 13. an elevator; 14. a wall body; 20. mounting holes; 21. a support bar; 22. a handle; 23. a butt joint plate; 231. a first rubber sheet; 24. a shielding cover; 241. a fixed block; 242. a sliding groove; 3. a guide plate; 30. a guide groove; 31. a reinforcing rod; 32. a reinforcing plate; 321. a second rubber sheet; 33. a motor; 331. a gear; 332. a rack; 4. a buffer seat; 41. a buffer sleeve; 42. a buffer rod; 43. a buffer plate; 44. a buffer spring.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses hanging flower basket is used in construction of green building outer wall. Referring to fig. 1 and 2, the basket for outer wall construction comprises a basket body 1, four hanging lugs 11 and slings 12, in the embodiment, the basket body 1 is a rectangular uncovered box, the four hanging lugs 11 are respectively fixed at four corner positions at the top of the basket body 1, the slings 12 are bound and hung on the hanging lugs 11, the four slings 12 are converged into one strand and then connected with a lifter 13, and in the embodiment, the lifter 13 is installed at the top of a wall 14.
Five mounting holes 20 are horizontally formed in one side, close to the wall 14, of the hanging basket body 1 in a penetrating mode, wherein the five mounting holes 20 are arranged in a quincunx mode, the mounting holes 20 are arranged in a threaded mode, a supporting rod 21 is connected to each mounting hole 20 in a threaded mode, the supporting rod 21 is a round rod, the stress is even, and the stability of the supporting rod 21 is guaranteed. The outer wall of the support rod 21 is provided with a thread matched with the mounting hole 20, so that the support rod 21 can penetrate through the side wall of the hanging basket body 1 through the mounting hole 20. Three of the five support rods 21 can be used according to the requirement, so that a triangular stable structure is always kept among the support rods 21. According to the position of the worker standing for work, the connecting point between the side wall of the hanging basket body 1 and the wall body 14 is adjusted to ensure the balance of the hanging basket body 1.
Referring to fig. 3 and 4, one end of the support rod 21 located in the basket body 1 is fixed with a handle 22, the support rod 21 is convenient to rotate, one end of the support rod 21 located outside the basket body 1 is fixed with a butt plate 23, in this embodiment, the surface of the butt plate 23 is perpendicular to the support rod 21, and the surface area of the butt plate 23 is greater than the end area of the support rod 21, so that the butt plate 23 can be attached to the wall 14, and the contact area between the support rod 21 and the wall 14 can be increased, so as to effectively improve the stability of the basket body 1.
In addition, the first rubber sheet 231 is attached to one side of the abutting plate 23, which is far away from the basket body 1, so that the friction force between the wall 14 and the abutting plate 23 can be increased, the stability of the support rod 21 can be improved, and the stability of the basket body 1 can be further improved.
Through twist grip 22, can drive bracing piece 21 and rotate, bracing piece 21 advances to 14 direction levels of wall body along the screw of mounting hole 20 rotation, laminates mutually until butt plate 23 and wall body 14, continues twist grip 22 again, until unable rotation, makes wall body 14 reach the higher value in the frictional force between butt plate 23, improves the stability of bracing piece 21 on wall body 14 to can improve the stability of hanging flower basket body 1.
Referring to fig. 2 and 3, in addition, a shielding cover 24 is slidably connected to the basket body 1 to shield the support rods 21, so as to reduce the influence of construction sundries falling on the support rods 21 on the rotation of the support rods 21, and reduce the possibility of injury to passerby caused by the construction sundries falling from the gap between the basket body 1 and the wall 14. Wherein, be provided with the vertical fixed block 241 that is fixed with in one side top of bracing piece 21 at hanging flower basket body 1, shelter from lid 24 bottom and seted up the groove 242 that slides, in this embodiment, the length direction in groove 242 that slides is unanimous with the direction of bracing piece 21 displacement, the size of fixed block 241 and the size looks adaptation in groove 242 that slides, under the mutually supporting of fixed block 241 and groove 242 that slides, shelter from lid 24 and can slide and hanging flower basket body 1 top, can shelter from the position of lid 24 according to the change and convenient regulation of bracing piece 21 position, in order to guarantee the effect of sheltering from to bracing piece 21.
Referring to fig. 3 and 4, in the present embodiment, the bottom of the basket body 1 is provided with a reinforcing component which can be abutted against the wall 14, so that the stability of the basket body 1 in the hovering state can be further improved. The reinforcement assembly in this embodiment includes: the hanging basket comprises guide plates 3, reinforcing rods 31, reinforcing plates 32 and a driving piece, wherein the driving piece is arranged at the bottom of the hanging basket body 1, and the reinforcing rods 31 and the reinforcing plates 32 are arranged at the output end of the driving piece.
In this embodiment, the guide plate 3 is fixed at the bottom of the basket body 1, and is integrally inclined downward, and the guide groove 30 is opened on the guide plate 3, wherein the length direction of the guide groove 30 is consistent with the length direction of the guide plate 3, and the reinforcing rod 31 slides in the guide groove 30, and can slide back and forth along the guide groove 30. The reinforcing plate 32 is fixed at one end of the reinforcing rod 31 far away from the basket body 1, and the surface of the reinforcing plate 32 is parallel to the surface of the wall 14. In addition, the second rubber sheet 321 is arranged on the side of the reinforcing plate 32 far away from the basket body 1, so that the friction force between the reinforcing plate 32 and the wall 14 can be increased, and the stability of the basket body 1 can be improved.
The driving member in this embodiment includes: motor 33, gear 331 and rack 332. Wherein, motor 33 is fixed on the bearing surface of deflector 3, gear 331 is installed on the output shaft of motor 33 through the shaft coupling, rack 332 is fixed on the roof of reinforcement rod 31 and meshes with gear 331.
When the distance between the basket body 1 and the wall 14 needs to be fixed, the motor 33 is turned on, the gear 331 can be driven to rotate, and under the guiding action of the guide plate 3 and the guide groove 30, the rack 332 moves along the length direction of the guide plate 3, so that the reinforcing plate 32 can be attached to the wall 14. At this time, the bottom wall of the basket body 1, the reinforcing rods 31 and the wall 14 form a triangular structure, so that the stability of the basket body 1 in hovering can be improved.
Still set up buffer seat 4 in hanging flower basket body 1 bottom, can slow down hanging flower basket body 1 descending speed to can make and reserve certain clearance between hanging flower basket body 1 and the ground, reduce the broken possibility of reinforcing rod 31 by the extrusion.
The cushion socket 4 in this embodiment includes: buffer 41, buffer rod 42, buffer plate 43 and buffer spring 44, wherein, buffer 41 is vertical to be fixed in hanging flower basket body 1 outer diapire central point department, buffer spring 44 is fixed on the interior roof of buffer 41, in this embodiment, buffer spring 44's extending direction is vertical direction, buffer 42 is fixed in the one end that buffer spring 44 keeps away from buffer 41, and buffer 42 can alternate in buffer 41, buffer 42's length direction is unanimous with buffer 41's length direction, buffer plate 43 is fixed in the one end that buffer 42 kept away from hanging flower basket body 1. In this embodiment, the surface of the buffer plate 43 is parallel to the bottom wall of the basket body 1 to ensure that the recoil force applied when the basket body 1 descends can be stably buffered.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. A hanging flower basket is used in construction of green building outer wall, includes: a basket body (1); hanging lugs (11) arranged at four corners of the top of the hanging basket body (1); and hang and locate hoist cable (12) on hangers (11), its characterized in that, mounting hole (20) have been run through to hanging flower basket body (1) one side level that is close to wall body (14), mounting hole (20) internal thread connection has bracing piece (21), bracing piece (21) are located one end in hanging flower basket body (1) is provided with handle (22), bracing piece (21) are located the outer one end of hanging flower basket body (1) is provided with butt plate (23), hanging flower basket body (1) bottom is provided with the reinforcement subassembly with wall body (14) looks butt, hanging flower basket body (1) bottom is provided with and is used for the buffering cushion socket (4) of hanging flower basket body (1) gravity.
2. The hanging basket for construction of an outer wall of a green building as claimed in claim 1, wherein the reinforcing member comprises: the guide plate (3) is obliquely arranged at the bottom of the hanging basket body (1); a reinforcing rod (31) connected on the bearing surface of the guide plate (3) in a sliding manner; the reinforcing plate (32) is arranged at one end of the reinforcing rod (31) far away from the hanging basket body (1); and the driving piece is arranged on the hanging basket body (1) and used for driving the reinforcing rod (31) to displace along the extension direction of the reinforcing rod (31).
3. The cradle for construction of exterior wall of green building as claimed in claim 2, wherein the driving member comprises: the motor (33) is arranged at the bottom of the hanging basket body (1); a gear (331) provided to an output shaft of the motor (33); and a rack (332) which is arranged on the top wall of the reinforcing rod (31) and is meshed with the gear (331).
4. The hanging basket for the construction of the outer wall of the green building as claimed in claim 1, wherein the mounting holes (20) are arranged on the side wall of the hanging basket body (1) in a quincuncial shape, and support rods (21) are arranged in the mounting holes (20).
5. The cradle for construction of exterior wall of green building as claimed in claim 1, wherein the buffer seat (4) comprises: the buffer sleeve (41) is vertically arranged at the bottom of the hanging basket body (1); a buffer rod (42) inserted in the buffer sleeve (41); the buffer plate (43) is arranged at one end of the buffer rod (42) far away from the hanging basket body (1); and a buffer spring (44) arranged between the buffer rod (42) and the buffer sleeve (41).
6. The hanging basket for the construction of the outer wall of the green building as claimed in claim 1, wherein a shielding cover (24) is arranged on the top of one side of the hanging basket body (1) provided with the supporting rod (21).
7. The hanging basket for the construction of the outer wall of the green building as claimed in claim 6, wherein a fixing block (241) is fixed to the top of one side of the hanging basket body (1) provided with the supporting rod (21), a sliding groove (242) with the length direction consistent with the displacement direction of the supporting rod (21) is formed in the bottom of the shielding cover (24), and the fixing block (241) is connected in the sliding groove (242) in a sliding manner.
8. The hanging basket for the construction of the outer wall of the green building as claimed in claim 2, wherein a first rubber sheet (231) is adhered to one side of the abutting plate (23) far away from the hanging basket body (1), and a second rubber sheet (321) is adhered to one side of the reinforcing plate (32) far away from the hanging basket body (1).
CN202023005552.1U 2020-12-12 2020-12-12 Hanging flower basket is used in construction of green building outer wall Expired - Fee Related CN214302808U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023005552.1U CN214302808U (en) 2020-12-12 2020-12-12 Hanging flower basket is used in construction of green building outer wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023005552.1U CN214302808U (en) 2020-12-12 2020-12-12 Hanging flower basket is used in construction of green building outer wall

Publications (1)

Publication Number Publication Date
CN214302808U true CN214302808U (en) 2021-09-28

Family

ID=77853623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023005552.1U Expired - Fee Related CN214302808U (en) 2020-12-12 2020-12-12 Hanging flower basket is used in construction of green building outer wall

Country Status (1)

Country Link
CN (1) CN214302808U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114165038A (en) * 2021-12-20 2022-03-11 陈双财 Prevent wind hanging flower basket that shakes with high stability
CN116005940A (en) * 2022-12-16 2023-04-25 温州丰成建设有限公司 Building carrying frame and mounting method thereof
CN118108132A (en) * 2024-04-10 2024-05-31 广州市海申机电工程有限公司 Intelligent installation robot for installing air conditioner outdoor unit
CN119221431A (en) * 2024-12-03 2024-12-31 辽宁润泽建设工程有限公司 A supporting and protecting device for dam construction
CN119616188A (en) * 2025-02-11 2025-03-14 福建省工业设备安装有限公司 Hanging basket for roof construction of large-span special-shaped curved surface steel structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114165038A (en) * 2021-12-20 2022-03-11 陈双财 Prevent wind hanging flower basket that shakes with high stability
CN116005940A (en) * 2022-12-16 2023-04-25 温州丰成建设有限公司 Building carrying frame and mounting method thereof
CN118108132A (en) * 2024-04-10 2024-05-31 广州市海申机电工程有限公司 Intelligent installation robot for installing air conditioner outdoor unit
CN119221431A (en) * 2024-12-03 2024-12-31 辽宁润泽建设工程有限公司 A supporting and protecting device for dam construction
CN119616188A (en) * 2025-02-11 2025-03-14 福建省工业设备安装有限公司 Hanging basket for roof construction of large-span special-shaped curved surface steel structure

Similar Documents

Publication Publication Date Title
CN201987468U (en) Counterweight type high-rise window cleaning machine
CN210558941U (en) Lifting device for bridge engineering
CN210177926U (en) Sliding telescopic hanging basket for building external wall construction
CN208899842U (en) A kind of safety hanging basket for construction
CN108185897A (en) A kind of truss-like window cleaning equipment horizontal extension hanging basket
CN112627565B (en) Suspension mechanism of building curtain wall cleaning device and using method thereof
CN215212267U (en) A pull-up hanging basket for construction engineering
CN207609158U (en) A kind of movable altitude job engineering hanging basket
CN212269261U (en) High-safety bridge crane with anti-collision mechanism
CN218561044U (en) A operation platform for installing template
CN214828351U (en) Shockproof connector of hanging basket
CN215254391U (en) Hanging flower basket is used to green building outer wall fitment
CN219118717U (en) Non-counterweight type steel truss inclined-pulling special-shaped hanging basket device
CN219365374U (en) Tool for reinforcing front support arm of hanging basket
CN107386609B (en) A dry hanging device for exterior wall decoration stone and its application
CN212478492U (en) Hanging basket fixing device for curtain wall construction
CN218757249U (en) A platform of encorbelmenting for pier construction
CN214611227U (en) Curtain wall and light building material lifting machine
CN201923813U (en) Swinging-arm type lifting machine
CN210636779U (en) Protective hanging basket for high-altitude operation
CN212561213U (en) Railway pier top surrounding hanging basket safe operation platform
CN210055870U (en) Glass curtain wall washs hanging flower basket
CN221318948U (en) Tower crane hook with high stability
CN216737493U (en) Winch for construction engineering hanging basket
CN220203362U (en) Stable hanging basket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210928