CN110080246A - A kind of construction method of subway station occlusion fender post - Google Patents
A kind of construction method of subway station occlusion fender post Download PDFInfo
- Publication number
- CN110080246A CN110080246A CN201910403388.2A CN201910403388A CN110080246A CN 110080246 A CN110080246 A CN 110080246A CN 201910403388 A CN201910403388 A CN 201910403388A CN 110080246 A CN110080246 A CN 110080246A
- Authority
- CN
- China
- Prior art keywords
- ontology
- noumenon
- occlusion
- fender post
- connection ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of construction methods of subway station occlusion fender post, are related to the construction method of fender post, the main points of its technical scheme are that: include the following steps, step 1: scribing line;Step 2: leading wall production;Step 3: drilling pours, the production method for leading wall is first to dig guide wall, simultaneously fixed form is put in guide wall, and in the assembling reinforcement of template two sides, then the casting concrete on reinforcing bar, the template includes the first noumenon, second ontology adjacent with the first noumenon, the third ontology opposite with the first noumenon, it is provided with the connector for being detachably fixed connection the first noumenon and the second ontology between the first noumenon and the second ontology, the alignment component for being aligned the first noumenon Yu third ontology is provided on the first noumenon and the third ontology.The present invention is by template the advantages of facilitating installation to improve construction efficiency.
Description
Technical field
The present invention relates to the construction method of fender post, in particular to a kind of construction method of subway station occlusion fender post.
Background technique
Subway station is built, the construction method of existing foundation pit are as follows: will need generally all in underground so needing to carry out foundation pit digging
The position digged pit carries out scribing operation, fender post is poured on foundation pit periphery, outside the landslide or foundation pit for preventing foundation pit side-wall
Infiltration inside lateral foundation pit.
In order to improve the intensity of fender post, a kind of existing occlusion fender post allows two neighboring concrete column to be formed irregular
Occlusive state improves the support strength of fender post.
The construction method of existing occlusion fender post are as follows: template is fixed on the ground, then pours and leads on the outside of template
Wall drills in the portion within the walls that leads, and two adjacent drillings intersect, and alternately casting concrete stake, allows adjacent in drilling
Two concrete-piles be mutually twisted, formed interlocking pile, improve the intensity of fender post.
Above-mentioned the shortcomings of the prior art is: pour lead wall during, need using template, existing skill
Template in art includes the plate body of arc and the support bracket for connecting opposite two plate bodys and adjacent plate body, plate body are
Metal is made, and quality is larger, due to being that bolt is fixedly connected between support bracket and plate body, dismounts or carry inconvenience, in turn
Influence construction efficiency.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to: a kind of occlusion fender post in subway station is provided
Construction method, by using easy disassembly template so that improve construction efficiency the advantages of.
Above-mentioned technical purpose is achieved through the following technical solutions, a kind of construction party of subway station occlusion fender post
Method includes the following steps, step 1: scribing line;Step 2: leading wall production;Step 3: drilling pours, the production method for leading wall is
Guide wall is first dug, simultaneously fixed form is put in guide wall, and in the assembling reinforcement of template two sides, is then poured on reinforcing bar mixed
Solidifying soil, the template include the first noumenon, second ontology adjacent with the first noumenon, the third ontology opposite with the first noumenon,
The connection for being detachably fixed connection the first noumenon and the second ontology is provided between the first noumenon and the second ontology
The alignment component for being aligned the first noumenon Yu third ontology is provided on part, the first noumenon and the third ontology.
Construction can be allowed more accurate through the above technical solutions, first carrying out scribing line, the production for leading wall can facilitate drilling
The use of mechanical equipment in casting process, mechanical equipment operates on leading wall can be reduced borehole sidewall in boring procedure and is set by machinery
The standby risk for rolling landslide, can more accurately the position of drilling be drawn a circle to approve by leading wall by template construct, allow lead wall according to
Scheduled shape is poured.The first noumenon and the second ontology are detachably connected by template by connector, facilitate template
Transport, installation and disassembly, and then reduce transport and installation time, so as to improve construction efficiency.
Further, the connector includes being fixedly connected on the first noumenon close to the first connection ring of the second ontology side
And it is fixedly connected on second connection ring of second ontology close to the first noumenon side, pass through first connection ring and described
Second connection ring is plugged with connecting rod, and connector further includes for the first connection ring and the second connection ring to be fixed on connecting rod
Plugboard.
Through the above technical solutions, connecting rod, which is inserted into connection ring, to connect the first noumenon and the second ontology
It connects, by plugboard that the first noumenon and the second ontology fixed operation is convenient, the mode of grafting can allow connection more convenient,
When dismantling template, it is only necessary to extract connecting rod out of the first connection ring and the second connection ring after extracting plugboard
The first noumenon is separated with the second ontology, it is easy to operate.
Further, it is fixedly connected in connecting rod in the middle part of the plugboard, the plugboard two sides are plugged on the respectively
On one ontology and the second ontology.
Through the above technical solutions, the positional relationship of the fixed two neighboring stencil body of connecting rod, it can by plugboard
Fix the relative angle of two stencil bodies, it is only necessary to which the fixation of two templates of operation can be completed in Plug Action, easy to operate.
Further, the application method of connector are as follows: the first noumenon and the second ontology are placed in guide wall, by first
Connection ring is opposite with the annular distance of the second connection ring to sequentially pass through the first connection ring and the second connection ring for connecting rod afterwards, and will insert
Fishplate bar is inserted into the first noumenon and the second ontology.
Through the above technical solutions, capableing of the fixation of more convenient pair of body position.
Further, the alignment component include be respectively fixedly connected on the first noumenon and third ontology to penetrating laser
Sensor includes being fixed on the first noumenon close to the transmitting terminal of third ontology side and being fixed on third to laser sensor is penetrated
Ontology is electrically connected with indicator light on the receiving end of the first noumenon side, laser-correlation sensor.
Through the above technical solutions, can determine the first noumenon and third ontology face when opposite type sensor face, it can
Facilitate the position of determining third ontology, in operating process, the line of demarcation that first step generates to the layout line put the first noumenon and
Third ontology, by penetrate laser sensor can facilitate to third body position relationship determine operation it is more convenient, more
Precisely, it can conveniently see whether that laser sensor is aligned by the setting of indicator light.
Further, the alignment component includes two pairs to penetrating laser sensor altogether, and is electrically connected with indicator light.
Through the above technical solutions, separate according to what two points make a line, one is not accurate enough to the setting of laser sensor,
Two laser sensors are aligned to illustrate the first noumenon and third ontology face, can be more accurate judge
And adjustment.
Further, the spacing for measuring the first noumenon Yu third ontology is provided between the first noumenon and third ontology
From measuring piece.
Through the above technical solutions, by the setting of measuring piece can control between the first noumenon and third ontology away from
From, and then control and lead the distance between wall and drilling, it is more convenient during drilling construction.
Further, the measuring piece includes the casing being rotatably connected on the first noumenon, and is rotatably connected on second
Ontology and the scale bar being inserted on the first noumenon.
Through the above technical solutions, scale bar is inserted into casing, after then the first noumenon and third ontology are well placed,
Adjusting the distance between the first noumenon and third ontology can be facilitated by observing scale bar, it is easy to operate.
The present invention has following technical effect that in summary
1, the transport of template can be facilitated by being detachably connected for template, be made since template is generally metal, transport and
Carrying needs manpower or material resources relatively more, can facilitate the carrying of template by the card disassembly of template, during wall is led in production
It can accelerate construction progress;
2, by the way that connector is arranged to connecting rod and plugboard, it is only necessary to which connecting rod is inserted into the first connection ring and second
In connection ring, and plugboard is inserted into two adjacent templates to the grafting that two neighboring plugboard can be completed, construction is more
It is easy, it is convenient for disassembly and assembly.
Detailed description of the invention
Fig. 1 is the positional diagram of the laser-correlation sensor in embodiment 1;
Fig. 2 is the configuration state schematic diagram of multiple arcs template splicing together in embodiment 1;
Fig. 3 is in embodiment 1 to penetrating laser sensor positional diagram;
Fig. 4 is the circuit diagram of the laser sensor and indicator light in embodiment 1;
Fig. 5 is the positional diagram of the mixed stake and plain stake in embodiment 1.
Appended drawing reference: 1, the first noumenon;10, the first connection ring;11, the first transmitting terminal;12, the second receiving end;13, first
Indicator light;2, the second ontology;20, the second connection ring;3, third ontology;30, the first receiving end;31, the second transmitting terminal;32,
Two indicator lights;4, connecting rod;5, plugboard;50, embedded groove;6, connecting column;60, fixing glue;61, winding pin;610, fixed plate;
611, kinking bar;612, barrier plate;7, filament;8, measuring piece;80, casing;81, scale bar;82, jackscrew.
Specific embodiment
A kind of embodiment 1, construction method of subway station occlusion fender post, includes the following steps:
The first step, scribing line.
In the present embodiment, scribing operation step are as follows: the place cleaning in the earth's surface for digging foundation pit in advance, and base is planned in ground on the scene
Hole digs the position built needed for position and fender post, and crosses on a predetermined position, has surely in four apexes of foundation pit
Connecting column 6 fastens filament 7 on connecting column 6, and filament 7 is allowed successively around four connecting columns 6, to form four and suspend on the ground
Dividing line, be the position that fender post is digged pit inside line of demarcation.
Connecting column 6 includes the fixing glue 60 of grafting on the ground, and is fixed on winding pin of the fixing glue 60 far from ground
61, winding pin 61 includes being fixed on the fixed plate 610 of separate ground one end in fixing glue 60, being fixed on twining in fixed plate 610
Line bar 611 and the barrier plate 612 for being fixed on separate 60 one end of fixing glue on kinking bar 611, filament 7 are wrapped in kinking bar 611
On, filament 7 is fixed plate 610 and barrier plate 612 limits movement position, makes scribing line more accurate.
The position of fender post is planned in advance on foundation pit periphery, and the periphery of fender post is divided with above-mentioned hatched manner and is demarcated
Line.
It is preset in the line of demarcation periphery in fender post predetermined position and leads wall displacement, crossed, the profile for leading wall is provided
Cut-off rule.
Second step leads wall production.
Lead the operating procedure of wall production are as follows: cleared up on the ground for leading wall displacement, lead wall leading wall predeterminated position and digging
Slot, the assembling reinforcement in guide wall, and template is put in scheduled position, the hole spacing of template and fender post is in 15-25CM
Between, 20CM is set as in the present embodiment.
Referring to Fig.1, template includes multiple arcs stencil body arranged side by side, two neighboring arc formwork in the present embodiment
Ontology is respectively designated as the first noumenon 1 and the second ontology 2, and the first noumenon 1 is fixedly connected with close to 2 a side of the second ontology
One connection ring 10, the second ontology 2 are fixedly connected with the second connection ring 20 close to 1 a side of the first noumenon, the first connection ring 10
One end of axis direction is bonded with one end of 20 axis direction of the second connection ring, passes through the first connection ring 10 and the second connection ring 20
It is plugged with connecting rod 4,4 top of connecting rod is extended with plugboard 5 to two sides, and plugboard 5 is located at the first noumenon 1 and the second ontology
Above 2, the embedded groove 50 for the first noumenon 1 and the insertion of the second ontology 2 is offered on plugboard 5.
In conjunction with Fig. 2, Fig. 3, the template of the side opposite with 1 second ontology 2 of the first noumenon is named as third ontology 3, and two
The alignment component for being aligned the first noumenon 1 Yu third ontology 3 is fixed on opposite arc formwork ontology, alignment component includes
Two pairs of laser sensors, laser sensor include transmitting terminal and receiving end, be fixed on the first noumenon 1 first transmitting terminal 11 with
And second receiving end 12, first receiving end 30 opposite with the first transmitting terminal 11 is fixedly connected on third ontology 3 and with
The first opposite transmitting terminal 11 of two receiving ends 12.The triggering of sensor when transmitting terminal is radiated at receiving end.
It is fixedly connected to indicator light on the first noumenon 1 and third ontology 3, the indicator light on the first noumenon 1 is the first finger
Showing lamp 13, the indicator light on the second ontology 2 is the second indicator light 32, when the first transmitting terminal 11 is radiated at the first receiving end 30,
First indicator light 13 is bright, and when the second transmitting terminal 31 is radiated at the second receiving end 12, the second indicator light 32 is bright.
Two identical to the circuit structure for penetrating laser sensor, referring to Fig. 4, is in series with the first amplification on the first receiving end 30
Triode T, the base stage of the first amplifying triode T are connected on the first receiving end 30, and the reflection of the first amplifying triode is connected
On the first indicator light 13.
After the first noumenon 1 and the second ontology 2 are put according to line of demarcation, fine tuning the first noumenon 1 is opposite with the second ontology 2
First transmitting terminal 11 is radiated on the first receiving end 30 by position, and the second transmitting terminal 31 is radiated on the second receiving end 12, until
First indicator light 13 and the second indicator light 32 are all bright, illustrate the first noumenon 1 and the second ontology 2 face.
It is provided between the first noumenon 1 and the second ontology 2 for measuring distance between the first noumenon 1 and the second ontology 2
Measuring piece 8, measuring piece 8 is including being fixed on the first noumenon 1 and perpendicular to the casing of the first noumenon 1 80, and is fixed on third sheet
Scale bar 81 on body 3 is plugged in casing 80 far from 3 one end of third ontology, is threaded on casing 80 and is connected to scale bar
Jackscrew 82 on 81.
In the outside casting concrete of arc formwork ontology, formation leads wall, then again removes arc formwork ontology.
The method for removing arc formwork are as follows: take out connecting rod 4 out of the first connection ring 10 and the second connection ring 20, i.e.,
Two adjacent arc formwork ontologies are separated, it is convenient to remove, the arc formwork ontology relative to integrally connected, it is not easy to destroy
Lead wall.
Third step, drilling.
The method of drilling is, first by form removable, to be then opened in pipe rubbing machine and lead on wall, and in divided wire tag
Good position drills.
Referring to Fig. 5, fender post includes mixed stake and plain stake, and mixed stake is arranged alternately with plain stake, and A1, A2, A3, A4 are mixed in figure
Stake, B1, B2, B3, B4 are plain stake, and when drilling, then the drilling of subdrilling two plain stakes carries out pouring plain stake with super slow concrete,
The setting time of super slow concrete was needed more than 60 hours, then dug the drilling of mixed stake with pipe rubbing machine between two plain stakes, so
After work out rebar cylinder mould, rebar cylinder mould is lifted in the drilling of mixed stake, then the casting concrete in the drilling of mixed stake, is completed
Mixed stake pours, and then digs the drilling of next plain stake, and is poured, and mixed stake is allowed alternately and to be mutually twisted with element stake.
Complete pouring for interlocking pile.
Embodiment 2, the difference of the present embodiment and embodiment 1 are as follows: in the first step, the operation of scribing line is on the ground
Separator bar is drawn in soft ground with the objects such as pen or reinforcing bar or branch, and practical reinforcing bar is selected to carry out on ground in the present embodiment
Upper scribing line.
Embodiment 3, the present embodiment difference from example 1 is that:
In second step, the first noumenon 1 is fixedly connected with the second ontology 2, and the first noumenon 1 is fixedly connected with third ontology 3, when installation
The first noumenon 1 and the second ontology 2 are fixed to each other, and are placed in guide wall.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this
All by the protection of Patent Law in the scope of the claims of invention.
Claims (8)
1. a kind of construction method of subway station occlusion fender post, includes the following steps, step 1: scribing line;Step 2: the wall system of leading
Make;Step 3: drilling pours, it is characterised in that: the production method for leading wall is first to dig guide wall, is put in guide wall and solid
Solid plate, and in the assembling reinforcement of template two sides, the then casting concrete on reinforcing bar, the template include the first noumenon (1), with
Adjacent the second ontology (2) of the first noumenon (1), with the first noumenon (1) opposite third ontology (3), the first noumenon (1) with
The connector for being detachably fixed connection the first noumenon (1) and the second ontology (2), institute are provided between second ontology (2)
It states and is provided on the first noumenon (1) and the third ontology (3) for being aligned being aligned for the first noumenon (1) and third ontology (3)
Component.
2. a kind of construction method of subway station occlusion fender post according to claim 1, it is characterised in that: the connection
Part includes being fixedly connected on the first noumenon (1) close to first connection ring (10) of the second ontology (2) side and being fixedly connected on
Second ontology (2) passes through first connection ring (10) and described close to second connection ring (20) of the first noumenon (1) side
Second connection ring (20) is plugged with connecting rod (4), and connector further includes for by the first connection ring (10) and the second connection ring
(20) plugboard (5) being fixed on connecting rod (4).
3. a kind of construction method of subway station occlusion fender post according to claim 2, it is characterised in that: the grafting
It is fixedly connected on connecting rod (4) in the middle part of plate (5), plugboard (5) two sides are plugged on the first noumenon (1) and second respectively
On ontology (2).
4. a kind of construction method of subway station occlusion fender post according to claim 3, it is characterised in that: connector
Application method are as follows: the first noumenon (1) and the second ontology (2) is placed in guide wall, the first connection ring (10) are connected with second
Connecting rod (4) is sequentially passed through the first connection ring (10) and the second connection ring (20) afterwards relatively by the annular distance for connecing ring (20), and will
Plugboard (5) is inserted into the first noumenon (1) and the second ontology (2).
5. a kind of construction method of subway station occlusion fender post according to claim 2, it is characterised in that: the alignment
Component include be respectively fixedly connected on the first noumenon (1) and third ontology (3) to penetrating laser sensor, to penetrating laser sensing
Device includes being fixed on the first noumenon (1) close to the transmitting terminal of third ontology (3) side and being fixed on third ontology (3) close to the
The receiving end of one ontology (1) side is electrically connected with indicator light on laser-correlation sensor.
6. a kind of construction method of subway station occlusion fender post according to claim 5, it is characterised in that: the alignment
Component includes two pairs to penetrating laser sensor altogether, and is electrically connected with indicator light.
7. a kind of construction method of subway station occlusion fender post according to claim 1, it is characterised in that: the first noumenon
(1) measuring piece for measuring distance between the first noumenon (1) and third ontology (3) is provided between third ontology (3)
(8)。
8. a kind of construction method of subway station occlusion fender post according to claim 7, it is characterised in that: the measurement
Part (8) includes the casing (80) that is rotatably connected on the first noumenon (1), and is rotatably connected on the second ontology (2) and insertion the
Scale bar (81) on one ontology (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910403388.2A CN110080246B (en) | 2019-05-15 | 2019-05-15 | Construction method of interlocking fender post of subway station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910403388.2A CN110080246B (en) | 2019-05-15 | 2019-05-15 | Construction method of interlocking fender post of subway station |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110080246A true CN110080246A (en) | 2019-08-02 |
CN110080246B CN110080246B (en) | 2021-04-13 |
Family
ID=67420331
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910403388.2A Active CN110080246B (en) | 2019-05-15 | 2019-05-15 | Construction method of interlocking fender post of subway station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110080246B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111395344A (en) * | 2020-03-25 | 2020-07-10 | 中国一冶集团有限公司 | Reusable secant pile positioning device and construction method |
CN113309364A (en) * | 2021-04-14 | 2021-08-27 | 黄康 | Assembled wallboard reinforcing bar is to hole device with correct function |
CN113653031A (en) * | 2021-09-08 | 2021-11-16 | 中建八局第二建设有限公司 | Occlusive pile guide wall template and formwork structure construction method |
CN113832963A (en) * | 2021-11-02 | 2021-12-24 | 中建八局第二建设有限公司 | Occlusive pile guide wall template and formwork structure construction method |
CN114518076A (en) * | 2022-02-17 | 2022-05-20 | 中建八局第二建设有限公司 | On-site quality detection device based on 3D (three-dimensional) picture and detection method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102962884A (en) * | 2012-11-18 | 2013-03-13 | 李鹏 | Concrete formwork |
CN205976458U (en) * | 2016-08-18 | 2017-02-22 | 江苏华维新能源有限公司 | Building templates parallels mosaic structure |
KR20170111300A (en) * | 2016-03-26 | 2017-10-12 | (주)삼호언더폼이엔지 | Form Panel with Sub-panel for Form Removal |
CN207079926U (en) * | 2017-08-29 | 2018-03-09 | 北京城建北方建设有限责任公司 | A kind of wall column formwork structure for being easy to align |
CN207633756U (en) * | 2017-05-12 | 2018-07-20 | 中启胶建集团有限公司 | A kind of angle and the adjustable building internal corner template of length |
CN207920062U (en) * | 2017-12-27 | 2018-09-28 | 上海三凯建设管理咨询有限公司 | A kind of spliced template in construction |
CN109469045A (en) * | 2018-12-12 | 2019-03-15 | 上海建工七建集团有限公司 | Guide wall of occlusive pile template, guide wall of occlusive pile formwork erecting structure and construction technology |
-
2019
- 2019-05-15 CN CN201910403388.2A patent/CN110080246B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102962884A (en) * | 2012-11-18 | 2013-03-13 | 李鹏 | Concrete formwork |
KR20170111300A (en) * | 2016-03-26 | 2017-10-12 | (주)삼호언더폼이엔지 | Form Panel with Sub-panel for Form Removal |
CN205976458U (en) * | 2016-08-18 | 2017-02-22 | 江苏华维新能源有限公司 | Building templates parallels mosaic structure |
CN207633756U (en) * | 2017-05-12 | 2018-07-20 | 中启胶建集团有限公司 | A kind of angle and the adjustable building internal corner template of length |
CN207079926U (en) * | 2017-08-29 | 2018-03-09 | 北京城建北方建设有限责任公司 | A kind of wall column formwork structure for being easy to align |
CN207920062U (en) * | 2017-12-27 | 2018-09-28 | 上海三凯建设管理咨询有限公司 | A kind of spliced template in construction |
CN109469045A (en) * | 2018-12-12 | 2019-03-15 | 上海建工七建集团有限公司 | Guide wall of occlusive pile template, guide wall of occlusive pile formwork erecting structure and construction technology |
Non-Patent Citations (1)
Title |
---|
江苏省建设工程质量监督总站,南京市轨道交通建设工程质量安全监督站: "《城市轨道交通工程质量监督实务》", 30 November 2017 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111395344A (en) * | 2020-03-25 | 2020-07-10 | 中国一冶集团有限公司 | Reusable secant pile positioning device and construction method |
CN113309364A (en) * | 2021-04-14 | 2021-08-27 | 黄康 | Assembled wallboard reinforcing bar is to hole device with correct function |
CN113653031A (en) * | 2021-09-08 | 2021-11-16 | 中建八局第二建设有限公司 | Occlusive pile guide wall template and formwork structure construction method |
CN113832963A (en) * | 2021-11-02 | 2021-12-24 | 中建八局第二建设有限公司 | Occlusive pile guide wall template and formwork structure construction method |
CN113832963B (en) * | 2021-11-02 | 2022-10-11 | 中建八局第二建设有限公司 | Occlusive pile guide wall template and formwork structure construction method |
CN114518076A (en) * | 2022-02-17 | 2022-05-20 | 中建八局第二建设有限公司 | On-site quality detection device based on 3D (three-dimensional) picture and detection method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN110080246B (en) | 2021-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110080246A (en) | A kind of construction method of subway station occlusion fender post | |
CN104895092B (en) | The method that a kind of interim lattice column of inner support is used as permanent structure post | |
CN109629455A (en) | The construction method of highway reconstruction bridge | |
CN103292035A (en) | Construction method of underground pipe jacking | |
CN103438820A (en) | Borehole profile rock and soil mass layered deformation optical fiber measuring method | |
CN109555116A (en) | A kind of high density karst intense development area fully-sleeved filled pile construction method | |
CN205776339U (en) | Both arms Retaining Wall | |
CN112900450A (en) | Rotary drilling and full-rotation combined back-inserting method positioning method for steel pipe structure pile by reverse construction method | |
CN107246007B (en) | A kind of CFG of construction method | |
CN102912806B (en) | A kind of construction method of dewatering well | |
CN100482993C (en) | Lay out method of pipeline and synthetic pipeline with pipe frame component | |
CN110080245A (en) | A kind of construction method of subway station entrance fender post | |
CN105041348B (en) | A kind of underground space tunneling construction method of use compound roof | |
CN204040021U (en) | Large diameter pile construction equipment system in city underground engineering tunneling pilot tunnel | |
CN112814685A (en) | Ultra-large section chamber tunneling blasting method | |
CN217298858U (en) | Datum point fixing device for settlement monitoring | |
CN109208586A (en) | A kind of slope protection pile construction method | |
CN108943368A (en) | A kind of beam making bench construction method and box beam prefabricated factory construction method | |
CN214583185U (en) | Highway is reformed transform and is expanded fill road bed section and subsides monitoring devices | |
CN113863954A (en) | Double-layer lining large-diameter shield tunnel segment health monitoring arrangement method | |
CN108978645A (en) | Rich water sandy gravel shallow embedding riverbed uplift pile anti-floating plate reinforced construction method is worn under shield | |
CN109083132A (en) | A kind of Composite Bolt stake and its construction technology | |
CN112359819B (en) | Wall structure construction method for increasing depth of old diaphragm wall | |
CN218865211U (en) | Underground water level measuring device | |
CN219157405U (en) | Suspension bridge prestressed steel stranded wire rock Kong Maoding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |