CN102962884A - Concrete formwork - Google Patents

Concrete formwork Download PDF

Info

Publication number
CN102962884A
CN102962884A CN2012104635974A CN201210463597A CN102962884A CN 102962884 A CN102962884 A CN 102962884A CN 2012104635974 A CN2012104635974 A CN 2012104635974A CN 201210463597 A CN201210463597 A CN 201210463597A CN 102962884 A CN102962884 A CN 102962884A
Authority
CN
China
Prior art keywords
formwork
adapter sleeve
template body
bodies
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012104635974A
Other languages
Chinese (zh)
Inventor
李鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2012104635974A priority Critical patent/CN102962884A/en
Publication of CN102962884A publication Critical patent/CN102962884A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a formwork for producing concrete precast elements, which has the advantages of no need of auxiliary materials and convenience and quickness in construction. The formwork comprises formwork bodies, wherein a side face of each formwork body is provided with a connecting hook, and another opposite side face is provided with a connecting sleeve at a symmetric position; and when more than two formwork bodies are combined, the connecting hooks on the formwork bodies are penetrated into the connecting sleeves on adjacent formwork bodies and are movably matched with the connecting sleeves to form an integral structure. When a plurality of formworks are combined into a cavity, only the connecting hooks of previous formworks are required to be inserted into the connecting sleeves of next formworks in sequence so as to finish connection. The distance that the connecting hooks extend into the connecting sleeves is properly adjusted, so that the included angle of two adjacent formwork bodies reaches the set requirement, and the requirements of various concrete precast elements of different sectional shapes are met.

Description

A kind of concrete blinding
Technical field
The present invention relates to a kind of template of producing precast concrete.
Background technology
Along with the raising of production efficiency, use the situation of precast concrete more and more in building trade.The various fixed forms of main employing are fixed into the shape that needs with template now, after concrete setting, fixture are removed again.The fixture that adopts now mostly is greatly timber, will discard after using repeatedly, not only wastes resource, also causes production cost to improve, and wastes time and energy in the time of fixedly, and efficient is lower.
Summary of the invention
The purpose of this invention is to provide a kind of template that does not need auxiliary material and structure mould conveniently to produce precast concrete.
Technical scheme of the present invention is: comprise the template body, template body one side is provided with to connect and colludes, the symmetric position of another opposite flank is provided with adapter sleeve, when the template body more than two makes up, connection on the template body is colluded in the adapter sleeve that penetrates on the adjacent forms body, and cooperates and be integrally formed structure with adapter sleeve is movable.
Described connection is colluded and is that arc-shaped rack, tooth section are positioned on the arc-shaped rack side towards the center of circle, connects to collude an end and be provided with connecting plate, and crown tilts to the connecting plate direction.
Described adapter sleeve is the arc shrouds corresponding with connecting hook-shaped shape, one side is provided with opening to sleeve pipe to the center of circle, and sleeve pipe is provided with locating dowel and limited post, and spring is contained on the locating dowel, one end of spring is arranged in opening, the other end be stuck between limited post and the locating dowel and with the limited post Elastic Contact.
Because template body both sides are respectively equipped with to connect and collude and adapter sleeve among the present invention, when the polylith form assembly is consisted of die cavity, only need successively the connection of upper piece template is colluded in the adapter sleeve that inserts lower piece template, can finish connection.Suitably adjust to connect and colludes the distance that enters adapter sleeve, make the angle of adjacent two template bodies reach the setting requirement, satisfy the needs of various precast concretes without cross sectional shape.
Description of drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 connects the structural representation that colludes among Fig. 1.
Fig. 3 is the structural representation of adapter sleeve among Fig. 1.
Fig. 4 connects the schematic diagram that cooperates that colludes with adapter sleeve among the present invention.
The specific embodiment
Below in conjunction with drawings and Examples the present invention is described in further detail, but does not consist of any limitation of the invention.Shown in Figure 1, the present invention includes template body 1, template body 1 one sides are provided with to connect colludes 2, the symmetric position of another opposite flank is provided with adapter sleeve 3, when the template body 1 more than two makes up, connection on the template body 1 is colluded in 2 adapter sleeves 3 that penetrate on the adjacent forms body 1, and cooperates and be integrally formed structure with adapter sleeve 3 is movable.Shown in Figure 2, described connection colludes 2 for arc-shaped rack, and tooth section is positioned on the arc-shaped rack towards a side in the center of circle, connects to collude 2 one ends and be provided with connecting plate, and crown tilts to the connecting plate direction.Fig. 3 shows, described adapter sleeve 3 is for to collude the corresponding arc shrouds of 2 shapes with connection, one side is provided with opening to sleeve pipe to the center of circle, sleeve pipe is provided with locating dowel 6 and limited post 5, spring 4 is contained on the locating dowel 6, one end of spring 4 is arranged in opening, the other end be stuck between limited post 5 and the locating dowel 6 and with limited post 5 Elastic Contact.Shown in Figure 4, collude 2 and be isocentric circular arc with adapter sleeve 3 owing to connect, when being contained on the template body 1, all take the interior arris of template body 1 as the center of circle, therefore, can form angle between two adjacent forms bodies 1, this angle colludes the different angle that how much forms of 2 screw-in adapter sleeves 3 by connection.Connect that to collude 2 crown be to tilt to the connecting plate direction, and spring 4 one side pressures are in the opening of adapter sleeve 3, also are embedded in the connection that is exposed in the opening simultaneously and collude in 2 the tooth root, therefore, connection colludes 2 can only back down spring 4 to the in other words insertion of adapter sleeve 3 directions screw-in by external force, and can not automatically withdraw from.Regulate in this way the angle of two adjacent template bodies 1, and reach the function of self-locking.When needs separate two template bodies 1, with pushing down spring 4 back pressure of tooth root, make spring 4 away from tooth root, collude the 2 unfettered adapter sleeves 3 of pulling out thereby make to connect, reach the purpose of separating template body 1.

Claims (3)

1. concrete blinding, comprise template body (1), it is characterized in that: template body (1) one side is provided with to connect colludes (2), the symmetric position of another opposite flank is provided with adapter sleeve (3), when the template body (1) more than two makes up, connection on the template body (1) is colluded (2) and is cooperated with adapter sleeve (3) on the adjacent forms body (1), is integrally formed structure.
2. concrete blinding according to claim 1 is characterized in that: described connection is colluded (2) and is arc-shaped rack, and tooth section is positioned on the arc-shaped rack towards a side in the center of circle, connects to collude (2) one ends and be provided with connecting plate, and crown tilts to the connecting plate direction.
3. concrete blinding according to claim 1, it is characterized in that: described adapter sleeve (3) is for colluding the corresponding arc shrouds of (2) shape with connection, one side is provided with opening to this sleeve pipe to the center of circle, sleeve pipe is provided with locating dowel (6) and limited post (5), spring (4) is contained on the locating dowel (6), one end of spring (4) is arranged in opening, the other end be stuck between limited post (5) and the locating dowel (6) and with limited post (5) Elastic Contact.
CN2012104635974A 2012-11-18 2012-11-18 Concrete formwork Pending CN102962884A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012104635974A CN102962884A (en) 2012-11-18 2012-11-18 Concrete formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012104635974A CN102962884A (en) 2012-11-18 2012-11-18 Concrete formwork

Publications (1)

Publication Number Publication Date
CN102962884A true CN102962884A (en) 2013-03-13

Family

ID=47793466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012104635974A Pending CN102962884A (en) 2012-11-18 2012-11-18 Concrete formwork

Country Status (1)

Country Link
CN (1) CN102962884A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150524A (en) * 2016-08-20 2016-11-23 中铁十九局集团第工程有限公司 A kind of device producing tunnel water handling non-fine concrete building block
CN110080246A (en) * 2019-05-15 2019-08-02 广州穗岩土木科技股份有限公司 A kind of construction method of subway station occlusion fender post

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1339223A1 (en) * 1985-12-25 1987-09-23 Всесоюзный научно-исследовательский институт организации и механизации шахтного строительства Device for joining opposing boards of forms
US5328146A (en) * 1993-02-02 1994-07-12 Lin Tai Yuan Clamping device for mold boards
CN2825829Y (en) * 2005-09-27 2006-10-11 北京中建柏利工程技术发展有限公司 Template clamp
CN202500336U (en) * 2011-12-26 2012-10-24 中国十七冶集团有限公司 Tooth clasping steel moulding plate fixing fixture
CN202910973U (en) * 2012-11-18 2013-05-01 李鹏 Concrete formwork

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1339223A1 (en) * 1985-12-25 1987-09-23 Всесоюзный научно-исследовательский институт организации и механизации шахтного строительства Device for joining opposing boards of forms
US5328146A (en) * 1993-02-02 1994-07-12 Lin Tai Yuan Clamping device for mold boards
CN2825829Y (en) * 2005-09-27 2006-10-11 北京中建柏利工程技术发展有限公司 Template clamp
CN202500336U (en) * 2011-12-26 2012-10-24 中国十七冶集团有限公司 Tooth clasping steel moulding plate fixing fixture
CN202910973U (en) * 2012-11-18 2013-05-01 李鹏 Concrete formwork

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106150524A (en) * 2016-08-20 2016-11-23 中铁十九局集团第工程有限公司 A kind of device producing tunnel water handling non-fine concrete building block
CN110080246A (en) * 2019-05-15 2019-08-02 广州穗岩土木科技股份有限公司 A kind of construction method of subway station occlusion fender post

Similar Documents

Publication Publication Date Title
CN204492190U (en) Aluminum alloy mould plate back cord fastening devices
CN204850442U (en) A arc formwork for special -shaped beam column node
CN203808265U (en) Blocking structure for small reserved opening members of floor
CN102031868A (en) Building construction erecting formwork
CN102962884A (en) Concrete formwork
CN202910973U (en) Concrete formwork
CN205063032U (en) Wall connection node structure
CN204402030U (en) A kind of oval door opening concrete wall template
CN202910974U (en) Connecting device
CN205036077U (en) Shear force wall formwork support suitable for narrow and small space usage
CN102962886A (en) Connecting device
CN203905326U (en) Construction form for construction of roof exhaust pipe piers
CN202031252U (en) Cushion block for steel wire mesh or steel wire mesh frame
CN207920082U (en) A kind of magnetic-type engineering pipeline reserved opening assembling die
CN207920080U (en) A kind of engineering pipeline reserved opening assembling die
CN103031931B (en) Arc-shaped structure roof flashing construction tool and method
CN201495750U (en) Wall brick sticking tool for buildings
CN207920081U (en) A kind of adjustable size engineering pipeline reserved opening assembling die
CN203716395U (en) T-shaped outer wallboard for assembling integrated shear wall
CN203004049U (en) Demoulding device
CN103029205B (en) Movable in-row template
CN204081080U (en) The syndeton of a kind of precast plate and main structure body
CN204826290U (en) Novel prefabricated steel pipe concrete restraint slab board shear force wall
CN204343666U (en) Roof plate template bearer combined structure
CN219153285U (en) Cement prefabricated thin-wall component

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130313