CN110067379A CN201910468272.7A CN201910468272A CN110067379A CN 110067379 A CN110067379 A CN 110067379A CN 201910468272 A CN201910468272 A CN 201910468272A CN 110067379 A CN110067379 A CN 110067379A
Authority
CN
China
Prior art keywords
hopper
baffle
column
construction
constructional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910468272.7A
Other languages
Chinese (zh)
Inventor
顾超
邵志华
施德忠
刘波
杨剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Sijian Construction Group Co Ltd
Original Assignee
Nantong Sijian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Sijian Construction Group Co Ltd filed Critical Nantong Sijian Construction Group Co Ltd
Priority to CN201910468272.7A priority Critical patent/CN110067379A/en
Publication of CN110067379A publication Critical patent/CN110067379A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/08Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/002Workplatforms, railings; Arrangements for pouring concrete, attached to the form

Abstract

The invention discloses a kind of constructional columns to pour tool and constructional column casting method, and it includes the first baffle for being removably mounted on construction column template, being used to form the hopper for pouring mouth and capable of moving between construction column template and hopper that wherein constructional column, which pours tool,.It is arranged such, operating personnel passes through hopper to concrete perfusion on the inside of construction column template, a period of time is stood after the completion of concreting, it is inserted into first baffle immediately, concrete extra in hopper and constructional column are separated, it removes hopper and is transferred to next place to be onstructed, extra concrete clout can be collected and be utilized again simultaneously, material is neither wasted in this way, bracket structure will not be formed, greatly accelerate construction efficiency, it ensure that concrete pouring quality, reduce the artificial expenditure that the later period cuts and repair, it solves constructional column in the prior art and pours a mouthful formed by integrally casting molding and generate bracket and the later period is needed to remove, cause to influence Constructional Col-umn Construction quality, greatly waste material and artificial problem.

Description

A kind of constructional column pours tool and a kind of constructional column casting method
Technical field
The present invention relates to construction engineering technical fields, pour tool and a kind of structure more specifically to a kind of constructional column Make column casting method.
Background technique
In order to enhance the globality and stability of building, reinforced concrete can be generally set in the wall of multilayer building Native constructional column, and be connected with each layer collar tie beam, the space frame for capableing of bending resistance shearing resistance is formed, setting constructional column is to prevent house from falling A kind of effective measures collapsed.It is all to be implanted into construction column template in wall, and reserve at the top of it at present when pouring constructional column Concreting mouth, pours mouth and constructional column formed by integrally casting forms.In this way, after the completion of pouring, will at the top of constructional column shape At the oblique angle bracket of prominent metope, this bracket could integrally be cut after only concrete being waited to form completely, this, which is not only limited, applies Work speed and efficiency, spend human and material resources, and will lead to constructional column rough surface injustice when knocking out bracket in the later period, split Seam etc. generates secondary destruction to constructional column, influences Constructional Col-umn Construction quality.Therefore, how to solve in the prior art constructional column and It pours a mouthful formed by integrally casting molding to generate bracket and the later period is needed to remove, causes to influence Constructional Col-umn Construction quality, greatly waste material With artificial problem, become those skilled in the art's important technological problems to be solved.
Summary of the invention
The purpose of the present invention is to provide a kind of constructional columns to pour tool and a kind of constructional column casting method, existing to solve Constructional column needs the later period to remove with mouthful formed by integrally casting molding generation bracket is poured in technology, causes to influence Constructional Col-umn Construction quality, Greatly waste material and artificial problem.
The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of constructional column provided by the invention pours tool, including is connected with construction column template, is used to form and pours mouth Hopper and the first baffle that is movably disposed between the construction column template and the hopper, the hopper and the structure It is detachably connectable to make column template, the first baffle is for opening and closing between the construction column template and the hopper Channel, when the first baffle is in first position, the channel is opened, concrete is injected the construction column template Inside, when the first baffle is in the second position, the channel closes, with will the construction column template in the hopper Concrete separating open.
It preferably, further include the discharge port being arranged on the hopper and being movably disposed on the hopper, being used for Block the second baffle of the discharge port.
Preferably, one end of the second baffle is bent to form bayonet, so that the second baffle is connected to the hopper On.
Preferably, the hopper includes the first coaming plate being obliquely installed and is arranged in the second of first coaming plate two sides and encloses Plate, the lower end of first coaming plate, two second coaming plates be connected with the construction column template, so that the hopper with The construction column template pours mouth described in surrounding.
Preferably, the discharge port is arranged on first coaming plate, and the discharge port is circular open.
Preferably, the hopper further includes respectively with two the second coaming plate bending connections and to far from the hopper Direction extend fixation wing plate, two fixed wing plates and first coaming plate are equipped with for connecting the constructional column mould The mounting hole of plate.
Preferably, the lower end of first coaming plate is equipped with the mounting hole, the top and bottom of each fixed wing plate It is equipped with the mounting hole.
Preferably, the hopper further includes the feed tube being connected with the discharge port.
Preferably, the material of the hopper, the first baffle and the second baffle is stainless steel.
The present invention also provides a kind of constructional column casting methods, comprising:
After mounting structure column template in place's to be onstructed, hopper is mounted on the construction column template, pours mouth to be formed, And the channel between the construction column template and the hopper is opened;
Second baffle is blocked into discharge port, by the mouth that pours to concrete perfusion on the inside of the construction column template;
Constructional column is stood after the completion of pouring, then by first baffle be moved to the hopper and the construction column template it Between, the concrete separating of concrete and constructional column in the hopper is opened;
The second baffle is removed, exposes the discharge port, by the discharge port by the concrete in the hopper Discharge;
Remove the hopper.
In technical solution provided by the invention, it includes being connected with construction column template, being used for that a kind of constructional column, which pours tool, The first baffle for forming the hopper for pouring mouth and being movably disposed between construction column template and hopper, hopper and constructional column mould Plate is detachably connectable, and first baffle works as first baffle for opening and closing the channel between construction column template and hopper When in first position, channel is opened, to inject concrete on the inside of construction column template, when first baffle is in the second position When, channel is closed, to open construction column template with the concrete separating in hopper.So set, operating personnel by hopper to Concrete perfusion on the inside of column template is constructed, a period of time is stood after the completion of concreting, first baffle is inserted into immediately, by hopper Interior extra concrete is separated with constructional column, is removed hopper and is transferred to next place to be onstructed, while can be by extra coagulation Native clout collects to be utilized again, is neither wasted material in this way, will not be formed bracket structure, and construction effect is greatly accelerated Rate ensure that concrete pouring quality, reduces the artificial expenditure that the later period cuts and repair, solves constructional column in the prior art It needs the later period to remove with mouthful formed by integrally casting molding generation bracket is poured, causes to influence Constructional Col-umn Construction quality, greatly waste material Material and artificial problem.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the structural schematic diagram that constructional column pours tool in the embodiment of the present invention;
Fig. 2 is the connection schematic diagram of hopper and construction column template in the embodiment of the present invention;
Fig. 3 is the perspective view of hopper in the embodiment of the present invention;
Fig. 4 is the main view of hopper in the embodiment of the present invention;
Fig. 5 is the main view of first baffle in the embodiment of the present invention;
Fig. 6 is the top view of first baffle in the embodiment of the present invention;
Fig. 7 is the main view of second baffle in the embodiment of the present invention;
Fig. 8 is the left view of second baffle in the embodiment of the present invention.
In Fig. 1-Fig. 8:
Hopper -1, discharge port -3, second baffle -4, bayonet -5, the first coaming plate -6, the second coaming plate -7, is consolidated first baffle -2 Determine wing plate -8, mounting hole -9, feed tube -10, hook part -11.
Specific embodiment
To make the object, technical solutions and advantages of the present invention clearer, technical solution of the present invention will be carried out below Detailed description.Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Base Embodiment in the present invention, those of ordinary skill in the art are obtained all without making creative work Other embodiment belongs to the range that the present invention is protected.
Present embodiment provides a kind of constructional column and pours tool and a kind of constructional column casting method, solves existing Constructional column needs the later period to remove with mouthful formed by integrally casting molding generation bracket is poured in technology, causes to influence Constructional Col-umn Construction quality, Greatly waste material and artificial problem.
Hereinafter, elaborating in conjunction with attached drawing to embodiment.In addition, embodiments illustrated below is not remembered claim The content of the invention of load plays any restriction effect.In addition, the full content of composition represented by following example is not limited to conduct Necessary to the solution of the invention described in the claims.
Attached drawing 1-8 is please referred to, constructional column provided in this embodiment pours tool, including is connected with construction column template, uses In the first baffle 2 for forming the hopper 1 for pouring mouth and being movably disposed between construction column template and hopper 1.Hopper 1 and structure It is detachably connectable to make column template, as shown in Fig. 2, opening up notch on construction column template, hopper 1 is bolted on the position Place is set, pours channel to be formed.First baffle 2 is such as schemed for opening and closing the channel between construction column template and hopper 1 Shown in 1, first baffle 2 can be inserted into from the side of hopper 1, first baffle 2 arrow direction can move back and forth along Fig. 1.When When one baffle 2 is in first position, i.e., state as shown in Figure 1, channel is opened, and concrete can be injected to shape on the inside of construction column template At constructional column;When first baffle 2 is in the second position, i.e., first baffle 2 as shown in Figure 1 moves right insertion configuration column template On the notch that opens up, channel is closed, so that construction column template be opened with the concrete separating in hopper 1, i.e., by bracket from construction It is cut away on column.It should be noted that referring to the side towards operating personnel on the outside of construction column template, inside then refers to phase To the side for deviating from operating personnel, as shown in Fig. 2, dash area is construction column template in figure, the left side is inside, the right is outer Side.So set, operating personnel stands one to concrete perfusion on the inside of column template, concreting is constructed by hopper after the completion The section time, it is inserted into first baffle immediately, concrete extra in hopper and constructional column are separated, removes hopper and is transferred to down One place to be onstructed, while concrete clout extra in hopper can be collected and be utilized again, material is neither wasted in this way, It not will form bracket structure, greatly accelerate construction efficiency, ensure that concrete pouring quality, reducing the later period cuts and repair Artificial expenditure, solve constructional column in the prior art and pour the molding of mouthful formed by integrally casting and generate bracket and the later period is needed to remove, lead It causes to influence Constructional Col-umn Construction quality, greatly waste material and artificial problem.
In the present embodiment, constructional column pours tool and further includes the discharge port 3 being arranged on hopper 1 and be movably disposed Second baffle 4 on hopper 1, for blocking discharge port 3.In this way, second baffle can prevent concrete material from overflowing when pouring, pour First the clout in hopper can be discharged after the completion of building, collected, then dismantle hopper, both facilitated operation, also saved material, passed through Ji environmental protection.Preferably, hopper 1 further includes the feed tube 10 being connected with discharge port 3, in this way can convenient for collect clout, avoid to Surrounding is splashed.
When second baffle 4 is blocked in discharge port 3, for the ease of fixed second baffle 4, prevent it unexpected from hopper 1 It falls off, as shown in figure 8, one end of second baffle 4 is bent to form bayonet 5, so that second baffle 4 is connected on hopper 1.In this way, It is reliably fixed baffle with hopper, effectively plays the effect for blocking discharge port.
As optional embodiment, as shown in figure 3, hopper 1 includes the first coaming plate 6 being obliquely installed and is arranged first Second coaming plate 7 of 6 two sides of coaming plate, the second coaming plate of two sides 7 with the first coaming plate 6 bend connect, can by one piece of whole plate bending forming, Or respectively production, again by welding, paste etc. fixed forms connection molding.The lower end of first coaming plate 6, two the second coaming plates 7 It is connected with construction column template, so that hopper 1 and construction column template surround and pour mouth, such structure is convenient for concrete along material Bucket 1 slides on the inside of template.Wherein, discharge port 3 is arranged on the first coaming plate 6, and discharge port 3 is circular open, openings of sizes It can design according to actual needs, in this way, as shown in figure 4, the first coaming plate 6 is towards operating personnel after installation, convenient in discharge hopper 1 Clout.
In the preferred embodiment of the present embodiment, hopper 1 further includes bending connection and Xiang Yuan with two the second coaming plates 7 respectively The fixation wing plate 8 that direction from hopper 1 extends, two fixed wing plates 8 and the first coaming plate 6 are equipped with for connecting structure column template Mounting hole 9.Fixed wing plate 8 can be parallel to the setting of constructional column template surface, be convenient for stationary hopper 1 in this way.Wherein, the first coaming plate 6 lower end is equipped with the mounting hole 9 passed through for fasteners such as bolts, and the top and bottom of each fixed wing plate 8 are equipped with the peace Fill hole 9.Optionally, as shown in figure 4, the upper end of fixed wing plate 8 is set there are two mounting hole 9, the lower end of fixed wing plate 8, first enclose The lower end of plate 6 is equipped with a mounting hole 9, guarantees that hopper 1 is reliably connected with template.Certainly, the position of mounting hole 9, size etc. can It is modified, set according to actual job site requirement.
It should be noted that when the orientation "upper" "lower" mentioned in text refers to the placement state of hopper as shown in Figure 4 it Meaning, up and down direction is orientation up and down in figure, then the relatively top position of structure is the upper end in figure, and structure is opposite in figure leans on Under position be its lower end.
In the present embodiment, the material of hopper 1, first baffle 2 and second baffle 4 is stainless steel.In this way, stainless Steel utensil is recyclable to be used for multiple times, and reduces the loss of the materials such as template, and stainless steel surface is smooth, in constructional column after bracket excision The surface of upper formation is also the same bright and clean smooth, reduces the later period to the artificial investment of concrete chisel removal, repairing etc..Certainly, baffle etc. It can also be made of plank.In addition, as shown in fig. 6, one end of first baffle 2 is convenient for equipped with the hook part 11 held for hand Operation, convenient working personnel's push-pull plate.Hook part 11 may be designed as arc-shaped, smooth in appearance, prevent plowing from hand, certainly It can be designed as other shapes.
The present embodiment additionally provides constructional column casting method, comprising:
After mounting structure column template in place's to be onstructed, hopper 1 is mounted on construction column template, can be consolidated by bolt It is scheduled in template, pours mouth to be formed, the channel constructed between column template and hopper 1 at this time is opened, and first baffle 2 does not block logical Road can be inserted in 1 marginal position of hopper by first baffle 2 as shown in Figure 1, or can extract first baffle 2 out, waiting need using when It is inserted into;
Second baffle 4 is blocked into discharge port 3, is then poured by pouring mouth to concrete perfusion on the inside of construction column template It builds, at this time settable bayonet 5 on second baffle 4, plays fixed function on hopper 1 to hang over;
Constructional column pour after the completion of stand a period of time, then by first baffle 2 be moved to hopper 1 and construction column template it Between, the concrete separating of concrete and constructional column in hopper 1 is opened;
Second baffle 4 is removed, exposes discharge port 3, the concrete clout in hopper 1 is discharged and is received by discharge port 3 Collection gets up, and neither wastes material in this way nor pollutes ground;
Hopper 1 is removed, next place to be onstructed is transferred to.In this way, the construction method is applied to secondary knot in architectural engineering Structure constructional column pours, and with novel pouring tool, improves concrete pouring quality, solves in the prior art because the later period digs Except top concrete caused by bracket pours uncompacted problem, reduce material loss and artificial expenditure, accelerates construction speed Degree.
It should be noted that the device or component of the different function in above-mentioned each embodiment can be combined, for example, Constructional column pours tool in the preferred embodiment of the present embodiment, pours the material of mouth including being connected with construction column template, being used to form Bucket 1 and the first baffle 2 being movably disposed between construction column template and hopper 1, hopper 1 and construction column template are removably It is connected, one end of first baffle 2 is equipped with the hook part 11 held for hand.Wherein, first baffle 2 is for opening and closing structure The channel between column template and hopper 1 is made, when first baffle 2 is in first position, channel is opened, concrete is injected structure It makes on the inside of column template, when first baffle 2 is in the second position, channel is closed, will construct the coagulation in column template and hopper 1 Soil separates.Constructional column pours tool and further includes the discharge port 3 being arranged on hopper 1 and be movably disposed on hopper 1, use In the second baffle 4 for blocking discharge port 3, one end of second baffle 4 is bent to form bayonet 5, so that second baffle 4 is suspended on hopper On 1, discharge port 3 is connected with feed tube 10.In addition, hopper 1, first baffle 2, second baffle 4 and feed tube 10 material be Stainless steel.
In this embodiment, hopper 1 includes the first coaming plate 6 being obliquely installed and is arranged in the second of 6 two sides of the first coaming plate Coaming plate 7, the lower end of the first coaming plate 6, two the second coaming plates 7 are connected, so that hopper 1 and construction column template with construction column template It surrounds and pours mouth.Discharge port 3 is arranged on the first coaming plate 6, and discharge port 3 is circular open.Hopper 1 further include respectively with two Second coaming plate 7 bending connection and the fixation wing plate 8 extended to the direction of separate hopper 1, two fixed wing plates 8 and the first coaming plate 6 It is equipped with the mounting hole 9 for connecting structure column template.Wherein, the lower end of the first coaming plate 6 is equipped with mounting hole 9, each fixed-wing The top and bottom of plate 8 are equipped with mounting hole 9.
So set, operating personnel passes through hopper to concrete perfusion on the inside of construction column template, after the completion of concreting A period of time is stood, first baffle is inserted into immediately, concrete extra in hopper and constructional column is separated, opens and is arranged on hopper Discharge port, by extra concrete clout outlet and collect, remove hopper and be transferred to next place to be onstructed, use The utility model, which pours tool, can effectively improve the construction quality that constructional column pours mouth, guarantee that constructional column concrete vibrating is closely knit, and Concrete is cut due to not needing the later period, avoids the secondary destruction to constructional column, guarantees that concrete surface is complete, smooth, mentions High construction quality and concrete formation effect, greatly accelerate construction efficiency, reduce the artificial expenditure that the later period cuts and repair, Concrete clout extra in hopper can be collected and be utilized again simultaneously, neither waste material in this way, it will not be impurely Face solves constructional column in the prior art and pours mouthful formed by integrally casting molding generation bracket and the later period is needed to remove, causes to influence structure Make column construction quality, greatly waste material and artificial problem.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest scope of cause.

Claims (10)

1. a kind of constructional column pours tool, which is characterized in that pour the material of mouth including being connected with construction column template, being used to form Bucket (1) and the first baffle (2) being movably disposed between the construction column template and the hopper (1), the hopper (1) It is detachably connectable with the construction column template, the first baffle (2) for opening and closing the construction column template with Channel between the hopper (1), when the first baffle (2) is in first position, the channel opened, with by concrete Inject on the inside of the construction column template, when the first baffle (2) be in the second position, the channel closes, with will described in Construction column template is opened with the concrete separating in the hopper (1).
2. constructional column as described in claim 1 pours tool, which is characterized in that further include being arranged on the hopper (1) It discharge port (3) and is movably disposed on the hopper (1), the second baffle (4) for blocking the discharge port (3).
3. constructional column as claimed in claim 2 pours tool, which is characterized in that one end bent of the second baffle (4) At bayonet (5), so that the second baffle (4) is connected on the hopper (1).
4. constructional column as claimed in claim 2 pours tool, which is characterized in that the hopper (1) includes be obliquely installed The second coaming plate (7) of one coaming plate (6) and setting in the first coaming plate (6) two sides, the lower end of first coaming plate (6), two Second coaming plate (7) is connected, so that the hopper (1) and the construction column template surround institute with the construction column template It states and pours mouth.
5. constructional column as claimed in claim 4 pours tool, which is characterized in that the discharge port (3) is arranged described first On coaming plate (6), and the discharge port (3) is circular open.
6. constructional column as claimed in claim 4 pours tool, which is characterized in that the hopper (1) further include respectively with two Second coaming plate (7) bending connects and to the fixation wing plate (8) that the direction far from the hopper (1) extends, and two described solid Determine wing plate (8) and first coaming plate (6) is equipped with for connecting the mounting hole (9) for constructing column template.
7. constructional column as claimed in claim 6 pours tool, which is characterized in that the lower end of first coaming plate (6) is equipped with institute It states mounting hole (9), the top and bottom of each fixed wing plate (8) are equipped with the mounting hole (9).
8. constructional column as claimed in claim 2 pours tool, which is characterized in that the hopper (1) further includes and the discharging The feed tube (10) that mouth (3) is connected.
9. constructional column as claimed in claim 2 pours tool, which is characterized in that the hopper (1), the first baffle (2) Material with the second baffle (4) is stainless steel.
10. a kind of constructional column casting method for being poured tool based on the described in any item constructional columns of claim 2-9, feature are existed In, comprising:
After mounting structure column template in place's to be onstructed, hopper (1) is mounted on the construction column template, pours mouth to be formed, And the channel between the construction column template and the hopper (1) is opened;
Second baffle (4) is blocked into discharge port (3), by the mouth that pours to concrete perfusion on the inside of the construction column template;
Constructional column is stood after the completion of pouring, then by first baffle (2) be moved to the hopper (1) and the construction column template it Between, the concrete separating of concrete and constructional column in the hopper (1) is opened;
The second baffle (4) are removed, expose the discharge port (3), it will be in the hopper (1) by the discharge port (3) Concrete discharge;
Remove the hopper (1).
CN201910468272.7A 2019-05-31 2019-05-31 A kind of constructional column pours tool and a kind of constructional column casting method Pending CN110067379A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910468272.7A CN110067379A (en) 2019-05-31 2019-05-31 A kind of constructional column pours tool and a kind of constructional column casting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910468272.7A CN110067379A (en) 2019-05-31 2019-05-31 A kind of constructional column pours tool and a kind of constructional column casting method

Publications (1)

Publication Number Publication Date
CN110067379A true CN110067379A (en) 2019-07-30

Family

ID=67372185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910468272.7A Pending CN110067379A (en) 2019-05-31 2019-05-31 A kind of constructional column pours tool and a kind of constructional column casting method

Country Status (1)

Country Link
CN (1) CN110067379A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115162716A (en) * 2022-07-26 2022-10-11 中国建筑第五工程局有限公司 Primary pouring method for secondary structure of building
CN117266547A (en) * 2023-09-21 2023-12-22 广东省勃诚建设有限公司 Template assembling and pouring system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206873929U (en) * 2017-06-07 2018-01-12 广西建工集团第二安装建设有限公司 Combined live tears bucket mould open at the top of a kind of constructional column
JP2018127804A (en) * 2017-02-08 2018-08-16 大成建設株式会社 Beam structure and construction method of beam structure
CN208251626U (en) * 2018-05-22 2018-12-18 江苏省苏中建设集团股份有限公司 A kind of constructional column top concrete primary concreting molding backform
CN109138274A (en) * 2018-10-17 2019-01-04 陕西建工集团有限公司 A kind of filling wall construction column construction method
CN210164233U (en) * 2019-05-31 2020-03-20 南通四建集团有限公司 Constructional column pouring tool

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018127804A (en) * 2017-02-08 2018-08-16 大成建設株式会社 Beam structure and construction method of beam structure
CN206873929U (en) * 2017-06-07 2018-01-12 广西建工集团第二安装建设有限公司 Combined live tears bucket mould open at the top of a kind of constructional column
CN208251626U (en) * 2018-05-22 2018-12-18 江苏省苏中建设集团股份有限公司 A kind of constructional column top concrete primary concreting molding backform
CN109138274A (en) * 2018-10-17 2019-01-04 陕西建工集团有限公司 A kind of filling wall construction column construction method
CN210164233U (en) * 2019-05-31 2020-03-20 南通四建集团有限公司 Constructional column pouring tool

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115162716A (en) * 2022-07-26 2022-10-11 中国建筑第五工程局有限公司 Primary pouring method for secondary structure of building
CN115162716B (en) * 2022-07-26 2023-10-03 中国建筑第五工程局有限公司 One-time pouring method for secondary structure of building
CN117266547A (en) * 2023-09-21 2023-12-22 广东省勃诚建设有限公司 Template assembling and pouring system
CN117266547B (en) * 2023-09-21 2024-03-22 广东省勃诚建设有限公司 Template assembling and pouring system

Similar Documents

Publication Publication Date Title
CN110067379A (en) A kind of constructional column pours tool and a kind of constructional column casting method
CN205935650U (en) Template is supported to post -cast strip
CN106760503A (en) A kind of constructional column based on standard knot combination is poured uses template
CN109057339A (en) A kind of one-time-concreting construction method of the anti-bank in toilet
CN207296408U (en) Portable concrete constructional column irrigation device
CN205677249U (en) A kind of casting concrete constructional column hopper
CN208950320U (en) Constructional column concrete placings suitable for reading and closure mold
CN107419904A (en) The skewed slot mounting structure and its application method poured for concrete column
CN209556385U (en) A kind of concreting funnel assisting blanking
CN210164233U (en) Constructional column pouring tool
CN209053437U (en) A kind of Prefabricated superposed beam structure concrete casting device
CN210622313U (en) Constructional column pouring template
CN208363609U (en) A kind of constructional column assembly type can have enough to meet the need aluminum alloy pattern plate
CN208329633U (en) A kind of construction concrete conveyance tower crane hopper
CN210658959U (en) Constructional column concrete placement construction structures of smashing
CN206267523U (en) A kind of constructional column based on standard knot combination is poured uses template
CN207332309U (en) A kind of support shuttering of post-cast strip
CN213174787U (en) High-low span column concrete pouring template
CN206319404U (en) A kind of building precast exterior sheathing
CN110644676B (en) Synchronous pouring construction method for preset isolation layer of concrete constructional column
CN209585613U (en) A section support device is poured after precast concrete column
CN207960164U (en) Prefabricated enclosure wall
CN209958780U (en) Thin-walled steel tube bundle filling wall is with supplementary device of pouring of easy dismouting formula concrete
CN207999092U (en) A kind of wall hole to be provided antiseep plugging device
CN207484981U (en) Secondary structure vertical member concrete construction pours device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination