CN209556385U - A kind of concreting funnel assisting blanking - Google Patents
A kind of concreting funnel assisting blanking Download PDFInfo
- Publication number
- CN209556385U CN209556385U CN201821953238.6U CN201821953238U CN209556385U CN 209556385 U CN209556385 U CN 209556385U CN 201821953238 U CN201821953238 U CN 201821953238U CN 209556385 U CN209556385 U CN 209556385U
- Authority
- CN
- China
- Prior art keywords
- chute
- blanking
- fixed
- plate
- feed opening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of concreting funnel assisting blanking, including hopper, feed opening and chute, wherein hopper bottom is fixedly mounted with feed opening, which is fixed with inclined chute;Activity is embedded with blanking plate in chute, and chute bottom is fixed with cam motor;The bottom of blanking plate is fixed with stiffening plate along blanking direction, which is fixedly connected with the output shaft of cam motor;Cross-stiffened plate is fixed in feed opening.The concreting funnel pushes the concrete discharging in chute by the blanking plate auxiliary moved back and forth, the residual concrete in chute is removed by the movement of blanking plate simultaneously, it prevents it from accumulating or blocking, is poured in casting process without suspending because of cleaning obstruction slag charge.
Description
Technical field
The utility model belongs to concreting technical field, especially a kind of concreting funnel for assisting blanking.
Background technique
Modern industry class engineering project all develops to enlargement, and monomer equipment is also increasing, and load bearing equipment mixes
Solidifying earth foundation also increases with it, current usual casting of concrete in mass, pours the time for control, and it is slower to pour rate, pours
Period is long, and concrete adheres on reinforcing bar when pouring, until pouring top, the solidification of surface laitance, and cleaning trouble, this construction party
Method the main problems are as follows:
1, waste of resource, cleaning concrete residue need to consume a large amount of manpower, and waste of resource wastes time.
2, influencing concrete pouring quality cannot interrupt although concreting will control speed of perfusion, and cleaning is mixed
Solidifying soil influences the continuity poured.The free-falling height of concrete mix such as more than 2 meters when, mixture fall when impulse force
Very big, stone is easy to be projected out after impact steel bar reinforced net and separate with mortar, and stone honeycombing occurs due to lacking mortar.
3, influence concrete quality, rebar surface laitance solidification may cause concreting after the completion of bonding strength not
Foot, leads to concrete surface crack, influences concrete quality.
Utility model content
The purpose of the utility model is to overcome the concrete in place of the deficiencies in the prior art, providing a kind of auxiliary blanking to pour
Funnel is built, which pushes the concrete discharging in chute by the blanking plate auxiliary moved back and forth, leads to simultaneously
The residual concrete in the movement removing chute of blanking plate is crossed, prevents it from accumulating or blocking, without because of cleaning in casting process
Block slag charge and suspends and pour.
A kind of concreting funnel assisting blanking, including hopper, feed opening and chute, wherein hopper bottom is fixedly mounted with down
Material mouth, the feed opening bottom are fixed with inclined chute;Activity is embedded with blanking plate in chute, and chute bottom is fixed with cam
Motor;The bottom of blanking plate is fixed with stiffening plate along blanking direction, which is fixedly connected with the output shaft of cam motor;Under
Cross-stiffened plate is fixed in material mouth.
The preferred technical solution of the utility model are as follows: sliding slot is formed in chute, be slidably installed blanking plate in the sliding slot, and sliding
The shovel material slope with blanking plate upper surface clearance fit is formed on slot outer wall.
The preferred technical solution of the utility model are as follows: be fixed with fixed block on the output shaft of cam motor, the fixed block is logical
Fixed pin is crossed to be fixedly connected with stiffening plate;The pin hole of multiple inserting fixed pins is formed in stiffening plate.
The preferred technical solution of the utility model are as follows: be fixed with handgrip on the outer wall of hopper.
The advantages of the utility model and economic effect are:
A kind of brick auxiliary conveying device of the utility model, pours suitable for architectural engineering super-thickness and mass concrete,
Power can be provided by cam motor drives blanking plate to move back and forth along the blanking direction of chute, mixed in auxiliary push chute
Solidifying soil falls;The motion range of blanking plate, and the fixation pin connection by adjusting fixed block and stiffening plate can be limited by sliding slot
The stroke for adjusting blanking plate is realized in position;Concrete remaining on blanking plate can be cleared up by the shovel material slope of sliding slot outer wall, and
Preventing concrete residue from entering in sliding slot hinders blanking plate to move back and forth;Why can add the structure of feed opening by cross-stiffened plate
Intensity increases the anti-shake performance of feed opening;The structural strength that blanking plate can be strengthened by stiffening plate prevents blanking plate carrying mixed
It is just deformed when solidifying soil gravity is excessive or is displaced;It is mobile that hopper finally can be artificially controlled by handgrip, to adjust chute
Casting position.
Detailed description of the invention
Fig. 1 is the cross-sectional view of the utility model;
Fig. 2 is the top view of the utility model;
In figure: 1- hopper;2- cross-stiffened plate;3- feed opening;4- chute;5- sliding slot;6- cam motor;7- shovel material is oblique
Slope;8- blanking plate;9- stiffening plate;10- fixed pin;11- pin hole;12- fixed block;13- output shaft;14- handgrip.
Specific embodiment
For the contents, features and effects that can further appreciate that the utility model, the following examples are hereby given, and cooperates attached drawing
Detailed description are as follows.It should be noted that the present embodiment be it is descriptive, be not restrictive, cannot thus limit practical
Novel protection scope.
A kind of concreting funnel assisting blanking, including hopper 1, feed opening 3 and chute 4, wherein hopper bottom is solid
Material mouth is loaded, which is fixed with inclined chute;Activity is embedded with blanking plate 8 in chute, and chute bottom is fixedly mounted with
There is cam motor 6;The bottom of blanking plate is fixed with stiffening plate 9 along blanking direction, and the output shaft of the stiffening plate and cam motor is solid
Fixed connection;Cross-stiffened plate 2 is fixed in feed opening.
The preferred technical solution of the utility model are as follows: sliding slot 5 is formed in chute, be slidably installed blanking plate in the sliding slot, and
The shovel material slope 7 with blanking plate upper surface clearance fit is formed on sliding slot outer wall.
The preferred technical solution of the utility model are as follows: be fixed with fixed block 12 on the output shaft 13 of cam motor, this is fixed
Block is fixedly connected by fixed pin 10 with stiffening plate;The pin hole 11 of multiple inserting fixed pins is formed in stiffening plate.
The preferred technical solution of the utility model are as follows: handgrip 14 is fixed on the outer wall of hopper.
In order to more clearly describe specific embodiment of the present utility model, a kind of embodiment is provided below:
1, working principle and explanation
After the completion of mold installation is fixed, placing installation base concrete, mold can be mobile with pump line, and mold is fallen in when pouring
On reinforced mesh, chute is protruded into from reinforcing bar gap, is avoided concrete water mud from being sticked on reinforcing bar and is solidified, while can be to avoid coagulation
Soil causes reinforcing bar tripping, concrete disintegration to the impact of reinforced mesh.
2, operating procedure
1) hopper is made of 3mm steel sheet and plate, generally box-structure, size 730*730*200mm, the weldering of hopper bottom
It connects feed opening and welds cross-stiffened plate in feed opening, improve hopper and feed opening intensity, feed opening are square, increase material
The contact area of slot and reinforced mesh, to the impact force of reinforced mesh when reducing concreting;Feed opening size 330*330,
Feed opening is divided into four blanking holes by intermediate cross-stiffened plate, can effectively improve the mobility of concrete, reduces blowing mistake
It causes to block fastly, while reinforcing bar can also be protected by Concrete contamination, not improve hopper integral strength well.
2) blanking hole is four 150*150 square holes, and length 100mm, outlet is made into slight horn mouth when production, can be effective
Increase the passability of concrete, blanking hole side-wall outer side reserve aperture, when pour thickness it is excessive when, install additional chute under blanking hole
Open connection is held, the flowing velocity of concrete is increased.
3) bottom plate of chute is made of 6mm thick steel plate, and side wall is 3mm steel plate, and branch of putting more energy into is arranged in both upper ends thereof and centre
Support, groove body width 150mm, length adjusts according to use demand, it is ensured that concrete free-falling height is less than 2m, groove body when use
End is suspended on reinforced mesh using hook.
4) handgrip is arranged in box hopper two sides, is moved easily, and handgrip uses 16 reinforcement fabrication of round steel, when concreting,
It since concrete impulse force is larger, is manually fixed or is mentioned with hand, will caused high effort for.Handgrip can be used as supporting point, utilize reinforcement fabrication
Support increases fixation of the operator to hopper.
When in use, funnel can be mobile with pump line for the concreting funnel of the auxiliary blanking of this programme, will leakage when pouring
Bucket is fallen on reinforced mesh, and concrete is fallen into from funnel, and cement slurry will not be left on reinforced mesh, is not needed later period cleaning and is existed
Install chute below funnel additional, it is possible to reduce concrete free-falling height.Funnel is made into box-structure using sheet metal, mitigates certainly
Weight improves intensity, while can be improved qualitative, the contact area of increase and reinforced mesh, reduces won ton to the pressure of reinforcing bar;Leakage
Struggling against, it is split type to use with chute, and when concreting thickness is less than two meters, chute of dismantling only uses funnel;Thickness is poured to be greater than
Chute is installed at two meters additional, according to the chute for pouring thickness production different length when use.Feed opening use four well formats, lower mouth with
The open connection of chute, can greatly improve the mobility of concrete, avoid the too urgent feed opening being blocked of blowing.
It should be understood that for those of ordinary skills, it can be modified or changed according to the above description,
And all these modifications and variations all should belong to the protection scope of the appended claims for the utility model.
Claims (4)
1. a kind of concreting funnel for assisting blanking, it is characterised in that: including hopper, feed opening and chute, wherein hopper
Bottom is fixedly mounted with feed opening, which is fixed with inclined chute;Activity is embedded with blanking plate, and chute in the chute
Bottom is fixed with cam motor;The bottom of the blanking plate is fixed with stiffening plate along blanking direction, the stiffening plate and cam motor
Output shaft be fixedly connected;Cross-stiffened plate is fixed in the feed opening.
2. a kind of concreting funnel for assisting blanking according to claim 1, it is characterised in that: system in the chute
There is sliding slot, be slidably installed blanking plate in the sliding slot, and is formed on sliding slot outer wall oblique with the shovel material of blanking plate upper surface clearance fit
Slope.
3. a kind of concreting funnel for assisting blanking according to claim 1, it is characterised in that: the cam motor
Output shaft on be fixed with fixed block, which is fixedly connected by fixed pin with stiffening plate;It is formed in the stiffening plate more
The pin hole of a inserting fixed pin.
4. a kind of concreting funnel for assisting blanking according to claim 1, it is characterised in that: outside the hopper
Handgrip is fixed on wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821953238.6U CN209556385U (en) | 2018-11-26 | 2018-11-26 | A kind of concreting funnel assisting blanking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821953238.6U CN209556385U (en) | 2018-11-26 | 2018-11-26 | A kind of concreting funnel assisting blanking |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209556385U true CN209556385U (en) | 2019-10-29 |
Family
ID=68299468
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821953238.6U Active CN209556385U (en) | 2018-11-26 | 2018-11-26 | A kind of concreting funnel assisting blanking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209556385U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111923808A (en) * | 2020-07-10 | 2020-11-13 | 潍坊学院 | Road and bridge construction transport vechicle |
CN114212439A (en) * | 2021-11-26 | 2022-03-22 | 河北华丰能源科技发展有限公司 | Chute with anti-blocking function |
CN114439236A (en) * | 2022-02-25 | 2022-05-06 | 上海建工集团股份有限公司 | Dynamic optimization concrete pouring system and method |
-
2018
- 2018-11-26 CN CN201821953238.6U patent/CN209556385U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111923808A (en) * | 2020-07-10 | 2020-11-13 | 潍坊学院 | Road and bridge construction transport vechicle |
CN114212439A (en) * | 2021-11-26 | 2022-03-22 | 河北华丰能源科技发展有限公司 | Chute with anti-blocking function |
CN114439236A (en) * | 2022-02-25 | 2022-05-06 | 上海建工集团股份有限公司 | Dynamic optimization concrete pouring system and method |
CN114439236B (en) * | 2022-02-25 | 2023-10-24 | 上海建工集团股份有限公司 | Dynamic optimization concrete pouring system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209556385U (en) | A kind of concreting funnel assisting blanking | |
CN109680953B (en) | Discharging and mixing vibrating device for self-moving regenerated block | |
CN206174120U (en) | Prefabricated constructional column and structure thereof | |
CN107989049A (en) | A kind of construction method of frame bank protection | |
CN105064502B (en) | Using the regeneration concrete bean column node and construction method of cross-shaped profile steel plate weld edge of a wing stiffener | |
CN208168479U (en) | A kind of prefabricated rod structure in inspection hole | |
CN105178511B (en) | Section steel flange weakens regeneration concrete energy dissipation coupled column and preparation method thereof | |
CN109056520A (en) | A kind of bolt connection of prefabricated overhead guardrail board | |
CN108570974A (en) | A kind of prefabricated fish pass slot of bottom plate | |
CN110761562A (en) | Auxiliary tool for pouring concrete and using method | |
CN213388738U (en) | Fashioned blast furnace mould is pour to integral type | |
CN106917357A (en) | A kind of drop high concrete conveyance tandem barrel device in abrupt slope high | |
CN210369938U (en) | A can have enough to meet need sleeve for pouring stake core | |
CN209538168U (en) | A kind of pile foundation underwater concreting structure | |
CN209491337U (en) | The tundish of resistance to melting loss | |
CN208328869U (en) | A kind of prefabricated fish pass slot of bottom plate | |
CN212350358U (en) | Drainage sand discharging device for ladle pouring | |
CN112376569B (en) | Structure for pouring bottom plate by using abandoned dewatering well as string barrel | |
CN108343082A (en) | A kind of foundation construction method of high pressure shaft tower | |
CN109025306A (en) | Concreting buffering vertical slip cylinder in civil construction | |
CN106142302A (en) | The particular manufacturing craft of a kind of processing cable ditch prefabricated component and processing method thereof | |
CN208650523U (en) | A kind of runner type long tube hopper | |
CN215053029U (en) | Segregation preventing device for underwater ultra-deep concrete pouring | |
CN217399647U (en) | Control of super thick component bulky concrete crack is with pouring equipment | |
CN219138391U (en) | Pump line export concrete transfer device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |