CN208328869U - A kind of prefabricated fish pass slot of bottom plate - Google Patents

A kind of prefabricated fish pass slot of bottom plate Download PDF

Info

Publication number
CN208328869U
CN208328869U CN201820779087.0U CN201820779087U CN208328869U CN 208328869 U CN208328869 U CN 208328869U CN 201820779087 U CN201820779087 U CN 201820779087U CN 208328869 U CN208328869 U CN 208328869U
Authority
CN
China
Prior art keywords
prefabricated
fish pass
steel plate
plate
prefabricated panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820779087.0U
Other languages
Chinese (zh)
Inventor
尹高云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 11 Co Ltd
PowerChina 11th Bureau Engineering Co Ltd
Original Assignee
Sinohydro Bureau 11 Co Ltd
Sinohydro Bureau 11 Zhengzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 11 Co Ltd, Sinohydro Bureau 11 Zhengzhou Co Ltd filed Critical Sinohydro Bureau 11 Co Ltd
Priority to CN201820779087.0U priority Critical patent/CN208328869U/en
Application granted granted Critical
Publication of CN208328869U publication Critical patent/CN208328869U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model belongs to hydraulic and hydroelectric engineering field, more particularly to a kind of prefabricated fish pass slot of bottom plate, including prefabricated panel and cast-in-place abutment wall, prefabricated panel is rectangle structure, section is U-shaped, the prefabricated panel includes horizontal bottom end and vertical two side ends, and cast-in-place abutment wall is arranged above both side ends;The steel mesh that the internal arrangement of prefabricated panel is made of horizontal bar and vertical muscle, bottom end are embedded with the hanging ring structure for lifting.The purpose of the utility model is to overcome fish pass long construction periods, the disadvantage that material investment is big, construction cost is high in the construction of existing dam project, a kind of prefabricated fish pass slot of bottom plate for not accounting for and pressing the straight line duration of main structure, the investment for reducing fish pass construction circulation material, speed of application fast is provided, the prefabricated fish pass slot of the bottom plate is suitble to various light section fish pass concrete constructions.

Description

A kind of prefabricated fish pass slot of bottom plate
Technical field
The utility model belongs to hydraulic and hydroelectric engineering field more particularly to a kind of prefabricated fish pass slot of bottom plate.
Background technique
In dam project construction, to restore fish migration channel, alleviating influences Fish Survival environment, to meet ring Water conservation is protected and ecology needs, and often adds fish pass engineering design and construction.
It is generally in the majority with the quantity of vertical seam type fish channel by fish pass design structure and arrangement form, fish pass engineering structure form There are dark culvert formula and aqueduct type etc..Fish pass engineering construction often with the interspersed progress of main structure, is generally taken and sets up full hall scaffold The construction of fish pass concrete cast-in-situ is carried out with the method for pre-buried type steel support;Take set up full hall scaffold construction, restrictive condition compared with It is more, mostly because working face is narrow, interchange operation interference, reinforcing bar is intensive, mechanical equipment is put to good use not open, steel pipe framed bent peace is torn open Period length, material, which put into the reasons such as big and duration anxiety, not to be implemented;Although and taking the method for pre-buried type steel support than taking If full hall scaffold construction is convenient, interference is also small, but same long construction period, type steel support need to reach to fish pass concrete Some strength rear is dismountable, and section steel material usage amount is also big, can not have enough to meet the need in time, and construction cost is high.
Summary of the invention
The purpose of the utility model is to overcome fish pass long construction period, materials in above-mentioned existing dam project construction to throw Enter disadvantage big, that construction cost is high, a kind of do not account for is provided and presses the straight line duration of main structure, reduce fish pass construction circulation material The fast prefabricated fish pass slot of bottom plate of investment, speed of application, the prefabricated fish pass slot of the bottom plate are suitble to various light section fish pass concrete constructions.
To achieve the goals above, the utility model adopts the following technical solutions: a kind of prefabricated fish pass slot of bottom plate, including Prefabricated panel and cast-in-place abutment wall, prefabricated panel are rectangle structure, section be it is U-shaped, which includes horizontal bottom end With vertical two side ends, cast-in-place abutment wall is arranged above both side ends;The internal arrangement of prefabricated panel has horizontal bar and vertical The steel mesh of muscle composition, bottom end is embedded with the hanging ring structure for lifting.
The side end junction of abutment wall and prefabricated panel is provided with rubber fastening band, the U-shaped mouth in the both ends of prefabricated panel it is outer Rubber fastening band is also equipped on end face.
The hanging ring structure is four, is symmetrically embedded on bottom end two-by-two.
Steel mesh inside bottom end is divided into top mat and lower layer's steel mesh, and the hanging ring structure includes being embedded in bottom Main steel plate on lower layer's steel mesh of end, the upper end of main steel plate are higher than the face layer of bottom end, are being higher than face layer position A hole for hoist is offered on main steel plate.
One steel plate, the upper face of secondary steel plate and prefabricated panel bottom end are vertically respectively welded with main steel plate in main steel plate two sides The face layer in portion is in same plane.
A stiffening plate, the position of the correspondence hole for hoist in stiffening plate are respectively welded in the position of main steel plate two sides setting hole for hoist It sets and also opens up and the lifting identical hole of pore size.
Two blocks of vertical right-angled trapezium strength plates are respectively welded on each secondary steel plate, ipsilateral two of main steel plate are arranged in stiffening plate Between the trapezoidal strength plate of block.
The inverted U hanging ring reinforcing bar of vertical distribution, the open end of inverted U are welded on the lower part two sides of the main steel plate Far from main steel plate, sealing end face and the main steel plate of inverted U are fully welded, U-shaped two side ends respectively with the top mat of prefabricated panel It is welded and fixed with lower layer steel mesh.
The good effect that the technical solution of the utility model generates is as follows: the prefabricated fish pass slot of the utility model bottom plate takes bottom The prefabricated assembled construction again of plate, prefabricated panel carried out in precasting yard it is prefabricated, abutment wall carry out at the scene it is cast-in-place, to be suitble to each Kind light section fish pass concrete construction;Bottom plate can be prefabricated in advance, does not account for the straight line duration of pressure main structure, reduces fish pass construction The investment of circulation material has many advantages, such as that construction interference is small, speed of application is fast, construction cost is low and short construction period, Ke Yi great It is big to improve construction efficiency, it accelerates construction progress;It is long, all to solve the multi-span long range fish pass cast-in-place concrete construction period Turn the problem that material investment is more, construction cost is high.
The bottom end setting hanging ring structure of prefabricated panel is to lift prefabricated panel to installation site;In hanging ring structure Main steel plate two sides hole for hoist position weld stiffening plate, be in order to main steel plate lifting hole(eyelet) position increase thickness, enhancing master The intensity of steel plate;In the secondary steel plate of main steel plate two sides welding, it is to provide for also enhancing master to trapezoidal strength plate stress supporting point The integral strength of steel plate;And the setting of trapezoidal strength plate is in order to connect time steel plate and stiffening plate when main steel plate is promoted, further Enhance the robustness of hanging ring structure;Connect the bottom end of main steel plate and prefabricated panel in the setting of the hanging ring reinforcing bar of main steel plate two sides Connect stronger, raising overall stability.
Detailed description of the invention
Fig. 1 is the overlooking structure diagram of the utility model fish pass installation.
Fig. 2 is the sectional view of the utility model bottom plate prefabricated fish pass slot end.
Fig. 3 is the schematic perspective view of the prefabricated fish pass slot of the utility model bottom plate.
Fig. 4 is the sectional view of the utility model hanging ring structure installation.
Fig. 5 is the side view of the utility model hanging ring structure.
Fig. 6 is the steel bar arrangement figure of the utility model prefabricated panel.
It is marked in figure are as follows: 1, prefabricated panel;2, abutment wall;3, rubber fastening band;4, hanging ring structure;5, main steel plate;6, hanging ring Reinforcing bar;7, superstructure steel mesh;8, understructure steel mesh;9, secondary steel plate;10, trapezoidal strength plate;11, stiffening plate;12, it lifts Hole;13, face layer.
Specific embodiment
With reference to the accompanying drawing and specific embodiment makees further the technical solution of the prefabricated fish pass slot of the utility model bottom plate Illustration and description.
A kind of prefabricated fish pass slot of bottom plate, as shown in figures 1 to 6, the prefabricated fish pass slot of the bottom plate includes prefabricated panel 1 and cast-in-place side Wall 2, prefabricated panel are rectangle structure, section be it is U-shaped, which includes the side end of horizontal bottom end and two sides, Cast-in-place abutment wall is arranged above both side ends, and it is highly 5.0~7.1m that prefabricated panel length, which is 8.43m, width 3.6m,;In advance Bottom plate and sidewall thickness processed are 0.6m, and prefabricated panel clear height is 0.8m;The bottom end of prefabricated panel and the inside of side end are equal It is arranged with the steel mesh of horizontal bar and vertical muscle composition, the steel mesh in bottom end is divided into top mat 7 and lower layer's steel mesh 8, the hanging ring structure 4 of pre-buried four symmetric arrays in bottom end, hanging ring structure centre line and abutment wall inner edge minimum range are 20cm, It is 1.8m with prefabricated component end sideline minimum range, lifting of the hanging ring structure for prefabricated panel is installed.
The hanging ring structure includes main steel plate 5, secondary steel plate 9, right-angled trapezium strength plate 10 and stiffening plate 11, main steel plate 300* 800*18mm, the lower end of main steel plate are vertically welded on lower layer's steel mesh of prefabricated panel bottom end, and the upper surface of main steel plate is high Face layer 13 in prefabricated panel bottom end offers the circle that diameter is 4cm on the main steel plate higher than the position of face layer and hangs Fill hole 12;Respectively weld the secondary steel plate of a 200*300*18mm perpendicular to main steel plate in the two sides of main steel plate, secondary steel plate it is upper The face layer 13 of end face and bottom end in the same plane, respectively welds two pieces both perpendicular to main steel plate and time steel on secondary steel plate The vertical 10mm thickness right-angled trapezium strength plate of plate, right-angled trapezium strength plate are fully welded with main steel plate and time steel plate;In main steel plate the same side Two blocks of trapezoidal strength plates between two pieces of side lengths of welding be 20cm square stiffening plate, stiffening plate hangs having a size of 180*180*18mm The position in dress hole is located at the center of stiffening plate, also opened up in stiffening plate one it is homogeneous with lifting hole site and size on main steel plate Same circular hole.Three Φ, 32 hanging ring reinforcing bar is respectively welded in the two sides of main steel plate, and 32 hanging ring reinforcing bar of Φ is bent into inverted U-shaped structure, U The open end of type is fully welded far from main steel plate, outer end face and the main steel plate of the sealing end of inverted U, leg and pre- on the upside of 32 hanging ring reinforcing bar of Φ The downside leg of the superstructure steel mesh firm welding of bottom plate bottom end processed, 32 hanging ring reinforcing bar of Φ is placed in prefabricated panel bottom end Understructure reinforcing bar sieve bottom, and firm welding.
After the horizontal bar of prefabricated panel, vertical muscle and hanging ring structure install, pouring for prefabricated panel is carried out.
The side end junction of abutment wall and prefabricated panel is provided with rubber fastening band 3, the U-shaped mouth in the both ends of prefabricated panel it is outer It is also equipped with 651 type rubber fastening bands on end face, forms section sealing structure, prevents percolating water;Prefabricated panel two ends are taken Connect on established pier wall bracket, the lap of splice is no less than 50cm, overlap joint end by bottom it is supreme set gradually supporting steel plate and Neoprene support, overlap joint end pour second stage concrete again;Prefabricated panel one end and a phase structural concrete pedestal lap-joint, Shift to an earlier date pre-buried one of red copper sealing again along a phase structural concrete periphery, is played jointly with the inbuilt rubber fastening band of prefabricated fish pass Water-stagnating effect.
The prefabricated fish pass slot of bottom plate in the present embodiment Tibetan wood powerhouse of hydropower station tail water gate pier section factory (cross) 0+000~ Utilization in factory (cross) 0+110.58 fish pass engineering construction, Tibetan wood power station fish pass first stage of the project are mainly arranged in workshop mark Construction area and tail water slope protection section, starting point are arranged in the apron right side and lead wall (dam) 0+265.00 pile No. position, and along sediment outflow gallery The right side is led on the right side of wall from downstream upstream to unit tail water section, is worn right sand washing bottom outlet barricade through tail water gate pier and is extended to tail water slope protection (dam) 0+709.55 pile No. position, fish pass base slope controls between 1.7%~2.4%, in the axial direction every 3.0m inside fish pass Armored concrete water blocking plate, plate thickness 0.3m, highly from 9.0m gradual change to 3.5m are set;Copper sheet is used at fish channel structure seam And rubber water-proof closing.
Tail water gate pier section fish pass, which is used, is arranged overhanging bracket in tail water gate pier, is aqueduct form;The right section fish pass that rushes is using dark 3 imports are arranged in culvert form, fish pass altogether, and wherein 3 fish inlets are arranged in 1# import, are arranged in starting point (fish 1) 0+011.009 Number position;1 fish inlet is arranged in 3# import, is arranged in the sediment outflow gallery partition wall beginning position (fish 1) 0+152.979;4# import is set 1 fish inlet is set, the right sand washing bottom outlet partition wall beginning position (fish 1) 0+270.839 is arranged in.
Fish pass prefabricated panel reaches 75% of design strength or more, can be installed in batches in the unified production of precast plant; Prefabricated panel is mainly assembled using punching block is dissipated, and wooden model is squeegeeed;Reinforcing bar makes in processing factory, then is transported to precast plant's binding;Prefabricated bottom Board concrete is fed by batching plant, and dump truck transport is manually put in storage, and each prefabricated panel one-time-concreting is completed, using φ 70 Or 50 flexible axle vibrating spear of φ sufficiently vibrates;Prefabricated panel and the faying face of cast-in-place concrete need dabbing to handle;Concreting After completing 12~18h, watering covering curing at moisture-retention and heat-insulation is taken in time, and concrete continuous curing time is no less than 28 days.It is prefabricated The transhipment of bottom plate and hoist controlling are as follows:
(1) it stacks: stacking that levelling of the land is solid, and component must not stack the damage for causing concrete component, it is ensured that stack surely It is fixed.
(2) transport: the intensity of precast concrete reaches 75% or more of design strength standard value, just can to component into Luggage fortune, handles with care when unloading, prevents clashing and breaking;
(3) surveying setting-out: before lifting, survey crew releases the center of elevation, the center line of structure, support to supporting platform seat The end line and sideline of line and prefabricated panel, and it is clear with the line of ink marker or red paint mark.
(4) interim prefabricated place setting: in view of the transfer of prefabricated panel is difficult, it is arranged on the platform of tailwater channel outlet The one interim prefabricated place of fish pass bottom plate, facilitates transhipment and installation.
(5) handling: tail water gate pier section fish pass bottom plate uses the handling of 260t crane and installation, when installation component, concrete Intensity is not less than design strength requirement, is lifted in strict accordance with Hoisting Program, and special messenger takes charge, using steel plate as support Backing plate;Slowly slow play is played when lifting, slowly in place, the angle in hoist rope and modular level face is not less than 45 °;It is done before lifting Good temperature pier measure, avoids prefabricated panel from deforming, prevents crack and damage.
(6) it inspects for acceptance: after being installed, special messenger being sent to check support and component, check that support whether there is or not hanging, is taken Whether spreading degree is enough;It checks whether component surface has cracking or abnormal conditions, and carries out relative recording.
After prefabricated panel installation is in place, then end seam second stage concrete is poured, finally founds steel form again and pour fish pass side Wall concrete, side wall concrete mainly use carvel built, layer thickness 50cm;If have coarse aggregate accumulation in storehouse, it will accumulate Aggregate uniformly dissipate paving to mortar compared with many places, in order to avoid cause internal cellular;It is put in storage using extension skin cylinder or automotive pump under sleeping tank;It is mixed Solidifying soil is vibrated using φ 70 or 50 vibrating spear of φ in time after closing a position, and vibrating spear and prefabricated panel edge keep 5~10cm's Distance, preventing prefabricated panel from being vibrated influences and deforms;Concrete multiple spot blanking prevents blanking is too fast from causing to run mould.
The prefabricated fish pass slot of this engineering tail water gate pier section bottom plate is mainly supported by adding the pattern of bracket, prefabricated panel A height of 1.4m, the cast-in-place structural of a height of 3.6~5.7m of abutment wall, the fish pass a length of 8.43m, clear span 2.4m, clear height is 4.4~ 6.5m, single prefabricated panel weigh 65.75t, amount to 12 fish pass prefabricated panels.
The present embodiment solves that the multi-span long range fish pass cast-in-place concrete construction period is long, circulation material investment is more, applies Work problem at high cost ensures construction quality in the process, improves construction efficiency, accelerates construction speed, is hiding the wooden water power It stands and has played great economic benefit in fish pass engineering construction, provide reliable construction experience for successive projects.

Claims (8)

1. a kind of prefabricated fish pass slot of bottom plate, it is characterised in that: including prefabricated panel and cast-in-place abutment wall, prefabricated panel is rectangle knot Structure, section be it is U-shaped, which includes horizontal bottom end and two vertical side ends, and cast-in-place abutment wall is arranged in two sides Above end;The steel mesh that the internal arrangement of prefabricated panel is made of horizontal bar and vertical muscle, bottom end is embedded with for lifting by crane Hanging ring structure.
2. the prefabricated fish pass slot of a kind of bottom plate according to claim 1, it is characterised in that: the side end of abutment wall and prefabricated panel Junction is provided with rubber fastening band, is also equipped with rubber fastening band on the outer end face of the U-shaped mouth in the both ends of prefabricated panel.
3. the prefabricated fish pass slot of a kind of bottom plate according to claim 1, it is characterised in that: the hanging ring structure be four, two Two are symmetrically embedded on bottom end.
4. the prefabricated fish pass slot of a kind of bottom plate according to claim 1 or 3, it is characterised in that: the steel mesh inside bottom end It is divided into top mat and lower layer's steel mesh, the hanging ring structure includes the main steel being embedded on lower layer's steel mesh of bottom end Plate, the upper end of main steel plate are higher than the face layer of bottom end, offer a hole for hoist on the main steel plate for being higher than face layer position.
5. the prefabricated fish pass slot of a kind of bottom plate according to claim 4, it is characterised in that: main steel plate two sides vertically with main steel Plate respectively welds one steel plate, and the upper face of secondary steel plate and the face layer of prefabricated panel bottom end are in same plane.
6. the prefabricated fish pass slot of a kind of bottom plate according to claim 4, it is characterised in that: hole for hoist is arranged in main steel plate two sides Position respectively weld a stiffening plate, the position of the correspondence hole for hoist in stiffening plate also opens up identical with lifting pore size Hole.
7. the prefabricated fish pass slot of a kind of bottom plate according to claim 6, it is characterised in that: respectively weld two on each secondary steel plate The vertical right-angled trapezium strength plate of block, stiffening plate are arranged between two blocks of ipsilateral trapezoidal strength plates of main steel plate.
8. the prefabricated fish pass slot of a kind of bottom plate according to claim 4, it is characterised in that: the lower part two sides of the main steel plate On be welded with the inverted U hanging ring reinforcing bar of vertical distribution, the open end of inverted U is far from main steel plate, the sealing end face of inverted U and master Steel plate is fully welded, and U-shaped two side ends are welded and fixed with the top mat of prefabricated panel and lower layer's steel mesh respectively.
CN201820779087.0U 2018-05-24 2018-05-24 A kind of prefabricated fish pass slot of bottom plate Active CN208328869U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820779087.0U CN208328869U (en) 2018-05-24 2018-05-24 A kind of prefabricated fish pass slot of bottom plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820779087.0U CN208328869U (en) 2018-05-24 2018-05-24 A kind of prefabricated fish pass slot of bottom plate

Publications (1)

Publication Number Publication Date
CN208328869U true CN208328869U (en) 2019-01-04

Family

ID=64774979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820779087.0U Active CN208328869U (en) 2018-05-24 2018-05-24 A kind of prefabricated fish pass slot of bottom plate

Country Status (1)

Country Link
CN (1) CN208328869U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108570974A (en) * 2018-05-24 2018-09-25 中水电第十工程局(郑州)有限公司 A kind of prefabricated fish pass slot of bottom plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108570974A (en) * 2018-05-24 2018-09-25 中水电第十工程局(郑州)有限公司 A kind of prefabricated fish pass slot of bottom plate
CN108570974B (en) * 2018-05-24 2023-12-26 中电建十一局工程有限公司 Prefabricated fishway groove of bottom plate

Similar Documents

Publication Publication Date Title
CN104805866B (en) Prefabricated pipe gallery and construction method
CN108330980A (en) The hidden rail sliding-mode structure of large area slope concrete and construction method
CN108570974A (en) A kind of prefabricated fish pass slot of bottom plate
CN106012960A (en) Assembly type long piled wharf upper structure system and construction method thereof
CN108678220A (en) A kind of concrete shear force wall of steel bar template integrative installation technology
CN108457243A (en) A kind of construction method of assembly concrete wave wall
CN104532754A (en) Prestress concrete box girder end sealing formwork construction method
CN202730579U (en) Recyclable prefabricated concrete block for hardening construction plant
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN208328869U (en) A kind of prefabricated fish pass slot of bottom plate
CN208650086U (en) A kind of movable type streetlamp foundation
CN207891904U (en) A kind of prefabricated basic component of additional elevator of existing building
CN203905331U (en) Cast-in-place plate-type staircase with seamless steps
CN108130889B (en) Manufacturing method of stepped construction joint between main bottom plate of pump brake and side wall of runner layer
CN207957611U (en) A kind of small members are mobile and install equipment
CN216973019U (en) Prefabricated assembled temporary parking lot construction structure
CN210194691U (en) Protective structure for post-cast strip of settlement of basic raft
CN205502058U (en) Pin -connected panel tower crane foundation
CN105421780B (en) A kind of construction method of prefabricated concrete structure
CN213829507U (en) Hollow nut block vertical casting mold
CN209413171U (en) A kind of prefabricated component stair of light silencing
CN205776322U (en) A kind of steel tower with novel foundation structure
CN208328850U (en) A kind of seamless spliced prefab-form of inclination
CN208455615U (en) A kind of prefabricated guide groove structure of concrete cut
CN206396779U (en) A kind of integral type foundation structure built for small-sized bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 450001 No. 59 Lianhua street, hi tech Development Zone, Henan, Zhengzhou

Co-patentee after: SINOHYDRO Bureau 11 Co., Ltd.

Patentee after: China Power Construction Eleventh Bureau Engineering Co., Ltd.

Address before: 450001 No. 59 Lianhua street, hi tech Development Zone, Henan, Zhengzhou

Co-patentee before: SINOHYDRO Bureau 11 Co., Ltd.

Patentee before: China Hydropower eleventh Engineering Bureau (Zhengzhou) Co., Ltd.

CP03 Change of name, title or address