CN208329633U - A kind of construction concrete conveyance tower crane hopper - Google Patents

A kind of construction concrete conveyance tower crane hopper Download PDF

Info

Publication number
CN208329633U
CN208329633U CN201820795190.4U CN201820795190U CN208329633U CN 208329633 U CN208329633 U CN 208329633U CN 201820795190 U CN201820795190 U CN 201820795190U CN 208329633 U CN208329633 U CN 208329633U
Authority
CN
China
Prior art keywords
concrete
buckle
tower crane
valve
discharge barrel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820795190.4U
Other languages
Chinese (zh)
Inventor
蒋汉军
姚才敬
杨文波
刘鹏
杨进莲
荀利斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YCIH No 2 Construction Co Ltd
Original Assignee
YCIH No 2 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YCIH No 2 Construction Co Ltd filed Critical YCIH No 2 Construction Co Ltd
Priority to CN201820795190.4U priority Critical patent/CN208329633U/en
Application granted granted Critical
Publication of CN208329633U publication Critical patent/CN208329633U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of construction concrete conveyance tower crane hopper, bucket (2) are held including concrete, support system (3), discharge barrel (4), valving (5), it buckles (7), it is characterized by: being equipped with concrete on support system (3) holds bucket (2), discharge barrel (4) and buckle (7) are sequentially installed from top to bottom in the lower section that concrete holds bucket (2), wherein, concrete holds lower end connection discharge barrel (4) of bucket (2), discharge barrel (4) passes through buckle (7) connecting valve device (5), valving (5) outlet connection discharge nozzle (6).The utility model installation procedure is simple, and material input amount is smaller, and cost is relatively low, on the one hand can save concrete, reduces the waste in circular flow;On the other hand the dead angle that can effectively solve the problems, such as that tower crane does not cover pours.

Description

A kind of construction concrete conveyance tower crane hopper
Technical field
The utility model relates to a kind of tower crane hoppers, relate particularly to a kind of construction concrete conveyance tower crane material Bucket, mainly applies to carry out concreting in monolithic reinforced concrete structure, belongs to construction articles field.
Background technique
Currently, most cast-in-place concrete buildings all use the auxiliary tools such as automotive pump to carry out concreting, it should Technology greatly improves work efficiency.But many buildings due to temporary site usable floor area it is limited, automotive pump etc. can not be put Put, and tower crane do not cover position and it is easy to form pour dead angle, cause concreting difficult, if mixed between Solidifying soil turnover, needs a large amount of manpower and material resources, can also waste raw material, cause inconvenience.Currently, solving the problems, such as the main of this Method is to make the wooden chute using nail, and using the wooden chute, the personnel of being operated first cannot get safety guarantee, take second place blowing when will appear throwing Spill material context, waste raw material, also often to move the wooden chute, these all can lost labor, cause insecurity factor.So Solving the problems, such as this has the realm of building construction and its important meaning.
Therefore, need to develop a kind of practical and high construction of construction efficiency with concrete conveyance tower crane hopper is solution The certainly key point of above-mentioned technical problem.
Summary of the invention
For many shortcomings and deficiencies present in above-mentioned background technique, the utility model improves traditional hopper With innovation, and it is an object of the present invention to provide a kind of can adapt to execution conditions complicated and severe in site operation, there is certain practical valence Value, is able to satisfy and meets the requirement in armored concrete acceptance specification to reinforcement welding intensity and presentation quality, be conducive to improve The quality and such a construction in service life concrete conveyance tower crane hopper of building.
In order to solve the above problem and reach above-mentioned goal of the invention, a kind of construction concrete conveyance of the utility model Tower crane hopper is realized by using following design structure and using following technical solution:
Bucket is held as a kind of improvement of the utility model construction concrete conveyance tower crane hopper, including concrete (2), support system (3), discharge barrel (4), valving (5), buckle (7), are equipped with concrete on support system (3) and hold It struggles against (2), discharge barrel (4) and buckle (7) is sequentially installed from top to bottom in the lower section that concrete holds bucket (2), wherein concrete Lower end connection discharge barrel (4) of bucket (2) is held, discharge barrel (4) passes through buckle (7) connecting valve device (5), valving (5) Outlet connection discharge nozzle (6).
The improvement above-mentioned as the utility model, it is hollow cylinder (21) that the concrete, which holds bucket (2) upper end, under End is infundibulate (22);The concrete holds the middle part that bucket (2) is fixed at support system (3).
The further improvement above-mentioned as the utility model, the support system (3) is mainly by four vertical supporting bars (31) it is formed with four horizontal support bars (32), wherein four horizontal support bars (32), which mutually are spelled to take, surrounds square frame, at this The four corners of square frame, which are respectively perpendicular, is equipped with vertical supporting bar (31) upwards, forms it into whole, a composition chassis body, should Chassis body is made of metal material or alloy material.
The further improvement above-mentioned as the utility model, the discharge barrel (4) include discharge barrel ontology (41), discharging The cylindrical structure of cylinder ontology (41) generally inner hollow is equipped with discharging in the lower end of the discharge barrel (4) of the cylindrical structure Interface (42), discharging interface (42) are linked together with discharge barrel ontology (41), are integrally formed molding structure.
The further improvement above-mentioned as the utility model, the valving (5) include valve conveying pipeline (52), box Formula buckles (53), valve block (54) and stopper (55), wherein boxlike buckle (53) is divided into identical up and down two to be mutually symmetrical of size Part, the two parts are integral by the way that fixing bolt (531) are affixed, and valve conveying pipeline (52) is installed in boxlike buckle (53) Portion extends the valve interface (51) for being equipped with conjoined structure on valve conveying pipeline (52);Valve block (54) is centrally located in boxlike card Between the two parts up and down for detaining (53), stopper (55) are symmetrically arranged at the both ends of boxlike buckle (53) and valve block (54), in stopper (55) compatible handle (56) therewith is installed, the rubber on the outer surface of handle (56) equipped with conjoined structure is anti-on Skidding.
The further improvement above-mentioned as the utility model, the circle of the valve conveying pipeline (52) generally inner hollow Column structure;The generally internal plate-like body member for being provided with circular through hole of the boxlike buckle (53);The valve block (54) is whole For the plate-like body member for being provided with circular through hole in the middle part of one end;Valve conveying pipeline (52) sequentially passes through boxlike buckle (53) from top to bottom On through-hole and valve block (54) on through-hole after by fixing bolt (531) its valve conveying pipeline (52) and boxlike are buckled into (53) And valve block (54) is connected to one.
The again further improvement above-mentioned as the utility model, " U " or " C " of the stopper (55) generally recess Character form structure;The generally rodlike cylindrical structure of the handle (56), the handle (56) and stopper of cylindrical structure (55) it is either flexibly connected between to be fixedly connected, wherein be fixedly connected as being welded to connect or being machined directly to one Molding structure;It is flexibly connected as articulated connection either plug-in connection.
The again again further improvement above-mentioned as the utility model, extends the company of being equipped in discharge nozzle (6) one end exit The discharging interface tube (61) of body structure, discharging interface tube (61) connect concrete pump pipe.
As the utility model it is above-mentioned again be more further improved again, the discharge nozzle (6) is straight tube or bend pipe.
Working principle is: a kind of construction of above-mentioned design structure is carrying out using it with concrete conveyance tower crane hopper Before, need to be carried out assembling as spare.
When assembling, first by valving (5) with buckle (7) firm discharging interface (42) for being connected to discharge barrel (4) on, Whether installation discharging is being increased on the valve interface (51) of valving (5) according to the selection of scene actual use situation when use It manages (6), and installs concrete pump pipe additional on discharge nozzle (6).
When work, first by a kind of above-mentioned construction concrete conveyance tower crane hopper carrying being completed To casting position, then, valving (5) is pulled to closed state, and concrete is put into concrete later and is held in bucket (2), with That is, opening valving (5), being poured when hopper is lifted to region to be poured.
After the completion of concreting, each component parts of its device is removed and cleaned up, with Afterwards, operator is carried to storage repository and is reserved as next recycling.
Utility model has the following beneficial effects compared with the prior art: the utility model passes through to traditional hopper It is improved, when being poured into above-mentioned building dead angle, the soft pump line of concrete conveyance can be installed additional on hopper and poured, expected Bucket can also install valve directly on hopper and use as common hopper, and the use of the new type hopper is easy to use, be not necessarily to exterior wall Shelf can be moved arbitrarily and be put, while can also penetrate through scaffold and balcony and ash is directly directly sent to interior, remove previous old-fashioned material from Bucket needs employment to go the phenomenon that scooping up ash, ash discarding to balcony.The utility model installation procedure is simple, and material input amount is smaller, cost It is lower, concrete on the one hand can be saved, the waste in circular flow is reduced;On the other hand tower crane covering can effectively be solved not To dead angle pour problem.
Detailed description of the invention
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing, in which:
Fig. 1 is the southwestern shaft side figure one of the utility model;
Fig. 2 is the southwestern shaft side figure two of the utility model;
Fig. 3 is the southwestern shaft side figure three of the utility model;
Fig. 4 is the front view of the utility model;
Fig. 5 is the top view of the utility model;
Fig. 6 is the discharge nozzle overall structure diagram of the utility model;
Fig. 7 is the valving overall structure diagram of the utility model;
Fig. 8 is the sectional view of the valving of the utility model.
Wherein, figure label: 2-concrete hold bucket;21-is cylindrical;22-infundibulates;
3-support systems;31-vertical supporting bars;32-horizontal support bars;
4-discharge barrels;41-discharge barrel ontologies;42-discharging interfaces;
5-valvings;51-valve interfaces;52-valve discharge nozzles;53-boxlikes buckle;531-fixing bolts; 54-valve blocks;55-stoppers;56-handles;
6-discharge nozzles, 61-discharging interface tubes.
Specific embodiment
In order to make technological means of the utility model, create feature, reach purpose and effect is easy to understand, under Further detailed description is made to the technical solution of the utility model in conjunction with attached drawing and specific embodiment in face.
A kind of construction concrete conveyance tower crane hopper as shown in Figure of description 1 to Figure of description 8, including Concrete holds bucket 2, support system 3, discharge barrel 4, valving 5, buckle 7, is equipped with concrete on support system 3 and holds Bucket 2 is sequentially equipped with discharge barrel 4 and buckle 7 in the lower section that concrete holds bucket 2, wherein concrete holds bucket 2 from top to bottom Lower end connect discharge barrel 4, discharge barrel 4 by buckle 7 connecting valve devices 5, valving 5 outlet connection discharge nozzle 6.
Further, it is hollow cylinder 21 that concrete, which holds 2 upper ends of bucket, and lower end is infundibulate 22;The concrete is contained Put the middle part that bucket 2 is fixed at support system 3.
Further, support system 3 is mainly made of four vertical supporting bars 31 and four horizontal support bars 32, In, four horizontal support bars 32, which mutually spell to take, surrounds square frame, is respectively perpendicular in the four corners of the square frame and is equipped with upwards Vertical supporting bar 31 forms it into an entirety, constitutes chassis body, which is by metal material or alloy material texture At.
Further, discharge barrel 4 includes discharge barrel ontology 41, the cylindrical knot of the generally inner hollow of discharge barrel ontology 41 Structure is equipped with discharging interface 42 in the lower end of the discharge barrel 4 of the cylindrical structure, and discharging interface 42 and discharge barrel ontology 41 are linked as one Body is integrally formed molding structure.
Further, valving 5 includes valve conveying pipeline 52, boxlike buckle 53, valve block 54 and stopper 55, wherein It is the identical two parts up and down being mutually symmetrical of size that boxlike, which buckles 53 points, and it is one whole that the two parts are affixed by fixing bolt 531 Body, valve conveying pipeline 52 are installed on 53 middle part of boxlike buckle, extend the valve equipped with conjoined structure on valve conveying pipeline 52 and connect Mouth 51;Valve block 54 is centrally located between two parts up and down of boxlike buckle 53, at the both ends pair of boxlike buckle 53 and valve block 54 Claim to be equipped with stopper 55, compatible handle 56 therewith is installed in stopper 55, the company of being equipped on the outer surface of handle 56 The rubber antiskid pad of body structure.
Specifically, the cylindrical structure of the generally inner hollow of valve conveying pipeline 52;The boxlike buckle 53 is generally interior Portion is provided with the plate-like body member of circular through hole;The plate-like body member of circular through hole is provided in the middle part of the valve block 54 generally one end; Valve conveying pipeline 52 passes through fixing bolt after sequentially passing through the through-hole on through-hole and valve block 54 on boxlike buckle 53 from top to bottom 531 are connected to one its valve conveying pipeline 52 and boxlike buckle 53 and valve block 54.
Specifically, " U " or " C " character form structure of the generally recess of stopper 55;The handle 56 is generally rodlike Cylindrical structure is fixedly connected or is flexibly connected between the handle 56 and stopper 55 of cylindrical structure, wherein fixed It is connected as being welded to connect and is either machined directly to integrated formed structure;It is flexibly connected and connects for articulated connection either plug-in It connects.
Further, extend the discharging interface tube 61 equipped with conjoined structure in 6 one end exit of discharge nozzle, discharge interface tube 61 connection concrete pump pipes.
Specifically, discharge nozzle 6 is straight tube or bend pipe.
A kind of construction of above-mentioned design structure before carrying out use, is needed it with concrete conveyance tower crane hopper Assembling is carried out as spare.
In conclusion more specifically embodiment is the utility model:
When assembling, first by valving 5 on the 7 firm discharging interfaces 42 for being connected to discharge barrel 4 of buckle, root when use Whether increasing installation discharge nozzle on the valve interface 51 of valving 5 according to the selection of scene actual use situation.
When work, first by a kind of above-mentioned construction concrete conveyance tower crane hopper carrying being completed To casting position, then, valving 5 is pulled to closed state, later by concrete be put into concrete hold bucket 2 in, with that is, to When hopper is lifted to region to be poured, valving 5 is opened, is poured.
After the completion of concreting, each component parts of its device is removed and cleaned up, with Afterwards, operator is carried to storage repository and is reserved as next recycling.
In conclusion the utility model is in a specific embodiment advantageously:
1, installation is simple, convenient, fast, substantially increases construction efficiency and construction precision, is conducive to improve construction speed And construction quality;
2, material investment is reduced, cost is reduced;
3, economic and environment-friendly;
4, the labour cost of the material production and assembling and disassembling of wooden irony ash-pit can be saved;
5, the phenomenon that old-fashioned hopper removes ash when putting ash is avoided;
6 compare a large amount of labour cost of saving with ground pump step material machine;
7, easy to process, cost is relatively low;
8, simple and convenient for operation when using, greatly improve work efficiency;
9, its material uses iron sheet, long service life.
Finally, it should be noted that above in conjunction with the embodiments with attached drawing to design of the invention, specific structure and generation Technical effect be clearly and completely described, to be completely understood by the purpose of the present invention, feature and effect.Obviously, described Embodiment be a part of the embodiments of the present invention, rather than whole embodiments, based on the embodiment of the present invention, this field Technical staff's other embodiments obtained without creative efforts, belong to the scope of protection of the invention. In addition, all connections being previously mentioned in text, connection relationship, not singly refer to that component directly connects, and referring to can be according to specific implementation Situation, by adding or reducing couple auxiliary, to form more preferably coupling structure.Each technical characteristic in the invention, It can be with combination of interactions under the premise of not conflicting conflict.

Claims (9)

1. a kind of construction concrete conveyance tower crane hopper, including concrete hold bucket (2), support system (3), discharge barrel (4), valving (5), buckle (7), it is characterised in that: concrete is installed on support system (3) and holds bucket (2), mixed The lower section that solidifying soil holds bucket (2) is sequentially equipped with discharge barrel (4) and buckle (7) from top to bottom, wherein concrete holds bucket (2) Lower end connect discharge barrel (4), discharge barrel (4) by buckle (7) connecting valve device (5), valving (5) outlet connect out Expects pipe (6).
2. a kind of construction according to claim 1 concrete conveyance tower crane hopper, it is characterised in that: the coagulation It is hollow cylinder (21) that soil, which holds bucket (2) upper end, and lower end is infundibulate (22);The concrete holds bucket (2) fixed setting At the middle part of support system (3).
3. a kind of construction according to claim 1 concrete conveyance tower crane hopper, it is characterised in that: the support System (3) is mainly made of four vertical supporting bars (31) and four horizontal support bars (32), wherein four horizontal support bars (32) it mutually spells to take and surrounds square frame, be respectively perpendicular in the four corners of the square frame and be equipped with vertical supporting bar (31) upwards, An entirety is formed it into, constitutes chassis body, which be made of metal material or alloy material.
4. a kind of construction according to claim 1 concrete conveyance tower crane hopper, it is characterised in that: the discharging Cylinder (4) includes discharge barrel ontology (41), and the cylindrical structure of discharge barrel ontology (41) generally inner hollow is tied in the cylinder The lower end of the discharge barrel (4) of structure is equipped with discharging interface (42), and discharging interface (42) is linked together with discharge barrel ontology (41), constitutes Integrated formed structure.
5. a kind of construction according to claim 1 concrete conveyance tower crane hopper, it is characterised in that: the valve Device (5) includes valve conveying pipeline (52), boxlike buckle (53), valve block (54) and stopper (55), wherein boxlike buckles (53) It is divided into the identical two parts up and down being mutually symmetrical of size, which is integral by the way that fixing bolt (531) are affixed, and valve is defeated Expects pipe (52) is installed in the middle part of boxlike buckle (53), extends the valve interface for being equipped with conjoined structure on valve conveying pipeline (52) (51);Valve block (54) is centrally located between two parts up and down of boxlike buckle (53), in boxlike buckle (53) and valve block (54) Both ends be symmetrically arranged with stopper (55), compatible handle (56) therewith is installed on stopper (55), in handle (56) Outer surface be equipped with conjoined structure rubber antiskid pad.
6. a kind of construction according to claim 5 concrete conveyance tower crane hopper, it is characterised in that: the valve The cylindrical structure of conveying pipeline (52) generally inner hollow;The boxlike buckle (53) is generally internal to be provided with circular through hole Plate-like body member;The plate-like body member of circular through hole is provided in the middle part of the valve block (54) generally one end;Valve conveying pipeline (52) From top to bottom sequentially pass through boxlike buckle (53) on through-hole and valve block (54) on through-hole after by fixing bolt (531) by its Valve conveying pipeline (52) and boxlike buckle (53) and valve block (54) are connected to one.
7. a kind of construction according to claim 5 concrete conveyance tower crane hopper, it is characterised in that: the stopper (55) generally " U " or " C " character form structure of recess;The generally rodlike cylindrical structure of the handle (56), cylinder It is either flexibly connected between the handle (56) of body structure and stopper (55) to be fixedly connected, wherein be fixedly connected as welding Connection is either machined directly to integrated formed structure;It is flexibly connected as articulated connection either plug-in connection.
8. a kind of construction according to claim 1 concrete conveyance tower crane hopper, it is characterised in that: in discharge nozzle (6) one end exit extends the discharging interface tube (61) for being equipped with conjoined structure, and discharging interface tube (61) connects concrete pump pipe.
9. a kind of construction according to claim 8 concrete conveyance tower crane hopper, it is characterised in that: the discharging Managing (6) is straight tube or bend pipe.
CN201820795190.4U 2018-05-25 2018-05-25 A kind of construction concrete conveyance tower crane hopper Active CN208329633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820795190.4U CN208329633U (en) 2018-05-25 2018-05-25 A kind of construction concrete conveyance tower crane hopper

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820795190.4U CN208329633U (en) 2018-05-25 2018-05-25 A kind of construction concrete conveyance tower crane hopper

Publications (1)

Publication Number Publication Date
CN208329633U true CN208329633U (en) 2019-01-04

Family

ID=64775343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820795190.4U Active CN208329633U (en) 2018-05-25 2018-05-25 A kind of construction concrete conveyance tower crane hopper

Country Status (1)

Country Link
CN (1) CN208329633U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778914A (en) * 2019-03-14 2019-05-21 广东省长大公路工程有限公司 A kind of steel-shelled concrete can constant speed adjust blanking velocity transportation system and method
CN110748164A (en) * 2019-07-15 2020-02-04 中交第四公路工程局有限公司 Assembled light steel pipe pouring funnel device with replaceable screen and manufacturing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778914A (en) * 2019-03-14 2019-05-21 广东省长大公路工程有限公司 A kind of steel-shelled concrete can constant speed adjust blanking velocity transportation system and method
CN110748164A (en) * 2019-07-15 2020-02-04 中交第四公路工程局有限公司 Assembled light steel pipe pouring funnel device with replaceable screen and manufacturing method

Similar Documents

Publication Publication Date Title
CN206233596U (en) Building block exterior wall constructional column concrete casting device
CN208329633U (en) A kind of construction concrete conveyance tower crane hopper
CN203856202U (en) Simple pullable sizing device of reserved holes
CN106193588A (en) A kind of method pouring building post-cast strip and pour mould
CN205677249U (en) A kind of casting concrete constructional column hopper
CN204238562U (en) Concreting hopper
CN207538471U (en) A kind of funnel poured for post-cast strip
CN204000505U (en) CRTSIII plate-type non-fragment orbit self-compacting concrete side direction perfusion frock
CN207750651U (en) A kind of concrete pump pipe temporary blocking device
CN217175793U (en) Movable assembly type box column grouting device
CN208605122U (en) A kind of connecting elements for bridge pier safety climbing ladder
CN205976503U (en) Vertical concrete structure's template lacing device
CN207228614U (en) A kind of formwork fastener and its installation node
CN110067379A (en) A kind of constructional column pours tool and a kind of constructional column casting method
CN209353705U (en) What a kind of quick peace was torn open blocks up hole device to pull-type exterior wall
CN209228033U (en) Regularization template external corner reinforcing device
CN203475860U (en) Combined hole covering piece
CN208201872U (en) A kind of improved simple self-made concrete elephant trunk
CN209162834U (en) A kind of sealing floral tube grouting equipment
CN206646646U (en) Interior ring type steel tube regeneration monolith assembling structure
CN106703196B (en) Interior ring type steel tube regeneration monolith assembling structure
CN106481082A (en) A kind of improvement casting method of constructional column
CN208502220U (en) A kind of embedded nut method wall-connecting piece
CN207789282U (en) A kind of integrated final-assembly die of concrete prefabricated element
CN206538759U (en) It is a kind of to prevent the device of rising of steel cage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant