CN208329633U - A kind of construction concrete conveyance tower crane hopper - Google Patents
A kind of construction concrete conveyance tower crane hopper Download PDFInfo
- Publication number
- CN208329633U CN208329633U CN201820795190.4U CN201820795190U CN208329633U CN 208329633 U CN208329633 U CN 208329633U CN 201820795190 U CN201820795190 U CN 201820795190U CN 208329633 U CN208329633 U CN 208329633U
- Authority
- CN
- China
- Prior art keywords
- concrete
- buckle
- tower crane
- valve
- discharge barrel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a kind of construction concrete conveyance tower crane hopper, bucket (2) are held including concrete, support system (3), discharge barrel (4), valving (5), it buckles (7), it is characterized by: being equipped with concrete on support system (3) holds bucket (2), discharge barrel (4) and buckle (7) are sequentially installed from top to bottom in the lower section that concrete holds bucket (2), wherein, concrete holds lower end connection discharge barrel (4) of bucket (2), discharge barrel (4) passes through buckle (7) connecting valve device (5), valving (5) outlet connection discharge nozzle (6).The utility model installation procedure is simple, and material input amount is smaller, and cost is relatively low, on the one hand can save concrete, reduces the waste in circular flow;On the other hand the dead angle that can effectively solve the problems, such as that tower crane does not cover pours.
Description
Technical field
The utility model relates to a kind of tower crane hoppers, relate particularly to a kind of construction concrete conveyance tower crane material
Bucket, mainly applies to carry out concreting in monolithic reinforced concrete structure, belongs to construction articles field.
Background technique
Currently, most cast-in-place concrete buildings all use the auxiliary tools such as automotive pump to carry out concreting, it should
Technology greatly improves work efficiency.But many buildings due to temporary site usable floor area it is limited, automotive pump etc. can not be put
Put, and tower crane do not cover position and it is easy to form pour dead angle, cause concreting difficult, if mixed between
Solidifying soil turnover, needs a large amount of manpower and material resources, can also waste raw material, cause inconvenience.Currently, solving the problems, such as the main of this
Method is to make the wooden chute using nail, and using the wooden chute, the personnel of being operated first cannot get safety guarantee, take second place blowing when will appear throwing
Spill material context, waste raw material, also often to move the wooden chute, these all can lost labor, cause insecurity factor.So
Solving the problems, such as this has the realm of building construction and its important meaning.
Therefore, need to develop a kind of practical and high construction of construction efficiency with concrete conveyance tower crane hopper is solution
The certainly key point of above-mentioned technical problem.
Summary of the invention
For many shortcomings and deficiencies present in above-mentioned background technique, the utility model improves traditional hopper
With innovation, and it is an object of the present invention to provide a kind of can adapt to execution conditions complicated and severe in site operation, there is certain practical valence
Value, is able to satisfy and meets the requirement in armored concrete acceptance specification to reinforcement welding intensity and presentation quality, be conducive to improve
The quality and such a construction in service life concrete conveyance tower crane hopper of building.
In order to solve the above problem and reach above-mentioned goal of the invention, a kind of construction concrete conveyance of the utility model
Tower crane hopper is realized by using following design structure and using following technical solution:
Bucket is held as a kind of improvement of the utility model construction concrete conveyance tower crane hopper, including concrete
(2), support system (3), discharge barrel (4), valving (5), buckle (7), are equipped with concrete on support system (3) and hold
It struggles against (2), discharge barrel (4) and buckle (7) is sequentially installed from top to bottom in the lower section that concrete holds bucket (2), wherein concrete
Lower end connection discharge barrel (4) of bucket (2) is held, discharge barrel (4) passes through buckle (7) connecting valve device (5), valving (5)
Outlet connection discharge nozzle (6).
The improvement above-mentioned as the utility model, it is hollow cylinder (21) that the concrete, which holds bucket (2) upper end, under
End is infundibulate (22);The concrete holds the middle part that bucket (2) is fixed at support system (3).
The further improvement above-mentioned as the utility model, the support system (3) is mainly by four vertical supporting bars
(31) it is formed with four horizontal support bars (32), wherein four horizontal support bars (32), which mutually are spelled to take, surrounds square frame, at this
The four corners of square frame, which are respectively perpendicular, is equipped with vertical supporting bar (31) upwards, forms it into whole, a composition chassis body, should
Chassis body is made of metal material or alloy material.
The further improvement above-mentioned as the utility model, the discharge barrel (4) include discharge barrel ontology (41), discharging
The cylindrical structure of cylinder ontology (41) generally inner hollow is equipped with discharging in the lower end of the discharge barrel (4) of the cylindrical structure
Interface (42), discharging interface (42) are linked together with discharge barrel ontology (41), are integrally formed molding structure.
The further improvement above-mentioned as the utility model, the valving (5) include valve conveying pipeline (52), box
Formula buckles (53), valve block (54) and stopper (55), wherein boxlike buckle (53) is divided into identical up and down two to be mutually symmetrical of size
Part, the two parts are integral by the way that fixing bolt (531) are affixed, and valve conveying pipeline (52) is installed in boxlike buckle (53)
Portion extends the valve interface (51) for being equipped with conjoined structure on valve conveying pipeline (52);Valve block (54) is centrally located in boxlike card
Between the two parts up and down for detaining (53), stopper (55) are symmetrically arranged at the both ends of boxlike buckle (53) and valve block (54), in stopper
(55) compatible handle (56) therewith is installed, the rubber on the outer surface of handle (56) equipped with conjoined structure is anti-on
Skidding.
The further improvement above-mentioned as the utility model, the circle of the valve conveying pipeline (52) generally inner hollow
Column structure;The generally internal plate-like body member for being provided with circular through hole of the boxlike buckle (53);The valve block (54) is whole
For the plate-like body member for being provided with circular through hole in the middle part of one end;Valve conveying pipeline (52) sequentially passes through boxlike buckle (53) from top to bottom
On through-hole and valve block (54) on through-hole after by fixing bolt (531) its valve conveying pipeline (52) and boxlike are buckled into (53)
And valve block (54) is connected to one.
The again further improvement above-mentioned as the utility model, " U " or " C " of the stopper (55) generally recess
Character form structure;The generally rodlike cylindrical structure of the handle (56), the handle (56) and stopper of cylindrical structure
(55) it is either flexibly connected between to be fixedly connected, wherein be fixedly connected as being welded to connect or being machined directly to one
Molding structure;It is flexibly connected as articulated connection either plug-in connection.
The again again further improvement above-mentioned as the utility model, extends the company of being equipped in discharge nozzle (6) one end exit
The discharging interface tube (61) of body structure, discharging interface tube (61) connect concrete pump pipe.
As the utility model it is above-mentioned again be more further improved again, the discharge nozzle (6) is straight tube or bend pipe.
Working principle is: a kind of construction of above-mentioned design structure is carrying out using it with concrete conveyance tower crane hopper
Before, need to be carried out assembling as spare.
When assembling, first by valving (5) with buckle (7) firm discharging interface (42) for being connected to discharge barrel (4) on,
Whether installation discharging is being increased on the valve interface (51) of valving (5) according to the selection of scene actual use situation when use
It manages (6), and installs concrete pump pipe additional on discharge nozzle (6).
When work, first by a kind of above-mentioned construction concrete conveyance tower crane hopper carrying being completed
To casting position, then, valving (5) is pulled to closed state, and concrete is put into concrete later and is held in bucket (2), with
That is, opening valving (5), being poured when hopper is lifted to region to be poured.
After the completion of concreting, each component parts of its device is removed and cleaned up, with
Afterwards, operator is carried to storage repository and is reserved as next recycling.
Utility model has the following beneficial effects compared with the prior art: the utility model passes through to traditional hopper
It is improved, when being poured into above-mentioned building dead angle, the soft pump line of concrete conveyance can be installed additional on hopper and poured, expected
Bucket can also install valve directly on hopper and use as common hopper, and the use of the new type hopper is easy to use, be not necessarily to exterior wall
Shelf can be moved arbitrarily and be put, while can also penetrate through scaffold and balcony and ash is directly directly sent to interior, remove previous old-fashioned material from
Bucket needs employment to go the phenomenon that scooping up ash, ash discarding to balcony.The utility model installation procedure is simple, and material input amount is smaller, cost
It is lower, concrete on the one hand can be saved, the waste in circular flow is reduced;On the other hand tower crane covering can effectively be solved not
To dead angle pour problem.
Detailed description of the invention
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing, in which:
Fig. 1 is the southwestern shaft side figure one of the utility model;
Fig. 2 is the southwestern shaft side figure two of the utility model;
Fig. 3 is the southwestern shaft side figure three of the utility model;
Fig. 4 is the front view of the utility model;
Fig. 5 is the top view of the utility model;
Fig. 6 is the discharge nozzle overall structure diagram of the utility model;
Fig. 7 is the valving overall structure diagram of the utility model;
Fig. 8 is the sectional view of the valving of the utility model.
Wherein, figure label: 2-concrete hold bucket;21-is cylindrical;22-infundibulates;
3-support systems;31-vertical supporting bars;32-horizontal support bars;
4-discharge barrels;41-discharge barrel ontologies;42-discharging interfaces;
5-valvings;51-valve interfaces;52-valve discharge nozzles;53-boxlikes buckle;531-fixing bolts;
54-valve blocks;55-stoppers;56-handles;
6-discharge nozzles, 61-discharging interface tubes.
Specific embodiment
In order to make technological means of the utility model, create feature, reach purpose and effect is easy to understand, under
Further detailed description is made to the technical solution of the utility model in conjunction with attached drawing and specific embodiment in face.
A kind of construction concrete conveyance tower crane hopper as shown in Figure of description 1 to Figure of description 8, including
Concrete holds bucket 2, support system 3, discharge barrel 4, valving 5, buckle 7, is equipped with concrete on support system 3 and holds
Bucket 2 is sequentially equipped with discharge barrel 4 and buckle 7 in the lower section that concrete holds bucket 2, wherein concrete holds bucket 2 from top to bottom
Lower end connect discharge barrel 4, discharge barrel 4 by buckle 7 connecting valve devices 5, valving 5 outlet connection discharge nozzle 6.
Further, it is hollow cylinder 21 that concrete, which holds 2 upper ends of bucket, and lower end is infundibulate 22;The concrete is contained
Put the middle part that bucket 2 is fixed at support system 3.
Further, support system 3 is mainly made of four vertical supporting bars 31 and four horizontal support bars 32,
In, four horizontal support bars 32, which mutually spell to take, surrounds square frame, is respectively perpendicular in the four corners of the square frame and is equipped with upwards
Vertical supporting bar 31 forms it into an entirety, constitutes chassis body, which is by metal material or alloy material texture
At.
Further, discharge barrel 4 includes discharge barrel ontology 41, the cylindrical knot of the generally inner hollow of discharge barrel ontology 41
Structure is equipped with discharging interface 42 in the lower end of the discharge barrel 4 of the cylindrical structure, and discharging interface 42 and discharge barrel ontology 41 are linked as one
Body is integrally formed molding structure.
Further, valving 5 includes valve conveying pipeline 52, boxlike buckle 53, valve block 54 and stopper 55, wherein
It is the identical two parts up and down being mutually symmetrical of size that boxlike, which buckles 53 points, and it is one whole that the two parts are affixed by fixing bolt 531
Body, valve conveying pipeline 52 are installed on 53 middle part of boxlike buckle, extend the valve equipped with conjoined structure on valve conveying pipeline 52 and connect
Mouth 51;Valve block 54 is centrally located between two parts up and down of boxlike buckle 53, at the both ends pair of boxlike buckle 53 and valve block 54
Claim to be equipped with stopper 55, compatible handle 56 therewith is installed in stopper 55, the company of being equipped on the outer surface of handle 56
The rubber antiskid pad of body structure.
Specifically, the cylindrical structure of the generally inner hollow of valve conveying pipeline 52;The boxlike buckle 53 is generally interior
Portion is provided with the plate-like body member of circular through hole;The plate-like body member of circular through hole is provided in the middle part of the valve block 54 generally one end;
Valve conveying pipeline 52 passes through fixing bolt after sequentially passing through the through-hole on through-hole and valve block 54 on boxlike buckle 53 from top to bottom
531 are connected to one its valve conveying pipeline 52 and boxlike buckle 53 and valve block 54.
Specifically, " U " or " C " character form structure of the generally recess of stopper 55;The handle 56 is generally rodlike
Cylindrical structure is fixedly connected or is flexibly connected between the handle 56 and stopper 55 of cylindrical structure, wherein fixed
It is connected as being welded to connect and is either machined directly to integrated formed structure;It is flexibly connected and connects for articulated connection either plug-in
It connects.
Further, extend the discharging interface tube 61 equipped with conjoined structure in 6 one end exit of discharge nozzle, discharge interface tube
61 connection concrete pump pipes.
Specifically, discharge nozzle 6 is straight tube or bend pipe.
A kind of construction of above-mentioned design structure before carrying out use, is needed it with concrete conveyance tower crane hopper
Assembling is carried out as spare.
In conclusion more specifically embodiment is the utility model:
When assembling, first by valving 5 on the 7 firm discharging interfaces 42 for being connected to discharge barrel 4 of buckle, root when use
Whether increasing installation discharge nozzle on the valve interface 51 of valving 5 according to the selection of scene actual use situation.
When work, first by a kind of above-mentioned construction concrete conveyance tower crane hopper carrying being completed
To casting position, then, valving 5 is pulled to closed state, later by concrete be put into concrete hold bucket 2 in, with that is, to
When hopper is lifted to region to be poured, valving 5 is opened, is poured.
After the completion of concreting, each component parts of its device is removed and cleaned up, with
Afterwards, operator is carried to storage repository and is reserved as next recycling.
In conclusion the utility model is in a specific embodiment advantageously:
1, installation is simple, convenient, fast, substantially increases construction efficiency and construction precision, is conducive to improve construction speed
And construction quality;
2, material investment is reduced, cost is reduced;
3, economic and environment-friendly;
4, the labour cost of the material production and assembling and disassembling of wooden irony ash-pit can be saved;
5, the phenomenon that old-fashioned hopper removes ash when putting ash is avoided;
6 compare a large amount of labour cost of saving with ground pump step material machine;
7, easy to process, cost is relatively low;
8, simple and convenient for operation when using, greatly improve work efficiency;
9, its material uses iron sheet, long service life.
Finally, it should be noted that above in conjunction with the embodiments with attached drawing to design of the invention, specific structure and generation
Technical effect be clearly and completely described, to be completely understood by the purpose of the present invention, feature and effect.Obviously, described
Embodiment be a part of the embodiments of the present invention, rather than whole embodiments, based on the embodiment of the present invention, this field
Technical staff's other embodiments obtained without creative efforts, belong to the scope of protection of the invention.
In addition, all connections being previously mentioned in text, connection relationship, not singly refer to that component directly connects, and referring to can be according to specific implementation
Situation, by adding or reducing couple auxiliary, to form more preferably coupling structure.Each technical characteristic in the invention,
It can be with combination of interactions under the premise of not conflicting conflict.
Claims (9)
1. a kind of construction concrete conveyance tower crane hopper, including concrete hold bucket (2), support system (3), discharge barrel
(4), valving (5), buckle (7), it is characterised in that: concrete is installed on support system (3) and holds bucket (2), mixed
The lower section that solidifying soil holds bucket (2) is sequentially equipped with discharge barrel (4) and buckle (7) from top to bottom, wherein concrete holds bucket (2)
Lower end connect discharge barrel (4), discharge barrel (4) by buckle (7) connecting valve device (5), valving (5) outlet connect out
Expects pipe (6).
2. a kind of construction according to claim 1 concrete conveyance tower crane hopper, it is characterised in that: the coagulation
It is hollow cylinder (21) that soil, which holds bucket (2) upper end, and lower end is infundibulate (22);The concrete holds bucket (2) fixed setting
At the middle part of support system (3).
3. a kind of construction according to claim 1 concrete conveyance tower crane hopper, it is characterised in that: the support
System (3) is mainly made of four vertical supporting bars (31) and four horizontal support bars (32), wherein four horizontal support bars
(32) it mutually spells to take and surrounds square frame, be respectively perpendicular in the four corners of the square frame and be equipped with vertical supporting bar (31) upwards,
An entirety is formed it into, constitutes chassis body, which be made of metal material or alloy material.
4. a kind of construction according to claim 1 concrete conveyance tower crane hopper, it is characterised in that: the discharging
Cylinder (4) includes discharge barrel ontology (41), and the cylindrical structure of discharge barrel ontology (41) generally inner hollow is tied in the cylinder
The lower end of the discharge barrel (4) of structure is equipped with discharging interface (42), and discharging interface (42) is linked together with discharge barrel ontology (41), constitutes
Integrated formed structure.
5. a kind of construction according to claim 1 concrete conveyance tower crane hopper, it is characterised in that: the valve
Device (5) includes valve conveying pipeline (52), boxlike buckle (53), valve block (54) and stopper (55), wherein boxlike buckles (53)
It is divided into the identical two parts up and down being mutually symmetrical of size, which is integral by the way that fixing bolt (531) are affixed, and valve is defeated
Expects pipe (52) is installed in the middle part of boxlike buckle (53), extends the valve interface for being equipped with conjoined structure on valve conveying pipeline (52)
(51);Valve block (54) is centrally located between two parts up and down of boxlike buckle (53), in boxlike buckle (53) and valve block (54)
Both ends be symmetrically arranged with stopper (55), compatible handle (56) therewith is installed on stopper (55), in handle (56)
Outer surface be equipped with conjoined structure rubber antiskid pad.
6. a kind of construction according to claim 5 concrete conveyance tower crane hopper, it is characterised in that: the valve
The cylindrical structure of conveying pipeline (52) generally inner hollow;The boxlike buckle (53) is generally internal to be provided with circular through hole
Plate-like body member;The plate-like body member of circular through hole is provided in the middle part of the valve block (54) generally one end;Valve conveying pipeline (52)
From top to bottom sequentially pass through boxlike buckle (53) on through-hole and valve block (54) on through-hole after by fixing bolt (531) by its
Valve conveying pipeline (52) and boxlike buckle (53) and valve block (54) are connected to one.
7. a kind of construction according to claim 5 concrete conveyance tower crane hopper, it is characterised in that: the stopper
(55) generally " U " or " C " character form structure of recess;The generally rodlike cylindrical structure of the handle (56), cylinder
It is either flexibly connected between the handle (56) of body structure and stopper (55) to be fixedly connected, wherein be fixedly connected as welding
Connection is either machined directly to integrated formed structure;It is flexibly connected as articulated connection either plug-in connection.
8. a kind of construction according to claim 1 concrete conveyance tower crane hopper, it is characterised in that: in discharge nozzle
(6) one end exit extends the discharging interface tube (61) for being equipped with conjoined structure, and discharging interface tube (61) connects concrete pump pipe.
9. a kind of construction according to claim 8 concrete conveyance tower crane hopper, it is characterised in that: the discharging
Managing (6) is straight tube or bend pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820795190.4U CN208329633U (en) | 2018-05-25 | 2018-05-25 | A kind of construction concrete conveyance tower crane hopper |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820795190.4U CN208329633U (en) | 2018-05-25 | 2018-05-25 | A kind of construction concrete conveyance tower crane hopper |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208329633U true CN208329633U (en) | 2019-01-04 |
Family
ID=64775343
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820795190.4U Active CN208329633U (en) | 2018-05-25 | 2018-05-25 | A kind of construction concrete conveyance tower crane hopper |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208329633U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109778914A (en) * | 2019-03-14 | 2019-05-21 | 广东省长大公路工程有限公司 | A kind of steel-shelled concrete can constant speed adjust blanking velocity transportation system and method |
CN110748164A (en) * | 2019-07-15 | 2020-02-04 | 中交第四公路工程局有限公司 | Assembled light steel pipe pouring funnel device with replaceable screen and manufacturing method |
-
2018
- 2018-05-25 CN CN201820795190.4U patent/CN208329633U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109778914A (en) * | 2019-03-14 | 2019-05-21 | 广东省长大公路工程有限公司 | A kind of steel-shelled concrete can constant speed adjust blanking velocity transportation system and method |
CN110748164A (en) * | 2019-07-15 | 2020-02-04 | 中交第四公路工程局有限公司 | Assembled light steel pipe pouring funnel device with replaceable screen and manufacturing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206233596U (en) | Building block exterior wall constructional column concrete casting device | |
CN208329633U (en) | A kind of construction concrete conveyance tower crane hopper | |
CN203856202U (en) | Simple pullable sizing device of reserved holes | |
CN106193588A (en) | A kind of method pouring building post-cast strip and pour mould | |
CN205677249U (en) | A kind of casting concrete constructional column hopper | |
CN204238562U (en) | Concreting hopper | |
CN207538471U (en) | A kind of funnel poured for post-cast strip | |
CN204000505U (en) | CRTSIII plate-type non-fragment orbit self-compacting concrete side direction perfusion frock | |
CN207750651U (en) | A kind of concrete pump pipe temporary blocking device | |
CN217175793U (en) | Movable assembly type box column grouting device | |
CN208605122U (en) | A kind of connecting elements for bridge pier safety climbing ladder | |
CN205976503U (en) | Vertical concrete structure's template lacing device | |
CN207228614U (en) | A kind of formwork fastener and its installation node | |
CN110067379A (en) | A kind of constructional column pours tool and a kind of constructional column casting method | |
CN209353705U (en) | What a kind of quick peace was torn open blocks up hole device to pull-type exterior wall | |
CN209228033U (en) | Regularization template external corner reinforcing device | |
CN203475860U (en) | Combined hole covering piece | |
CN208201872U (en) | A kind of improved simple self-made concrete elephant trunk | |
CN209162834U (en) | A kind of sealing floral tube grouting equipment | |
CN206646646U (en) | Interior ring type steel tube regeneration monolith assembling structure | |
CN106703196B (en) | Interior ring type steel tube regeneration monolith assembling structure | |
CN106481082A (en) | A kind of improvement casting method of constructional column | |
CN208502220U (en) | A kind of embedded nut method wall-connecting piece | |
CN207789282U (en) | A kind of integrated final-assembly die of concrete prefabricated element | |
CN206538759U (en) | It is a kind of to prevent the device of rising of steel cage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |