CN204238562U - Concreting hopper - Google Patents
Concreting hopper Download PDFInfo
- Publication number
- CN204238562U CN204238562U CN201420670507.3U CN201420670507U CN204238562U CN 204238562 U CN204238562 U CN 204238562U CN 201420670507 U CN201420670507 U CN 201420670507U CN 204238562 U CN204238562 U CN 204238562U
- Authority
- CN
- China
- Prior art keywords
- blowing
- hopper
- concrete
- concreting
- elephant trunk
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of concreting hopper, be made up of concrete storing hopper (5) and blowing quarrel (6), it is characterized in that, blowing quarrel (6) is provided with blowing elephant trunk (3), blowing switch valve (7) is provided with in blowing elephant trunk (3), be provided with suspension ring (8) at the place suitable for reading, tapering of concrete storing hopper (5), concrete storing hopper (5) is provided with column supporting leg (4).Compared with prior art, the utility model only needs aside due to hopper, can not impact reinforcing bar etc., when silo bulkhead or shear wall concrete construction, no longer built site condition and limited, concrete is placed in concreting hopper, utilize tower crane that hopper is winched to work plane, blowing elephant trunk is aimed at and needs concreting position, open blowing switch valve, make concrete storing hopper inner concrete directly be poured into appointed part by blowing elephant trunk.
Description
Technical field
The utility model relates to a kind of concreting hopper.
Background technology
At present, the concrete hopper of prior art does not have blowing elephant trunk, by concrete transportation to work plane, directly can only unload in the plane, has following drawback:
1. use position limited: directly can only be discharged on work plane by concrete when building large area concrete, and when silo bulkhead and building shear wall construction, affect directly cannot be discharged to work plane by reinforcing bar and concreting point cross section, can only be discharged on operating platform, recycling artificial by concrete down to building a little.
2. uncontrollable discharge rate, flow: after utilizing prior art concrete hopper that concrete is transported to work plane, open bottom blowing quarrel, namely concrete is released by hopper port, because drain hole is in bottom, manual control blowing amount is difficult to, then once unsnatch after generally opening, uncontrollable discharge rate, flow.
Therefore, design one can either control discharge rate, flow, and directly can build again the concreting hopper of silo bulkhead and building shear wall, be the current technical issues that need to address.
Summary of the invention
Technical problem to be solved in the utility model is to provide one can either control discharge rate, flow, directly can build again the concreting hopper of silo bulkhead and building shear wall.
The technical scheme in the invention for solving the technical problem is:
Concreting hopper, be made up of concrete storing hopper and blowing quarrel, blowing quarrel is provided with blowing elephant trunk, in blowing elephant trunk, be provided with blowing switch valve, be provided with suspension ring at the place suitable for reading, tapering of concrete storing hopper, concrete storing hopper is provided with column supporting leg.Main operational principle: concrete is directly put in hopper, utilize tower crane handling to needing concreting position, blowing elephant trunk is aimed at the bulkhead needing to build or wall, open blowing switch valve, make concrete flow in bulkhead by own wt through blowing elephant trunk, unload enough until amount of concrete, close blowing switch valve, utilize tower crane that concreting hopper is moved to the next position, continue to build, repeat aforesaid operations and can complete bulkhead or wall concreting.
As a kind of preferred version of the present utility model, the sidewall of concrete storing hopper is provided with handrail.
As a kind of preferred version of the present utility model, be provided with stiffened steel plates at the upper oral part of concrete storing hopper, described suspension ring are welded on stiffened steel plates.
As a kind of preferred version of the present utility model, suspension ring φ 16 round steel makes.
As a kind of preferred version of the present utility model, blowing elephant trunk adopts DN200 welded tube, and blowing chute is tilting, becomes miter angle with ground, is convenient to concrete and utilizes own wt to flow out.
As a kind of preferred version of the present utility model, blowing switch valve adopts 8mm steel plate to make, and ensures switch intensity.
As a kind of preferred version of the present utility model, blowing switch valve adopts 8mm steel plate to make, and ensures switch intensity.
Compared with prior art, the utility model only needs aside due to hopper, can not impact reinforcing bar etc., when silo bulkhead or shear wall concrete construction, no longer built site condition and limited, concrete is placed in concreting hopper, utilize tower crane that hopper is winched to work plane, blowing elephant trunk is aimed at and needs concreting position, open blowing switch valve, make concrete storing hopper inner concrete directly be poured into appointed part by blowing elephant trunk.Concrete flow quantity can be controlled by the unlatching size of gauge tap valve, avoid concrete bulk deposition to cause concrete secondary to turn over shovel, greatly reduce the labour intensity of workman.
Accompanying drawing explanation
Fig. 1 is the front view of structural representation of the present utility model;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is that face is looked on a left side of Fig. 1;
Fig. 4 is the right view of Fig. 1;
Fig. 5 is the structural representation of part 7 in Fig. 1.
Detailed description of the invention
Concreting hopper, be made up of concrete storing hopper 5 and blowing quarrel 6, blowing quarrel 6 is provided with blowing elephant trunk 3, in blowing elephant trunk 3, be provided with blowing switch valve 7, be provided with suspension ring 8 at the place suitable for reading, tapering of concrete storing hopper 5, concrete storing hopper 5 is provided with column supporting leg 4.
The sidewall of concrete storing hopper 5 is provided with handrail 2.
Be provided with stiffened steel plates 1 at the upper oral part of concrete storing hopper 5, described suspension ring 8 are welded on stiffened steel plates 1.
Suspension ring 8 φ 16 round steel makes.
Blowing elephant trunk adopts DN200 welded tube, and blowing chute is tilting, becomes miter angle with ground.
Claims (5)
1. concreting hopper, be made up of concrete storing hopper (5) and blowing quarrel (6), it is characterized in that, blowing quarrel (6) is provided with blowing elephant trunk (3), blowing switch valve (7) is provided with in blowing elephant trunk (3), be provided with suspension ring (8) at the place suitable for reading, tapering of concrete storing hopper (5), concrete storing hopper (5) is provided with column supporting leg (4).
2. concreting hopper according to claim 1, is characterized in that, the sidewall of concrete storing hopper (5) is provided with handrail (2).
3. concreting hopper according to claim 1, is characterized in that, is provided with stiffened steel plates (1) at the upper oral part of concrete storing hopper (5), and described suspension ring (8) are welded on stiffened steel plates (1).
4. concreting hopper according to claim 1, is characterized in that, suspension ring (8) φ 16 round steel makes.
5. concreting hopper according to claim 1, is characterized in that, blowing elephant trunk adopts DN200 welded tube, and blowing chute is tilting, becomes miter angle with ground.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420670507.3U CN204238562U (en) | 2014-11-12 | 2014-11-12 | Concreting hopper |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420670507.3U CN204238562U (en) | 2014-11-12 | 2014-11-12 | Concreting hopper |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204238562U true CN204238562U (en) | 2015-04-01 |
Family
ID=52768075
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420670507.3U Expired - Fee Related CN204238562U (en) | 2014-11-12 | 2014-11-12 | Concreting hopper |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204238562U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105775655A (en) * | 2016-05-17 | 2016-07-20 | 广西凌云县永和冶炼有限责任公司 | Belt conveying device and carrier roller assembly thereof |
CN105775706A (en) * | 2016-05-17 | 2016-07-20 | 广西凌云县永和冶炼有限责任公司 | Belt conveying device and transfer mechanism thereof |
CN106638608A (en) * | 2016-12-27 | 2017-05-10 | 中交第二航务工程局有限公司 | Blanking-height-adjustable hopper structure and construction method thereof |
CN108149930A (en) * | 2017-12-26 | 2018-06-12 | 中国十七冶集团有限公司 | A kind of moving concrete pours chute device |
CN113997401A (en) * | 2021-11-17 | 2022-02-01 | 中建八局第四建设有限公司 | Concrete pouring device |
-
2014
- 2014-11-12 CN CN201420670507.3U patent/CN204238562U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105775655A (en) * | 2016-05-17 | 2016-07-20 | 广西凌云县永和冶炼有限责任公司 | Belt conveying device and carrier roller assembly thereof |
CN105775706A (en) * | 2016-05-17 | 2016-07-20 | 广西凌云县永和冶炼有限责任公司 | Belt conveying device and transfer mechanism thereof |
CN106638608A (en) * | 2016-12-27 | 2017-05-10 | 中交第二航务工程局有限公司 | Blanking-height-adjustable hopper structure and construction method thereof |
CN108149930A (en) * | 2017-12-26 | 2018-06-12 | 中国十七冶集团有限公司 | A kind of moving concrete pours chute device |
CN113997401A (en) * | 2021-11-17 | 2022-02-01 | 中建八局第四建设有限公司 | Concrete pouring device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204238562U (en) | Concreting hopper | |
CN203856202U (en) | Simple pullable sizing device of reserved holes | |
CN203230185U (en) | Height-adjustable concrete discharge hopper for building | |
CN204920229U (en) | Modular concrete hopper | |
CN204212423U (en) | The interval device for discharging simultaneously of difference in a kind of Integral lifting casting system | |
CN211643282U (en) | Turnover concrete and mortar pouring hopper | |
CN208329633U (en) | A kind of construction concrete conveyance tower crane hopper | |
CN207829478U (en) | A kind of magazine attachment | |
CN204186004U (en) | Multifunctional concrete split heads | |
CN205840345U (en) | A kind of embedded type tower crane funnel | |
CN204309110U (en) | A kind of jumbo bag fill type dry mixed mortar stirring storehouse | |
CN202882033U (en) | Novel steel water tank | |
CN202055540U (en) | Self-flowing type concrete pouring device | |
CN201507118U (en) | Large-volume concrete hopper for construction of high-rise building or multi-storey basement | |
CN208068539U (en) | A kind of piping lane precast segment lubricating substance slot device | |
CN202767537U (en) | Simple and convenient concrete lengthening hopper | |
CN204299187U (en) | A kind of detachable concrete casting device | |
CN204059983U (en) | Concrete lift hopper | |
CN204920232U (en) | Hopper of mortar is carried in hoist and mount | |
CN204056816U (en) | A kind of material stores lifting Fang Dou | |
CN204850473U (en) | Portable concrete placement speed controlling means | |
CN205012320U (en) | Stake hole protection steel apron | |
CN204452842U (en) | Ship is built in a kind of new concrete transport | |
CN204001757U (en) | The concrete joint materials device that puts in storage and build for backhoe | |
CN103835564A (en) | Low-cost pollution-free multifunctional silo wall structure and manufacturing method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150401 Termination date: 20161112 |