CN110017085A CN201910235838.1A CN201910235838A CN110017085A CN 110017085 A CN110017085 A CN 110017085A CN 201910235838 A CN201910235838 A CN 201910235838A CN 110017085 A CN110017085 A CN 110017085A
Authority
CN
China
Prior art keywords
sliding window
sash
wood composite
mounting process
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910235838.1A
Other languages
Chinese (zh)
Inventor
任元友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingde Doors And Windows (chengdu) Co Ltd
Original Assignee
Pingde Doors And Windows (chengdu) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingde Doors And Windows (chengdu) Co Ltd filed Critical Pingde Doors And Windows (chengdu) Co Ltd
Priority to CN201910235838.1A priority Critical patent/CN110017085A/en
Publication of CN110017085A publication Critical patent/CN110017085A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/56Fastening frames to the border of openings or to similar contiguous frames
    • E06B1/60Fastening frames to the border of openings or to similar contiguous frames by mechanical means, e.g. anchoring means
    • E06B1/6015Anchoring means
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/62Tightening or covering joints between the border of openings and the frame or between contiguous frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Building Environments (AREA)

Abstract

The present invention provides a kind of aluminum wood composite sliding window mounting process, can protect sliding window glass, and carries out watertightness detection to sliding window during installation, which includes the following steps: 1: in a pre-installation, checking the hole of aluminum wood composite sliding window;2: label positioning process point;3: sliding window being moved at hole, confirms the position of sliding window again, self-tapping screw is passed through into sash using electric screw driver and is fixedly connected with fixing piece;4: the sash of sliding window is clogged;5: watertightness detection: after the solidification of mortar stuff up a crack, water is filled in spray equipment, is sprayed water from the top down from periphery of the outside of sash to sash, and rectification is marked in the position of leak source at detection, until ne-leakage;6: the sash of clean sliding window;7: gluing;8: high-pressure flush forms continuous water curtain on the surface of sliding window with the water that the nozzle of hydraulic giant sprays, continuously sprays 5min.

Description

A kind of aluminum wood composite sliding window mounting process
Technical field
The present invention relates to installing engineering fields, in particular to a kind of aluminum wood composite sliding window mounting process.
Background technique
Aluminium clad wood doors and windows be under the premise of retaining pure Solid Door window property and function, by heat-insulating bridge-cut-off aluminium alloy extrusions and The framework that solid wood is combined by mechanical means.Two kinds of materials are connected by macromolecule nylon part, sufficiently looked after timber and The different attribute of metal contracts coefficient.
Timber selected by two kinds of materials produces natural larch by the red oak and Russia for being grown in east, By the bonding glue strictly screened and anti-corrosion, degreasing, fire-retardant etc. handle, and use Germany high-intensitive, make the strong of timber Degree, corrosion resistance, weatherability etc. are ensured, and have heat-insulation and heat-preservation, sound insulaton, the performances such as sturdy and durable.
In aluminum wood composite sliding window technique in the prior art, often whole fan sliding window is installed, to sliding window Watertightness etc. does not detect, and if during the installation process operation error be also easy to by the lanes such as glass flower, make a mess of, it is unnecessary to cause Loss.
Summary of the invention
The purpose of the present invention is to provide a kind of aluminum wood composite sliding window mounting process, can protect sliding window glass, And watertightness detection is carried out to sliding window during installation, guarantees installation effect.
The embodiment of the present invention is achieved in that
A kind of aluminum wood composite sliding window mounting process, the mounting process include the following steps:
Step 1: in a pre-installation, the hole of aluminum wood composite sliding window being checked, by the painting size at hole and push-and-pull Gap between window is controlled in 20-25mm;
Step 2: fixing piece is mounted on positioning process point using screw by label positioning process point, and confirmation is fixed again The point of part away from and position, fixing piece include being fixed by screws on the forms frame of sliding window, fixing piece is rectangular configuration, Gu Determine to be provided with mounting hole and grab on part, the end within doors of fixing piece is higher than room outer end, and the bottom edge of fixing piece and horizontal plane are presented 30 Spend angle, grab is rectangular configuration, and the side of the width direction fan of grab connect with fixing piece, the side on the length direction of grab with 30 degree of angles are presented in the bottom edge of fixing piece;
Step 3: sliding window is moved at hole, confirms the position of sliding window again, it will be certainly using electric screw driver Tapping passes through sash and is fixedly connected with fixing piece;
Step 4: the sash of sliding window being clogged, is clogged on the hole periphery of sliding window using screed, and use perching knife Scrape off extra mortar;
Step 5: watertightness detection: after the solidification of mortar stuff up a crack, filling water in spray equipment, right from the outside of sash The periphery of sash is sprayed water from the top down, and rectification is marked in the position of leak source at detection, until ne-leakage;
Step 6: the sash of clean sliding window is cleaned down the surface impurity of sash using hairbrush, glass is mounted on The inside of sash, the filling glass glue between sash and the gap of glass;
Step 7: gluing cleans out the rubbish, dust and cement clinker of hole table top and two sides, from outdoor to interior to Framework surrounding gap, which is postponed, stamps foamed glue;
Step 8: high-pressure flush controls hydraulic pressure in 130KPa by control valve and pressure gauge, is sprayed with the nozzle of hydraulic giant Water forms continuous water curtain on the surface of sliding window, continuously sprays 5min, observes unlatching seam, sash between sash and sash Between splicing seams and sash and window hole installation seam leakage scenarios.
In the preferred embodiment, in above-mentioned steps 3, the aluminum windowsill of sliding window and the sash of sliding window Contact surface carries out fastening by tapping screw and locks, and nylon plastic(s) pad is provided on tapping screw.
In the preferred embodiment, it is additionally provided with insulation board on the sash of above-mentioned sliding window and expands anti-watertight Strip of paper used for sealing needs to compress downwards insulation board until expansion water-proof sealing strip is close to compacting when pasting the insulation board of sash side.
In the preferred embodiment, the production method of above-mentioned insulation board includes the following steps:
S1: insulation board needs to be aged under field conditions (factors) 30-45 days before factory or in 70-90 degrees Celsius of steam Ageing 5-7 days;
S2: in ageing process, protective layer is smeared on the surface that heat preservation is pressed;
S3: before large-area construction, needing scene using identical material, construction way and technique production sample project, and Through just can be carried out construction after the assay was approved;
S4: in construction period and completing in 24 hours constructed, and the air themperature of base and environment is not less than 5 degrees Celsius, And summer is avoided to be exposed to the sun;
S5: prevent to adulterate sand and cement in the bonded adhesives and protective layer glue of insulating layer.
In the preferred embodiment, above-mentioned mounting process further includes step 9, receives pressure sliding window by wetpressing Hole is additionally provided at hole and turns over packet net and reinforcing mat.
In the preferred embodiment, above-mentioned that heat insulation protecting layer rubber cement net is set on the sash exterior wall of sliding window Ge Bu is constructed using compound float coat and is completed, then carries out the construction of finish coat again.
In the preferred embodiment, above-mentioned wetpressing includes the following steps: carrying out grid cloth construction or PVC When lines are constructed, first by rubber cement it is enough be applied to base, then carry out compression work grid cloth is wet;And through rubber cement from Grid cloth or PVC lines hole squeeze out and then are closed flat.
In the preferred embodiment, after above-mentioned completion base cleaning, base need to be made to meet surface cleaning, it is oil-free Dirt, release agent, floating ash and the attachment for interfering bonding, should be rooted out if any protrusion, hollowing and porous spot and with cement mortar or Next step operation is carried out after Polymer-Modified Mortar is levelling.
In the preferred embodiment, the thickness of the insulating layer on above-mentioned sash is less than or equal to 80mm.
In the preferred embodiment, at least 3 times epoxy zinc chromate primers are coated on above-mentioned sash, overall thickness is not Less than 100 microns, protection and the construction of decorative coating ornamental surface are carried out after dry again.
The beneficial effect of the embodiment of the present invention is: 1, sash is installed rear detection with regard to carry out watertightness, it can Trimming of doing over again directly is carried out after detection problem, while being only mounted with sash at this time, glass is not installed, then do over again repairing Whole operation will be more convenient, while the case where also reduce the leak after being installed completely;
2, acrylate waterproof paint, the application of the coating are sprayed between window hole and sash after the completion of mortar plug is filled out Waterproof performance can further be enhanced, and the water-repellent paint is easy for construction when spraying, be set using special spraying It is standby both to complete to operate;
3, detect door and window whether leak when selection when sash is installed and door and window be completely installed after carry out Two step detection process of detection, realize that the detection process of the watertightness of door and window is more perfect, drainage in door and window use process Almost it is difficult to occur.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the operating process schematic diagram of the embodiment of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.
Therefore, the detailed description of the embodiment of the present invention provided in the accompanying drawings is not intended to limit below claimed The scope of the present invention, but be merely representative of selected embodiment of the invention.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without creative efforts belongs to the model that the present invention protects It encloses.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, or be somebody's turn to do Invention product using when the orientation or positional relationship usually put, be merely for convenience of description of the present invention and simplification of the description, without It is that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore not It can be interpreted as limitation of the present invention.In addition, term " first ", " second ", " third " etc. are only used for distinguishing description, and cannot manage Solution is indication or suggestion relative importance.
In addition, the terms such as term "horizontal", "vertical", " pendency " are not offered as requiring component abswolute level or pendency, and It is that can be slightly tilted.It is not to indicate the structure if "horizontal" only refers to that its direction is more horizontal with respect to for "vertical" It has to fully horizontally, but can be slightly tilted.
In the description of the present invention, it is also necessary to which explanation is unless specifically defined or limited otherwise, term " setting ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be fixedly connected, may be a detachable connection or one Connect to body;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be indirect by intermediary It is connected, can be the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.
First embodiment
Referring to Figure 1, the present embodiment provides a kind of aluminum wood composite sliding window mounting process, which includes following step It is rapid:
Step 1: in a pre-installation, the hole of aluminum wood composite sliding window being checked, by the painting size at hole and push-and-pull Gap between window is controlled in 20-25mm;
Step 2: fixing piece is mounted on positioning process point using screw by label positioning process point, and confirmation is fixed again The point of part away from and position, fixing piece include being fixed by screws on the forms frame of sliding window, fixing piece is rectangular configuration, Gu Determine to be provided with mounting hole and grab on part, the end within doors of fixing piece is higher than room outer end, and the bottom edge of fixing piece and horizontal plane are presented 30 Spend angle, grab is rectangular configuration, and the side of the width direction fan of grab connect with fixing piece, the side on the length direction of grab with 30 degree of angles are presented in the bottom edge of fixing piece;
Step 3: sliding window is moved at hole, confirms the position of sliding window again, it will be certainly using electric screw driver Tapping passes through sash and is fixedly connected with fixing piece;
Step 4: the sash of sliding window being clogged, is clogged on the hole periphery of sliding window using screed, and use perching knife Scrape off extra mortar;
Step 5: watertightness detection: after the solidification of mortar stuff up a crack, filling water in spray equipment, right from the outside of sash The periphery of sash is sprayed water from the top down, and rectification is marked in the position of leak source at detection, until ne-leakage;
Step 6: the sash of clean sliding window is cleaned down the surface impurity of sash using hairbrush, glass is mounted on The inside of sash, the filling glass glue between sash and the gap of glass;
Step 7: gluing cleans out the rubbish, dust and cement clinker of hole table top and two sides, from outdoor to interior to Framework surrounding gap, which is postponed, stamps foamed glue;
Step 8: high-pressure flush controls hydraulic pressure in 130KPa by control valve and pressure gauge, is sprayed with the nozzle of hydraulic giant Water forms continuous water curtain on the surface of sliding window, continuously sprays 5min, observes unlatching seam, sash between sash and sash Between splicing seams and sash and window hole installation seam leakage scenarios.
In the preferred embodiment, in above-mentioned steps 3, the aluminum windowsill of sliding window and the sash of sliding window Contact surface carries out fastening by tapping screw and locks, and nylon plastic(s) pad is provided on tapping screw.
In the preferred embodiment, it is additionally provided with insulation board on the sash of above-mentioned sliding window and expands anti-watertight Strip of paper used for sealing needs to compress downwards insulation board until expansion water-proof sealing strip is close to compacting when pasting the insulation board of sash side.
In the preferred embodiment, the production method of above-mentioned insulation board includes the following steps:
S1: insulation board needs to be aged under field conditions (factors) 30-45 days before factory or in 70-90 degrees Celsius of steam Ageing 5-7 days;
S2: in ageing process, protective layer is smeared on the surface that heat preservation is pressed;
S3: before large-area construction, needing scene using identical material, construction way and technique production sample project, and Through just can be carried out construction after the assay was approved;
S4: in construction period and completing in 24 hours constructed, and the air themperature of base and environment is not less than 5 degrees Celsius, And summer is avoided to be exposed to the sun;
S5: prevent to adulterate sand and cement in the bonded adhesives and protective layer glue of insulating layer.
In the preferred embodiment, above-mentioned mounting process further includes step 9, receives pressure sliding window by wetpressing Hole is additionally provided at hole and turns over packet net and reinforcing mat.
In the preferred embodiment, above-mentioned that heat insulation protecting layer rubber cement net is set on the sash exterior wall of sliding window Ge Bu is constructed using compound float coat and is completed, then carries out the construction of finish coat again.
In the preferred embodiment, above-mentioned wetpressing includes the following steps: carrying out grid cloth construction or PVC When lines are constructed, first by rubber cement it is enough be applied to base, then carry out compression work grid cloth is wet;And through rubber cement from Grid cloth or PVC lines hole squeeze out and then are closed flat.
In the preferred embodiment, after above-mentioned completion base cleaning, base need to be made to meet surface cleaning, it is oil-free Dirt, release agent, floating ash and the attachment for interfering bonding, should be rooted out if any protrusion, hollowing and porous spot and with cement mortar or Next step operation is carried out after Polymer-Modified Mortar is levelling.
In the preferred embodiment, the thickness of the insulating layer on above-mentioned sash is less than or equal to 80mm.
In the preferred embodiment, at least 3 times epoxy zinc chromate primers are coated on above-mentioned sash, overall thickness is not Less than 100 microns, protection and the construction of decorative coating ornamental surface are carried out after dry again.
In conclusion the installation method in the present embodiment includes following advantage: 1, with regard to carrying out after being installed sash The detection of watertightness can directly carry out trimming of doing over again after detection problem, while only be mounted with sash at this time, not install Glass, then carrying out doing over again finishing operation will be more convenient, while the case where also reduce the leak after being installed completely;
2, acrylate waterproof paint, the application of the coating are sprayed between window hole and sash after the completion of mortar plug is filled out Waterproof performance can further be enhanced, and the water-repellent paint is easy for construction when spraying, be set using special spraying It is standby both to complete to operate;
3, detect door and window whether leak when selection when sash is installed and door and window be completely installed after carry out Two step detection process of detection, realize that the detection process of the watertightness of door and window is more perfect, drainage in door and window use process Almost it is difficult to occur.
Present specification describes the example of the embodiment of the present invention, it is not meant to that these embodiments illustrate and describe this All possible forms of invention.It should be understood that the embodiment in specification can be implemented with a variety of alternative forms.Attached drawing is without in proportion It draws;Some features can be zoomed in or out to show the details of particular elements.Disclosed specific structure and function details should not Make limited interpretation, only those skilled in the art is instructed to implement representative basis of the invention in a variety of forms.In the art It should be understood to the one skilled in the art that the multiple features illustrated and described with reference to either figure can with said in one or more of the other attached drawing Bright feature combination is to form the embodiment for not yet explicitly illustrating or describing.The assemblage characteristic of explanation provides the generation for being used for typical case Table embodiment.It is answered however, can according to need with the multiple combinations of the consistent feature of the teachings of the present invention and modification for specific With or implement.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of aluminum wood composite sliding window mounting process, which is characterized in that the mounting process includes the following steps:
Step 1: in a pre-installation, the hole of the aluminum wood composite sliding window is checked, by the painting size at the hole and Gap between the sliding window is controlled in 20-25mm;
Step 2: fixing piece is mounted on positioning process point using screw, confirms fixing piece again by label positioning process point Point away from and position, the fixing piece include being fixed by screws on the forms frame of the sliding window, the fixing piece be square Shape structure, mounting hole and grab are provided on the fixing piece, and the end within doors of the fixing piece is higher than room outer end, the fixing piece Bottom edge and horizontal plane 30 degree angles are presented, the grab is rectangular configuration, side that the width direction of the grab is fanned and described Fixing piece connects, and 30 degree of angles are presented in the bottom edge on side and fixing piece on the length direction of the grab;
Step 3: the sliding window being moved at hole, the position of the sliding window is confirmed again, utilizes electric screw driver Self-tapping screw is passed through sash to be fixedly connected with the fixing piece;
Step 4: the sash of the sliding window being clogged, is clogged on the hole periphery of the sliding window using screed, and use Perching knife scrapes off extra mortar;
Step 5: watertightness detection: after the solidification of mortar stuff up a crack, water is filled in spray equipment, from the outside of sash to door and window The periphery of frame is sprayed water from the top down, and rectification is marked in the position of leak source at detection, until ne-leakage;
Step 6: cleaning the sash of the sliding window, the surface impurity of sash is cleaned down using hairbrush, glass is mounted on The inside of the sash, the filling glass glue between sash and the gap of glass;
Step 7: gluing cleans out the rubbish, dust and cement clinker of hole table top and two sides, from outdoor to interior to framework Surrounding gap, which is postponed, stamps foamed glue;
Step 8: high-pressure flush controls hydraulic pressure in 130KPa by control valve and pressure gauge, is existed with the water that the nozzle of hydraulic giant sprays The surface of sliding window forms continuous water curtain, continuously sprays 5min, between the unlatching seam, sash between observation sash and sash Splicing seams and sash and window hole installation seam leakage scenarios.
2. aluminum wood composite sliding window mounting process according to claim 1, which is characterized in that described to push away in the step 3 The sash contact surface of the aluminum windowsill and sliding window that draw window carries out fastening by tapping screw and locks, on the tapping screw It is provided with nylon plastic(s) pad.
3. aluminum wood composite sliding window mounting process according to claim 1, which is characterized in that the sash of the sliding window On be additionally provided with insulation board and expansion water-proof sealing strip needs to compress downwards when pasting the insulation board of the sash side The insulation board is until the expansion water-proof sealing strip is close to compacting.
4. aluminum wood composite sliding window mounting process according to claim 1, which is characterized in that the production side of the insulation board Method includes the following steps:
S1: the insulation board needs to be aged under field conditions (factors) 30-45 days before factory or in 70-90 degrees Celsius of steam Ageing 5-7 days;
S2: in the ageing process, protective layer is smeared on the surface pressed that keeps the temperature;
S3: before large-area construction, need scene using identical material, construction way and technique production sample project, and through examining It tests and just can be carried out construction after qualification;
S4: in construction period and completing in 24 hours of construction, and the air themperature of base and environment is not less than 5 degrees Celsius, and Summer is avoided to be exposed to the sun;
S5: prevent to adulterate sand and cement in the bonded adhesives and protective layer glue of the insulating layer.
5. aluminum wood composite sliding window mounting process according to claim 1, which is characterized in that the mounting process further includes Step 9, the hole for pressing the sliding window is received by wetpressing, is additionally provided at the hole and is turned over packet net and reinforcing mat.
6. aluminum wood composite sliding window mounting process according to claim 1, which is characterized in that in the door and window of the sliding window Heat insulation protecting layer rubber cement grid cloth is set on outer frame wall, is constructed and is completed using compound float coat, then carry out applying for finish coat again Work.
7. aluminum wood composite sliding window mounting process according to claim 1, which is characterized in that the wetpressing includes as follows Step: when carrying out grid cloth construction or PVC lines and constructing, first by rubber cement it is enough be applied to base, then in the net Ge Bu is wet to carry out compression work;And it squeezes out and then is closed flat from grid cloth or PVC lines hole through rubber cement.
8. aluminum wood composite sliding window mounting process according to claim 1, which is characterized in that after completing base cleaning, need Base is set to meet surface cleaning, no greasy dirt, release agent, floating ash and the attachment for interfering bonding, if any protrusion, hollowing and puff Position should root out and with cement mortar or Polymer-Modified Mortar it is levelling after carry out next step operation.
9. aluminum wood composite sliding window mounting process according to claim 1, which is characterized in that the institute on the sash The thickness for stating insulating layer is less than or equal to 80mm.
10. aluminum wood composite sliding window mounting process according to claim 1, which is characterized in that be coated on the sash At least 3 times epoxy zinc chromate primers, overall thickness are not less than 100 microns, carry out protection and decorative coating ornamental surface after dry again Construction.
CN201910235838.1A 2019-03-27 2019-03-27 A kind of aluminum wood composite sliding window mounting process Pending CN110017085A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910235838.1A CN110017085A (en) 2019-03-27 2019-03-27 A kind of aluminum wood composite sliding window mounting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910235838.1A CN110017085A (en) 2019-03-27 2019-03-27 A kind of aluminum wood composite sliding window mounting process

Publications (1)

Publication Number Publication Date
CN110017085A true CN110017085A (en) 2019-07-16

Family

ID=67190080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910235838.1A Pending CN110017085A (en) 2019-03-27 2019-03-27 A kind of aluminum wood composite sliding window mounting process

Country Status (1)

Country Link
CN (1) CN110017085A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110469242A (en) * 2019-08-14 2019-11-19 安徽金鹏住工有限公司 A kind of sliding aluminium alloy erection of doors and windows method
CN112324089A (en) * 2020-11-19 2021-02-05 湖南森云门窗有限公司 Method for mounting aluminum alloy door and window
CN113482490A (en) * 2021-07-13 2021-10-08 珠海固美幕墙装饰工程有限公司 Door and window installation and fixation method
CN114575707B (en) * 2022-02-16 2024-06-11 四川金秋新型建材有限公司 Door and window mounting process

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203891670U (en) * 2014-06-03 2014-10-22 昆山市春阳门窗装璜工程有限公司 Window mounting and fixing structure
CN108708651A (en) * 2018-05-25 2018-10-26 四川华厦建辉门窗幕墙装饰有限公司 A kind of installation method of building doors and windows
CN109339636A (en) * 2018-10-16 2019-02-15 肖霞 A kind of different parts construction technique of water-impervious metal windowsill

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203891670U (en) * 2014-06-03 2014-10-22 昆山市春阳门窗装璜工程有限公司 Window mounting and fixing structure
CN108708651A (en) * 2018-05-25 2018-10-26 四川华厦建辉门窗幕墙装饰有限公司 A kind of installation method of building doors and windows
CN109339636A (en) * 2018-10-16 2019-02-15 肖霞 A kind of different parts construction technique of water-impervious metal windowsill

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110469242A (en) * 2019-08-14 2019-11-19 安徽金鹏住工有限公司 A kind of sliding aluminium alloy erection of doors and windows method
CN112324089A (en) * 2020-11-19 2021-02-05 湖南森云门窗有限公司 Method for mounting aluminum alloy door and window
CN113482490A (en) * 2021-07-13 2021-10-08 珠海固美幕墙装饰工程有限公司 Door and window installation and fixation method
CN114575707B (en) * 2022-02-16 2024-06-11 四川金秋新型建材有限公司 Door and window mounting process

Similar Documents

Publication Publication Date Title
CN110017085A (en) A kind of aluminum wood composite sliding window mounting process
CN101956432B (en) Fireproofing structure of polyphenyl plate outer-wall outer heat-insulating building system and construction method thereof
CN104612261A (en) Method for external insulation construction of polystyrene board thin plastered surface in cold and windy area
CN103572845B (en) A kind of insulation clay reflective heat-insulation paint exterior wall heat-preserving system and construction technology thereof
CN201128990Y (en) Composite environment-friendly thermal insulation material for wall
CN108590185A (en) Building exterior wall heat preserving construction technology
CN105909122A (en) Mounting method of plastic steel door and window
CN202324443U (en) Thermal-bridge-resisting composite anti-radiation rock wool energy-saving decorative system
CN207469478U (en) The splicing joint waterproofing node structure of assembled integrated wall
CN102359235A (en) Heat resisting bridge composite counter radiation rock wool energy-saving decoration system and construction method thereof
CN112081255A (en) Window opening heat-insulating waterproof structure and construction method
CN109577671A (en) A kind of environment-friendly type window leak wall-surface patching method
CN109339636A (en) A kind of different parts construction technique of water-impervious metal windowsill
CN209539044U (en) Closing-in structure outside a kind of exterior window room
CN205976290U (en) Compound incubation intergral template anchor is held in palm and is hung structure
CN111851896B (en) Construction method of heat-preservation decoration sintering integrated plate of building external wall
CN209040320U (en) A kind of steel construction heat preservation mortar for outer wall retaining design with tension member
CN104389399A (en) Thermal Insulation and Decoration Integration Board and its Construction Practice
CN103711208A (en) Heat reflection heat-insulation energy-saving system for outer wall and manufacturing method thereof
CN209494067U (en) Steel structural plant roof deformation joint structure
CN211257224U (en) Drainage structure
CN109024939A (en) Steel construction heat preservation mortar for outer wall retaining design and its construction technology with tension member
CN217501163U (en) Waterproof, renovate, decorate integration construction structures of old tile roofing
CN219710776U (en) Wall body facade waterproofing membrane binding off structure
CN203654491U (en) Heat reflection insulation energy saving system for exterior wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190716