CN110014521A - Bar planting assistor and its construction method at the top of secondary structure constructional column - Google Patents
Bar planting assistor and its construction method at the top of secondary structure constructional column Download PDFInfo
- Publication number
- CN110014521A CN110014521A CN201910395312.XA CN201910395312A CN110014521A CN 110014521 A CN110014521 A CN 110014521A CN 201910395312 A CN201910395312 A CN 201910395312A CN 110014521 A CN110014521 A CN 110014521A
- Authority
- CN
- China
- Prior art keywords
- extension bar
- bar
- electric drill
- handrail
- operating stick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28D—WORKING STONE OR STONE-LIKE MATERIALS
- B28D1/00—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
- B28D1/14—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28D—WORKING STONE OR STONE-LIKE MATERIALS
- B28D7/00—Accessories specially adapted for use with machines or devices of the preceding groups
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Steps, Ramps, And Handrails (AREA)
Abstract
The present invention provides a kind of secondary structure constructional column top bar planting assistor, and including vertical front end extension bar and handrail, front end extension bar lower part is connected by connecting rod with operating stick with handrail top;Connecting rod and operating stick are arranged in parallel, and front end extension bar, handrail, connecting rod and operating stick are connected in parallelogram frame body by bolt pin;It is equipped with the U-shaped folder for fixing electric drill at the top of the extension bar of front end and is used for support electric drill baffle;The present invention also provides the construction methods of bar planting assistor at the top of above-mentioned secondary structure constructional column, and front end extension bar, handrail, connecting rod, operating stick are bolted;Electric drill is fixed at the top of the extension bar of front end by U-shaped folder, electric drill baffle support is in electric drill bottom;Shake operation bar increases front end extension bar, until assistant structure is simple on electric drill top to bar planting point, easy for installation, bar planting construction, effective protection safety of workers is can be completed in work on the ground.
Description
Technical field
The invention belongs to wall top portion structure construction technology field is filled in architectural engineering, and in particular to secondary structure constructional column
Top bar planting assistor and its construction method.
Background technique
In present structure type, frame structure is more and more, after the completion of concrete structure construction, the secondary structure that is related to
Filled wall builds more and more.Building wall relates to more constructional column, report frame column binding, needs being related to before binding
Bar planting is learned, chemically-planted steel bar construction needs the first aperture on ground or top plate.
Due to higher away from ground at the top of constructional column, worker wants the construction on top plate and needs setting operation platform knot below
Structure, more at present is using traveling centering.But traveling centering lease expenses is higher, and uses scaffold aperture
Two worker's coordinative constructions (people operates on scaffold, and a people is in ground moving scaffold) are needed when operation, worker is upper and lower
Scaffold is inconvenient, and working efficiency is low.Especially aperture construction is carried out using traveling centering facing side or the high higher position of layer
When, foot hand does not have enough protection to worker, and risk possibly even endangers worker's life security.
Summary of the invention
The technical problem to be solved by the present invention is to bar planting mounting hole is carried out at the top of secondary structure constructional column using scaffold
Punching, working efficiency is low, time-consuming and laborious, and has the problem of biggish security risk.
The present invention provides a kind of secondary structure constructional column top plant that can be used on the ground to solve above-mentioned technical problem
Muscle assistor, and using the construction method of the assistor, concrete scheme is as follows:
A kind of secondary structure constructional column top bar planting assistor also connects including vertical front end extension bar and handrail
Extension bar and operating stick;Front end extension bar lower part is connected by connecting rod with operating stick with handrail top;Connecting rod one end is with before
Extension bar is held to pass through bolt pin joint by bolt pin joint, the other end and handrail top;Operating stick one end passes through bolt and front end
Extension bar bottom end pin joint, operating stick centre pass through bolt and handrail pin joint;Connecting rod and operating stick are arranged in parallel;The front end
It is equipped with the U-shaped folder for fixing electric drill at the top of extension bar and is used for support electric drill baffle;It is stretched in the middle part of the extension bar of front end equipped with length
Shrinking structure;Handrail bottom is equipped with pedestal.
The operation pole length 800mm to 1500mm.
Bolt is 20*60 bolt, and bolt two is equipped with gasket.
This structure replaces movable Scaffold to participate in bar planting construction at the top of constructional column, simple and light, instead of worker's arm
Electric drill is lifted to constructional column ceiling height and is exerted oneself to electric drill.Height adjustment range is big, adapts to the high space of a variety of layers.
The construction method of bar planting assistor at the top of above-mentioned secondary structure constructional column: front end extension bar, handrail, connecting rod,
Operating stick is bolted, and is configured to the parallelogram frame body of deformation;Electric drill is fixed on front end by U-shaped folder to lengthen
At the top of bar, electric drill baffle support is in electric drill bottom;Front end extension bar and handrail is vertical, and pedestal is put it on the ground, and front end adds
Stock and pedestal adjust highly according to constructional column top position;Shake operation bar, make front end extension bar increase, until electric drill top to plant
On muscle point.
One can be operated the method, and assistor freely adjusts upright bar length, and work efficiency is high for height-regulating, and operator station exists
It on ground, does not need to ascend a height, compares safety facing the construction of side position yet.
Detailed description of the invention
Fig. 1 this assistant structure figure;
Fig. 2 this assistor usage state diagram;
This assistor of Fig. 3 receipts disturb state diagram.
In figure: front end extension bar 1, telescopic structure 11, handrail 2, connecting rod 3, operating stick 4, pedestal 5, U-shaped folder 6,
Electric drill baffle 7, electric drill 8.
Specific embodiment
As shown in Figure 1, bar planting assistor at the top of secondary structure constructional column provided by the invention, lengthens including vertical front end
Bar 1 and handrail 2, there are also connecting rod 3 and operating stick 4,1 lower part of front end extension bar and 2 top of handrail pass through 3 He of connecting rod
Operating stick 4 connects;By bolt pin joint, the other end passes through bolt with 2 top of handrail for 3 one end of connecting rod and front end extension bar 1
Pin joint;4 one end of operating stick passes through bolt and 2 pin joint of handrail by bolt and 1 bottom end pin joint of front end extension bar, centre;Connection
Bar 3 and operating stick 4 are arranged in parallel;The U-shaped folder 6 and electric drill baffle 7 for fixing electric drill are equipped at the top of the front end extension bar 1;
Telescopic structure 11 is equipped in the middle part of front end extension bar 1;2 bottom of handrail is equipped with pedestal 5.
Flitch production can be used in this assistor front end extension bar 1, handrail 2, connecting rod 3, operating stick 4, and front end lengthens
Length-adjustable structure is designed in the middle part of bar 1.Flitch uses very universal, materials convenience at the construction field (site).
Operating stick 4 suggests that length is 800mm-1500mm, and the longer lever the more laborsaving.
Four kinds of structural poles form parallel four sides row structure by bolt, and pin joint point connecting portion bolt uses 20*60 bolt,
Guarantee consolidating when the quadrilateral structure deformation of assistor.Assistor deformation is controlled by shake operation bar, and amplitude of deformation is very big,
The minimum state temporarily collapsed when not used in assistor is shown referring specifically to Fig. 2 and Fig. 3, Fig. 3, but simultaneously non-leading end in Fig. 2
The maximum state of extension bar height.
Bolt two sides Upper gasket prevents from wearing, can also brush used oil here.
Assistor top is using the fixed drilling machine of U-shaped folder.
In conjunction with Fig. 2, using bar planting assistor progress construction method at the top of above-mentioned secondary structure constructional column: front end extension bar 1,
Handrail 2, connecting rod 3, operating stick 4 are bolted, and constitute deformable parallelogram frame body;Electric drill 8 is passed through into U
Type folder 6 is fixed on 1 top of front end extension bar, and 7 support of electric drill baffle is in 8 bottom of electric drill;Front end extension bar 1 and handrail 2 are erected
Directly, pedestal 5 is put it on the ground, and front end extension bar 1 and pedestal 5 adjust highly according to constructional column top position;Shake operation bar 4,
Increase front end extension bar 1, until on the top to bar planting point of electric drill 8.
The effect of movable Scaffold when the present invention replaces existing bar planting to construct, extends worker's arm by way of the arm of force
Firmly, bar planting can be completed in worker station on the ground, avoids and is ascended a height the danger that can generate of construction by scaffold.
Claims (4)
1. bar planting assistor at the top of a kind of secondary structure constructional column, it is characterized in that: including vertical front end extension bar and handrail,
There are also connecting rods and operating stick;Front end extension bar lower part is connected by connecting rod with operating stick with handrail top;Connecting rod one
End passes through bolt pin joint by bolt pin joint, the other end and handrail top with front end extension bar;Operating stick one end passes through bolt
With front end extension bar bottom end pin joint, operating stick centre passes through bolt and handrail pin joint;Connecting rod and operating stick are arranged in parallel;Institute
It states and is equipped at the top of the extension bar of front end for fixing the U-shaped folder of electric drill and for the electric drill baffle of support electric drill;In the extension bar of front end
Portion is equipped with telescopic structure;Handrail bottom is equipped with pedestal.
2. bar planting assistor at the top of secondary structure constructional column as described in claim 1, it is characterized in that: the operation pole length
800mm to 1500mm.
3. bar planting assistor at the top of secondary structure constructional column as described in claim 1, it is characterized in that: bolt is 20*60 bolt, spiral shell
Bolt two sides are equipped with gasket.
4. the construction method of secondary structure constructional column top bar planting assistor as described in any one of claim 1-3: front end adds
Stock, handrail, connecting rod, operating stick are bolted, and are configured to the parallelogram frame body of deformation;By electric drill U
Type folder is fixed at the top of the extension bar of front end, and electric drill baffle support is in electric drill bottom;Vertical, the pedestal by front end extension bar and handrail
It puts it on the ground, front end extension bar and pedestal adjust highly according to constructional column top position;Shake operation bar makes front end extension bar
It increases, until on electric drill top to bar planting point.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910395312.XA CN110014521A (en) | 2019-05-13 | 2019-05-13 | Bar planting assistor and its construction method at the top of secondary structure constructional column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910395312.XA CN110014521A (en) | 2019-05-13 | 2019-05-13 | Bar planting assistor and its construction method at the top of secondary structure constructional column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110014521A true CN110014521A (en) | 2019-07-16 |
Family
ID=67193590
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910395312.XA Pending CN110014521A (en) | 2019-05-13 | 2019-05-13 | Bar planting assistor and its construction method at the top of secondary structure constructional column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110014521A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110541575A (en) * | 2019-09-09 | 2019-12-06 | 五冶集团上海有限公司 | Movable wall skin shoveling machine |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN204430348U (en) * | 2014-12-19 | 2015-07-01 | 中国建筑第八工程局有限公司 | A kind of bar planting boring lever parallelogram mechanical arm |
CN205189423U (en) * | 2015-10-13 | 2016-04-27 | 中国建筑第二工程局有限公司 | Bar planting auxiliary device |
CN105645749A (en) * | 2014-12-01 | 2016-06-08 | 肖特股份有限公司 | Method and device of carving thin glass and carved thin glass |
CN106695356A (en) * | 2017-01-25 | 2017-05-24 | 湖南省第五工程有限公司 | Top plate drilling device and application method thereof |
CN206769800U (en) * | 2017-05-24 | 2017-12-19 | 中建四局第五建筑工程有限公司 | A kind of assembly type drilling equipment |
CN206854702U (en) * | 2017-05-31 | 2018-01-09 | 北京城建六建设集团有限公司 | A kind of construction drilling device for bonded rebar |
CN107999829A (en) * | 2017-10-23 | 2018-05-08 | 中国十七冶集团有限公司 | Bar planting drilling aid at the top of a kind of building secondary structure constructional column |
CN210500860U (en) * | 2019-05-13 | 2020-05-12 | 中国二十二冶集团有限公司 | Secondary structure constructional column top bar planting assistor |
-
2019
- 2019-05-13 CN CN201910395312.XA patent/CN110014521A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105645749A (en) * | 2014-12-01 | 2016-06-08 | 肖特股份有限公司 | Method and device of carving thin glass and carved thin glass |
CN204430348U (en) * | 2014-12-19 | 2015-07-01 | 中国建筑第八工程局有限公司 | A kind of bar planting boring lever parallelogram mechanical arm |
CN205189423U (en) * | 2015-10-13 | 2016-04-27 | 中国建筑第二工程局有限公司 | Bar planting auxiliary device |
CN106695356A (en) * | 2017-01-25 | 2017-05-24 | 湖南省第五工程有限公司 | Top plate drilling device and application method thereof |
CN206769800U (en) * | 2017-05-24 | 2017-12-19 | 中建四局第五建筑工程有限公司 | A kind of assembly type drilling equipment |
CN206854702U (en) * | 2017-05-31 | 2018-01-09 | 北京城建六建设集团有限公司 | A kind of construction drilling device for bonded rebar |
CN107999829A (en) * | 2017-10-23 | 2018-05-08 | 中国十七冶集团有限公司 | Bar planting drilling aid at the top of a kind of building secondary structure constructional column |
CN210500860U (en) * | 2019-05-13 | 2020-05-12 | 中国二十二冶集团有限公司 | Secondary structure constructional column top bar planting assistor |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110541575A (en) * | 2019-09-09 | 2019-12-06 | 五冶集团上海有限公司 | Movable wall skin shoveling machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102383588B (en) | Lifting platform for protecting safety of high-level construction | |
CN201158933Y (en) | High-rise maintaining scaffold device with extruding structure | |
CN107999829A (en) | Bar planting drilling aid at the top of a kind of building secondary structure constructional column | |
CN107882317B (en) | A kind of nacelle device for external wall high altitude operation | |
CN209244217U (en) | A kind of height-adjustable building construction scaffold | |
CN110014521A (en) | Bar planting assistor and its construction method at the top of secondary structure constructional column | |
CN213626572U (en) | Tool type external cantilever operation platform | |
CN219241819U (en) | Punching device for rectangular anti-slide piles | |
CN108331335A (en) | A kind of pre-splicing separation type hydraulic of steel and wood composite is from climbing support | |
CN210500860U (en) | Secondary structure constructional column top bar planting assistor | |
CN214942600U (en) | Laborsaving advancing device suitable for installation of large-scale round pin axle of steel construction engineering | |
CN212802413U (en) | Combined multifunctional scaffold for building construction | |
CN212406019U (en) | Adjustable regularization safety operation platform construction equipment | |
CN212406038U (en) | Lower hanging construction platform module of high-altitude large-cantilever steel roof truss | |
CN210459915U (en) | Combined operation platform | |
CN209040527U (en) | A kind of scaffold cradle structure | |
CN211114732U (en) | Portable movable reinforcement operation platform | |
CN209874434U (en) | Simple and easy scaffold frame of encorbelmenting of building high latitude | |
JPH11166315A (en) | Structure dismantling device | |
CN219653539U (en) | Support frame is used in construction of multi-functional bridge of convenient regulation | |
CN220909052U (en) | High-strength steel structure supporting frame | |
CN214605199U (en) | Auxiliary device for punching high beam plate | |
CN220549926U (en) | Auxiliary hoisting installation device for railway T-beam top beam moving jack | |
CN216380480U (en) | Integral movable operation frame | |
CN211622697U (en) | Anti-falling device for building construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |