Punching device for rectangular anti-slide piles Download PDF

Info

Publication number
CN219241819U
CN219241819U CN202320488960.1U CN202320488960U CN219241819U CN 219241819 U CN219241819 U CN 219241819U CN 202320488960 U CN202320488960 U CN 202320488960U CN 219241819 U CN219241819 U CN 219241819U
Authority
CN
China
Prior art keywords
hammer
lifting
truss
frame
punching device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320488960.1U
Other languages
Chinese (zh)
Inventor
宫庆福
邱洋
胥航
孙淏麟
岳文刚
李兴权
李文龙
杨亚方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN202320488960.1U priority Critical patent/CN219241819U/en
Application granted granted Critical
Publication of CN219241819U publication Critical patent/CN219241819U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a punching device for rectangular anti-slide piles, which belongs to the technical field of constructional engineering construction and comprises a support frame, a lifting hammer, a winch and a steel rope, wherein the winch and the steel rope are positioned on the support frame and can drive the lifting hammer to lift. According to the utility model, the conical teeth are arranged at the bottom of the lifting hammer to perform punching construction of the rectangular hole, so that compared with manual excavation, the working efficiency can be improved, the manpower and material resources are saved, the construction is safe and reliable, and the construction progress is easier to control.

Description

Punching device for rectangular anti-slide piles
Technical Field
The utility model relates to the technical field of building engineering construction, in particular to a punching device for rectangular anti-slide piles.
Background
In the construction process of buildings, for some buildings which are arranged on landslide and have complicated geological conditions, reinforced support is usually required by arranging anti-slide piles. Most of traditional slide piles are cylindrical, and the advantages of the traditional slide piles are that the construction is convenient, but the traditional slide piles have the defect of poor slide resistance. At present, more and more anti-slide piles begin to adopt rectangular structures, and the rectangular anti-slide piles have better blocking effect on landslide than round anti-slide piles, but are more troublesome to construct and are mainly embodied on the construction of anti-slide pile holes.
The construction of traditional rectangular anti-slide pile holes mainly relies on manual work to dig holes, because only cylindrical drilling equipment can not be used for punching rectangular piles at present. The concrete hole digging process is that firstly, locking construction of the slide-resistant pile is carried out, excavation construction is carried out after the locking construction is completed, as the extrusion effect of the impact pile is avoided, a section of protection is needed to be carried out immediately after the construction in the excavation process, and subsequent construction is carried out until the protection strength reaches the corresponding requirement, and the design elevation is reached. In the construction process, the top is required to be sealed after construction is completed every day, safety is guaranteed, gas detection is carried out before construction is carried out the next day, follow-up construction is carried out after detection is qualified, the overall construction safety risk is high, the construction speed is low, and the labor cost is high.
Disclosure of Invention
In order to overcome the defects of the existing manual excavation of rectangular anti-slide pile holes, the utility model aims to solve the technical problems that: the punching device for the rectangular slide-resistant pile can improve construction efficiency and is safe and reliable.
The technical scheme adopted for solving the technical problems is as follows:
a punching device for rectangle slide-resistant stake, including support frame and hammer to and be located hoist engine and the steel cable that can drive the hammer lift on the support frame, the support frame includes truss and bracing frame, the truss bottom passes through landing leg and underground basis fixed connection, the tip at the truss is installed to the bracing frame, the hoist engine sets up at the truss top, links to each other with the hammer after the pulley of the steel cable of hoist engine walks around the bracing frame and hangs the end, the cross section of hammer is rectangular structure, and the hammer top evenly is provided with a plurality of lugs, and each lug passes through auxiliary rope and links to each other with the steel cable, the equipartition of hammer bottom has a plurality of toper teeth.
Further, the truss comprises two bottom beams and two top beams which are arranged along the horizontal direction, and a plurality of supporting vertical rods and inclined struts which are connected between the bottom beams and the top beams, the winch is fixed on the top beams through a frame, and the supporting legs are arranged on the bottom beams.
Further, the inclined strut comprises two inclined strut frames which are respectively arranged on the two top cross beams, the hanging ends of the two inclined strut frames are folded towards the middle part and are connected through a fixed shaft, and a pulley is arranged in the middle of the fixed shaft.
Furthermore, the inclined support frame is a diamond frame formed by four rods, and vertical rods are arranged between two opposite angles except the hanging end in the diamond frame for supporting.
Further, the periphery of the top of the lifting hammer is provided with a mounting frame, the lifting hammer is connected with the mounting frame through bolts, and the lifting lug is arranged on the mounting frame.
Further, a first cavity penetrating through two side surfaces of the hanging hammer is formed in the middle of the hanging hammer, and a second cavity communicated with the first cavity is formed in the center of the top of the hanging hammer.
The beneficial effects of the utility model are as follows: according to the lifting hammer of the size design rectangle of slide-resistant stake, set up the toper tooth in the lifting hammer bottom to drive the lifting hammer through supporting frame and hoist engine and go up and down to punch a hole the operation, then arrange the slag tap with the grout method, compare artifical excavation, utilize the lifting hammer to punch a hole, can improve the operating efficiency, use manpower sparingly material resources, can play extrusion reinforcement effect to the pore wall in the punching process, need not support, the people also need not descend in the hole, construction safe and reliable, the construction progress is also easier to control.
Drawings
FIG. 1 is a front elevational view of the structure of the present utility model;
FIG. 2 is a top plan view of the structure of the present utility model;
the drawing is marked as 1-truss, 2-inclined strut, 3-hanging hammer, 4-hoist, 11-bottom beam, 12-top beam, 13-support vertical rod, 14-inclined strut, 15-landing leg, 21-fixed shaft, 31-conical tooth, 32-installation frame, 33-first cavity, 34-second cavity, 41-steel rope, 42-pulley, 43-auxiliary rope and 44-frame.
Detailed Description
The utility model is further described below with reference to the accompanying drawings.
As shown in fig. 1 and 2, the punching device for rectangular slide piles comprises a support frame, a lifting hammer 3, a winch 4 and a steel rope 41, wherein the winch 4 and the steel rope 41 are positioned on the support frame and can drive the lifting hammer 3 to lift, the support frame comprises a truss 1 and an inclined strut 2, the bottom of the truss 1 is fixedly connected with an underground foundation through a supporting leg 15, the inclined strut 2 is arranged at the end part of the truss 1, the winch 4 is arranged at the top of the truss 1, the steel rope 41 of the winch 4 bypasses a pulley 42 at the hanging end of the inclined strut 2 and is then connected with the lifting hammer 3, the cross section of the lifting hammer 3 is of a rectangular structure, a plurality of lifting lugs are uniformly arranged at the top of the lifting hammer 3 and are connected with the steel rope 41 through auxiliary ropes 43, and a plurality of conical teeth 31 are uniformly distributed at the bottom of the lifting hammer 3.
The support frame mainly plays the effect of fixed whole device and balanced sledge hammer 3, consequently truss 1 needs to have sufficient weight and the stability of installation, and accessible increases truss 1 length and realizes, and truss 1 passes through the bolt with the underground foundation and is connected, and the underground foundation can be pre-buried rag bolt. The inclined strut 2 is used for supporting the lifting hammer 3 outside the truss 1, so that interference with the truss 1 in the lifting process is avoided. The hanging hammer 3 can be made of cast iron, weight is increased, the conical teeth 31 can be in a conical structure or a triangular plate structure, preferably a conical structure, and the hanging hammer 3 can be detachably mounted by bolts so as to be replaced after being worn and damaged.
The application process of the utility model is as follows: firstly, the construction locking is carried out similarly to the traditional mode, the locking construction has the main functions of stabilizing the hole wall to prevent hole collapse, isolating surface water, protecting the hole opening ground, fixing the pile hole position and the like, then equipment is installed, the lifting hammer 3 is aligned with the anti-slide pile hole, finally, the lifting hammer 3 is repeatedly lifted by the winch 4 to carry out punching operation, after a period of impact, the lifting hammer 3 is lifted, mud is filled into the hole, the mud is pumped out, slag stone generated by the impact is discharged, and the operation is carried out repeatedly until the punching reaches the design elevation, and the anti-slide pile punching construction is completed.
The truss 1 has a concrete structure that the truss 1 comprises two bottom cross beams 11 and two top cross beams 12 which are arranged along the horizontal direction, a plurality of support vertical rods 13 and diagonal braces 14 which are connected between the bottom cross beams 11 and the top cross beams 12, the winch 4 is fixed on the top cross beams 12 through a frame 44, and the supporting legs 15 are arranged on the bottom cross beams 11. The whole truss 1 is of a quadrangular prism structure, and the section of the whole truss can be rectangular or trapezoidal, so that stable stress is ensured.
In order to correspond to the two top cross beams 12, the two diagonal braces 2 are respectively arranged on the two top cross beams 12, the hanging ends of the two diagonal braces 2 are folded towards the middle and are connected through a fixed shaft 21, and a pulley 42 is arranged in the middle of the fixed shaft 21. The gravity of the hanging hammer can be dispersed to the two bottom cross beams 11 by the two diagonal braces 2, so that the whole truss 1 is balanced in stress and cannot incline.
Furthermore, the diagonal bracing frame 2 is a diamond frame formed by four rods, and vertical rods are arranged between two opposite angles except for hanging ends in the diamond frame for supporting. The inclined strut 2 with the diamond structure can improve the rigidity of the structure and ensure the stability of hanging the hanging hammer 3.
The main body of the lifting hammer 3 is generally cast, and is inconvenient to directly fix to the auxiliary rope 43, so that the mounting frame 32 is arranged on the periphery of the top of the lifting hammer 3, the lifting hammer 3 and the mounting frame 32 are connected through bolts, and the lifting lug is arranged on the mounting frame 32. The weight of the hammer 3 is dispersed by the mounting frame 32, and leveling by the auxiliary rope 43 is better performed.
Since the rectangular hanging weight 3 has a larger cross section and receives larger resistance of air and groundwater in the impact process, in order to reduce the resistance, a first cavity 33 penetrating through two sides of the hanging weight 3 is arranged in the middle of the hanging weight 3, and a second cavity 34 communicated with the first cavity 33 is arranged in the center of the top of the hanging weight 3. In the impact process, air and underground water can be discharged upwards from the first cavity 33 and the second cavity 34, so that impact resistance is reduced, and meanwhile, the first cavity 33 and the second cavity 34 can play a role in buffering deformation to a certain extent, and cracks of the lifting hammer 3 due to rigid impact are avoided.

Claims (6)

1. A punching device for rectangle slide-resistant stake, including support frame and sledge hammer (3), and hoist engine (4) and steel cable (41) that are located on the support frame and can drive sledge hammer (3) and go up and down, characterized by: the supporting frame comprises a truss (1) and an inclined strut (2), the bottom of the truss (1) is fixedly connected with an underground foundation through supporting legs (15), the inclined strut (2) is installed at the end part of the truss (1), a winch (4) is arranged at the top of the truss (1), a steel rope (41) of the winch (4) bypasses a pulley (42) at the hanging end of the inclined strut (2) and then is connected with a lifting hammer (3), the cross section of the lifting hammer (3) is of a rectangular structure, a plurality of lifting lugs are uniformly arranged at the top of the lifting hammer (3), each lifting lug is connected with the steel rope (41) through an auxiliary rope (43), and a plurality of conical teeth (31) are uniformly distributed at the bottom of the lifting hammer (3).
2. A punching device for rectangular slide piles as claimed in claim 1, wherein: truss (1) are including two bottom crossbeam (11) and two top crossbeam (12) that set up along the horizontal direction to and connect many spinal branch stay (13) and bracing (14) between bottom crossbeam (11) and top crossbeam (12), hoist engine (4) are fixed on top crossbeam (12) through frame (44), landing leg (15) set up on bottom crossbeam (11).
3. A punching device for rectangular slide piles as claimed in claim 2, wherein: the two inclined strut frames (2) are respectively arranged on the two top cross beams (12), the hanging ends of the two inclined strut frames (2) are folded towards the middle and are connected through a fixed shaft (21), and a pulley (42) is arranged in the middle of the fixed shaft (21).
4. A punching device for rectangular slide piles as claimed in claim 3, wherein: the diagonal bracing frame (2) is a diamond frame formed by four rod pieces, and a vertical rod is arranged between two opposite angles except a hanging end in the diamond frame for supporting.
5. A punching device for rectangular slide piles as claimed in claim 1, wherein: the top periphery of the lifting hammer (3) is provided with a mounting frame (32), the lifting hammer (3) is connected with the mounting frame (32) through bolts, and the lifting lug is arranged on the mounting frame (32).
6. A punching device for rectangular slide piles as claimed in claim 5, wherein: the middle part of the lifting hammer (3) is provided with a first cavity (33) penetrating through two side surfaces of the lifting hammer (3), and the center of the top of the lifting hammer (3) is provided with a second cavity (34) communicated with the first cavity (33).
CN202320488960.1U 2023-03-14 2023-03-14 Punching device for rectangular anti-slide piles Active CN219241819U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320488960.1U CN219241819U (en) 2023-03-14 2023-03-14 Punching device for rectangular anti-slide piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320488960.1U CN219241819U (en) 2023-03-14 2023-03-14 Punching device for rectangular anti-slide piles

Publications (1)

Publication Number Publication Date
CN219241819U true CN219241819U (en) 2023-06-23

Family

ID=86844051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320488960.1U Active CN219241819U (en) 2023-03-14 2023-03-14 Punching device for rectangular anti-slide piles

Country Status (1)

Country Link
CN (1) CN219241819U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116220070A (en) * 2023-03-14 2023-06-06 中国十九冶集团有限公司 Construction method of rectangular anti-slide pile

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116220070A (en) * 2023-03-14 2023-06-06 中国十九冶集团有限公司 Construction method of rectangular anti-slide pile

Similar Documents

Publication Publication Date Title
CN107299643A (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN219241819U (en) Punching device for rectangular anti-slide piles
CN111622126B (en) Construction method of high-altitude vertical manned channel in high mountain rock area
CN113148893A (en) Hydraulic jacking load-bearing support and mounting method thereof
CN110820950A (en) Integral synchronous jacking construction method for large-span combined type overweight eccentric slope angle steel structure
CN210483094U (en) Inverted triangular pipe truss lifting device
CN206753488U (en) A kind of artificial digging pile reaming auxiliary equipment
CN112412154B (en) Ultra-high voltage transmission line construction process with floating type overwater platform as operation surface
CN212405472U (en) Cross node connection structure of assembled frame structure
CN210194445U (en) Vertical transportation self-lifting system for slip form construction
CN219653713U (en) Heavy pile foundation steel reinforcement cage positioner
CN116220070A (en) Construction method of rectangular anti-slide pile
CN212863855U (en) Convenient repeatedly usable's manual hole digging pile dregs hoisting device
CN207176719U (en) Steel lattice column combined type tower-crane foundation structure in a kind of foundation ditch
CN111622347A (en) Cross-shaped node connecting structure of assembled frame structure and construction method thereof
CN207109815U (en) A kind of anchor jacked pile pile pressing device
CN217150235U (en) Device for construction of manual hole digging cast-in-place pile
CN218025011U (en) Hole assembled longmen gallows is dug in manual work
CN111157211A (en) Large-scale hydraulic pile hammer test bench
CN216920047U (en) A crawl device for jacking bridge bent cap
CN220768059U (en) Device for preventing reinforcement cage from floating and recycling hanging bars for bored pile
CN220319075U (en) Guy rope hanging basket assembling platform
CN218860185U (en) Deep basal pit concrete support overhead hoist
CN213329138U (en) Loading device and test equipment for foundation pile pulling-resistant static load test