CN205189423U - Bar planting auxiliary device - Google Patents
Bar planting auxiliary device Download PDFInfo
- Publication number
- CN205189423U CN205189423U CN201520787029.9U CN201520787029U CN205189423U CN 205189423 U CN205189423 U CN 205189423U CN 201520787029 U CN201520787029 U CN 201520787029U CN 205189423 U CN205189423 U CN 205189423U
- Authority
- CN
- China
- Prior art keywords
- hinge
- bar planting
- bar
- support post
- arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 13
- 239000010959 steel Substances 0.000 claims abstract description 13
- 229910000838 Al alloy Inorganic materials 0.000 claims description 5
- 238000001125 extrusion Methods 0.000 claims description 5
- 238000009434 installation Methods 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 230000003014 reinforcing effect Effects 0.000 abstract description 6
- 238000002513 implantation Methods 0.000 abstract description 2
- 210000003205 muscle Anatomy 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 4
- 230000001174 ascending effect Effects 0.000 description 2
- 239000007943 implant Substances 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 231100000768 Toxicity label Toxicity 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Cultivation Of Plants (AREA)
Abstract
The utility model provides a plant muscle auxiliary device, includes that the top that is connected by the articulated frame of the four-bar linkage in plane that support post, dowel steel, action arm and connecting rod are constituteed puts the thing bracket, be equipped with between the observation side of support post, hinge A and the hinge D and hang down accurate bubble A and still be equipped with the horizontally indicator arm simultaneously, be equipped with between the observation side of dowel steel, hinge B and the hinge C and hang down accurate bubble B and still be equipped with simultaneously with the corresponding bar planting degree of depth scale of indicator arm, the measuring range of the mounted position of indicator arm and bar planting degree of depth scale all suits with the length of the movement track of dowel steel, the top of dowel steel upwards extends from hinge B, and the top of dowel steel can be dismantled and be connected with and put the thing bracket. The utility model discloses can regard as the floor height to use at the bottom of the higher department board, during beam-bottom constructional column reinforcing bar planting, be applicable to the top bar planting in the space below the headroom 6m to the control implantation degree of depth need not to repeat and sets up the handling frame, and efficiency improves greatly, and the security can be ensured.
Description
Technical field
The utility model relates to a kind of construction auxiliary device, particularly a kind of bar planting servicing unit.
Background technology
Floor height at present when building is higher, and workman is to when carrying out bar planting construction at the bottom of plate, at the bottom of beam, all need to set up steel pipe operation support body or movable support body, different positions needs to set up respectively.Easily there is following problem in this mode of operation: one, traditional high floor height bar planting different parts all needs to set up operation support body, and workload is large, and bar planting efficiency is low; Two, traditional high floor height bar planting personnel need on handling frame, highly more than 2m, have certain danger to cause certain potential safety hazard; During three, traditional high floor height bar planting, personnel look up, and operation inconvenience, bar planting length is wayward, easily occurs quality problems.
Utility model content
The purpose of this utility model is to provide a kind of bar planting servicing unit, solve the bar planting of existing higher position to there is operation support bodys a large amount of in work progress and set up work, the technical problem that efficiency of construction is low, also will solve the safety because personnel ascend a height, support body is set up etc. causes and quality problems.
For achieving the above object, the utility model adopts following technical scheme:
A kind of bar planting servicing unit, is placed in ground and treats between bar planting component, the holding carriage that the top comprising the hinged auxiliary stand of plane double leval jib and the dowel bar be made up of support post, dowel bar, motion arm and connecting rod is connected,
Described support post is parallel with dowel bar, and the bottom of support post is placed on ground, and the top of support post is hinged by one end of hinge A and connecting rod, and the other end of connecting rod passes through the upper articulation of hinge B and dowel bar,
Described motion arm is parallel with connecting rod, the bottom-hinged of hinge C and dowel bar is passed through at the top of motion arm, the middle part of motion arm is hinged by the middle part of hinge D and support post, motion arm extends to handle from hinge D, dowel bar vertically has the straight-line trajectory along hinge B and hinge C connecting line, the length of movement locus with treat that the length of bar planting adapts
The observation side of described support post, between hinge A and hinge D, be provided with the indicating arm that vertical accurate bubble A is also provided with level simultaneously, the observation side of described dowel bar, be provided with vertical accurate bubble B between hinge B with hinge C and be also provided with the bar planting deep calibration corresponding with indicating arm simultaneously, the installation site of described indicating arm and the measurement category of bar planting deep calibration all adapt with the length of the movement locus of dowel bar
The top of described dowel bar upwards extends from hinge B, and the top side detachable of dowel bar is connected with holding carriage.
Also be provided with nominal telescope between the top of described dowel bar and holding carriage to save, described nominal telescope joint is set to two joints at the most.
Described removably connecting adopts bolt aperture pin joint or spring cassette connection up and down.
Described support post is hollow rectangle aluminium alloy extrusions, and the outside cover of support post has dismountable fastener, and the observation side of fastener is connected with indicating arm, and the both sides, front and back of described fastener have hole, is installed with screw and makes screw withstand on the outer surface of support post in hole.
Described holding carriage comprise be connected with lower member tube connector, close the glove supporting plate at tube connector top, twice equipment that the both sides of the turning backing steel plate that is inserted with in slot that tube connector back is provided with, slot and turning backing steel plate are respectively equipped with fixes belt and twice bar planting retainer ring.
Described motion arm adopts pipe to make, and the length of handle section and the motion arm length between hinge C and hinge D is than being 2:1.
The scope of described bar planting deep calibration is 0-300mm.
Compared with prior art the utility model has following characteristics and beneficial effect:
Bar planting servicing unit of the present utility model is as at the bottom of floor height higher position plate, use during constructional column reinforcing steel implant at the bottom of beam, adopt aluminium alloy extrusions as main support, add torque operation arm, vertical bubble, indicating arm, holding carriage etc., user can be allowed can to operate on ground, be applicable to the top bar planting in the space of below headroom 6m.General business and house overwhelming majority headroom are all at below 6m at present, therefore this support can meet the bar planting needs of most high floor height substantially, and set up handling frame without the need to repeating, efficiency improves greatly; Personnel, without the need to ascending a height, can operate on ground, avoid the danger of ascending a height, and reduce potential safety hazard; Scale can be utilized to measure, the conveniently keyhole degree of depth, bar planting length simultaneously, the object controlling rebar-planting quality can be reached.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in more detail.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the schematic diagram that removably connects of indicating arm and column.
Fig. 3 is the structural representation of top support frame.
Fig. 4 is the structural representation of cassette nominal telescope joint.
Fig. 5 is the using state figure after installing electric drill.
Using state figure when Fig. 6 is boring.
Using state figure when Fig. 7 is bar planting.
Reference numeral: 1-motion arm, 1.1-handle section, 2-support post, 3-dowel bar, 4-indicating arm, 5-hangs down accurate bubble A, 6-connecting rod, 7-cassette nominal telescope saves, 8-top support frame, 9-screw, 10-treats bar planting component, 11-ground, 12-hinge A, 13-hinge B, 14-hinge C, 15-hinge D, 16-treats bar planting, 17-hangs down accurate bubble B, 18-bar planting deep calibration, 19-holding carriage, 19.1-tube connector, 19.2-glove supporting plate, 19.3-slot, the turning backing steel plate of 19.4-, 19.5-equipment fixes belt, 19.6-bar planting retainer ring, 20-fastener.
Detailed description of the invention
Embodiment is shown in Figure 1, this device is applicable to the beam slab bar planting of below 6m clear height, this bar planting servicing unit, be placed in ground 11 and treat between bar planting component 10, the holding carriage 19 that the top comprising the hinged auxiliary stand of plane double leval jib and the dowel bar 3 be made up of support post 2, dowel bar 3, motion arm 1 and connecting rod 6 is connected
Described support post 2 is parallel with dowel bar 3, and the bottom of support post 2 is placed on ground 11, as auxiliary stand carrying use, adopts aluminium alloy extrusions rectangular tube to make, reduces deadweight.
The top of support post 2 is hinged by one end of hinge A12 and connecting rod 6, and the other end of connecting rod 6 passes through the upper articulation of hinge B13 and dowel bar 3.Motion arm 1 is parallel with connecting rod 6, the bottom-hinged of hinge C14 and dowel bar 3 is passed through at the top of motion arm 1, the middle part of motion arm 1 is hinged by the middle part of hinge D15 and support post 2, motion arm 1 extends to handle section 1.1 from hinge D15, dowel bar 3 vertically has the straight-line trajectory along hinge B13 and hinge C14 connecting line, the length of movement locus with treat that the length of bar planting 16 adapts.
Described motion arm adopts pipe to make, and the length of handle section 1.1 and the motion arm length between hinge C14 and hinge D15 is than being 2:1, the long 1200mm in outside, and the long 600mm in inner side, for the keyhole degree of depth and bar planting length.
The observation side of described support post 2, be provided with vertical accurate bubble A5 between hinge A12 and hinge D15 and be also provided with indicating arm 4 simultaneously.Shown in Figure 2, in the present embodiment, the outside cover of support post 2 has dismountable fastener 8, loads onto during use, the used time does not remove, the observation side of fastener 8 is connected with indicating arm 4, and the both sides, front and back of described fastener 8 have hole, is installed with screw 9 and makes screw withstand on the outer surface of support post 2 in hole.Indicating arm also can adopt expansion coupling form, makes, can adjust with different floor height of hollow circular-tube, and sealing bar is arranged on the outside supporting column.
The observation side of described dowel bar 3, be provided with vertical accurate bubble B17 be also provided with the bar planting deep calibration 18 corresponding with indicating arm simultaneously between hinge B13 with hinge C14, the installation site of described indicating arm 4 and the measurement category of bar planting deep calibration 18 all adapt with the length of the movement locus of dowel bar 3.Scale adopts millimeter unit, and consider the general bar planting degree of depth, the scope of bar planting deep calibration is 0-300mm.
Vertical accurate bubble is set respectively in the upside of support post and scale, the verticality during bubble control bar planting of both direction can be passed through.
The top of described dowel bar 3 upwards extends from hinge B13, and the top side detachable of dowel bar 3 is connected with holding carriage 19.Also be provided with cassette nominal telescope between the top of described dowel bar 3 and holding carriage 19 and save 7, this removably connect adopt bolt aperture pin joint or up and down spring cassette connect, single cassette nominal telescope saves 7 shown in Figure 4.What the present embodiment adopted be the connection of upper and lower spring cassette, and between namely the top of dowel bar 3 saves 7 with cassette nominal telescope, cassette nominal telescope saves and be upper and lower spring cassette between 7 with holding carriage 19 and be connected.Described cassette nominal telescope joint 7 is set to two joints at the most.Cassette nominal telescope is saved and is applied when differing heights, and higher position increases standard knot quantity, and consider stability, standard knot increase is no more than 2, therefore maximum measuring distance is 6m, exceedes this distance, and auxiliary stand deadweight and stability all can reduce.
Shown in Figure 3, described holding carriage 19 comprise be connected with lower member tube connector 19.1, close the glove supporting plate 19.2 at tube connector top, twice equipment that the both sides of the turning backing steel plate 19.4 that is inserted with in slot 19.3 that tube connector back is provided with, slot and turning backing steel plate are respectively equipped with fixes belt 19.5 and twice bar planting retainer ring 19.6.Fixing belt is used for fixing electric drill, hair-dryer, and bar planting retainer ring is used for the fixing reinforcing bar implanted, and replaces when using and backer board is changed a direction.
The utility model adopts lighter aluminium alloy extrusions as main material, controls deadweight; The vertical accurate bubble being provided with both direction controls verticality, indicating arm and the scale label keyhole degree of depth and bar planting length, top is provided with bracket and may be used for fixing electric drill, hair-dryer, reinforcing bar etc., this support directly lands, personnel only need hand steered control vertical, and without the need to load-bearing, motion arm adopts lever principle, arrange by 2:1 length ratio, laborsaving convenience.By adjustment operation arm and variation standard knot quantity, this support is applicable to the bar planting of the following scope of clear space 6m.
Use step of the present utility model is as follows:
Step one, first puts top rebars bar planting position well line on the ground according to drawing before construction, has marked crosspoint.
Step 2, adopts laser plummet by top rebars bar planting position from crosspoint, ground upright projection to top.
Step 3, shown in Figure 5, electric drill is fixed on holding carriage, opens auxiliary stand, fix indicating arm.
Step 4, the vertical accurate bubble according to both direction regulates auxiliary stand position, guarantees that auxiliary stand is vertical.
Step 5, shown in Figure 6, the red-label point aiming at plumb aligner projection is holed, control electric drill by the handle of downward pressing operation arm slowly to pierce, along with the movement of electric drill, operator is by bar planting deep calibration reading numerical values, thus the keyhole degree of depth, oppositely exit after reaching requirement;
Step 6, is fixed on hair-dryer on holding carriage, controls the cleaning degree of depth by the handle of downward pressing operation arm, cleans out oppositely to exit afterwards;
Step 7, shown in Figure 7, after reinforcing bar cleans out, firm for backing plate is changed direction, and allow bar planting retainer ring inwardly, the reinforcing bar that need implant is fixed on after wrapping anchoring adhesive after on bar planting retainer ring, slowly entered by the handle control reinforcing bar of motion arm in the hole of having bored, read the numerical value of bar planting deep calibration, after reaching design implantation depth, oppositely exit motion arm.
Step 8, complete bar planting operation, the handle of unclamp operation arm, takes off holding carriage and indicating arm, is received by auxiliary stand and folds, finish the work.
Arrange 3 supports respectively, water operation by boring, clear hole, bar planting when auxiliary stand uses, efficiency can improve further, the time of dismantling in minimizing process.When using motion arm operation, answer cooperating equipment to pierce situation and slowly exert oneself, can not be too quickly.
Claims (7)
1. a bar planting servicing unit, be placed in ground (11) and treat between bar planting component (10), it is characterized in that: the holding carriage (19) that the top comprising the hinged auxiliary stand of plane double leval jib and the dowel bar (3) be made up of support post (2), dowel bar (3), motion arm (1) and connecting rod (6) is connected
Described support post (2) is parallel with dowel bar (3), the bottom of support post (2) is placed on ground (11), the top of support post (2) is by hinge A(12) hinged with one end of connecting rod (6), the other end of connecting rod (6) is by hinge B(13) with the upper articulation of dowel bar (3)
Described motion arm (1) is parallel with connecting rod (6), the top of motion arm (1) is by hinge C(14) with the bottom-hinged of dowel bar (3), the middle part of motion arm (1) is by hinge D(15) hinged with the middle part of support post (2), motion arm (1) is from hinge D(15) extend to handle section (1.1), dowel bar (3) vertically has along hinge B(13) and hinge C(14) straight-line trajectory of connecting line, the length of movement locus with treat that the length of bar planting (16) adapts
The observation side of described support post (2), hinge A(12) and hinge D(15) between be provided with vertical accurate bubble A(5) be also provided with the indicating arm (4) of level simultaneously, the observation side of described dowel bar (3), hinge B(13) with hinge C(14) between be provided with vertical accurate bubble B(17) be also provided with the bar planting deep calibration (18) corresponding with indicating arm simultaneously, the installation site of described indicating arm (4) and the measurement category of bar planting deep calibration (18) all adapt with the length of the movement locus of dowel bar (3)
The top of described dowel bar (3) is from hinge B(13) upwards extend, the top side detachable of dowel bar (3) is connected with holding carriage (19).
2. bar planting servicing unit according to claim 1, is characterized in that: be also provided with cassette nominal telescope between the top of described dowel bar (3) and holding carriage (19) and save (7), and described cassette nominal telescope joint (7) is set to two joints at the most.
3. bar planting servicing unit according to claim 1 and 2, is characterized in that: described in removably connect adopt bolt aperture pin joint or up and down spring cassette connect.
4. bar planting servicing unit according to claim 1, it is characterized in that: described support post (2) is hollow rectangle aluminium alloy extrusions, the outside cover of support post (2) has dismountable fastener (8), the observation side of fastener (8) is connected with indicating arm (4), the both sides, front and back of described fastener (8) have hole, be installed with screw (9) and make screw withstand on the outer surface of support post (2) in hole.
5. bar planting servicing unit according to claim 1, is characterized in that: described holding carriage (19) comprise be connected with lower member tube connector (19.1), close the glove supporting plate (19.2) at tube connector top, twice equipment that the both sides of the turning backing steel plate (19.4) that is inserted with in slot (19.3) that tube connector back is provided with, slot and turning backing steel plate are respectively equipped with fixes belt (19.5) and twice bar planting retainer ring (19.6).
6. bar planting servicing unit according to claim 1, is characterized in that: described motion arm adopts pipe to make, and length and the motion arm of handle section (1.1) are positioned at hinge C(14) and hinge D(15) between length to compare be 2:1.
7. bar planting servicing unit according to claim 1, is characterized in that: the scope of described bar planting deep calibration is 0-300mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520787029.9U CN205189423U (en) | 2015-10-13 | 2015-10-13 | Bar planting auxiliary device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520787029.9U CN205189423U (en) | 2015-10-13 | 2015-10-13 | Bar planting auxiliary device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205189423U true CN205189423U (en) | 2016-04-27 |
Family
ID=55782424
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520787029.9U Expired - Fee Related CN205189423U (en) | 2015-10-13 | 2015-10-13 | Bar planting auxiliary device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205189423U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106695356A (en) * | 2017-01-25 | 2017-05-24 | 湖南省第五工程有限公司 | Top plate drilling device and application method thereof |
CN106735440A (en) * | 2017-01-19 | 2017-05-31 | 河南城建学院 | A kind of simple beam bottom perforating device |
CN107367270A (en) * | 2017-08-30 | 2017-11-21 | 中冶建工集团有限公司 | For establishing the measurement module and its application method of interior net storey height measurement point |
CN107401281A (en) * | 2017-08-04 | 2017-11-28 | 中建七局第四建筑有限公司 | A kind of method for aiding in tool for bar planting and aiding in bar planting |
CN107790787A (en) * | 2017-09-27 | 2018-03-13 | 中船第九设计研究院工程有限公司 | The lengthening support that a kind of packaged type electric drill drills vertically upward |
CN108086663A (en) * | 2018-02-05 | 2018-05-29 | 大荣建设集团有限公司 | Interior architecture object top and wall column flank hole bar planting stent and its construction method |
CN110014521A (en) * | 2019-05-13 | 2019-07-16 | 中国二十二冶集团有限公司 | Bar planting assistor and its construction method at the top of secondary structure constructional column |
CN111173295A (en) * | 2020-01-08 | 2020-05-19 | 王德铭 | Construction method for planting ribs at beam bottom of secondary structure of frame building |
-
2015
- 2015-10-13 CN CN201520787029.9U patent/CN205189423U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106735440A (en) * | 2017-01-19 | 2017-05-31 | 河南城建学院 | A kind of simple beam bottom perforating device |
CN106695356A (en) * | 2017-01-25 | 2017-05-24 | 湖南省第五工程有限公司 | Top plate drilling device and application method thereof |
CN107401281A (en) * | 2017-08-04 | 2017-11-28 | 中建七局第四建筑有限公司 | A kind of method for aiding in tool for bar planting and aiding in bar planting |
CN107367270A (en) * | 2017-08-30 | 2017-11-21 | 中冶建工集团有限公司 | For establishing the measurement module and its application method of interior net storey height measurement point |
CN107367270B (en) * | 2017-08-30 | 2023-07-21 | 中冶建工集团有限公司 | Measurement template for establishing indoor clear height measurement point and use method thereof |
CN107790787A (en) * | 2017-09-27 | 2018-03-13 | 中船第九设计研究院工程有限公司 | The lengthening support that a kind of packaged type electric drill drills vertically upward |
CN108086663A (en) * | 2018-02-05 | 2018-05-29 | 大荣建设集团有限公司 | Interior architecture object top and wall column flank hole bar planting stent and its construction method |
CN110014521A (en) * | 2019-05-13 | 2019-07-16 | 中国二十二冶集团有限公司 | Bar planting assistor and its construction method at the top of secondary structure constructional column |
CN111173295A (en) * | 2020-01-08 | 2020-05-19 | 王德铭 | Construction method for planting ribs at beam bottom of secondary structure of frame building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205189423U (en) | Bar planting auxiliary device | |
CN207214994U (en) | A kind of wall column verticality measuring tool | |
CN107570757A (en) | A kind of precisely apparatus for controlling of lifting and drilling equipment | |
CN107999829A (en) | Bar planting drilling aid at the top of a kind of building secondary structure constructional column | |
GB2549823A (en) | Bricky's profile tool | |
CN206467656U (en) | Simple soil nailing manual pore-forming's angle controller | |
CN207447418U (en) | A kind of accurate apparatus for controlling of lifting and drilling equipment | |
CN205777412U (en) | Roof flower is set a roof beam in place and exterior wall finishing construction mobile operating platform | |
CN201476740U (en) | Concrete-floor thickness detector | |
CN108612097B (en) | Pile position centering device and pile position centering process applying same | |
CN207267793U (en) | A kind of placing device of tower crane leg | |
CN215670131U (en) | Device capable of quickly and accurately adjusting steel structure embedded part | |
CN205599974U (en) | Portable drilling tool | |
CN212110038U (en) | Simple and easy measuring tool of template straightness that hangs down | |
CN211783494U (en) | On-spot group of superelevation tower is with straightness detection device that hangs down | |
CN210664373U (en) | Simple and easy template straightness measuring tool that hangs down | |
CN214169184U (en) | Foundation pit deformation monitoring device | |
CN208949829U (en) | A kind of truss-like cantilever form | |
CN207026541U (en) | It is removable just to adjust exhausting duct suspension rod drilling frame | |
CN221095920U (en) | Portable detachable adjustable leather number pole | |
CN220814974U (en) | Positioning device for longitudinal steel bars of constructional column | |
CN220206705U (en) | Simple pipe pile construction inclination measuring tool | |
CN211977897U (en) | Levelling rod vertically-placing auxiliary device | |
CN216405365U (en) | Foundation detection device for hydraulic engineering | |
CN208671966U (en) | A kind of prefabricated components installation vertical measurement instrument |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160427 Termination date: 20161013 |