CN109949001A - A kind of Project Supervision organization management system - Google Patents
A kind of Project Supervision organization management system Download PDFInfo
- Publication number
- CN109949001A CN109949001A CN201910134307.3A CN201910134307A CN109949001A CN 109949001 A CN109949001 A CN 109949001A CN 201910134307 A CN201910134307 A CN 201910134307A CN 109949001 A CN109949001 A CN 109949001A
- Authority
- CN
- China
- Prior art keywords
- audit
- project
- auditor
- management system
- database
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The present invention relates to a kind of Project Supervision organization management systems, it is related to a kind of engineering construction technical field, solves although working efficiency that existing Project Supervision organization and administration software improves administrative staff, but the activity of user can not be tracked, it is easy to appear user right abuse phenomenon problem, it includes controlling terminal, display interface, the enquiry module of audit user account needed for being inputted for auditor, it is stored with the key message database of Project Supervision organization management system key message, record has the access operation database of record of user account and corresponding user account access or operation key message database information situation in real time.The present invention, which has, carries out realization tracing record to the activity of user, to effectively prevent the effect for user right abuse phenomenon occur.
Description
Technical field
The present invention relates to a kind of engineering construction technical fields, organize system more particularly, to a kind of Project Supervision
System.
Background technique
The software of Project Supervision organization and administration at present is able to satisfy the engineered tissue management of the engineering construction project management target
Business norms;This system standardizes Project Management, reduces fault caused by due to human factor to the maximum extent.
Promote management work regulation and standardization, straightening management system layer inside and the relationship between design, management, unit in charge of construction, it is real
Existing each unit of taking part in building's information shared resources of project and information flow manage and control, and greatly reduce the centre in project management process
Link is further strengthened and is effectively controlled progress, quality, cost etc., so that administrative staff's working efficiency improves, decision-making period
Shorten, and risk can be reduced.Engineering cost use comprehensively can be tracked and be controlled, reinforces cost accounting, accelerates capital turnover,
It can guarantee engineering material, equipment supply in time, keep reducing cost while engineering construction high efficiency, avoid wasting, scene clothes
It is engaged in more quick
Although existing Project Supervision organization and administration software improves the working efficiency of administrative staff, but can not be to user's
The phenomenon that activity is tracked, and is easy to appear user right abuse, there is room for improvement.
Summary of the invention
The object of the present invention is to provide a kind of activities with to user to carry out realization tracing record, to effectively prevent
There is the Project Supervision organization management system of the effect of user right abuse phenomenon.
Foregoing invention purpose of the invention has the technical scheme that
A kind of Project Supervision organization management system, including controlling terminal, display interface, for auditor input needed for audit
The enquiry module of user account, the key message database for being stored with Project Supervision organization management system key message, reality
Shi Jilu has the access operation note of user account and corresponding user account access or operation key message database information situation
Record database;
The user account that controlling terminal is inputted using auditor in enquiry module records data as query object, in access operation
The key message of corresponding user account access and operation is inquired in library, and is shown at display interface.
By using above-mentioned technical proposal, by controlling terminal, display interface, enquiry module, key message database, visit
Ask that the setting in record data library facilitates auditor when needed and can track the access operation pass of each user
, there is the phenomenon that user abuses one's power to further avoid in the case where key information.
The present invention is further arranged to: Project Supervision organization management system further include be stored with auditor's account with
And corresponding auditor's account institute must audit project and respective item always audit number institute must an audit project audit situation
Database;
The account that controlling terminal is logged in using auditor is query object in the necessary audit project design conditions database of institute
Inquire must audit project and corresponding audit project number situation, show in the display interface and be shown in auditor
The top of access operation information that member is inquired, at the same for must audit project with number of auditing by as little as mostly in display interface
Place is from top to bottom shown.
By using above-mentioned technical proposal, by must audit project audit the setting of situation database, controlling terminal
Auditor be can be convenient when tracking the access operation key message of each user, can pay attention to the item that must audit constantly
Mesh situation avoids the access operation key message due to tracking user and project itself that audit needed for neglecting oneself.
The present invention is further arranged to: Project Supervising organization management system further includes being stored with audit project and right
The audit project audit result data library for answering audit project difference auditor's auditing result, herein there are two types of auditing results,
One is there are problem, secondly being no problem;
Controlling terminal inquires corresponding audit project in audit project audit result data library using audit project as query object
All auditing results, and in auditing result it is of problems audit number and no problem audit number difference it is absolute
Value is used as dividend, and total audit number of corresponding audit project is as divisor, to obtain the accounting of difference number, and with accounting
Priority ordering is carried out by as little as multipair audit project, priority is higher than the sequence of audit number.
By using above-mentioned technical proposal, can be obtained by the setting of audit project audit result data library, controlling terminal
The difference number accounting of audit project auditing result is taken to be ranked up, it is quite different that difference number is accounted for smaller i.e. auditing result
Audit project sequence preceding, to preferably cause auditor's note that be infused during follow-up audit
Meaning.
The present invention is further arranged to: controlling terminal is one by one using the account of all users as query object, one by one in access
All key messages that corresponding user account access and operation are inquired in record data library form total key message data
The number in library, access or operation in total key message database for each key message is counted;
Controlling terminal transfers total key message database, and to statistics number be more than controlling terminal preset times key message into
Row top set and be located at must be above audit project.
It, can be to certain passes by the setting of total key message database, controlling terminal by using above-mentioned technical proposal
When key information access or more number of operations, top set is carried out, so as to cause auditor's note that carrying out in first time
Processing.
The present invention is further arranged to: Project Supervision organization management system further include be stored with auditor's account with
And the auditor of corresponding the be inclined to color of auditor is inclined to color database;
Controlling terminal is inclined in color database in auditor as query object using auditor's account and inquires auditor
Be inclined to color, and mark to the preceding 3 progress colors for being from top to bottom shown in display interface are located to cause auditor's
Pay attention to.
It, can be right by the setting of auditor's tendency color database, controlling terminal by using above-mentioned technical proposal
The first three items of display interface carry out color mark, and the color marked is that auditor is inclined to color, to preferably draw
Play the attention of auditor.
The present invention is further arranged to: Project Supervision organization management system further include be stored with auditor's account with
And auditor's cell-phone number database, the short message sending device of corresponding auditor's account cell-phone number;
Controlling terminal is currently to log on to auditor's account work that Project Supervision organization management system carries out information inquiry
Auditor's cell-phone number is inquired in auditor's cell-phone number database for query object, and is sent by short message sending device
The audit ordering scenario being shown at display interface.
It, can be with by the setting of auditor's cell-phone number database, short message sending device by using above-mentioned technical proposal
The auditing result for being shown in display interface passes through short message sending device notice to corresponding user.
The present invention is further arranged to: the short message sending device is Short message alarm.
By using above-mentioned technical proposal, since short message sending device is Short message alarm, it can guarantee short massage notice
While reduce cost.
In conclusion advantageous effects of the invention are as follows: pass through controlling terminal, display interface, enquiry module, crucial letter
The setting of breath database, access operation database of record facilitates auditor and is believed key according to user account relative users
Access or the operation note record of breath are tracked inquiry, effectively prevent the phenomenon that user abuses one's power occur.
Detailed description of the invention
Fig. 1 is the block schematic illustration one of Project Supervision organization management system of the present invention.
Fig. 2 is the block schematic illustration two of Project Supervision organization management system of the present invention.
In figure, 1, controlling terminal;2, display interface;3, enquiry module;4, key message database;5, access operation records
Database;6, institute must audit project audit situation database;7, audit project audit result data library;8, total key message number
According to library;9, auditor is inclined to color database;10, color marks number of entry setup module;11, auditor's mobile phone number
According to library;12, short message sending device.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
It referring to Fig.1, is a kind of Project Supervision organization management system disclosed by the invention, including controlling terminal 1, display
Interface 2 inputs the enquiry module 3 of required audit user account for auditor, is stored with Project Supervision organization and administration system
The key message database 4 of system key message, in real time record have user account and corresponding user account access or operate crucial
The access operation database of record 5 of 4 information state of information database, controlling terminal 1 are preferably central processing unit.
Above-mentioned actual mechanical process is as follows: the user account that controlling terminal 1 is inputted with auditor in enquiry module 3
For query object, the key message of corresponding user account access and operation is inquired in access operation database of record 5, and is opened up
Show at display interface 2.
As shown in Figure 2, it is contemplated that access or operation note of the auditor inquiry user needed for inquiry at key message
When record, can keep in mind at all times for its own job must audit project inquiry, Project Supervision organization management system
Further include be stored with auditor's account and corresponding auditor's account institute must audit project and respective item always audit it is secondary
Several institutes must audit project audit situation database 6.
Above-mentioned actual application is as follows: the account that controlling terminal 1 is logged in using auditor is query object in institute
Must inquire in audit project design conditions database must audit project and corresponding audit project number situation,
The top for the access operation information that auditor is inquired is shown and is shown on display interface 2, while for the item that must audit
Mesh is with number of auditing by as little as mostly from top to bottom showing in display interface 2.
The auditing result presence difference there are multiple auditors about same audit project is further contemplated, is being occurred
Auditing result gap can preferably cause when larger auditor's note that Project Supervising organization management system also
Audit project audit result data including being stored with audit project and corresponding audit project difference auditor's auditing result
Library 7, herein there are two types of auditing results, one is that there are problems, secondly being no problem.
Above-mentioned actual application is as follows: controlling terminal 1 is audited in audit project as query object using audit project and is tied
All auditing results of corresponding audit project are inquired in fruit database 7, and with audit number of problems in auditing result
Be used as dividend with the absolute value of the difference of the audit number of no problem, total audit number of correspondence audit project as divisor,
To obtain the accounting of difference number, and priority ordering is carried out by as little as multipair audit project with accounting, priority, which is higher than, to be examined
The sequence of metering number.
In addition in view of when the access or operation excessively frequent herein for a certain key message occur can first when
Between cause auditor's note that controlling terminal 1 one by one using the account of all users as query object, one by one in access operation remember
All key messages that corresponding user account access and operation are inquired in record database 5 form total key message database 8, always
The number of access or operation in key message database 8 for each key message is counted;Controlling terminal 1 transfers total pass
Key information database 8, and the key message that statistics number is more than 1 preset times of controlling terminal is carried out top set and be located to examine
Above meter project.
It further contemplates when causing auditor to pay attention to, passes through the audit to needing auditor seriously to pay attention to
Item is coloured, and Project Supervision organization management system further includes being stored with auditor's account and corresponding auditor institute
The auditor for being inclined to color is inclined to color database 9.
Controlling terminal 1 inquires in auditor's tendency color database 9 careful using auditor's account as query object
The be inclined to color of meter personnel, and mark to the preceding 3 progress colors for being from top to bottom shown in display interface 2 are located to cause to audit
The attention of personnel.
Accordingly in view of the audit project quantity coloured required for different auditors is different, Project Supervision tissue
Management system further includes color mark number of entry setup module 10.
If auditor does not mark number of entry setup module 10 by color and is labeled to required color mark project,
Then it is defaulted as three;Conversely, then using auditor by color mark number of entry setup module 10 set by quantity as
Required mark color item number.
In addition further consider that auditor is easy to forget situation of auditing accordingly, Project Supervision when audit
Organization management system further includes the auditor's mobile phone for being stored with auditor's account and corresponding auditor's account cell-phone number
Number library 11, short message sending device 12, short message sending device 12 are preferably Short message alarm.
The concrete application process of features described above is as follows: controlling terminal 1 is currently to log on to Project Supervision organization and administration
Auditor's account that system carries out information inquiry inquires in auditor's cell-phone number database 11 careful as query object
Meter personnel's cell-phone number, and the audit ordering scenario being shown at display interface 2 is sent by short message sending device 12.
The implementation principle of the present embodiment are as follows:
After auditor is by the account of tracking user needed for inputting in enquiry module 3, controlling terminal 1 transfers access operation note
The access operation information in database 5 is recorded, and access operation information is shown accordingly by display interface 2.
The information shown at display interface 2 accordingly can also pass through control in addition to the access operation information of inquired user
Terminal 1, institute must audit project audit situation databases 6, audit project audit result data library 7, total key message database 8
Setting show the audit item that corresponding auditor must audit, and carry out rational sorting according to the case where designing item.
And when showing auditor's audit item, it is contemplated that can preferably cause auditor's note that knot
Close auditor's tendency color database 9, color mark number of entry setup module 10 can be required according to auditor to pass
Key item is coloured, to preferably cause the attention of auditor.
And auditor can also be audited by the setting of auditor's cell-phone number database 11, short message sending device 12
Situation is sent in the mobile phone of auditor in a manner of short message, to facilitate auditor to be able to carry out when needed in time
Inquiry.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this
Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it
It is interior.
Claims (8)
1. a kind of Project Supervision organization management system, it is characterised in that: including controlling terminal (1), display interface (2), supply
The enquiry module (3) of audit user account needed for auditor's input is stored with Project Supervision organization management system key
The key message database (4) of information, in real time record have user account and corresponding user account access or operation key message
The access operation database of record (5) of database (4) information state;
The user account that controlling terminal (1) is inputted using auditor in enquiry module (3) is remembered as query object in access operation
The key message of corresponding user account access and operation is inquired in record database (5), and is shown at display interface (2).
2. a kind of Project Supervision organization management system according to claim 1, it is characterised in that: Project Supervision
Organization management system further include be stored with auditor's account and corresponding auditor's account institute must audit project and corresponding
Project always audit number institute must an audit project audit situation database (6);
Controlling terminal (1) must audit project design conditions database in institute as query object using the account that auditor is logged in
In inquire must audit project and corresponding audit project number situation, show and be shown on display interface (2)
The top for the access operation information that auditor is inquired, at the same for must audit project with audit number by as little as mostly showing
Show and is from top to bottom shown at interface (2).
3. a kind of Project Supervision organization management system according to claim 2, it is characterised in that: Project Supervising
Organization management system further includes the audit item for being stored with audit project and corresponding audit project difference auditor's auditing result
Mesh audit result data library (7), herein there are two types of auditing results, one is that there are problems, secondly being no problem;
Controlling terminal (1) inquires corresponding examine using audit project as query object in audit project audit result data library (7)
All auditing results of meter project, and with the difference of audit number of problems in auditing result and the audit number of no problem
Absolute value as dividend, total audit number of corresponding audit project is as divisor, to obtain the accounting for distinguishing number, and
Priority ordering is carried out by as little as multipair audit project with accounting, priority is higher than the sequence of audit number.
4. a kind of Project Supervision organization management system according to claim 3, it is characterised in that: controlling terminal (1)
One by one using the account of all users as query object, corresponding user's account is inquired in access operation database of record (5) one by one
All key messages of number access and operation form total key message database (8), for every in total key message database (8)
The number of access or the operation of a key message is counted;
Controlling terminal (1) transfers total key message database (8), and is more than controlling terminal (1) preset times to statistics number
Key message carries out top set and is located above necessary audit project.
5. a kind of Project Supervision organization management system according to claim 4, it is characterised in that: Project Supervision
Organization management system further includes the auditor's tendency for being stored with auditor's account and corresponding the be inclined to color of auditor
Color database (9);
Controlling terminal (1) inquires in auditor's tendency color database (9) careful using auditor's account as query object
The be inclined to color of meter personnel, and mark to the preceding 3 progress colors for being from top to bottom shown in display interface (2) are located to cause to examine
The attention of meter personnel.
6. a kind of Project Supervision organization management system according to claim 5, it is characterised in that: Project Supervision
Organization management system further includes color mark number of entry setup module (10);
If auditor does not mark project to required color by color mark number of entry setup module (10) and is labeled,
It is defaulted as three;Conversely, then using auditor by color mark number of entry setup module (10) set by quantity as
Required mark color item number.
7. a kind of Project Supervision organization management system according to claim 6, it is characterised in that: Project Supervision
Organization management system further includes the auditor's mobile phone for being stored with auditor's account and corresponding auditor's account cell-phone number
Number library (11), short message sending device (12);
Controlling terminal (1) is currently to log on to auditor's account that Project Supervision organization management system carries out information inquiry
Auditor's cell-phone number is inquired in auditor's cell-phone number database (11) as query object, and is sent and filled by short message
It sets (12) and sends the audit ordering scenario being shown at display interface (2).
8. a kind of Project Supervision organization management system according to claim 7, it is characterised in that: the short message is sent
Device (12) is Short message alarm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910134307.3A CN109949001B (en) | 2019-02-22 | 2019-02-22 | Construction engineering supervision organization management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910134307.3A CN109949001B (en) | 2019-02-22 | 2019-02-22 | Construction engineering supervision organization management system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109949001A true CN109949001A (en) | 2019-06-28 |
CN109949001B CN109949001B (en) | 2021-05-07 |
Family
ID=67007683
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910134307.3A Expired - Fee Related CN109949001B (en) | 2019-02-22 | 2019-02-22 | Construction engineering supervision organization management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109949001B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111414526A (en) * | 2020-03-02 | 2020-07-14 | 浙江同洲项目管理有限公司 | Elevator installation supervision method and computer readable storage medium |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103186637A (en) * | 2011-12-30 | 2013-07-03 | 中国移动通信集团广东有限公司 | Method and device for analyzing user behavior of BOSS database |
US20140310365A1 (en) * | 2012-01-31 | 2014-10-16 | Global Relay Communications Inc. | System and Method for Tracking Messages in a Messaging Service |
CN106339305A (en) * | 2016-08-30 | 2017-01-18 | 孙鸿鹏 | Supervision and examination method for security of database |
CN106339490A (en) * | 2016-08-31 | 2017-01-18 | 铁道第三勘察设计院集团有限公司 | System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model |
CN106384191A (en) * | 2016-08-31 | 2017-02-08 | 铁道第三勘察设计院集团有限公司 | Railway tunnel construction progress management system and method based on 3DGIS and engineering 3D model |
CN106384190A (en) * | 2016-08-31 | 2017-02-08 | 铁道第三勘察设计院集团有限公司 | Railway roadbed construction progress management system and method based on 3DGIS and engineering 3D model |
CN106503927A (en) * | 2016-11-14 | 2017-03-15 | 南京三方化工设备监理有限公司 | A kind of petrochemical industry project equipment Monitoring information management system |
CN109242366A (en) * | 2018-11-06 | 2019-01-18 | 国电南瑞科技股份有限公司 | A kind of multi-period tide optimization method of electric-gas interconnection integrated energy system |
CN109325044A (en) * | 2018-09-20 | 2019-02-12 | 快云信息科技有限公司 | A kind of the audit log processing method and relevant apparatus of database |
-
2019
- 2019-02-22 CN CN201910134307.3A patent/CN109949001B/en not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103186637A (en) * | 2011-12-30 | 2013-07-03 | 中国移动通信集团广东有限公司 | Method and device for analyzing user behavior of BOSS database |
US20140310365A1 (en) * | 2012-01-31 | 2014-10-16 | Global Relay Communications Inc. | System and Method for Tracking Messages in a Messaging Service |
CN106339305A (en) * | 2016-08-30 | 2017-01-18 | 孙鸿鹏 | Supervision and examination method for security of database |
CN106339490A (en) * | 2016-08-31 | 2017-01-18 | 铁道第三勘察设计院集团有限公司 | System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model |
CN106384191A (en) * | 2016-08-31 | 2017-02-08 | 铁道第三勘察设计院集团有限公司 | Railway tunnel construction progress management system and method based on 3DGIS and engineering 3D model |
CN106384190A (en) * | 2016-08-31 | 2017-02-08 | 铁道第三勘察设计院集团有限公司 | Railway roadbed construction progress management system and method based on 3DGIS and engineering 3D model |
CN106503927A (en) * | 2016-11-14 | 2017-03-15 | 南京三方化工设备监理有限公司 | A kind of petrochemical industry project equipment Monitoring information management system |
CN109325044A (en) * | 2018-09-20 | 2019-02-12 | 快云信息科技有限公司 | A kind of the audit log processing method and relevant apparatus of database |
CN109242366A (en) * | 2018-11-06 | 2019-01-18 | 国电南瑞科技股份有限公司 | A kind of multi-period tide optimization method of electric-gas interconnection integrated energy system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111414526A (en) * | 2020-03-02 | 2020-07-14 | 浙江同洲项目管理有限公司 | Elevator installation supervision method and computer readable storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN109949001B (en) | 2021-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7848947B1 (en) | Performance management system | |
CN109726922A (en) | A kind of computer room patrolling and checking management system and method based on block chain | |
CN107909349A (en) | A kind of project management Cloud Server and its method for realizing project management | |
CN110428112A (en) | A kind of dual prevention mechanism management system of enterprise based under internet+mode | |
CN104361445B (en) | Labour's real-time management system and management method | |
CN104318393B (en) | A kind of radiopharmacy management system | |
Doellgast | Collective voice under decentralized bargaining: a comparative study of work reorganization in US and German call centres | |
CN105046446A (en) | Workflow frame based user-defined permission flow method and system | |
KR102180377B1 (en) | Integrated work management solution system | |
CN108491935A (en) | A kind of customer information visualized O&M management system and method | |
CN107292592A (en) | Construction-engineering project data automatic classification orients supplying system | |
CN111160754A (en) | Process arrangement engine system | |
CN106372469A (en) | Process-based database permission automated management system meeting international auditing standards | |
CN109949001A (en) | A kind of Project Supervision organization management system | |
CN107316086A (en) | The main human rectal cancer system of substation equipment and O&M method | |
CN106952045A (en) | A kind of standardized information management system and approaches to IM | |
CN104331776A (en) | Electric power data application management platform | |
CN109636123A (en) | A kind of management-control method and system of the Balanced Score Card based on hospital performance examination | |
CN108830515A (en) | A kind of photovoltaic plant capital construction information management system | |
CN105224678A (en) | Electronic document management method and device | |
CN108062662A (en) | A kind of entertainment intermediate item manages system | |
CN108255584A (en) | A kind of work flow processing method and system and computer readable storage medium | |
CN108170721A (en) | A kind of report form generation method for privately-offered fund | |
CN110826923A (en) | Enterprise management comprehensive evaluation system | |
US20090177534A1 (en) | System for performing personnel evaluations and computer program thereofor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210507 |
|
CF01 | Termination of patent right due to non-payment of annual fee |