CN108062662A - A kind of entertainment intermediate item manages system - Google Patents
A kind of entertainment intermediate item manages system Download PDFInfo
- Publication number
- CN108062662A CN108062662A CN201810002045.0A CN201810002045A CN108062662A CN 108062662 A CN108062662 A CN 108062662A CN 201810002045 A CN201810002045 A CN 201810002045A CN 108062662 A CN108062662 A CN 108062662A
- Authority
- CN
- China
- Prior art keywords
- project
- module
- unit
- template
- stage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
Abstract
The present invention provides a kind of entertainment intermediate items to manage system, which includes:Project verification application module, template library module, stage change module, human resources module, fiscal module, dynamic process module, project upgrading evaluation module, data Sediment Module, dynamic monitoring module.The system can be directed to the characteristics of entertainment intermediate item, and Life cycle, comprehensive management is effectively performed;For specific entertainment project, which can be by relevant customization function, to realize effective management of fine match detailed programs.
Description
Technical field
The present invention relates to a kind of project management systems, particularly a kind of entertainment project management system.
Background technology
Project management is a key areas in business administration, and in recent years, enterprise is to the exploitation of new product, new markets
Expansion and organizational change, workflow reengineering and the foundation of information system etc. of enterprises, whether tactful level or management level
The planning and execution in face are carried out in a manner of project.Purpose is the flow and method with project management, limited
Resources costs input with risk control under, reach the set goal.After enterprise sets a project, the project is participated in
Multiple departments are had, including Finance Department, market department, administrative department etc., and different departments can not during Project Operation
The meeting avoided generates friction, need to be coordinated.System is managed by application item, the finance in business administration can be controlled
Integration is effectively performed in system, human resource management, risk control, quality management, communication management, purchasing management etc., to reach high
The purpose of effect, high-quality, inexpensive completion enterprises work in every or project.
For old project management system based on spreadsheet, data are at random, and are easily controlled by individual, it is difficult to for enterprise
The project management of industry provides the data of real-time and precise.With advances in technology, present project management system has been able to provide
The continuous data of dynamic reflection reality, and monitor the process of project in real time, become the essential management tool of enterprise.
The application of project management system is only limitted to the industries such as building, national defence, space flight from the eighties and rapidly develops to today
The various fields such as computer, telecommunications, financial circles.The project management system in each field is required for matching the spy in the field
Point, for the exclusive business model in each field and operation method, suitable for the project management system of different field, there is also very
Big difference.If patent CN 106022649B disclose a kind of project management system, it is mainly used for the management of engineering project, makes
Valency, bid, consulting etc., the formant of the system include project supervision processing unit, project cost processing unit, buying prison
Control unit, property monitoring unit etc.;Project management system disclosed in the patent be fully with engineering project field to matched,
By the project management system, can project supervisor, project in engineering project be effectively improved with reasonable integration resource and information
Administrative staff and the work efficiency of property management personnel.Patent CN 103714411B disclose a kind of project management system, mainly
For one department of management and control or the project management performance of trans-departmental i.e. multi-layer;Mainly include Information Access module, performance management
Module, pointer determination module and result output module etc..
Although the application of project management system has been spread in more and more fields, for entertainment intermediate item, until
Modern neither one project management system can realize Life cycle, comprehensive management, fail by people, money, thing dependency number
Get up according to the comprehensive integration of progress and effectively management;It also could not be by the function of instrumental (such as instant message, on-line meeting
Deng) elements such as same project, team, stage are integrated, unified solution can not be formed.
Compared with other field, the characteristics of entertainment intermediate item has its own.Entertainment item types are more, differentiation is bigger,
The division of labor and participant's substantial amounts in project, wherein being much the work of intention class, ununified production procedure and standard;
Meanwhile entertainment project can generate substantial amounts of achievement in the process, since each work post disperses to handle official business, operation coordination is poor,
Achievement is difficult to synchronous in time and is archived in inside entertainment industry.
In addition, between different specific entertainment projects, there is also larger differences.From time and cycle:Variety project
Cycle generally requires the time of 1 year or so, and cycle of film project needs then 2 years fast, then time of 3-5 slowly.From the division of labor and
Personnel see:The work post and personnel amount that different types of project participates in are also different, and variety project is relatively easy, the work post of participation
There is more than ten of work post such as commercial affairs, distribution, copyright, publicity, director, playwright, screenwriter, camera shooting, light, sound equipment, stage property;And film project compared with
For complexity, about twenties works such as action director, wire teacher, visual effect guidance are also needed in addition to variety project is related to work post
Kind, a program member up to a hundred.
Just because of the These characteristics of entertainment intermediate item, existing software product or system can not do effective item for it
Mesh management.
The content of the invention
The technical problems to be solved by the invention are in view of the above shortcomings of the prior art, to provide a kind of entertainment intermediate item
The characteristics of management system, which can be directed to entertainment intermediate item, Life cycle, comprehensive management is effectively performed;It is right
In specific entertainment project, which can be by relevant customization function, to realize effective pipe of fine match detailed programs
Reason.
In order to realize foregoing invention purpose, the present invention provides following technical scheme:
The present invention provides a kind of entertainment intermediate items to manage system, which includes:Project verification application module
110th, template library module 120, stage change module 130, human resources module 140, fiscal module 150, dynamic process module
160th, project upgrading evaluation module 170, data Sediment Module 180, dynamic monitoring module 190.
Project verification application module 110, the module include concept pool unit 111, project application unit 112 and review of project initiation unit
113;The starting of one project is derived from a concept or an idea, and concept and idea promoter can be in concept pool units
Concept initiation is carried out in 111, the mode of initiation is that conceptual information, which enters in the unit, is stored up to the unit typing conceptual information
Standby, the other users in system can access the conceptual information of typing;User accesses the concept letter in concept pool unit 111
After breath, it can select to be transferred to project application unit 112 and fill in project verification information simultaneously, carry out project verification application;Project appraisal
Committeeman can access project application unit 112, and select suitable project verification information, be transferred to review of project initiation unit
113, and organize project review board to it into evaluating under line, review comment can typing this unit, when review result is logical
It is out-of-date, template library module 120 is transferred to by project review board member.
Preferably, template keyword data is included in the project verification information, which is characterized in that including carrier keyword data
With type keyword data.
It is further preferred that the carrier keyword data includes TV station, video website, cinema;The type is closed
Keyword data include variety, TV play, film, live streaming.
Template library module 120, the module include template matches unit 121, template pool unit 122, collapsible form unit
123;After project verification information enters template library module 120, template matches unit 121 is initially entered, passes through the matching built in the unit
Function matches the data in information of setting up the project with the keyword data of each template in template pool unit 122, matching result warp
After relevant person in charge confirms, corresponding template is selected in template pool unit 122 by the director, and is transferred to collapsible form list
Member 123, the module for being transferred to collapsible form unit 123 is project management template used in this project;Template enters activity
After modular unit 123, the instruction of project initiation is sent to stage change module 130 immediately.
Preferably, template has been preset in template pool unit 122, the title of each template corresponds to 2-3 keyword, and template is pre-
If content include divided stages quantity and stage name, the work post that each stage participates in, user right distribution method, project liter
The index of grade.
Stage changes module 130, which includes Stage Counting device unit 131 and template call unit 132;Due to project
With multiple stages, when project enters a new phase, Stage Counting device unit 131 carries out Stage Counting and adds one, and by rank
Section count results are sent to template call unit 132;Template call unit 132 is according to Stage Counting result to collapsible form unit
123 send data, and collapsible form unit 123 returns to the stage default management information to template call unit 132, and template is called
Unit 132 by after the information in the template received the default stage, by related presupposed information be sent to human resources module 140,
Fiscal module 150 and dynamic process module 160;Wherein, the preset value of the Stage Counting in Stage Counting device unit 131 is 0, is received
To after the project initiation instruction sent by collapsible form unit 123, Stage Counting value is changed to 1.
Human resources module 140, the module include user information typing unit 141, authority distribution unit 142, performance and examine
Nuclear unit 143;By administrative staff by the data input user information typing unit 141 of the member of all participation projects, typing
Information includes name, work post;The preset content of the template sent according to template call unit 132 at this stage, authority distribution list
Member 142 matches user information with the preset content in template, and so as to determine the access rights of user, phase is distributed for user
Permission is answered, after distribution, module or unit that user has permission to access for it can be to the module or units into the typing of row information
Or it reads;Performance appraisal unit 143, the user for being responsible for performance appraisal may have access to the unit.
Fiscal module 150, the preset content of the template sent according to template call unit 132 at this stage, associated user
Financial management is carried out in the progress of fiscal module 150, and the financial relevant information of typing can be by the difference of project in fiscal module 150
Stage is stored in data Sediment Module 180.
Dynamic process module 160, the module include instant messaging unit 161, on-line meeting unit 162, project task list
Member 163;In instant communication unit 161, two and above user can form discussion group, associated item name when discussion group establishes
Claim and project stage, all the elements of user's typing in the discussion group are stored in data precipitation including word, voice messaging
Module 180;In on-line meeting unit 162, user can create on-line meeting, when creating on-line meeting associated item title and
Project stage, all the elements of user's typing in on-line meeting include word, voice, image information and are stored in data precipitation
Module 180;In project task unit 163, according to the task of each work post in default stage in template, user can typing times
Business plan, and typing the development of projects situation and relevant delivery object during progress at this stage;User is in project task
The information of typing is stored in data Sediment Module 180 in unit 163.
Project upgrading evaluation module 170, during project carries out, project leader can be according to application information and project
Process submits project upgrade request in project upgrades evaluation module 170, and after the project upgrade request typing module, project is commented
The index that the committee of examining upgrades according to the default project of the stage in template is unfolded to evaluate, project review board's warp to project
After evaluation, upgrade evaluation 170 typing review comment of module to project, and select through evaluation or do not pass through evaluation;It such as selects to lead to
Evaluation is crossed, project upgrading evaluation module 170 sends instruction to stage change module 130, carries out Stage Counting and add one.
After the project upgrading evaluation of the last stage of project passes through, project upgrading evaluates module 170 to stage change
More module 130 sends instruction, and Stage Counting device unit 131 carries out Stage Counting and adds one, and Stage Counting result is sent to mould
Plate call unit 132;Template call unit 132 sends data, movable mold according to Stage Counting result to collapsible form unit 123
The instruction that 123 return project of plate unit terminates, after the instruction that the project that template call unit 132 receives terminates, the project in system
Status Change to have completed.
Data Sediment Module 180, all information of user's typing in project management system are stored in data precipitation mould
Block 180 has the user of associated rights during project carries out and after the completion of project, can access the information of the module.
Dynamic monitoring module 190, dynamic monitoring module read the information of data Sediment Module 180;Pass through the module, user
Can be during project progress and after the completion of project, accessing oneself has the information of access rights, is inquired about, counted and is compared
Operation.
Preferably, dynamic monitoring module 190 can carry out statistics and analysis to data.
It is further preferred that dynamic monitoring module 190 can to data according to the time, the project stage, user, data type into
Row statistics and analysis.
Still further preferably, dynamic monitoring module 190 can be according to user in instant communication unit 161 and on-line meeting list
The participation index of user, the part as user's performance appraisal is calculated in the information of typing in member 162.
For entertainment intermediate item compared with sundry item, different phase differentiation is bigger, the division of labor and participant's number in project
Measure it is huge, wherein being much the work of intention class, ununified production procedure and standard;Meanwhile entertainment project is in the process
Substantial amounts of achievement can be generated, since each work post disperses to handle official business, operation coordination is poor, achievement be difficult to it is synchronous in time and
It is archived in inside entertainment industry.By using entertainment intermediate item provided by the invention manage system, can stage by stage to project into
Row management.Because the work post that each stage is related to and personnel are different, everyone disperses various regions and working time also disunity, leads to
Manpower resource module is crossed, according to the default content of module, the participant in each stage can be managed collectively, increases ginseng
Concertedness between personnel.The management system of the present invention built-in instant messaging unit and on-line meeting unit, and can be with
The content of instant messaging and the content of on-line meeting are stored respectively according to the different phase of project;On the one hand, by information
Access and summary after deposit system is convenient, on the other hand, these information can generate each after the processing of dynamic monitoring module
The instant messaging participation index of people and on-line meeting participation index, the two indexs, can be with for entertainment class industry
As important performance check-up target.
There is also larger differences, entertainment intermediate item of the invention management system between different specific entertainment projects to lead to
The mode of default template is crossed, to match different specific entertainment projects.For each template, template keyword is preset, has been passed through
Template keyword can carry out Auto-matching with the keyword in project verification information;The default content of template further includes divided stages
Quantity and stage name, the work post of participation of each stage, user right distribution method, the index of project upgrading.By using not
Effective management of fine match detailed programs can be realized in same template, entertainment intermediate item of the invention management system.
The present invention entertainment intermediate item manage system using project management and control as core, in strict accordance with project system to money, people, thing into
Row management and control;Personnel, business are assessed using data flow;Flow, evaluation mechanism are provided for project management;System possesses extension
Property, the volume of business of the annual thousands of scales of the project of support.The entertainment intermediate item management system of the present invention, which has been deployed on line, to be made
With operation state is good.
In short, it compared with prior art, the present invention has the following advantages that:Project management system provided by the invention can be with pin
Life cycle, comprehensive management is effectively performed in the characteristics of to entertainment intermediate item;For specific entertainment project, this is
System can realize effective management of fine match detailed programs by default template.
Description of the drawings
The entertainment intermediate item management system module schematic diagram of Fig. 1 present invention
The entertainment intermediate item management system user interface of Fig. 2 present invention
The user interface map of Fig. 3 project applications unit 112
User interface map of Fig. 4 user when on-line meeting unit 162 creates on-line meeting
Default project stage schematic diagram in Fig. 5 network variety templates
Default project stage schematic diagram in Fig. 6 TV stations TV play template
Specific embodiment
The invention will now be further described with reference to specific embodiments, the advantages and features of the present invention will be with description and
It is apparent.But these embodiments are only exemplary, do not form any restrictions to the scope of the present invention.People in the art
Member it should be understood that without departing from the spirit and scope of the invention can to the details of technical solution of the present invention and form into
Row modifications or substitutions, but these modifications and replacement are each fallen in protection scope of the present invention.
1 network variety project management of embodiment
Intention that the promoter of network variety project has had, idea, by 111 typing conceptual information of concept pool unit,
Concept initiation is carried out, conceptual information is laid in the unit.Other users in system are in concept pool unit 111 is accessed
Conceptual information after, select to be transferred to project application unit 112 and fill in project verification information simultaneously, including typing keyword network
And variety, it carries out project verification application user interface map and sees Fig. 3;Project review board member accesses project application unit 112, and selects
It selects and the project verification information is transferred to review of project initiation unit 113, and organize project review board that it into evaluating under line, will be evaluated
This unit of opinion typing, when review result be by when, template library module 120 is transferred to by project review board member.
After project verification information enters template library module 120, template matches unit 121 is initially entered, by built in the unit
Matching feature matches the data in information of setting up the project with the keyword data of each template in template pool unit 122, matching knot
Fruit is network variety project templet, after relevant person in charge confirms, selects network comprehensive in template pool unit 122 by the director
Skill project templet, and collapsible form unit 123 is transferred to, the module for being transferred to collapsible form unit 123 is this project institute
The project management template used, default project stage schematic diagram is shown in Fig. 5 in the template;Template enters collapsible form unit 123
Afterwards, the instruction of project initiation is sent to stage change module 130 immediately.
The preset value of Stage Counting in Stage Counting device unit 131 is 0, receives what is sent by collapsible form unit 123
After project initiation instruction, Stage Counting value is changed to 1, and Stage Counting result is sent to template call unit 132;Template
Call unit 132 sends data according to Stage Counting result to collapsible form unit 123, and collapsible form unit 123 is to template tune
The stage default management information is returned to unit 132, template call unit 132 is by the letter in the template received the default stage
After breath, the information of network variety template default first stage " conception stage " is sent to human resources module 140, financial mould
Block 150 and dynamic process module 160.
By administrative staff by the data input user information typing unit 141 of the member of all participation projects, the letter of typing
Breath includes name, work post;The preset content of the network variety template sent according to template call unit 132 at this stage, permission
Allocation unit 142 matches user information with the preset content in template, according to network variety template, the first of project
In the stage, the work post of participation is makes, and system distributes corresponding authority for the user of the work post, and after distribution, user has permission for it
The module or unit of access, can be to the module or unit into the typing or reading of row information;Being responsible for the user of performance appraisal can visit
Ask performance appraisal unit 143.
The preset content of the template sent according to template call unit 132 at this stage, associated user is in fiscal module 150
Carry out financial management in progress, the financial relevant information of typing can respectively be carried out by the different phase of project in fiscal module 150
Storage.
In instant communication unit 161, two and above user can form discussion group, associated item when discussion group establishes
Title and project stage, the user word of typing, voice messaging in the discussion group are stored in data Sediment Module 180;
In line conference device 162, user can create on-line meeting, and user interface map when creating on-line meeting is shown in Fig. 4, create online
Associated item title and project stage during meeting, the user word of typing, voice, image information in on-line meeting are stored in number
According to Sediment Module 180;In project task unit 163, according to the task of each work post in default stage in template, Yong Huke
Typing task scheduling, and typing the development of projects situation and relevant delivery object during progress at this stage;User is in item
The information of typing is stored in data Sediment Module 180 in mesh TU task unit 163.
Dynamic monitoring module 190 reads the information of data Sediment Module 180, and according to time, project stage, user, number
Statistics and analysis is carried out according to type;By the module, user can access the module during project progress and after the completion of project
In oneself there is the information of access rights, inquired about, counted and contrast operation.
During project carries out, project leader in project can upgrade and evaluate according to application information and project process
Project upgrade request is submitted in module 170, after the project upgrade request typing module, project review board was according to should in template
The index of stage default project upgrading, is unfolded to evaluate, project review board upgrades to project and evaluates after evaluation to project
170 typing review comment of module, and select through evaluation, project upgrading evaluation module 170 refers to the stage change transmission of module 130
Order carries out Stage Counting and adds one.
Stage Counting value in Stage Counting device unit 131 is changed to 2, and Stage Counting result is sent to template and is called
Unit 132;Template call unit 132 sends data, collapsible form unit according to Stage Counting result to collapsible form unit 123
123 return to the stage default management information to template call unit 132, and template call unit 132 presets the template received
The stage information after, the information of the default second stage of network variety template " creation stage " is sent to human resources mould
Block 140, fiscal module 150 and dynamic process module 160, carry out the project management of second stage.Within each stage, all in accordance with
The default content of template, and with reference to actual conditions, pass through human resources module 140, fiscal module 150 and dynamic process module
160 pairs of projects are managed.Each project upgrade request sends instruction after evaluation passes through, by changing module 130 to the stage,
Carry out Stage Counting and add one, make system administration into next stage, Systems Management processes as above, until the last one of project
After the project upgrading evaluation in stage passes through, project upgrading evaluation module 170 sends instruction, stage meter to stage change module 130
Number device unit 131 carries out Stage Counting and adds one, and Stage Counting result is sent to template call unit 132;Template is called single
Member 132 sends data according to Stage Counting result to collapsible form unit 123, and 123 return project of collapsible form unit terminates
Instruction, after the instruction that the project that template call unit 132 receives terminates, the Status Change of the project is to have completed in system.
The TV play project management of 2 TV stations of embodiment
Intention that the promoter of TV station's TV play project has had, idea, by believing to 111 typing concept of concept pool unit
Breath, carries out concept initiation, and conceptual information is laid in the unit.Other users in system are accessing concept pool unit
After conceptual information in 111, select to be transferred to project application unit 112 and fill in project verification information simultaneously, it is crucial including typing
Word TV station and TV play carry out project verification application user interface map and see Fig. 3;Project review board member accesses project request slip
Member 112, and select the project verification information being transferred to review of project initiation unit 113, and organize project review board to it under line
Evaluation, by this unit of review comment typing, when review result be by when, template is transferred to by project review board member
Library module 120.
After project verification information enters template library module 120, template matches unit 121 is initially entered, by built in the unit
Matching feature matches the data in information of setting up the project with the keyword data of each template in template pool unit 122, matching knot
Fruit is TV station's TV play project templet, after relevant person in charge confirms, selects electricity in template pool unit 122 by the director
Television stations TV play project templet, and collapsible form unit 123 is transferred to, the module for being transferred to collapsible form unit 123 is this
Project management template used in secondary project, default project stage schematic diagram is shown in Fig. 6 in the template;Template enters collapsible form
After unit 123, the instruction of project initiation is sent to stage change module 130 immediately.
The preset value of Stage Counting in Stage Counting device unit 131 is 0, receives what is sent by collapsible form unit 123
After project initiation instruction, Stage Counting value is changed to 1, and Stage Counting result is sent to template call unit 132;Template
Call unit 132 sends data according to Stage Counting result to collapsible form unit 123, and collapsible form unit 123 is to template tune
The stage default management information is returned to unit 132, template call unit 132 is by the letter in the template received the default stage
After breath, the information of TV station's TV play template default first stage " IP stages " is sent to human resources module 140, finance
Module 150 and dynamic process module 160.
By administrative staff by the data input user information typing unit 141 of the member of all participation projects, the letter of typing
Breath includes name, work post;The preset content of the network variety template sent according to template call unit 132 at this stage, permission
Allocation unit 142 matches user information with the preset content in template, according to network variety template, the first of project
In the stage, the work post of participation is makes, and system distributes corresponding authority for the user of the work post, and after distribution, user has permission for it
The module or unit of access, can be to the module or unit into the typing or reading of row information;Being responsible for the user of performance appraisal can visit
Ask performance appraisal unit 143.
The preset content of the template sent according to template call unit 132 at this stage, associated user is in fiscal module 150
Carry out financial management in progress, the financial relevant information of typing can respectively be carried out by the different phase of project in fiscal module 150
Storage.
In instant communication unit 161, two and above user can form discussion group, associated item when discussion group establishes
Title and project stage, the user word of typing, voice messaging in the discussion group are stored in data Sediment Module 180;
In line conference device 162, user can create on-line meeting, and user interface map when creating on-line meeting is shown in Fig. 4, create online
Associated item title and project stage during meeting, the user word of typing, voice, image information in on-line meeting are stored in number
According to Sediment Module 180;In project task unit 163, according to the task of each work post in default stage in template, Yong Huke
Typing task scheduling, and typing the development of projects situation and relevant delivery object during progress at this stage;User is in item
The information of typing is stored in data Sediment Module 180 in mesh TU task unit 163.
Dynamic monitoring module 190 reads the information of data Sediment Module 180, and according to time, project stage, user, number
Statistics and analysis is carried out according to type;By the module, user can access the module during project progress and after the completion of project
In oneself there is the information of access rights, inquired about, counted and contrast operation.
During project carries out, project leader in project can upgrade and evaluate according to application information and project process
Project upgrade request is submitted in module 170, after the project upgrade request typing module, project review board was according to should in template
The index of stage default project upgrading, is unfolded to evaluate, project review board upgrades to project and evaluates after evaluation to project
170 typing review comment of module, and select through evaluation, project upgrading evaluation module 170 refers to the stage change transmission of module 130
Order carries out Stage Counting and adds one.
Stage Counting value in Stage Counting device unit 131 is changed to 2, and Stage Counting result is sent to template and is called
Unit 132;Template call unit 132 sends data, collapsible form unit according to Stage Counting result to collapsible form unit 123
123 return to the stage default management information to template call unit 132, and template call unit 132 presets the template received
The stage information after, by the information of the default second stage of TV station's TV play template " conceptual phase " be sent to manpower money
Source module 140, fiscal module 150 and dynamic process module 160, carry out the project management of second stage.Within each stage, all
According to the default content of template, and with reference to actual conditions, pass through human resources module 140, fiscal module 150 and dynamic process mould
Block 160 is managed project.Each project upgrade request is referred to after evaluation passes through by changing the transmission of module 130 to the stage
Order carries out Stage Counting and adds one, makes system administration into next stage, and Systems Management processes are as above, last until project
After the project upgrading evaluation in one stage passes through, project upgrading evaluation module 170 sends instruction, rank to stage change module 130
Segment counter unit 131 carries out Stage Counting and adds one, and Stage Counting result is sent to template call unit 132;Template tune
Data are sent to collapsible form unit 123 according to Stage Counting result with unit 132, collapsible form unit 123 returns to project knot
The instruction of beam, after the instruction that the project that template call unit 132 receives terminates, the Status Change of the project is to have completed in system.
The technical means disclosed in the embodiments of the present invention is not limited to the technical means disclosed in the above technical means, and is further included
Formed technical solution is combined by more than technical characteristic.The above is the specific embodiment of the present invention, should be referred to
Go out, for those skilled in the art, without departing from the principle of the present invention, can also make several
Improvements and modifications, these improvements and modifications are also considered as protection scope of the present invention.
Claims (10)
1. a kind of entertainment intermediate item manages system, which is characterized in that the entertainment intermediate item management system includes project verification application mould
Block, template library module, stage change module, human resources module, fiscal module, dynamic process module, project upgrading evaluation mould
Block, data Sediment Module, dynamic monitoring module.
2. entertainment intermediate item described in accordance with the claim 1 manages system, which is characterized in that the project verification application module includes general
Read pool unit, project application unit, review of project initiation unit;User by the information in concept pool unit by being transferred to project application list
Member and typing project verification information, carry out project verification application;Template keyword data, template keyword data are included in the project verification information
Including carrier keyword data and type keyword data;Project verification application is evaluated in review of project initiation unit, and evaluation passes through
Afterwards, project verification information is transferred to template library module.
3. entertainment intermediate item described in accordance with the claim 2 manages system, which is characterized in that the carrier keyword data includes
TV station, video website, cinema;The type keyword data includes variety, TV play, film, live streaming.
4. entertainment intermediate item described in accordance with the claim 1 manages system, which is characterized in that the template library module includes template
Matching unit, template pool unit, collapsible form unit;The template that template matches unit will set up the project in information and template pool unit into
Row matching;Default template is stored in template pond;The template obtained by template matches units match is after manual confirmation, the mould
Plate is transferred to collapsible form unit;Collapsible form unit receives be transferred to the information of template after, to the stage change module send project open
Dynamic instruction.
5. the entertainment intermediate item described in 4 is required to manage system according to full profit, which is characterized in that the content bag of the default template
Include work post, user right distribution method, the index of project upgrading that divided stages quantity is participated in stage name, each stage.
6. entertainment intermediate item described in accordance with the claim 1 manages system, which is characterized in that the stage change module includes rank
Segment counter unit and template call unit;Stage Counting device unit has the function of that Stage Counting adds one, and by Stage Counting knot
Fruit is sent to template call unit;Template call unit sends data, template library according to Stage Counting result to template library module
Module returns to the stage default management information to template call unit, and template call unit is by the default rank of the template received
After the information of section, related presupposed information is sent to human resources module, fiscal module and dynamic process module.
7. entertainment intermediate item described in accordance with the claim 1 manages system, which is characterized in that the human resources module includes using
Family data input unit, authority distribution unit, performance appraisal unit;By administrative staff by the information of the member of all participation projects
Typing user information typing unit, the information of typing include name, work post;The template sent according to stage change module is in the rank
The preset content of section, authority distribution unit matches user information with the preset content in template, so as to determine user's
Access rights distribute corresponding authority for user, and after distribution, module or unit that user has permission to access for it can be to the moulds
Block or unit are into the typing or reading of row information;The user for being responsible for performance appraisal may have access to performance appraisal unit.
8. entertainment intermediate item described in accordance with the claim 1 manages system, which is characterized in that the dynamic process module is included i.e.
When communication unit, on-line meeting unit, project task unit;In instant communication unit, two and above user can form
Discussion group, associated item title and project stage when discussion group establishes;In on-line meeting unit, user can create online meeting
View, associated item title and project stage when creating on-line meeting;In project task unit, according to default rank in template
Section in each work post task, user can typing task scheduling, and at this stage carry out during typing the development of projects situation with
And relevant delivery object;User's information of typing in dynamic process module is stored in data Sediment Module.
9. entertainment intermediate item described in accordance with the claim 1 manages system, which is characterized in that during project carries out, has
The user of permission can submit project upgrade request, project according to application information and project process in project upgrades evaluation module
After the upgrade request typing module, index that project review board upgrades according to the default project of the stage in template, to item
Mesh expansion evaluation, project review board upgrades evaluation module typing review comment after evaluation, to project, and selects by commenting
It examines or does not pass through evaluation;When selection passes through evaluation, project upgrading evaluation module sends instruction to stage change module, into row order
Section, which counts, adds one.
10. entertainment intermediate item described in accordance with the claim 1 manages system, which is characterized in that the dynamic monitoring module is read
The information of data Sediment Module;Dynamic monitoring module can carry out statistics and analysis to data;By the module, user can be in project
During progress and after the completion of project, accessing oneself has the information of access rights, is inquired about, counted and contrast operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810002045.0A CN108062662A (en) | 2018-01-02 | 2018-01-02 | A kind of entertainment intermediate item manages system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810002045.0A CN108062662A (en) | 2018-01-02 | 2018-01-02 | A kind of entertainment intermediate item manages system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108062662A true CN108062662A (en) | 2018-05-22 |
Family
ID=62140850
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810002045.0A Pending CN108062662A (en) | 2018-01-02 | 2018-01-02 | A kind of entertainment intermediate item manages system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108062662A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109559085A (en) * | 2018-09-20 | 2019-04-02 | 中建科技有限公司深圳分公司 | The measures and procedures for the examination and approval and terminal device based on BIM light weighed model |
CN111563703A (en) * | 2020-07-16 | 2020-08-21 | 普源精电科技股份有限公司 | Project management system, project management method, computer device, and computer-readable storage medium |
CN113408912A (en) * | 2021-06-23 | 2021-09-17 | 中央广播电视总台 | Auditing system and electronic device for television station |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101901402A (en) * | 2009-05-27 | 2010-12-01 | 北京正辰科技发展有限责任公司 | Project management system |
CN101901406A (en) * | 2009-05-27 | 2010-12-01 | 北京正辰科技发展有限责任公司 | Technical level of application management system |
CN105653442A (en) * | 2015-12-21 | 2016-06-08 | 中电科航空电子有限公司 | Method for satisfying evaluation target of DO-178C standard |
CN106485466A (en) * | 2016-09-23 | 2017-03-08 | 天津大学 | A kind of project management system |
CN106708509A (en) * | 2016-11-28 | 2017-05-24 | 上海宝尊电子商务有限公司 | Automatic software project development all-link configuration management system |
-
2018
- 2018-01-02 CN CN201810002045.0A patent/CN108062662A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101901402A (en) * | 2009-05-27 | 2010-12-01 | 北京正辰科技发展有限责任公司 | Project management system |
CN101901406A (en) * | 2009-05-27 | 2010-12-01 | 北京正辰科技发展有限责任公司 | Technical level of application management system |
CN105653442A (en) * | 2015-12-21 | 2016-06-08 | 中电科航空电子有限公司 | Method for satisfying evaluation target of DO-178C standard |
CN106485466A (en) * | 2016-09-23 | 2017-03-08 | 天津大学 | A kind of project management system |
CN106708509A (en) * | 2016-11-28 | 2017-05-24 | 上海宝尊电子商务有限公司 | Automatic software project development all-link configuration management system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109559085A (en) * | 2018-09-20 | 2019-04-02 | 中建科技有限公司深圳分公司 | The measures and procedures for the examination and approval and terminal device based on BIM light weighed model |
CN109559085B (en) * | 2018-09-20 | 2021-04-09 | 中建科技有限公司深圳分公司 | Approval method based on BIM lightweight model and terminal equipment |
CN111563703A (en) * | 2020-07-16 | 2020-08-21 | 普源精电科技股份有限公司 | Project management system, project management method, computer device, and computer-readable storage medium |
CN113408912A (en) * | 2021-06-23 | 2021-09-17 | 中央广播电视总台 | Auditing system and electronic device for television station |
CN113408912B (en) * | 2021-06-23 | 2023-12-19 | 中央广播电视总台 | Audit system for television station and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108960627A (en) | A kind of full Schedule monitoring management system and method based on scientific research project | |
CN104408559B (en) | A kind of engineering information management system | |
Hughes et al. | Turning new product development into a continuous learning process | |
Vukovic | Crowdsourcing for enterprises | |
CN108647277A (en) | A kind of mobile campus comprehensive service platform and its working method | |
CN107977790A (en) | A kind of group enterprise technology innovation management information system | |
US11625800B2 (en) | Methods and systems for visualizing media rights management | |
CN108108957A (en) | Brand promotion project management method, device, terminal device and medium | |
CN109636443A (en) | The deep learning method and device of customer churn prediction | |
CN108062662A (en) | A kind of entertainment intermediate item manages system | |
CN107169894A (en) | Real estate operation management system based on SAP | |
CN109189844A (en) | A kind of inspection examining report business management system | |
CN107146143B (en) | Advanced manufacturing e-commerce platform | |
CN109460962A (en) | Design objective crowdsourcing management system and method based on full Photographing On-line platform | |
CN111898853A (en) | Engineering construction fine management system | |
Fioretti et al. | An agent-based representation of the garbage can model of organizational choice | |
Zhao et al. | Bid evaluation decision for major project based on analytic hierarchy process and data envelopment analysis cross-efficiency model | |
Bell et al. | The application of a research project selection method | |
CN111966585A (en) | Test task execution method, device, equipment and system | |
WO2020045885A2 (en) | Numerical determination system and method therefor | |
NOVIKOV et al. | Improving the enterprise resource planning system based on digital modules of the industry 4.0 concept | |
Liu et al. | An Intelligent Digital Media Asset Management Model Based on Business Ecosystem | |
Mohamad et al. | Application of System Dynamic Approach for Family Takaful Product Analysis. | |
Zhang et al. | Theory and practice of systems methodology in ERP implementation | |
Kang et al. | A framework for measuring and managing value achievement in business processes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 519000 -24860, 105 room 6, Baohua Road, Hengqin New District, Zhuhai, Guangdong (centralized office area) Applicant after: He Zhong (Zhuhai) Digital Technology Co., Ltd. Address before: 100023 No. 1133 Huizhou Hejie street, 55 Jianguo Road, Chaoyang District, Beijing Applicant before: He Zhong (Zhuhai) Digital Technology Co., Ltd. |
|
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180522 |