CN106708509A - Automatic software project development all-link configuration management system - Google Patents

Automatic software project development all-link configuration management system Download PDF

Info

Publication number
CN106708509A
CN106708509A CN201611061277.0A CN201611061277A CN106708509A CN 106708509 A CN106708509 A CN 106708509A CN 201611061277 A CN201611061277 A CN 201611061277A CN 106708509 A CN106708509 A CN 106708509A
Authority
CN
China
Prior art keywords
project
management system
operation management
code
automation operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611061277.0A
Other languages
Chinese (zh)
Inventor
程岳
孙慧
侯文权
仇文彬
吴骏华
陈兆明
徐立霞
顾文
陈璐
周红霞
林浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Bao Zun Agel Ecommerce Ltd
Original Assignee
Shanghai Bao Zun Agel Ecommerce Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Bao Zun Agel Ecommerce Ltd filed Critical Shanghai Bao Zun Agel Ecommerce Ltd
Priority to CN201611061277.0A priority Critical patent/CN106708509A/en
Publication of CN106708509A publication Critical patent/CN106708509A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/30Creation or generation of source code
    • G06F8/35Creation or generation of source code model driven
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/70Software maintenance or management
    • G06F8/71Version control; Configuration management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Software Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Computer Security & Cryptography (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to an automatic software project development all-link configuration management system. The system comprises a version management system, an optional template project, a continuous project building system, a project deploying system, a public service resource system and an automatic operation and maintenance management system, wherein the version management system is used for managing the historical versions, branches and labels of codes; the optional template project is used for generating the basic codes of a new project; the continuous project building system is used for continuously monitoring the version change of a code library, automatically executing unit testing and generating a testing report; Maven is used to compile source codes and generate a release package; the project deploying system is used for pre-generating a container template according project capacity requirements and deploying a container instance according to the project release package; the automatic operation and maintenance management system is used for controlling all flow nodes and calling the interfaces of each subsystem to generate or acquire necessary resources. By the system, automatic configuration and management of the whole life cycle of a project are achieved, project configuration and management is clear and ordered, and enterprises can be helped to save cost.

Description

The full link configuration management system of automated software project development
Technical field
The present invention relates to the exploitation of project iteratively faster and the automatic configuration management domain of configuration deployment Life cycle, tool Say body, be related to a kind of full link configuration management system of automated software project development.
Background technology
Software project or product general at present is required for by a mistake for complexity from approving and initiate a project formally reaching the standard grade Journey, exploitation, test (unit testing, integration testing, CAT) is included since the development phase, trial operation, is reached the standard grade A whole set of flow, wherein can be by the iterative development of countless wheels and regression test process.Traditional way is set according to project Meter scheme, needs to get out infrastructure service (the such as database server, buffer service of development environment dependence before formal exploitation Device etc.), and close beta environment, UAT environment, pre-manufactured environment, production are required stepping through in subsequent project process The configuration of each environment such as environment.The configuration of these software runtime environments is not only the process of a repetition and complexity, Er Qiesui The increase of the number of entry, can be faced and more and more be repeated.These repeat the manpower money for not only wasting preciousness Source, and operational risk can also increase accordingly;And with the accumulation of the number of entry, the management of project can be more and more chaotic, Corresponding attendant's demand can also be stepped up, and ultimately increase business burden.
Chinese patent literature CN200710024861.3, publication date 2009.01.07, disclose a kind of software development process Management system, the system is mainly realized to the project plan in software development process, project supervision and control, project configuration, item Mesh is purchased and Project contract, project risk, requirement developing, technology decision-making, design, coding, test, quality management, metric analysis And the management in field such as quantify, and realize being controlled whole software development process process by management to above field, make The development efficiency and final mass for obtaining software are improved, while the risk of software failure is reduced.Chinese patent literature CN200710026118.1, publication date 2009.02.18, disclose a kind of software development process management software for realizing 5S management, The rule that the system is mainly defined in software by user, the code identifier that specification and system are carried is to all of code Automatic detection is carried out, tracking, realizes the arrangement of code in time, rectified, cleaned;Pass through document file management system and document class simultaneously Not Ding Yi system knowledge document is arranged, rectify, clean, constantly use the system to cause to software development process Arrangement, rectify, cleaning reach ensured sustained development and habituation, so as to reach improve software project cleaning and improve employee worker Attainment purpose, the final comprehensive competitive power for improving enterprise.However, the full link of software project development is not implemented above Automatic configuration is managed.
In sum, need a kind of project configuration of achievable centralization badly, manage project configuration clear orderly, so that Project maintenance complexity is reduced, mitigates operation maintenance personnel work load, save the management system of entreprise cost, but yet there are no Relevant report.
The content of the invention
The purpose of the present invention is directed to deficiency of the prior art, there is provided a kind of full link of automated software project development is matched somebody with somebody Put management system.
Another purpose of the invention is to provide the full link configuration pipe of automated software project development described in a kind of application The method that reason system carries out the full link configuration management of automated software project development.
To realize above-mentioned first purpose, the present invention is adopted the technical scheme that:
A kind of full link configuration management system of automated software project development, is made up of following subsystem:
A) edition management system:Old version and branch, the management of label for realizing code;
B) optional template item:Foundation code for generating new projects;
C) project continues constructing system:For the version change in lasting monitor code storehouse, automatic running unit testing is simultaneously raw Into test report;Source code is compiled using Maven and generate issue bag;
D) project deployment system:For by project capacity requirement pre-generatmg container template, and integration project issue bag deployment Container instance;
E) public service resource system:Public service resource for providing bottom;
F) operation management system is automated:For controlling all of flow nodes and being responsible for calling the interface of subsystems Generate or obtain necessary resource.
Described edition management system is based on git.
It is with jenkins as core that described project continues constructing system.
Described project deployment system uses docker container techniques.
Described public service resource includes database service, load balancing service, buffer service and search service resource.
To realize above-mentioned second purpose, the present invention is adopted the technical scheme that:
Automated software project development is carried out using the described full link configuration management system of automated software project development The method of full link configuration management, comprises the following steps:
Step 1-1:At the beginning of approving and initiate a project, project manager submits project verification application to automation operation management system, and Selection project templet and project capacity requirement;
Step 1-2:Whether automation operation management system examination & verification project verification application, inspection current available resource meets project need Ask;
Step 1-3:Automation operation management system calls edition management system interface, is with the template item code for selecting Basis generation new projects' code library simultaneously distributes authority, output object:Item base code and code library address;
Step 1-4:Automation operation management system calls jenkins interfaces to configure project build parameter, output object:Project Corresponding constructing environment;
Step 1-5:Automation operation management system is applied to according to the suitable docker template generations of project Capacity Selection The container instance of application server operation, output object:Running environment example;
Step 1-6:Automation operation management system calls public service resource system interface to generate according to project demands must The Service Source wanted, output object:The public service resource configuration parameter of each environment;
Step 1-7:By after above-mentioned several operations, project initialization is finished, and all configuration parameters needed for project will Persist and feed back to project leader;
In the project development stage, added by automating operation management system/service of deletion is relied on, adjustment running environment should Planned with server capacity, issue project to specified running environment, acquisition test report.
Described issue project step is as follows:
Step 2-1:Developer submits issue application in automation operation management system, specifies issue environment, to be released Code release, update function point description;
Step 2-2:Automation operation management system is checked and obtains indicated release source code;
Step 2-3:Automation operation management system calls automatic build system interface to build project;
Step 2-4:Automation operation management system calls automatic build system interface running unit to test, test crash When, return this issue application;Operated into next step after being successfully tested, output object:Unit Test Report;
Step 2-5:Automation operation management system calls the issue bag that automatic deployment system will be successfully constructed to be distributed to finger Determine environment and restart the container instance application issue bag;
Step 2-6:Automation operation management system calls edition management system interface to be based on this code successfully issued Version labels;
Step 2-7:Automation operation management system records this publishing log, and this issue is finished and submits test to.
The invention has the advantages that:
The invention provides a kind of full link configuration management system of automated software project development, it is responsible for from approving and initiate a project out The automatic management for finally issuing the whole flow process reached the standard grade is sent to, the automatic configuration management of Whole Life Cycle of Projects is realized, Project configuration is managed to become apparent from without any confusion, reducing project maintenance complexity and the demand to related maintenance personnel, Personnel cost is reduced while reducing operational risk, operation maintenance personnel is liberated from daily repeated project configuration operation Out, operation maintenance personnel workload is significantly reduced, operation cost of enterprises is reduced.
Brief description of the drawings
Accompanying drawing 1 is the full link configuration management system structure diagram of automated software project development of the invention.
Accompanying drawing 2 is that full link configuration management system flow chart is developed in the independent store of automation of embodiment 2.
Specific embodiment
The specific embodiment that the present invention is provided is elaborated below in conjunction with the accompanying drawings.
The full link configuration management system of the automated software project development of the invention of embodiment 1
Fig. 1 is referred to, Fig. 1 is the full link configuration management system structure diagram of automated software project development of the invention.Institute The full link configuration management system of automated software project development stated is made up of following subsystem:
A) edition management system 102 (i.e. code library in Fig. 1) based on git
Old version and branch, the management of label for realizing code.
B) an optional template item
Foundation code for generating new projects.
C) project with jenkins as core continues constructing system 103 (i.e. automation in Fig. 1 builds subsystem)
For the version change in lasting monitor code storehouse, automatic running unit testing simultaneously generates test report;Using Maven Compiling source code simultaneously generates issue bag.
D) project deployment system 104 (i.e. project deployment subsystem in Fig. 1) with docker container techniques as representative
For by project capacity requirement pre-generatmg container template, and integration project issue bag deployment container example.
E) public service resource system 105 (i.e. public service subsystem in Fig. 1)
Public service resource for providing bottom, such as database service, load balancing service, buffer service, search clothes Business resource etc..
F) operation management system 101 is automated
It is the coordinator of subsystems, is the core of whole system, all of flow nodes is controlled by it and is responsible for The interface of subsystems is called to generate or obtain necessary resource.
Thus, whole system of the invention is responsible for from the configuration pipe approved and initiate a project to all nodes of final online operation Reason.
Full link configuration management system is developed in the independent store of automation of the invention of embodiment 2
The full chain of automated software project development of the invention is illustrated by taking the B2C of standard mono- brand officials store project as an example Road configuration management system.
Fig. 2 is referred to, Fig. 2 is that full link configuration management system flow chart is developed in the independent store of automation of embodiment 2, its Management process is as follows:
Step 1-1:At the beginning of approving and initiate a project, project manager submits project verification application to automation operation management system, and Selection project templet and project capacity requirement;
Step 1-2:Whether automation operation management system examination & verification project verification application, inspection current available resource meets project need Ask;
Step 1-3:Automation operation management system calls edition management system interface, is with the template item code for selecting Basis generation new projects' code library simultaneously distributes authority.Output object:Item base code and code library address;
Step 1-4:Automation operation management system calls jenkins interfaces to configure project build parameter.Output object:Project Corresponding constructing environment;
Step 1-5:Automation operation management system is applied to according to the suitable docker template generations of project Capacity Selection The container instance of application server operation.Output object:Running environment example;
Step 1-6:Automation operation management system calls public service resource subsystem interface to generate according to project demands Necessary Service Source.Output object:The public service resource configuration parameter of each environment;
Step 1-7:By after above-mentioned several operations, project initialization is finished, and all configuration parameters needed for project will Persist and feed back to project leader, including each environment access path of project, public resource Connecting quantity, project resource Distribution condition etc..
In the project development stage, service dependence, adjustment fortune can be added/deleted by automating operation management system at any time The operations such as the planning of row environmental applications server capacity, issue project to specified running environment, acquisition test report.With daily hair As a example by cloth:
Step 2-1:Developer submits issue application in automation operation management system, specifies issue environment, to be released Code release, update function point description;
Step 2-2:Automation operation management system is checked and obtains indicated release source code;
Step 2-3:Automation operation management system calls automatic build system interface to build project;
Step 2-4:Automation operation management system calls automatic build system interface running unit to test, test crash When, return this issue application;Operated into next step after being successfully tested.Output object:Unit Test Report;
Step 2-5:Automation operation management system calls the issue bag that automatic deployment system will be successfully constructed to be distributed to finger Determine environment and restart the container instance application issue bag;
Step 2-6:Automation operation management system calls edition management system interface to be based on this code successfully issued Version labels;
Step 2-7:Automation operation management system records this publishing log, and this issue is finished and submits test to.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art Member, on the premise of the inventive method is not departed from, can also make some improvement and supplement, and these are improved and supplement also should be regarded as Protection scope of the present invention.

Claims (7)

1. the full link configuration management system of a kind of automated software project development, it is characterised in that by following subsystem group Into:
A) edition management system:Old version and branch, the management of label for realizing code;
B) optional template item:Foundation code for generating new projects;
C) project continues constructing system:For the version change in lasting monitor code storehouse, automatic running unit testing simultaneously generates survey Examination report;Source code is compiled using Maven and generate issue bag;
D) project deployment system:For by project capacity requirement pre-generatmg container template, and integration project issue bag deployment container Example;
E) public service resource system:Public service resource for providing bottom;
F) operation management system is automated:For controlling all of flow nodes and being responsible for calling the interface of subsystems to generate Or obtain necessary resource.
2. the full link configuration management system of automated software project development according to claim 1, it is characterised in that described Edition management system be based on git.
3. the full link configuration management system of automated software project development according to claim 1, it is characterised in that described Project continue constructing system be with jenkins as core.
4. the full link configuration management system of automated software project development according to claim 1, it is characterised in that described Project deployment system use docker container techniques.
5. the full link configuration management system of automated software project development according to claim 1, it is characterised in that described Public service resource include database service, load balancing service, buffer service and search service resource.
6. automated software project is carried out using the full link configuration management system of automated software project development of claim 1 to open The method of management of sending out link configuration complete, it is characterised in that comprise the following steps:
Step 1-1:At the beginning of approving and initiate a project, project manager submits project verification application to automation operation management system, and selects Project templet and project capacity requirement;
Step 1-2:Whether automation operation management system examination & verification project verification application, inspection current available resource meets project demands;
Step 1-3:Automation operation management system calls edition management system interface, based on the template item code for selecting Generation new projects' code library simultaneously distributes authority, output object:Item base code and code library address;
Step 1-4:Automation operation management system calls jenkins interfaces to configure project build parameter, output object:Project correspondence Constructing environment;
Step 1-5:Automation operation management system is applied to application according to the suitable docker template generations of project Capacity Selection The container instance of server operation, output object:Running environment example;
Step 1-6:It is necessary that automation operation management system calls public service resource system interface to generate according to project demands Service Source, output object:The public service resource configuration parameter of each environment;
Step 1-7:By after above-mentioned several operations, project initialization is finished, and all configuration parameters needed for project will be held Longization simultaneously feeds back to project leader;
In the project development stage, added by automating operation management system/service of deletion is relied on, the application of adjustment running environment takes The capacity planning of business device, issue project to specified running environment, acquisition test report.
7. method according to claim 6, it is characterised in that described issue project step is as follows:
Step 2-1:Developer submits issue application in automation operation management system, specifies issue environment, generation to be released Code version, the function point description for updating;
Step 2-2:Automation operation management system is checked and obtains indicated release source code;
Step 2-3:Automation operation management system calls automatic build system interface to build project;
Step 2-4:Automation operation management system calls automatic build system interface running unit to test, and during test crash, moves back Return this issue application;Operated into next step after being successfully tested, output object:Unit Test Report;
Step 2-5:Automation operation management system calls the issue bag that automatic deployment system will be successfully constructed to be distributed to specified ring Simultaneously restart the container instance application issue bag in border;
Step 2-6:Automation operation management system calls edition management system interface to be based on this code release successfully issued Label;
Step 2-7:Automation operation management system records this publishing log, and this issue is finished and submits test to.
CN201611061277.0A 2016-11-28 2016-11-28 Automatic software project development all-link configuration management system Pending CN106708509A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611061277.0A CN106708509A (en) 2016-11-28 2016-11-28 Automatic software project development all-link configuration management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611061277.0A CN106708509A (en) 2016-11-28 2016-11-28 Automatic software project development all-link configuration management system

Publications (1)

Publication Number Publication Date
CN106708509A true CN106708509A (en) 2017-05-24

Family

ID=58934955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611061277.0A Pending CN106708509A (en) 2016-11-28 2016-11-28 Automatic software project development all-link configuration management system

Country Status (1)

Country Link
CN (1) CN106708509A (en)

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107229482A (en) * 2017-08-04 2017-10-03 郑州云海信息技术有限公司 A kind of method and system for software system development
CN107730125A (en) * 2017-10-20 2018-02-23 南方电网科学研究院有限责任公司 Laboratory management system
CN107864052A (en) * 2017-10-30 2018-03-30 广东亿迅科技有限公司 Method and its system based on lasting application deployment configuration automatic updating
CN108062662A (en) * 2018-01-02 2018-05-22 合中(珠海)数字技术有限公司 A kind of entertainment intermediate item manages system
US10095511B1 (en) * 2017-02-23 2018-10-09 Amdocs Development Limited System, method, and computer program for converting a current Java project to a Maven project
CN108959077A (en) * 2018-06-25 2018-12-07 郑州云海信息技术有限公司 A kind of agile development based on cloud computing technology mentions test tube reason system and method
CN109146417A (en) * 2018-08-16 2019-01-04 安徽云才信息技术有限公司 A kind of project management method that single service line entry based on git is parallel
CN109388415A (en) * 2018-09-27 2019-02-26 深圳供电局有限公司 Application automation updating device, system and method
CN109426602A (en) * 2017-07-18 2019-03-05 中国移动通信集团公司 Detection method and equipment used in a kind of application development process
CN109684215A (en) * 2018-12-25 2019-04-26 中国科学院电子学研究所苏州研究院 A kind of automated software Quality System Review and iteratively faster method
WO2019100690A1 (en) * 2017-11-21 2019-05-31 平安科技(深圳)有限公司 Electronic device, testing method, system and computer readable storage medium
CN110209385A (en) * 2019-05-09 2019-09-06 无线生活(杭州)信息科技有限公司 Establishment of item method and device
CN110321113A (en) * 2019-07-09 2019-10-11 苏宁消费金融有限公司 Using project batch as the integrated pipeline system and its working method of standard
CN110532189A (en) * 2019-07-18 2019-12-03 中国人民财产保险股份有限公司 A kind of continuous integration system, method and device
CN110579656A (en) * 2018-06-11 2019-12-17 鸿富锦精密工业(武汉)有限公司 signal measurement system and method
CN110895460A (en) * 2018-09-13 2020-03-20 深圳市优必选科技有限公司 Jenkins-based robot system integration method and device and terminal equipment
CN111258561A (en) * 2020-01-10 2020-06-09 北京慧博科技有限公司 Method for starting and monitoring software automatic compiling and deploying
CN111383100A (en) * 2020-03-25 2020-07-07 中国建设银行股份有限公司 Risk model-based full life cycle management and control method and device
CN111666081A (en) * 2020-04-30 2020-09-15 平安科技(深圳)有限公司 Project version release method, device, equipment and medium based on Git
CN112015371A (en) * 2020-05-19 2020-12-01 中国航空无线电电子研究所 Software development device under non-embedded software platform
CN112328307A (en) * 2020-11-10 2021-02-05 北京神州数字科技有限公司 Development, operation and maintenance integrated system
CN112712332A (en) * 2020-12-22 2021-04-27 宝付网络科技(上海)有限公司 DevOps project release management system
CN113553096A (en) * 2021-07-23 2021-10-26 中信银行股份有限公司 Integrated approval issuing method and system
CN113570317A (en) * 2020-04-29 2021-10-29 北京金山云网络技术有限公司 Project automation management method and device, electronic equipment and storage medium
CN114625630A (en) * 2020-12-14 2022-06-14 福建天泉教育科技有限公司 Testing method and testing system for multi-environment multi-role version release system
CN115857887A (en) * 2023-03-03 2023-03-28 小米汽车科技有限公司 Project creation method, device, equipment and medium
CN116719557A (en) * 2023-08-09 2023-09-08 山东浪潮数字商业科技有限公司 Rancher-based automatic application release method, system and tool
CN117908949A (en) * 2024-03-15 2024-04-19 西安衍舆航天科技有限公司 Packet release management method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1848077A (en) * 2005-04-15 2006-10-18 环达电脑(上海)有限公司 Optimal unified developing process
CN101403965A (en) * 2008-11-18 2009-04-08 四川赛文纳克软件有限公司 Integration type iteration software development process control system and method
US20120054720A1 (en) * 2010-08-30 2012-03-01 Udo Klein Middleware configuration processes
CN105701010A (en) * 2015-12-31 2016-06-22 北京元心科技有限公司 Method and device for accelerating software testing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1848077A (en) * 2005-04-15 2006-10-18 环达电脑(上海)有限公司 Optimal unified developing process
CN101403965A (en) * 2008-11-18 2009-04-08 四川赛文纳克软件有限公司 Integration type iteration software development process control system and method
US20120054720A1 (en) * 2010-08-30 2012-03-01 Udo Klein Middleware configuration processes
CN105701010A (en) * 2015-12-31 2016-06-22 北京元心科技有限公司 Method and device for accelerating software testing

Cited By (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10095511B1 (en) * 2017-02-23 2018-10-09 Amdocs Development Limited System, method, and computer program for converting a current Java project to a Maven project
CN109426602A (en) * 2017-07-18 2019-03-05 中国移动通信集团公司 Detection method and equipment used in a kind of application development process
CN107229482A (en) * 2017-08-04 2017-10-03 郑州云海信息技术有限公司 A kind of method and system for software system development
CN107730125A (en) * 2017-10-20 2018-02-23 南方电网科学研究院有限责任公司 Laboratory management system
CN107864052A (en) * 2017-10-30 2018-03-30 广东亿迅科技有限公司 Method and its system based on lasting application deployment configuration automatic updating
WO2019100690A1 (en) * 2017-11-21 2019-05-31 平安科技(深圳)有限公司 Electronic device, testing method, system and computer readable storage medium
CN108062662A (en) * 2018-01-02 2018-05-22 合中(珠海)数字技术有限公司 A kind of entertainment intermediate item manages system
CN110579656A (en) * 2018-06-11 2019-12-17 鸿富锦精密工业(武汉)有限公司 signal measurement system and method
CN108959077A (en) * 2018-06-25 2018-12-07 郑州云海信息技术有限公司 A kind of agile development based on cloud computing technology mentions test tube reason system and method
CN109146417A (en) * 2018-08-16 2019-01-04 安徽云才信息技术有限公司 A kind of project management method that single service line entry based on git is parallel
CN110895460A (en) * 2018-09-13 2020-03-20 深圳市优必选科技有限公司 Jenkins-based robot system integration method and device and terminal equipment
CN109388415A (en) * 2018-09-27 2019-02-26 深圳供电局有限公司 Application automation updating device, system and method
CN109684215A (en) * 2018-12-25 2019-04-26 中国科学院电子学研究所苏州研究院 A kind of automated software Quality System Review and iteratively faster method
CN110209385B (en) * 2019-05-09 2023-02-10 无线生活(杭州)信息科技有限公司 Project creation method and device
CN110209385A (en) * 2019-05-09 2019-09-06 无线生活(杭州)信息科技有限公司 Establishment of item method and device
CN110321113A (en) * 2019-07-09 2019-10-11 苏宁消费金融有限公司 Using project batch as the integrated pipeline system and its working method of standard
CN110321113B (en) * 2019-07-09 2022-08-02 苏宁消费金融有限公司 Integrated assembly line system taking project batches as standards and working method thereof
CN110532189B (en) * 2019-07-18 2022-11-01 中国人民财产保险股份有限公司 Continuous integration system, method and device
CN110532189A (en) * 2019-07-18 2019-12-03 中国人民财产保险股份有限公司 A kind of continuous integration system, method and device
CN111258561A (en) * 2020-01-10 2020-06-09 北京慧博科技有限公司 Method for starting and monitoring software automatic compiling and deploying
CN111383100A (en) * 2020-03-25 2020-07-07 中国建设银行股份有限公司 Risk model-based full life cycle management and control method and device
CN113570317A (en) * 2020-04-29 2021-10-29 北京金山云网络技术有限公司 Project automation management method and device, electronic equipment and storage medium
CN111666081B (en) * 2020-04-30 2024-04-05 平安科技(深圳)有限公司 Git-based project version release method, device, equipment and medium
CN111666081A (en) * 2020-04-30 2020-09-15 平安科技(深圳)有限公司 Project version release method, device, equipment and medium based on Git
WO2021217868A1 (en) * 2020-04-30 2021-11-04 平安科技(深圳)有限公司 Git-based project version release method and apparatus, device, and medium
CN112015371A (en) * 2020-05-19 2020-12-01 中国航空无线电电子研究所 Software development device under non-embedded software platform
CN112015371B (en) * 2020-05-19 2024-05-03 中国航空无线电电子研究所 Software development device under non-embedded software platform
CN112328307A (en) * 2020-11-10 2021-02-05 北京神州数字科技有限公司 Development, operation and maintenance integrated system
CN114625630A (en) * 2020-12-14 2022-06-14 福建天泉教育科技有限公司 Testing method and testing system for multi-environment multi-role version release system
CN112712332A (en) * 2020-12-22 2021-04-27 宝付网络科技(上海)有限公司 DevOps project release management system
CN113553096A (en) * 2021-07-23 2021-10-26 中信银行股份有限公司 Integrated approval issuing method and system
CN115857887A (en) * 2023-03-03 2023-03-28 小米汽车科技有限公司 Project creation method, device, equipment and medium
CN116719557B (en) * 2023-08-09 2023-11-24 山东浪潮数字商业科技有限公司 Rancher-based automatic application release method, system and tool
CN116719557A (en) * 2023-08-09 2023-09-08 山东浪潮数字商业科技有限公司 Rancher-based automatic application release method, system and tool
CN117908949A (en) * 2024-03-15 2024-04-19 西安衍舆航天科技有限公司 Packet release management method and system
CN117908949B (en) * 2024-03-15 2024-05-14 西安衍舆航天科技有限公司 Packet release management method and system

Similar Documents

Publication Publication Date Title
CN106708509A (en) Automatic software project development all-link configuration management system
Goodall et al. A data-driven simulation to support remanufacturing operations
US10338550B2 (en) Multisite version and upgrade management system
CN108427641A (en) A kind of multi-task scheduling automated testing method and system based on Docker containers
CN105719126B (en) system and method for scheduling Internet big data tasks based on life cycle model
CN105487977A (en) Agility-oriented automatic test management system and method
CN108805470B (en) Automatic configuration method and device for production orders
CN108415694A (en) A kind of Android agile development system and methods based on GitFlow workflows
CN104246697A (en) Version management for applications
CN112036825A (en) Automatic operation and maintenance management system based on work order
CN107301488B (en) Production material supply chain interruption management system and production method
CN102368216A (en) Process implementation method based on automatic project building
US10951696B2 (en) Data manager
CN105045601A (en) Product publishing and deploying system based on cloud platform
US20190107815A1 (en) Data architecture and improved model object interfaces for supporting integration of multiple disparate databases useable to model availability of a fleet of vehicles
CN109901872A (en) A kind of IT application in enterprises series of products version pipe control method
CN115719207A (en) Super-automation platform system
US20220261240A1 (en) Agile, automotive spice, dev ops software development and release management system
CN114816591A (en) Service interface processing method and device, computer equipment and storage medium
CN109389328A (en) A kind of card Product development process management method and system
Anand et al. Issues in scrum agile development principles and practices in software development
Boschi et al. Functional requirements for reconfigurable and flexible cyber-physical system
CN106486391A (en) Semiconductor manufacturing control method based on MES system and system
CN117111907A (en) Software development system
CN101794417A (en) Work flow dispatching and business flow modeling method based on sequence number

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170524