CN113570317A CN202010358195.2A CN202010358195A CN113570317A CN 113570317 A CN113570317 A CN 113570317A CN 202010358195 A CN202010358195 A CN 202010358195A CN 113570317 A CN113570317 A CN 113570317A
Authority
CN
China
Prior art keywords
data
project
preset
local management
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010358195.2A
Other languages
Chinese (zh)
Other versions
CN113570317B (en
Inventor
苏湘鹏
龚太祥
王炳章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Kingsoft Cloud Network Technology Co Ltd
Original Assignee
Beijing Kingsoft Cloud Network Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Kingsoft Cloud Network Technology Co Ltd filed Critical Beijing Kingsoft Cloud Network Technology Co Ltd
Priority to CN202010358195.2A priority Critical patent/CN113570317B/en
Publication of CN113570317A publication Critical patent/CN113570317A/en
Application granted granted Critical
Publication of CN113570317B publication Critical patent/CN113570317B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/23Updating

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Engineering & Computer Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Computer Hardware Design (AREA)
  • Economics (AREA)
  • Databases & Information Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The project automation management method, the project automation management device, the electronic equipment and the storage medium provided by the embodiment of the invention are used for acquiring data of a target project in project data managed by a project management system, wherein the target project corresponds to any local management project of the automation management system; updating data about a local management project stored in the automatic management system according to the acquired data of the target project to obtain first data of the local management project; processing the first data of the local management item according to a preset processing rule to obtain second data of the local management item; and judging the second data of the local management item according to a preset judgment rule so as to execute a preset operation according to a judgment result. Therefore, the automation degree of the project management system is improved, the data in the project management system are continuously monitored, and automatic preset operation is performed when any data is in an abnormal state, so that the labor cost is reduced.

Description

Project automation management method and device, electronic equipment and storage medium
Technical Field
The present invention relates to the field of information technologies, and in particular, to a method and an apparatus for automatically managing projects, an electronic device, and a storage medium.
Background
At present, project management systems are widely applied to many companies, and defect tracking, customer service, demand collection, process approval, task tracking, project tracking, agile management and the like can be performed through the project management systems. Therefore, management personnel can monitor each flow of the project conveniently, and the project management efficiency is improved.
Then, when the current project management system is used, after a manager needs to log in the project management system, the project process is monitored and judged in a manual mode, corresponding operation is executed according to data in the project management system, and the labor cost is high.
Disclosure of Invention
The embodiment of the invention aims to provide a project automation management method, a project automation management device, electronic equipment and a storage medium, so as to achieve the purpose of reducing labor cost in the project management process. The specific technical scheme is as follows:
in a first aspect, an embodiment of the present application provides a project automation management method, which is applied to an automation management system, where the automation management system is used to interact with a project management system and perform automation management on project data of the project management system, and the method includes:
acquiring data of a target project in project data managed by a project management system, wherein the target project corresponds to any local management project of the automatic management system;
updating data about a local management project stored in the automatic management system according to the acquired data of the target project to obtain first data of the local management project;
processing the first data of the local management item according to a preset processing rule to obtain second data of the local management item;
and judging the second data of the local management item according to a preset judgment rule so as to execute a preset operation according to a judgment result.
Optionally, the processing the first data of the local management item according to the preset processing rule to obtain the second data of the local management item includes:
and acquiring preset data of the local management project according to the preset processing rule, and processing the first data by using the preset data of the local management project according to the preset processing rule to obtain second data of the local management project.
Optionally, the determining, according to a preset determination rule, second data of the local management item to execute a preset operation according to a determination result, includes:
and matching the second data of the local management item with a preset condition according to a preset judgment rule, and executing a preset operation when the preset condition is met.
Optionally, the second data includes the bug total number of the local management item, and the second data of the local management item is judged according to a preset judgment rule, so as to execute a preset operation according to a judgment result, including:
and when the total number of the bug bugs of the local management project is larger than a preset number threshold, sending notification information to a target mailbox, and/or sending the notification information to a target telephone number in a telephone or short message notification mode.
Optionally, the method further includes:
and generating a chart corresponding to the second data according to the second data of the local management project so as to visually display the second data.
Optionally, the method further includes:
and recording the log information of the automatic management system.
In a second aspect, an embodiment of the present application provides an automatic project management apparatus, which is applied to an automatic project management system, where the automatic project management system is configured to interact with the project management system and perform automatic management on project data of the project management system, and the apparatus includes:
the system comprises a data acquisition module, a data processing module and a data processing module, wherein the data acquisition module is used for acquiring data of a target project in project data managed by a project management system, and the target project corresponds to any local management project of an automatic management system;
the data updating module is used for updating data about the local management project stored in the automatic management system according to the acquired data of the target project to obtain first data of the local management project;
the data processing module is used for processing the first data of the local management item according to a preset processing rule to obtain second data of the local management item;
and the data judgment module is used for judging the second data of the local management item according to a preset judgment rule so as to execute a preset operation according to a judgment result.
Optionally, the data processing module includes:
and the preset rule submodule is used for acquiring preset data of the local management project according to the preset processing rule, and processing the first data by using the preset data of the local management project according to the preset processing rule to obtain second data of the local management project.
Optionally, the data determining module includes:
and the judgment rule submodule is used for matching the second data of the local management item with a preset condition according to a preset judgment rule and executing a preset operation when the preset condition is met.
Optionally, the second data includes a bug total number of the local management item, and the data determining module includes:
and the notification information submodule is used for sending notification information to a target mailbox and/or sending notification information to a target telephone number in a telephone or short message notification mode when the total number of the bug bugs of the local management project is greater than a preset number threshold.
Optionally, the apparatus further comprises:
and the chart generation module is used for generating a chart corresponding to the second data according to the second data of the local management item so as to visually display the second data.
Optionally, the apparatus further comprises:
and the information recording module is used for recording the log information of the automatic management system.
In a third aspect, an embodiment of the present application provides an electronic device, including a processor, a communication interface, a memory, and a communication bus, where the processor, the communication interface, and the memory complete mutual communication through the communication bus;
a memory for storing a computer program;
a processor for implementing any of the above method steps when executing the computer program stored in the memory.
In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, in which a computer program is stored, and the computer program, when executed by a processor, implements any of the method steps described above.
The project automation management method, the project automation management device, the electronic equipment and the storage medium provided by the embodiment of the invention are used for acquiring data of a target project in project data managed by a project management system, wherein the target project corresponds to any local management project of the automation management system; updating data about a local management project stored in the automatic management system according to the acquired data of the target project to obtain first data of the local management project; processing the first data of the local management item according to a preset processing rule to obtain second data of the local management item; and judging the second data of the local management item according to a preset judgment rule so as to execute a preset operation according to a judgment result. Therefore, the automation degree of the project management system is improved, the data in the project management system are continuously monitored, and automatic preset operation is performed when any data is in an abnormal state, so that the labor cost is reduced. Of course, it is not necessary for any product or method of practicing the invention to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
Fig. 1 is a first flowchart of a project automation management method according to an embodiment of the present invention;
FIG. 2 is a second flowchart of a project automation management method according to an embodiment of the present invention;
FIG. 3 is a third flowchart of a project automation management method according to an embodiment of the present invention;
FIG. 4 is a fourth flowchart of a project automation management method according to an embodiment of the present invention;
FIG. 5 is a fifth flowchart of a project automation management method according to an embodiment of the present invention;
FIG. 6 is a sixth flowchart of a project automation management method according to an embodiment of the present invention;
FIG. 7 is a first schematic diagram of an automated project management apparatus according to an embodiment of the present invention;
FIG. 8 is a second schematic diagram of an automated project management apparatus according to an embodiment of the present invention;
FIG. 9 is a third schematic diagram of an automated project management apparatus according to an embodiment of the present invention;
FIG. 10 is a fourth schematic diagram of an automated project management apparatus according to an embodiment of the present invention;
FIG. 11 is a fifth schematic view of an automated project management apparatus according to an embodiment of the present invention;
FIG. 12 is a sixth schematic view of an automated project management apparatus according to an embodiment of the present invention;
fig. 13 is a schematic structural diagram of an electronic device according to an embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In a first aspect, an embodiment of the present application provides a project automation management method, which is applied to an automation management system, where the automation management system is used to interact with a project management system and perform automation management on project data of the project management system, and the method includes:
acquiring data of a target project in project data managed by a project management system, wherein the target project corresponds to any local management project of the automatic management system;
updating data about a local management project stored in the automatic management system according to the acquired data of the target project to obtain first data of the local management project;
processing the first data of the local management item according to a preset processing rule to obtain second data of the local management item;
and judging the second data of the local management item according to a preset judgment rule so as to execute a preset operation according to a judgment result.
By the project automatic management method, the automation degree of the project management system can be improved, the data in the project management system can be continuously monitored, and automatic preset operation can be performed when any data is in an abnormal state, so that the labor cost is reduced.
Referring to fig. 1, fig. 1 is a flowchart of a project automation management method according to an embodiment of the present application. The project automation management method provided by the embodiment of the application is applied to an automation management system, the automation management system is used for interacting with the project management system and automatically managing project data of the project management system, and the project automation management method comprises the following steps:
in step S11, data of a target item among the item data managed by the item management system is acquired.
The project management system in the present application may be a JIRA system, where the JIRA system is a project management system, and the JIRA system may perform work such as defect tracking, customer service, demand collection, process approval, task tracking, project tracking, and agile management. The acquisition of the data of the target item in the item data managed by the item management system may be periodically acquiring the data of the target item in the item data managed by the item management system, and for example, the data of the target item in the JIRA system may be acquired once per second.
The target project corresponds to any local management project of the automatic management system. For example, the data of the corresponding project in the corresponding project management system is acquired according to the local management project of the automation management system. The automated management system may be a python-jiara system, i.e., a management system written in python language for monitoring the jia a system
The project automation management method provided by the embodiment of the invention aims at project data in the intelligent terminal equipment, so that the project data can be executed through the intelligent terminal equipment, and specifically, the intelligent terminal equipment can be a computer or a server and the like.
Step S12, the data about the local management project stored in the automated management system is updated according to the acquired data of the target project, so as to obtain first data of the local management project.
Wherein, the target project corresponds to any local management project of the automatic management system. The data about the local management project stored in the automatic management system is updated according to the acquired data of the target project, and the data of the local management project can be updated according to the data of the target project, so that the first data of the local management project is obtained.
For example, data of an item in the JIRA system is periodically acquired by the automation management system, and then data of a locally managed item of the automation management system is updated based on the acquired item data. For example, the total number of recorded BUGs (BUGs) in the jitra system is acquired once per second, and then the data in the automated management system is updated according to the acquired total number of the BUGs, so that the updated total number of the BUGs, that is, the first data is obtained.
And step S13, processing the first data of the local management item according to a preset processing rule to obtain second data of the local management item.
The processing of the first data of the local management project according to the preset processing rule may be further processing the first data of the local project management system by using a preset operation rule. For example, the total number of the removed BUGs in the history period of time is obtained as the first data, and the number of the processed BUGs per day in the past period of time can be obtained by dividing the total number of the removed BUGs by the time, so that the working efficiency can be effectively monitored. For another example, the first data is the total number of the BUGs appearing in the current period of time and the total number of the BUGs already processed, and the total number of the current BUGs to be processed can be known by calculating a difference, so that the state of the current item can be monitored.
And step S14, judging the second data of the local management item according to a preset judgment rule, so as to execute a preset operation according to the judgment result.
The preset judgment rule may be a preset judgment rule for various items. And judging second data of the local management item according to a preset judgment rule, wherein the first data is, for example, the total number of the BUGs appearing in a current period of time and the total number of the BUGs already processed, and the total number of the BUGs to be processed currently, that is, the second data can be known by calculating a difference. By comparing the total number of the BUGs to be processed with a preset threshold value, whether the total number of the BUGs to be processed exceeds an alarm value or not can be known.
Wherein, a preset operation is executed according to the judgment result, for example, when the total number of the BUGs to be processed exceeds the alarm value, the alarm information related to the BUG can be sent for the item.
Therefore, the project automation management method can improve the automation degree of the project management system, continuously monitor the data in the project management system, and automatically preset operation when any data is in an abnormal state, thereby reducing the labor cost.
Optionally, referring to fig. 2, in step S13, processing the first data of the local management item according to a preset processing rule to obtain second data of the local management item, where the processing includes:
step S131, acquiring preset data of the local management project according to the preset processing rule, and processing the first data by using the preset data of the local management project according to the preset processing rule to obtain second data of the local management project.
The processing method includes acquiring preset data of a local management project according to a preset processing rule, and processing first data by using the preset data of the local management project according to the preset processing rule, where the processing method may be configured to process the first data for acquiring data related to the first data preset in the local management project according to the preset processing rule.
For example, the total number of the current BUGs to be processed and the total time length required for processing all the BUGs preset in the local management project are obtained. The workload per unit time can be obtained by dividing, and thus the work schedule per unit time can be arranged. For another example, the total number of the current BUGs to be processed is obtained, and the number of the different types of BUGs can be obtained by matching all the BUGs with the preset classification standard of the BUGs, for example, the total number of important BUGs and the total number of non-important BUGs are obtained.
Optionally, referring to fig. 3, in step S14, the determining, according to a preset determination rule, second data of the local management item, so as to execute a preset operation according to a determination result, where the preset operation includes:
and step S141, matching the second data of the local management item with a preset condition according to a preset judgment rule, and executing a preset operation when the preset condition is met.
And matching the second data of the local management item with a preset condition according to a preset judgment rule. For example, the second data obtained by the total number of the current BUGs to be processed and the scheduled working time is the total number of the BUGs scheduled to be processed daily, and the second data is matched with the preset conditions. Wherein the second condition is that the daily projected work task volume is greater than a certain threshold. The preset operation is performed when a preset condition is satisfied, wherein the preset operation may be a plurality of types of operations. For example, send alarm information, make a call or send a short message for notification, etc.
For example, the total number of unsolved BUGs is acquired, the total number of unsolved BUGs is compared with a preset alarm value, and a preset operation is performed when the total number of unsolved BUGs exceeds the alarm value. For another example, the important BUG occurrence time and the current time in the unresolved BUG are obtained, the time from the occurrence of the important BUG to the current time is obtained, and when the time exceeds a preset threshold, a preset operation is executed. For another example, the working schedule of the important BUG is obtained, and when the working schedule of the important BUG is smaller than a preset threshold, for example, after a preset time, the important BUG is still in an unprocessed (unsolved) state, a preset operation (sending notification information to relevant people, for example, sending notification information to relevant people through a telephone, a short message, and/or a mail) is performed. For another example, the default repair time length of the BUG and the used time length of the current BUG are obtained, and when the obtained remaining repair time length is smaller than the preset threshold value, the preset operation is executed.
Optionally, referring to fig. 4, the second data includes the total bug number of the local management item, and step S14 judges the second data of the local management item according to a preset judgment rule, so as to execute a preset operation according to a judgment result, where the preset operation includes:
step S142, determining whether the total number of bug bugs of the local management project is greater than a preset number threshold according to the preset determination rule.
And step S143, when the total number of the bug bugs of the local management project is larger than a preset number threshold, sending notification information to a target mailbox, and/or sending notification information to a target telephone number in a telephone or short message notification mode.
The notification by mail can be performed simultaneously with the telephone call notification and the short message notification, or can be performed separately. For example, the preset number threshold may include a plurality of values, such as a first threshold, a second threshold, and a third threshold, and when the total number of bugs is greater than the first threshold, the notification message is sent to the target mailbox. And when the total number of the bugs is larger than a second threshold value, sending notification information to the target telephone number in a telephone or short message notification mode. And when the total number of the bugs is larger than a third threshold value, sending notification information to a target mailbox, and sending the notification information to a target telephone number in a telephone or short message notification mode.
Optionally, referring to fig. 5, the method further includes:
and step S15, generating a chart corresponding to the second data according to the second data of the local management item so as to visually display the second data.
The generated chart can be a report of various types or formats, such as a graph, a line graph and the like. According to the second data of the local management item, a chart corresponding to the second data is generated, for example, the total number of processed BUGs in a past period of time per day can be obtained, and a graph of the number of processed BUGs per day is generated, so that the straight pipe judgment can be carried out on the work efficiency per day. For another example, by counting the total number of the BUGs and the total number of the currently completed BUGs, a pie chart is generated and displayed, and the percentage of the currently completed work can be seen through the straight tube.
Therefore, the chart corresponding to the second data is generated according to the second data of the local management project so as to visually display the second data, so that the current data can be more intuitively watched and processed by personnel.
Optionally, referring to fig. 6, on the basis of the foregoing method embodiment, the foregoing method may further include the following steps:
in step S16, log information of the automated management system is recorded.
The log information of the automated management system may be operation information, data information, and the like of the automated management system. For example, when a user performs a certain operation through the automated management system, the operation and time of the current user are recorded, or when the first data is acquired and the second data is generated, the first data and the generated second data are recorded. By recording the log information of the automatic management system, the accident tracing of workers can be facilitated, the current automatic management system can be improved, and the like.
Referring to fig. 7, fig. 7 is a schematic diagram of an automatic project management apparatus applied to an automatic management system, where the automatic management system is used to interact with a project management system to perform automatic management on project data of the project management system, and the apparatus includes:
a data obtaining module 701, configured to obtain data of a target project in project data managed by a project management system, where the target project corresponds to any local management project of an automation management system;
the data updating module 702 is configured to update data about a local management project stored in the automated management system according to the acquired data of the target project, so as to obtain first data of the local management project;
the data processing module 703 is configured to process the first data of the local management item according to a preset processing rule to obtain second data of the local management item;
and the data judgment module 704 is configured to judge the second data of the local management item according to a preset judgment rule, so as to execute a preset operation according to the judgment result.
Optionally, referring to fig. 8, the data processing module 703 includes:
the preset rule submodule 7031 is configured to obtain preset data of the local management item according to the preset processing rule, and process the first data by using the preset data of the local management item according to the preset processing rule to obtain second data of the local management item.
Optionally, referring to fig. 9, the data determining module 704 includes:
and the judgment rule sub-module 7041 is configured to match the second data of the local management item with a preset condition according to a preset judgment rule, and execute a preset operation when the preset condition is met.
Optionally, referring to fig. 10, the second data includes the bug total number of the local management item, and the data determining module 704 includes:
the determining sub-module 7042 is configured to determine, according to the preset determination rule, whether the total number of bug bugs of the local management project is greater than a preset number threshold.
And the notification information sub-module 7043 is configured to send notification information to the target mailbox and/or send notification information to the target telephone number in a telephone or short message notification manner when the total number of bug bugs of the local management project is greater than a preset number threshold.
Optionally, referring to fig. 11, the apparatus further includes:
the chart generating module 705 is configured to generate a chart corresponding to the second data according to the second data of the local management item, so as to visually display the second data.
Optionally, referring to fig. 12, the apparatus further includes:
and an information recording module 706, configured to record log information of the automation management system.
Therefore, the project automation management device can improve the automation degree of the project management system, continuously monitor the data in the project management system, and automatically preset when any data is in an abnormal state, thereby reducing the labor cost.
An embodiment of the present invention further provides an electronic device, as shown in fig. 13, including a processor 1301, a communication interface 1302, a memory 1303, and a communication bus 1304, where the processor 1301, the communication interface 1302, and the memory 1303 complete mutual communication through the communication bus 1304,
a memory 1303 for storing a computer program;
the processor 1301 is configured to implement the following steps when executing the program stored in the memory 1303:
acquiring data of a target project in project data managed by a project management system, wherein the target project corresponds to any local management project of the automatic management system;
updating data about a local management project stored in the automatic management system according to the acquired data of the target project to obtain first data of the local management project;
processing the first data of the local management item according to a preset processing rule to obtain second data of the local management item;
and judging the second data of the local management item according to a preset judgment rule so as to execute a preset operation according to a judgment result.
Optionally, the processor is configured to implement the automated management method according to any one of the above items when executing the program stored in the memory.
The communication bus mentioned in the electronic device may be a PCI (Peripheral Component Interconnect) bus, an EISA (Extended Industry Standard Architecture) bus, or the like. The communication bus may be divided into an address bus, a data bus, a control bus, etc. For ease of illustration, only one thick line is shown, but this does not mean that there is only one bus or one type of bus.
The communication interface is used for communication between the electronic equipment and other equipment.
The Memory may include a RAM (Random Access Memory) or an NVM (Non-Volatile Memory), such as at least one disk Memory. Optionally, the memory may also be at least one memory device located remotely from the processor.
The Processor may be a general-purpose Processor, including a Central Processing Unit (CPU), a Network Processor (NP), and the like; but also a DSP (Digital Signal Processor), an ASIC (Application Specific Integrated Circuit), an FPGA (Field-Programmable Gate Array) or other Programmable logic device, discrete Gate or transistor logic device, discrete hardware component.
In yet another embodiment provided by the present application, a computer-readable storage medium is further provided, which stores instructions that, when executed on a computer, cause the computer to perform any one of the above-mentioned embodiments of the method for automated management of items.
In yet another embodiment provided by the present application, there is also provided a computer program product containing instructions which, when run on a computer, cause the computer to perform the method for automated management of any of the above embodiments.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
All the embodiments in the present specification are described in a related manner, and the same and similar parts among the embodiments may be referred to each other, and each embodiment focuses on the differences from the other embodiments. In particular, for the system embodiment, since it is substantially similar to the method embodiment, the description is simple, and for the relevant points, reference may be made to the partial description of the method embodiment.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the scope of the present invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention shall fall within the protection scope of the present invention.

Claims (10)

1. An automatic project management method, applied to an automatic project management system, for interacting with the project management system to automatically manage project data of the project management system, the method comprising:
acquiring data of a target project in project data managed by a project management system, wherein the target project corresponds to any local management project of the automatic management system;
updating data about the local management project stored in the automatic management system according to the acquired data of the target project to obtain first data of the local management project;
processing the first data of the local management item according to a preset processing rule to obtain second data of the local management item;
and judging the second data of the local management item according to a preset judgment rule so as to execute a preset operation according to a judgment result.
2. The method according to claim 1, wherein the processing the first data of the local management item according to a preset processing rule to obtain the second data of the local management item comprises:
and acquiring preset data of the local management project according to a preset processing rule, and processing the first data by using the preset data of the local management project according to the preset processing rule to obtain second data of the local management project.
3. The method according to claim 1, wherein the determining the second data of the local management item according to a preset determination rule to perform a preset operation according to a determination result includes:
and matching the second data of the local management item with a preset condition according to a preset judgment rule, and executing a preset operation when the preset condition is met.
4. The method of claim 1, wherein the second data comprises bug total numbers of the local management items,
the judging the second data of the local management item according to a preset judging rule so as to execute a preset operation according to a judging result, comprising the following steps:
determining whether the total number of the bug bugs of the local management project is greater than a preset number threshold value or not according to the preset judgment rule;
and when the total number of the bug bugs of the local management project is larger than a preset number threshold, sending notification information to a target mailbox, and/or sending notification information to a target telephone number in a telephone or short message notification mode.
5. The method of claim 1, further comprising:
and generating a chart corresponding to the second data according to the second data of the local management project so as to visually display the second data.
6. The method according to any one of claims 1-5, further comprising:
and recording the log information of the automatic management system.
7. An automatic project management device, applied to an automatic project management system, for interacting with the project management system to automatically manage project data of the project management system, the device comprising:
the system comprises a data acquisition module, a data processing module and a data processing module, wherein the data acquisition module is used for acquiring data of a target project in project data managed by a project management system, and the target project corresponds to any local management project of the automatic management system;
the data updating module is used for updating the data about the local management project stored in the automatic management system according to the acquired data of the target project to obtain first data of the local management project;
the data processing module is used for processing the first data of the local management item according to a preset processing rule to obtain second data of the local management item;
and the data judgment module is used for judging the second data of the local management item according to a preset judgment rule so as to execute a preset operation according to a judgment result.
8. The apparatus of claim 7, wherein the data processing module comprises:
and the preset rule submodule is used for acquiring preset data of the local management project according to a preset processing rule, and processing the first data by using the preset data of the local management project according to the preset processing rule to obtain second data of the local management project.
9. An electronic device, comprising a processor, a communication interface, a memory and a communication bus, wherein the processor, the communication interface and the memory complete communication with each other through the communication bus;
a memory for storing a computer program;
a processor for implementing the method steps of any of claims 1-6 when executing the computer program stored in the memory.
10. A computer-readable storage medium, characterized in that a computer program is stored in the computer-readable storage medium, which computer program, when being executed by a processor, carries out the method steps of any one of claims 1 to 6.
CN202010358195.2A 2020-04-29 2020-04-29 Project automation management method and device, electronic equipment and storage medium Active CN113570317B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010358195.2A CN113570317B (en) 2020-04-29 2020-04-29 Project automation management method and device, electronic equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010358195.2A CN113570317B (en) 2020-04-29 2020-04-29 Project automation management method and device, electronic equipment and storage medium

Publications (2)

Publication Number Publication Date
CN113570317A true CN113570317A (en) 2021-10-29
CN113570317B CN113570317B (en) 2024-08-06

Family

ID=78158572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010358195.2A Active CN113570317B (en) 2020-04-29 2020-04-29 Project automation management method and device, electronic equipment and storage medium

Country Status (1)

Country Link
CN (1) CN113570317B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2642458A1 (en) * 2008-11-28 2010-05-28 Gerard Voon Tangible (upstream vertical chain) new technologies based on new designs and new compositions that increase people's quality of life relevant to my companies 'lines' of business
CN106605255A (en) * 2014-07-11 2017-04-26 特克斯图拉公司 Construction project performance management
CN106708509A (en) * 2016-11-28 2017-05-24 上海宝尊电子商务有限公司 Automatic software project development all-link configuration management system
CN107886242A (en) * 2017-11-10 2018-04-06 平安科技(深圳)有限公司 Data monitoring method, device, computer equipment and storage medium
CN108153599A (en) * 2017-12-26 2018-06-12 泰康保险集团股份有限公司 A kind of project management platform, method, storage medium and electronic equipment
CN108446123A (en) * 2017-02-14 2018-08-24 北京金山云网络技术有限公司 A kind of application deployment method and device
CN109213816A (en) * 2018-08-06 2019-01-15 国网福建省电力有限公司信息通信分公司 A method of early warning analysis is carried out based on the electric network data obtained in real time
CN109446668A (en) * 2018-10-31 2019-03-08 广西路桥工程集团有限公司 A kind of component Schedule monitoring system and method based on threedimensional model
CN110515844A (en) * 2019-08-15 2019-11-29 浙江万朋教育科技股份有限公司 A method of bug information, which is extracted, from JIRA generates multidimensional analysis report

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2642458A1 (en) * 2008-11-28 2010-05-28 Gerard Voon Tangible (upstream vertical chain) new technologies based on new designs and new compositions that increase people's quality of life relevant to my companies 'lines' of business
CN106605255A (en) * 2014-07-11 2017-04-26 特克斯图拉公司 Construction project performance management
CN106708509A (en) * 2016-11-28 2017-05-24 上海宝尊电子商务有限公司 Automatic software project development all-link configuration management system
CN108446123A (en) * 2017-02-14 2018-08-24 北京金山云网络技术有限公司 A kind of application deployment method and device
CN107886242A (en) * 2017-11-10 2018-04-06 平安科技(深圳)有限公司 Data monitoring method, device, computer equipment and storage medium
CN108153599A (en) * 2017-12-26 2018-06-12 泰康保险集团股份有限公司 A kind of project management platform, method, storage medium and electronic equipment
CN109213816A (en) * 2018-08-06 2019-01-15 国网福建省电力有限公司信息通信分公司 A method of early warning analysis is carried out based on the electric network data obtained in real time
CN109446668A (en) * 2018-10-31 2019-03-08 广西路桥工程集团有限公司 A kind of component Schedule monitoring system and method based on threedimensional model
CN110515844A (en) * 2019-08-15 2019-11-29 浙江万朋教育科技股份有限公司 A method of bug information, which is extracted, from JIRA generates multidimensional analysis report

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
KUZNETSOVA, E.V.: "Project Activity Automation for Organizations Performing IT Projects", INFORMATION TECHNOLOGIES, vol. 25, no. 9, pages 562 - 72 *
姜百合;傅建明;王应军;王亚丽;黄坚伟;: "基于Fuzzing技术的云数据泄露漏洞检测", 武汉大学学报(理学版), no. 02, pages 24 - 29 *
张微: "建设项目OA管理信息系统需求研究", 中国优秀硕士论文电子期刊网, no. 04, pages 1 - 71 *

Also Published As

Publication number Publication date
CN113570317B (en) 2024-08-06

Similar Documents

Publication Publication Date Title
CN107784481B (en) Task timeliness early warning method and device
CN111143102B (en) Abnormal data detection method and device, storage medium and electronic equipment
CN107302469B (en) Monitoring device and method for data update of distributed service cluster system
CN108599977B (en) System and method for monitoring system availability based on statistical method
US20190228353A1 (en) Competition-based tool for anomaly detection of business process time series in it environments
CN112148733A (en) Method, device, electronic device and computer readable medium for determining fault type
CN111738463A (en) Operation and maintenance method, device, system, electronic equipment and storage medium
CN110262955B (en) Application performance monitoring tool based on pinpoint
CN110955581A (en) Online software abnormity warning method and device, electronic equipment and storage medium
CN109639456B (en) Improvement method for automatic alarm and automatic processing platform for alarm data
CN114138601A (en) Service alarm method, device, equipment and storage medium
JP2010015246A (en) Failure information analysis management system
CN112988521A (en) Alarm method, device, equipment and storage medium
CN110633165B (en) Fault processing method, device, system server and computer readable storage medium
CN112488569A (en) Risk early warning method and device and storage medium
CN113570317A (en) Project automation management method and device, electronic equipment and storage medium
CN111835566A (en) System fault management method, device and system
CN113220379B (en) Task processing method and device, electronic equipment and readable storage medium
CN115858291A (en) System index detection method and device, electronic equipment and storage medium thereof
CN113835916A (en) Ambari big data platform-based alarm method, system and equipment
CN110502404B (en) Early warning processing method based on data management platform and related equipment
CN114500316A (en) Method and system for inspecting equipment of Internet of things
CN113676356A (en) Alarm information processing method and device, electronic equipment and readable storage medium
CN114095337A (en) KPI (Key Performance indicator) anomaly detection method and device, computing equipment and computer storage medium
CN108280090B (en) Intelligent feedback system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant