CN109949001B - Construction engineering supervision organization management system - Google Patents

Construction engineering supervision organization management system Download PDF

Info

Publication number
CN109949001B
CN109949001B CN201910134307.3A CN201910134307A CN109949001B CN 109949001 B CN109949001 B CN 109949001B CN 201910134307 A CN201910134307 A CN 201910134307A CN 109949001 B CN109949001 B CN 109949001B
Authority
CN
China
Prior art keywords
audit
auditor
database
key information
control terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201910134307.3A
Other languages
Chinese (zh)
Other versions
CN109949001A (en
Inventor
胡群
杨琨
纪焱
刘航
欧阳二兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Project Management Co Ltd
Original Assignee
Shanghai Project Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Project Management Co Ltd filed Critical Shanghai Project Management Co Ltd
Priority to CN201910134307.3A priority Critical patent/CN109949001B/en
Publication of CN109949001A publication Critical patent/CN109949001A/en
Application granted granted Critical
Publication of CN109949001B publication Critical patent/CN109949001B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a construction project supervision organization management system, which relates to the technical field of engineering construction and solves the problems that the work efficiency of managers is improved, the activities of users cannot be tracked and the phenomenon of user permission abuse is easy to occur in the existing construction project supervision organization management software. The invention has the effect of tracking and recording the activities of the user, thereby effectively avoiding the phenomenon of abuse of user authority.

Description

Construction engineering supervision organization management system
Technical Field
The invention relates to the technical field of engineering construction, in particular to a construction engineering supervision organization management system.
Background
At present, the construction project supervision organization management software can meet the project organization management service specification of the project construction project management target; the system standardizes the engineering project management work, and reduces errors caused by human factors to the maximum extent. The management work is normalized and standardized, the relations between the interior of a management layer and design, supervision and construction units are straightened out, the information height sharing and information flow management and control of each participating unit of a project are realized, intermediate links in the project management process are greatly reduced, the effective control on the progress, the quality, the cost and the like is further enhanced, the work efficiency of managers is improved, the decision-making period is shortened, and the risk is reduced. Can comprehensively track and control the use of engineering cost, strengthen cost accounting, accelerate fund turnover, ensure the timely supply of engineering materials and equipment, reduce cost while keeping the high efficiency of engineering construction, avoid waste and realize more rapid field service
Although the work efficiency of managers is improved by the existing construction project supervision organization management software, the activities of users cannot be tracked, the phenomenon of abuse of user permission is easy to occur, and the improvement space is provided.
Disclosure of Invention
The invention aims to provide a construction project supervision organization management system which has the effect of tracking and recording the activities of users so as to effectively avoid the phenomenon of abuse of user authorities.
The above object of the present invention is achieved by the following technical solutions:
a construction project supervision organization management system comprises a control terminal, a display interface, a query module for auditors to input required audit user accounts, a key information database for storing key information of the construction project supervision organization management system, and an access operation record database for recording the user accounts and information conditions of corresponding user account access or operation of the key information database in real time;
the control terminal takes the user account input by the auditor in the query module as a query object, queries key information corresponding to the access and operation of the user account in the access operation record database, and displays the key information on the display interface.
By adopting the technical scheme, the arrangement of the control terminal, the display interface, the query module, the key information database and the access operation record database is convenient for an auditor to track the condition of the access operation key information of each user when needed, so that the phenomenon that the user abuses the authority is further avoided.
The invention is further configured to: the construction project supervision organization management system also comprises a necessary audit project audit condition database which stores audit personnel accounts, necessary audit projects corresponding to the audit personnel accounts and total audit times of corresponding projects;
the control terminal takes the account number logged by the auditor as an inquiry object to inquire the necessary audit project and the frequency condition of the corresponding audit project in the necessary audit project design condition database, displays the necessary audit project and the frequency condition of the corresponding audit project on the display interface and above the access operation information inquired by the auditor, and simultaneously displays the necessary audit project from top to bottom at the display interface with the audit frequency from less to most.
By adopting the technical scheme, the arrangement of the essential audit condition database and the control terminal can facilitate audit personnel to pay attention to the essential audit condition when tracking the access operation key information of each user, and avoid neglecting the project required to be audited by the audit personnel due to tracking the access operation key information of the user.
The invention is further configured to: the building engineering supervision organization management system also comprises an audit project audit result database which stores audit projects and audit results of different auditors corresponding to the audit projects, wherein the audit results comprise two types, one type is a problem, and the other type is a no problem;
the control terminal takes the audit item as an inquiry object to inquire all audit results corresponding to the audit item in an audit result database of the audit item, takes the absolute value of the difference value between the audit times with problems and the audit times without problems in the audit result as a dividend, and takes the total audit times corresponding to the audit item as a divisor, thereby obtaining the percentage of the distinguishing times, and preferentially sequencing the audit items according to the percentage from less to most, wherein the priority is higher than the sequencing of the audit times.
By adopting the technical scheme, the difference times of the audit results of the audit projects can be obtained through the arrangement of the audit result database of the audit projects and the control terminal for sorting, and the difference times are sorted in front, namely the audit projects with larger audit results are sorted, so that the attention of auditors can be better attracted, and the attention can be paid in the subsequent audit process.
The invention is further configured to: the control terminal queries all key information accessed and operated by corresponding user accounts in an access operation record database one by one to form a total key information database by taking accounts of all users as query objects one by one, and the total key information database counts the times of access or operation of each key information;
and the control terminal calls the total key information database, and the key information with the statistical times exceeding the preset times of the control terminal is set on the top and is positioned above the project to be audited.
By adopting the technical scheme, the set of the total key information database and the control terminal can be used for setting the top of certain key information when the access or operation times of the key information are more, so that the attention of an auditor is attracted, and the processing is carried out at the first time.
The invention is further configured to: the construction project supervision organization management system also comprises an auditor tendency color database which stores auditor accounts and corresponding auditor tendency colors;
and the control terminal queries colors inclined by the auditors in the auditors inclination color database by taking the auditors account as a query object, and performs color labeling on the first 3 items displayed on the display interface from top to bottom to draw the attention of the auditors.
By adopting the technical scheme, the first three items of the display interface can be subjected to color marking through the arrangement of the auditor tendency color database and the control terminal, and the marked color is the auditor tendency color, so that the attention of auditors is better attracted.
The invention is further configured to: the construction project supervision organization management system also comprises an auditor mobile phone number database and a short message sending device, wherein the auditor mobile phone number database stores an auditor account and a mobile phone number corresponding to the auditor account;
the control terminal takes an auditor account which is logged in the construction project supervision organization management system at present to carry out information inquiry as an inquiry object to inquire the mobile phone number of the auditor in an auditor mobile phone number database, and sends the audit sequencing condition displayed on the display interface through a short message sending device.
By adopting the technical scheme, the audit result which can be displayed on the display interface can be notified to the corresponding user through the short message sending device through the setting of the mobile phone number database and the short message sending device of the auditor.
The invention is further configured to: the short message sending device is a short message alarm.
By adopting the technical scheme, the short message sending device is the short message alarm, so that the cost can be reduced while the short message notification is ensured.
In conclusion, the beneficial technical effects of the invention are as follows: through the arrangement of the control terminal, the display interface, the query module, the key information database and the access operation record database, an auditor can conveniently track and query the access or operation record of the key information of the corresponding user according to the user account, and the phenomenon that the user abuses the authority is effectively avoided.
Drawings
FIG. 1 is a first schematic diagram of a framework of the construction project supervision organization management system of the present invention.
Fig. 2 is a schematic diagram of a framework of the construction project supervision organization management system of the invention.
In the figure, 1, a control terminal; 2. displaying an interface; 3. a query module; 4. a key information database; 5. accessing an operation record database; 6. a project audit condition database must be audited; 7. an audit result database of the audit project; 8. a total key information database; 9. an auditor preference color database; 10. a color labeling item quantity setting module; 11. an auditor mobile phone number database; 12. a short message sending device.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, the construction project supervision organization management system disclosed by the present invention includes a control terminal 1, a display interface 2, a query module 3 for an auditor to input a required audit user account, a key information database 4 storing key information of the construction project supervision organization management system, and an access operation record database 5 recording user accounts and information of the corresponding user account access or operation key information database 4 in real time, where the control terminal 1 is preferably a central processing unit.
The actual operation process is as follows: the control terminal 1 takes the user account input by the auditor in the query module 3 as a query object, queries key information corresponding to the access and operation of the user account in the access operation record database 5, and displays the key information on the display interface 2.
As shown in fig. 2, in consideration of the fact that an auditor can forget to inquire about an audit project necessary for his own job when inquiring about access or operation records of a user at key information points, the construction project supervision organization management system further includes a necessary audit project audit condition database 6 storing an account number of the auditor, the audit project necessary for the account number of the auditor, and the total audit frequency of the corresponding project.
The practical application process is as follows: the control terminal 1 takes the account number logged by the auditor as an inquiry object to inquire the necessary audit project and the frequency condition of the corresponding audit project in the necessary audit project design condition database, displays the necessary audit project and the frequency condition of the corresponding audit project on the display interface 2 and above the access operation information inquired by the auditor, and simultaneously displays the necessary audit project from top to bottom at the display interface 2 with the audit frequency from less to most.
Further considering that a plurality of auditors have different auditing results about the same auditing project and can better draw attention of the auditors when the auditing result difference is large, the building engineering supervision organization management system also comprises an auditing project auditing result database 7 which stores the auditing projects and auditing results of different auditors corresponding to the auditing projects, wherein the auditing results have two types, one type is a problem, and the other type is no problem.
The practical application process is as follows: the control terminal 1 takes the audit item as an inquiry object to inquire all audit results of the corresponding audit item in the audit result database 7 of the audit item, takes the absolute value of the difference value between the audit times with problems and the audit times without problems in the audit results as a dividend, and takes the total audit times of the corresponding audit item as a divisor, thereby obtaining the percentage of the distinguishing times, and preferentially sorting the audit items according to the percentage from less to most, wherein the priority is higher than the sorting of the audit times.
In addition, considering that the attention of the auditors can be attracted at the first time when the access or operation of certain key information is too frequent, the control terminal 1 queries all key information accessed and operated by corresponding user accounts in the access operation record database 5 one by taking accounts of all users as query objects to form a total key information database 8, and the frequency of the access or operation of each key information in the total key information database 8 is counted; the control terminal 1 calls the total key information database 8, and the key information with the counting times exceeding the preset times of the control terminal 1 is set on the top and is positioned above the project to be audited.
Further considering that when the auditors pay attention, the construction project supervision organization management system also comprises an auditors tendency color database 9 which stores auditors accounts and auditors tendency colors corresponding to the auditors tendency colors by coloring the audit items needing serious attention of the auditors.
The control terminal 1 takes the account of the auditor as a query object to query the color of the auditor in the auditor tendency color database 9, and performs color labeling on the first 3 items displayed on the display interface 2 from top to bottom to draw the attention of the auditor.
Correspondingly, in consideration of the fact that different auditors need different colored audit project quantities, the construction project supervision organization management system further comprises a color labeling project quantity setting module 10.
If the auditor does not mark the required color marking items through the color marking item quantity setting module 10, default to three items; otherwise, the number set by the auditor through the color labeling item number setting module 10 is used as the number of the required labeling color items.
In addition, the construction project supervision organization management system further comprises an auditor mobile phone number database 11 storing auditor accounts and corresponding auditor account mobile phone numbers, and a short message sending device 12, wherein the short message sending device 12 is preferentially a short message alarm.
The specific application process of the above features is as follows: the control terminal 1 takes the auditor account logged in the construction project supervision organization management system for information inquiry as an inquiry object to inquire the auditor mobile phone number in the auditor mobile phone number database 11, and sends the audit sequencing condition displayed on the display interface 2 through the short message sending device 12.
The implementation principle of the embodiment is as follows:
after an auditor inputs an account number of a user to be tracked through the query module 3, the control terminal 1 calls access operation information in the access operation record database 5, and correspondingly displays the access operation information through the display interface 2.
Besides the access operation information of the inquired user, the information displayed on the display interface 2 can correspondingly display the audit items which are required to be audited by corresponding auditors through the settings of the control terminal 1, the required audit item audit condition database 6, the audit item audit result database 7 and the total key information database 8, and reasonably sort according to the conditions of the design items.
And when the audit items of the auditors are displayed, the key items can be colored according to the requirements of the auditors by combining the auditors tendency color database 9 and the color labeling item quantity setting module 10 in consideration of better attention of the auditors, so that the attention of the auditors is better attracted.
The condition of audit of the auditor can be sent to the mobile phone of the auditor in a short message mode through the arrangement of the mobile phone number database 11 and the short message sending device 12 of the auditor, so that the auditor can inquire in time when needed.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (1)

1. The utility model provides a construction engineering supervision organization management system which characterized in that: the system comprises a control terminal (1), a display interface (2), a query module (3) for auditors to input required audit user accounts, a key information database (4) for storing key information of a construction project supervision organization management system, and an access operation record database (5) for recording the user accounts and information conditions of corresponding user account access or operation key information database (4) in real time;
the control terminal (1) takes a user account input by an auditor in the query module (3) as a query object, queries key information corresponding to access and operation of the user account in the access operation record database (5), and displays the key information on the display interface (2);
the construction project supervision organization management system also comprises a necessary audit project audit condition database (6) which stores audit personnel accounts, necessary audit projects corresponding to the audit personnel accounts and the total audit times of the corresponding projects;
the control terminal (1) queries the necessary audit items and the frequency conditions of the corresponding audit items in the necessary audit item design condition database by taking the account number logged by the auditor as a query object, displays the necessary audit items and the frequency conditions of the corresponding audit items on the display interface (2) and above the access operation information queried by the auditor, and simultaneously displays the necessary audit items from top to bottom at the display interface (2) from less to most as many as the audit times;
the building engineering supervision organization management system also comprises an audit project audit result database (7) which stores audit projects and audit results of different auditors corresponding to the audit projects, wherein the audit results have two types, one type is a problem, and the other type is no problem;
the control terminal (1) takes the audit item as an inquiry object to inquire all audit results of the corresponding audit item in an audit result database (7) of the audit item, takes the absolute value of the difference value between the audit times with problems and the audit times without problems in the audit results as a dividend, and takes the total audit times of the corresponding audit item as a divisor, thereby obtaining the percentage of the distinguishing times, and preferentially sorting the audit items according to the percentage from less to most, wherein the priority is higher than the sorting of the audit times;
the control terminal (1) queries all key information accessed and operated by corresponding user accounts in the access operation record database (5) one by one to form a total key information database (8) by taking accounts of all users as query objects one by one, and the times of accessing or operating each key information in the total key information database (8) are counted;
the control terminal (1) calls a total key information database (8), and the key information with the statistical frequency exceeding the preset frequency of the control terminal (1) is set on top and positioned above the project to be audited;
the construction project supervision organization management system also comprises an auditor tendency color database (9) which stores auditor accounts and auditor tendency colors corresponding to the auditors;
the control terminal (1) takes an auditor account as an inquiry object to inquire the color inclined by the auditor in the auditor inclination color database (9), and carries out color marking on the first 3 items displayed on the display interface (2) from top to bottom so as to draw the attention of the auditor;
the construction project supervision organization management system also comprises a color labeling project quantity setting module (10);
if the auditor does not mark the required color marking items through the color marking item quantity setting module (10), default to three items; otherwise, the number set by the auditor through the color labeling item number setting module (10) is used as the number of the color items to be labeled;
the construction project supervision organization management system also comprises an auditor mobile phone number database (11) for storing auditor accounts and mobile phone numbers corresponding to the auditor accounts, and a short message sending device (12);
the control terminal (1) takes an auditor account which is logged in the construction project supervision organization management system for information inquiry at present as an inquiry object, inquires the auditor mobile phone number in the auditor mobile phone number database (11), and sends the audit sequencing condition displayed on the display interface (2) through a short message sending device (12);
the short message sending device (12) is a short message alarm.
CN201910134307.3A 2019-02-22 2019-02-22 Construction engineering supervision organization management system Expired - Fee Related CN109949001B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910134307.3A CN109949001B (en) 2019-02-22 2019-02-22 Construction engineering supervision organization management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910134307.3A CN109949001B (en) 2019-02-22 2019-02-22 Construction engineering supervision organization management system

Publications (2)

Publication Number Publication Date
CN109949001A CN109949001A (en) 2019-06-28
CN109949001B true CN109949001B (en) 2021-05-07

Family

ID=67007683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910134307.3A Expired - Fee Related CN109949001B (en) 2019-02-22 2019-02-22 Construction engineering supervision organization management system

Country Status (1)

Country Link
CN (1) CN109949001B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111414526B (en) * 2020-03-02 2023-04-21 浙江同洲项目管理有限公司 Elevator additionally-installed supervision method and computer-readable storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103186637A (en) * 2011-12-30 2013-07-03 中国移动通信集团广东有限公司 Method and device for analyzing user behavior of BOSS database
CN106503927A (en) * 2016-11-14 2017-03-15 南京三方化工设备监理有限公司 A kind of petrochemical industry project equipment Monitoring information management system
CN109242366A (en) * 2018-11-06 2019-01-18 国电南瑞科技股份有限公司 A kind of multi-period tide optimization method of electric-gas interconnection integrated energy system
CN109325044A (en) * 2018-09-20 2019-02-12 快云信息科技有限公司 A kind of the audit log processing method and relevant apparatus of database

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140310365A1 (en) * 2012-01-31 2014-10-16 Global Relay Communications Inc. System and Method for Tracking Messages in a Messaging Service
CN106339305A (en) * 2016-08-30 2017-01-18 孙鸿鹏 Supervision and examination method for security of database
CN106384191A (en) * 2016-08-31 2017-02-08 铁道第三勘察设计院集团有限公司 Railway tunnel construction progress management system and method based on 3DGIS and engineering 3D model
CN106339490A (en) * 2016-08-31 2017-01-18 铁道第三勘察设计院集团有限公司 System and method for managing railway bridge construction progress based on 3DGIS (Three-dimensional Geographic Information System) and engineering three-dimensional model
CN106384190A (en) * 2016-08-31 2017-02-08 铁道第三勘察设计院集团有限公司 Railway roadbed construction progress management system and method based on 3DGIS and engineering 3D model

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103186637A (en) * 2011-12-30 2013-07-03 中国移动通信集团广东有限公司 Method and device for analyzing user behavior of BOSS database
CN106503927A (en) * 2016-11-14 2017-03-15 南京三方化工设备监理有限公司 A kind of petrochemical industry project equipment Monitoring information management system
CN109325044A (en) * 2018-09-20 2019-02-12 快云信息科技有限公司 A kind of the audit log processing method and relevant apparatus of database
CN109242366A (en) * 2018-11-06 2019-01-18 国电南瑞科技股份有限公司 A kind of multi-period tide optimization method of electric-gas interconnection integrated energy system

Also Published As

Publication number Publication date
CN109949001A (en) 2019-06-28

Similar Documents

Publication Publication Date Title
CN104992308A (en) Enterprise informatization management system
US20050209901A1 (en) System and method for engineering project tracking
CN111081361A (en) Intelligent logistics platform management system
CN109727123A (en) User's collage-credit data construction method, device and computer readable storage medium
CN109949001B (en) Construction engineering supervision organization management system
CN111260233A (en) Concrete industry wisdom ecosystem platform
CN108376328A (en) A kind of networking overload remediation total management system and method
CN105608523A (en) Enterprise information mobile data acquisition system
CN111160754A (en) Process arrangement engine system
CN109919453A (en) A kind of city grid management system
CN110992158A (en) Financial voucher management system
CN106845855A (en) A kind of system on paying taxes service integrated management
CN110728567B (en) Electronic invoice reimbursement management system and method
CN107203955A (en) A kind of poverty alleviation relocation project management system of changing places based on big data
CN112232651A (en) Wisdom coking plant management system
CN112990886B (en) Aviation industry data management display system based on mobile phone terminal
CN111080262A (en) Intelligent logistics platform management method
CN114186955A (en) Standardized management system for safety production
CN202583814U (en) Management kanban system
CN104915738A (en) Industrial and commercial intelligent comprehensive law enforcement system
CN111353685A (en) Safety supervision system
CN110827172A (en) Wisdom water affairs cloud service platform
CN107918819A (en) APS/MES Lean Manufacturing management systems
CN111582777A (en) Material purchasing and warehousing informatization management system
CN110472878A (en) A kind of multi-functional goods and materials total management system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210507