CN109930549A - A kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir - Google Patents

A kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir Download PDF

Info

Publication number
CN109930549A
CN109930549A CN201910022196.7A CN201910022196A CN109930549A CN 109930549 A CN109930549 A CN 109930549A CN 201910022196 A CN201910022196 A CN 201910022196A CN 109930549 A CN109930549 A CN 109930549A
Authority
CN
China
Prior art keywords
reservoir
water
level
engineering
zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910022196.7A
Other languages
Chinese (zh)
Inventor
吴献花
吕锡武
赵健霞
周婧
普理禄
彭廷纯
赵竟云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuxi Normal University
Original Assignee
Yuxi Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuxi Normal University filed Critical Yuxi Normal University
Priority to CN201910022196.7A priority Critical patent/CN109930549A/en
Publication of CN109930549A publication Critical patent/CN109930549A/en
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses a kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir, including water source pump-station and management engineering, reservoir desilting engineering, prevention and control of soil erosion engineering, falling zone intensified ecological engineering and ecology self-restraint woods construction project, water source pump-station and management engineering include the division of functional areas and the environmental renovation of Surrounding Settlements, prevention and control of soil erosion engineering includes fender pile, lower geotextile layer and upper geotextile layer, the beneficial effects of the invention are as follows, stack room and its surrounding enviroment are administered by water source pump-station and management engineering, reservoir bottom sludge is understood by reservoir desilting engineering reservoir desilting engineering, improve the self-cleaning ability of reservoir, pass through the soil erosion problem of prevention and control of soil erosion engineering and falling zone intensified ecological engineering control reservoir, improve the ecological environment on reservoir periphery by the construction that ecology conserves woods.

Description

A kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir
Technical field
The present invention relates to reservoir Treatment process fields, and in particular to a kind of damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir Restorative procedure.
Background technique
Reservoir, it is general be construed to " flood retention water storage and adjust water flow water conservancy structure, can use irrigate, It generates electricity, control flood and breeds fish." it refers to the artificial lake that barrage formation is built at the narrow orifice in gully or river.Reservoir is built up Afterwards, the effects of flood control, catchwork irrigation can be played, water supply, generate electricity, breed fish.Sometimes natural lake is also referred to as reservoir (natural storage).Water Library scale usually presses the division of storage capacity size, is divided into small-sized, medium-sized, large-scale etc..
In the Southwestern China area in Yunnan, Guizhou and Sichuan, because the feature in geographical location, reservoir are generally built in mountain peak Between, since environmental pollution and soil erosion etc. influence, the ecosystem on reservoir periphery is destroyed, the water-holding quantity of reservoir and water outlet Water quality is by serious influence.
Summary of the invention
To solve the above problems, the present invention provides a kind of damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir reparation sides Method, the present invention is achieved through the following technical solutions.
A kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir, including water source pump-station and management engineering, Reservoir desilting engineering, prevention and control of soil erosion engineering, falling zone intensified ecological engineering and ecology self-restraint woods construction project,
The water source pump-station and management engineering include the division of functional areas and the environmental renovation of Surrounding Settlements, the function The division in area is specially that reservoir and its neighboring area are divided into waters functional areas and land-based area functional areas, the waters function distinguishing For level-one waters protection zone and second level waters protection zone, the range of level-one waters protection zone be Each reservoir body elevation reserve-water-level with Under waters, second level waters protection zone is the small rivers of reservoir outskirt, land-based area protection divide into level-one land-based area protection zone, Second level land-based area protection zone and three-level land-based area protection zone, level-one land-based area protection zone are waters elevation reserve-water-level land-based area below and take Land-based area within the scope of the above 200m of normal water bit line of mouth of a river side, second level land-based area protect (level-one land-based area guarantor within position water neck range Protect area other than) watershed, three-level land-based area protection zone be second protection zone other than entire watershed, for rank difference Protection zone different water resource protection systems is set;
The prevention and control of soil erosion engineering installation in the abrupt slope position of reservoir, prevention and control of soil erosion engineering include fender pile, under Geotextile layer and upper geotextile layer, the fender pile are located at the bottom on abrupt slope, and the outside of fender pile is equipped with lower river levee spats, the lower soil Work layer of cloth is laid on the abrupt slope on lower river levee spats top, and water-permeable brick, water-permeable brick horizontal position are provided at the top of lower geotextile layer It is additionally provided with river levee spats on the inside of the abrupt slope set, the top of the upper river levee spats and water-permeable brick is equipped with top plate, top plate lower part Blotter is additionally provided between upper river levee spats and water-permeable brick, the upper geotextile layer is laid on the abrupt slope on river levee spats top On, ecological concrete is additionally provided at the top of upper geotextile layer and is beared down on one, and is densely covered with single layered porous in lower geotextile layer and upper geotextile layer Concrete stone ball;
The falling zone intensified ecological engineering is specially to plant shrub on reservoir gentle slope and the position that the soil is porous, in reservoir Herbaceous plant is planted in gentle slope and the close position of soil property;
The ecology self-restraint woods construction project is specially the top of the slope position plantation ecology self-restraint woods on abrupt slope.
Further, the fender pile, lower river levee spats, water-permeable brick, upper river levee spats, top plate and celluar concrete stone ball are equal For the prefabricated components of ecological concreting.
Further, the top of lower geotextile layer journey water level low with reservoir filling is concordant, the upper geotextile layer Top is concordant with reservoir filling elevation water level.
Further, the gradient of the lower geotextile layer is less than the gradient of upper geotextile layer.
Further, the shrub is false indigo, capitate rhododendron branchlet and leaf, thorny elaeagnus, the white flower cuckoo, rose of fragment mixed planting With photinia glabra etc..
Further, the herbaceous plant is one of Bermuda grass, non-irrigated thatch, cogongrass, window box oxalis or a variety of.
The invention has the advantages that administering stack room and its surrounding enviroment by water source pump-station and management engineering, pass through Reservoir desilting engineering reservoir desilting engineering understands reservoir bottom sludge, improves the self-cleaning ability of reservoir, passes through prevention and control of soil erosion The soil erosion problem of engineering and falling zone intensified ecological engineering control reservoir improves reservoir week by the construction that ecology conserves woods The ecological environment on side.
Detailed description of the invention
It, below will be to required use in specific embodiment description in order to illustrate more clearly of technical solution of the present invention Attached drawing be briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for this For the those of ordinary skill of field, without creative efforts, it can also be obtained according to these attached drawings others Attached drawing.
A kind of Fig. 1: flow diagram of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir of the present invention;
Fig. 2: the structural schematic diagram of prevention and control of soil erosion engineering of the present invention.
Appended drawing reference is as follows:
1, fender pile, 2, lower geotextile layer, 3, upper geotextile layer, 4, lower river levee spats, 5, water-permeable brick, 6, upper river levee spats, 7, top plate, 8, blotter, 9, ecological concrete bear down on one, 10, celluar concrete stone ball.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other Embodiment shall fall within the protection scope of the present invention.
As shown in Figs. 1-2, a kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir, including water source pump-station And management engineering, reservoir desilting engineering, prevention and control of soil erosion engineering, falling zone intensified ecological engineering and ecology self-restraint woods build work Journey,
Water source pump-station and management engineering include the division of functional areas and the environmental renovation of Surrounding Settlements, the division of functional areas Reservoir and its neighboring area are specially divided into waters functional areas and land-based area functional areas, waters function distinguishing is level-one waters guarantor Protect area and second level waters protection zone, the range of level-one waters protection zone is Each reservoir body elevation reserve-water-level waters below, two Grade waters protection zone is the small rivers of reservoir outskirt, and level-one land-based area protection zone, second level land-based area protection zone are divided into land-based area protection With three-level land-based area protection zone, level-one land-based area protection zone is waters elevation reserve-water-level land-based area below and intake side ordinary water level Land-based area within the scope of the above 200m of line, second level land-based area protect the charge for remittance within position water neck range (other than level-one land-based area protection zone) Region, three-level land-based area protection zone are the entire watershed other than second protection zone, not for the different protection zone setting of rank Same water resource protection system;
For prevention and control of soil erosion engineering installation in the abrupt slope position of reservoir, prevention and control of soil erosion engineering includes fender pile 1, lower geotechnique Layer of cloth 2 and upper geotextile layer 3, fender pile 1 are located at the bottom on abrupt slope, and the outside of fender pile 1 is equipped with lower river levee spats 4, lower geotextile layer 2 It is laid on the abrupt slope on lower 4 top of river levee spats, the top of lower geotextile layer 2 is provided with water-permeable brick 5,5 horizontal position of water-permeable brick Abrupt slope on the inside of be additionally provided with river levee spats 6, the top of upper river levee spats 6 and water-permeable brick 5 is equipped with top plate 7,7 lower part of top plate it is upper Blotter 8 is additionally provided between river levee spats 6 and water-permeable brick 5, upper geotextile layer 3 is laid on the abrupt slope on 6 top of river levee spats On, the top of upper geotextile layer 3 is additionally provided with ecological concrete and bears down on one 9, is densely covered with single layer in lower geotextile layer 2 and upper geotextile layer 3 Celluar concrete stone ball 10;
Falling zone intensified ecological engineering is specially to plant shrub on reservoir gentle slope and the position that the soil is porous, on reservoir gentle slope And herbaceous plant is planted in the close position of soil property;
Ecology self-restraint woods construction project is specially the top of the slope position plantation ecology self-restraint woods on abrupt slope.
Preferably, fender pile 1, lower river levee spats 4, water-permeable brick 5, upper river levee spats 4, top plate 7 and celluar concrete stone ball are equal For the prefabricated components of ecological concreting.
Preferably, the top of lower geotextile layer 2 journey water level low with reservoir filling is concordant, the top of upper geotextile layer 3 and water Reservoir filling elevation water level is concordant.
Preferably, the gradient of lower geotextile layer 2 is less than the gradient of upper geotextile layer 3.
Preferably, shrub is false indigo, capitate rhododendron branchlet and leaf, thorny elaeagnus, white flower cuckoo, rose and the red autumnal leaves of fragment mixed planting Chinese photinia etc..
Preferably, herbaceous plant is one of Bermuda grass, non-irrigated thatch, cogongrass, window box oxalis or a variety of.
The specific embodiment of the present invention is as follows
Stack room and its surrounding enviroment are administered by water source pump-station and management engineering, pass through reservoir desilting engineering reservoir desilting Engineering understands reservoir bottom sludge, improves the self-cleaning ability of reservoir, passes through prevention and control of soil erosion engineering and falling zone intensified ecological The soil erosion problem of engineering control reservoir improves the ecological environment on reservoir periphery by the construction that ecology conserves woods.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment All details are described, also do not limit the specific embodiment that the invention is only.Obviously, according to the content of this specification, can make Many modifications and variations.These embodiments are chosen and specifically described to this specification, is original in order to better explain the present invention Reason and practical application, so that skilled artisan be enable to better understand and utilize the present invention.The present invention is only authorized The limitation of sharp claim and its full scope and equivalent.

Claims (6)

1. a kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir, it is characterised in that: including water source pump-station and Management engineering, reservoir desilting engineering, prevention and control of soil erosion engineering, falling zone intensified ecological engineering and ecology self-restraint woods build work Journey,
The water source pump-station and management engineering include the division of functional areas and the environmental renovation of Surrounding Settlements, the functional areas Dividing is specially that reservoir and its neighboring area are divided into waters functional areas and land-based area functional areas, and the waters function distinguishing is one Grade waters protection zone and second level waters protection zone, the range of level-one waters protection zone are that Each reservoir body elevation reserve-water-level is below Waters, second level waters protection zone are the small rivers of reservoir outskirt, and level-one land-based area protection zone, second level are divided into the land-based area protection Land-based area protection zone and three-level land-based area protection zone, level-one land-based area protection zone are waters elevation reserve-water-level land-based area below and intake Land-based area within the scope of the above 200m of normal water bit line of side, second level land-based area protect (level-one land-based area protection zone within position water neck range Watershed in addition), three-level land-based area protection zone is the entire watershed other than second protection zone, for the different guarantor of rank Different water resource protection systems is arranged in shield area;
For the prevention and control of soil erosion engineering installation in the abrupt slope position of reservoir, prevention and control of soil erosion engineering includes fender pile, lower geotechnique Layer of cloth and upper geotextile layer, the fender pile are located at the bottom on abrupt slope, and the outside of fender pile is equipped with lower river levee spats, the lower geotextiles Layer is laid on the abrupt slope on lower river levee spats top, and water-permeable brick is provided at the top of lower geotextile layer, water-permeable brick horizontal position It is additionally provided with river levee spats on the inside of abrupt slope, the top of the upper river levee spats and water-permeable brick is equipped with top plate, the upper river of top plate lower part Blotter is additionally provided between dike spats and water-permeable brick, the upper geotextile layer is laid on the abrupt slope on river levee spats top, Ecological concrete is additionally provided at the top of upper geotextile layer to bear down on one, and is densely covered with single layered porous coagulation in lower geotextile layer and upper geotextile layer Native stone ball;
The falling zone intensified ecological engineering is specially to plant shrub on reservoir gentle slope and the position that the soil is porous, on reservoir gentle slope And herbaceous plant is planted in the close position of soil property;
The ecology self-restraint woods construction project is specially the top of the slope position plantation ecology self-restraint woods on abrupt slope.
2. a kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir according to claim 1, feature exist In: the fender pile, lower river levee spats, water-permeable brick, upper river levee spats, top plate and celluar concrete stone ball are that eco-concrete pours The prefabricated components built.
3. a kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir according to claim 1, feature exist In: the top of lower geotextile layer journey water level low with reservoir filling is concordant, the top of the upper geotextile layer and reservoir filling Elevation water level is concordant.
4. a kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir according to claim 1, feature exist In: the gradient of the lower geotextile layer is less than the gradient of upper geotextile layer.
5. a kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir according to claim 1, feature exist In: the shrub is false indigo, capitate rhododendron branchlet and leaf, thorny elaeagnus, white flower cuckoo, rose and the photinia glabra etc. of fragment mixed planting.
6. a kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir according to claim 1, feature exist In: the herbaceous plant be one of Bermuda grass, non-irrigated thatch, cogongrass, window box oxalis or a variety of.
CN201910022196.7A 2019-01-10 2019-01-10 A kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir Pending CN109930549A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910022196.7A CN109930549A (en) 2019-01-10 2019-01-10 A kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910022196.7A CN109930549A (en) 2019-01-10 2019-01-10 A kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir

Publications (1)

Publication Number Publication Date
CN109930549A true CN109930549A (en) 2019-06-25

Family

ID=66984974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910022196.7A Pending CN109930549A (en) 2019-01-10 2019-01-10 A kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir

Country Status (1)

Country Link
CN (1) CN109930549A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112012159A (en) * 2020-08-14 2020-12-01 湖南水利水电职业技术学院 Reservoir water source area protection and ecological compensation method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839633A (en) * 2012-09-24 2012-12-26 金丹越 Slope-type ecological embankment

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102839633A (en) * 2012-09-24 2012-12-26 金丹越 Slope-type ecological embankment

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李树平: "《城市水系统》", 30 October 2015 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112012159A (en) * 2020-08-14 2020-12-01 湖南水利水电职业技术学院 Reservoir water source area protection and ecological compensation method

Similar Documents

Publication Publication Date Title
CN103803760B (en) Wet land purification system with serially-connected rice field drainage ditches in irrigated area
CN103314763B (en) Micro-reformation and vegetation restoration method for degraded plateau and lake wetlands
CN103086570B (en) Farmland non-point pollution stepped undercurrent dam ecological purification ditch system
CN105297671A (en) Ecological comprehensive treatment system of northern mountain river channel and construction method thereof
CN102874972A (en) Pre-reservoir series system of purification for non-point source pollution in hilly and mountainous area agriculture
CN216074968U (en) River course river system view combined type ecological revetment structure
CN103061311B (en) Beautifying and ecological restoration device and method of urban river hard revetment
CN105220731A (en) A kind of novel hillside rain water collecting system and mountain torrents, debris flow method
CN106320253A (en) Multi-pond ecological water compensation system construction method
CN101337742A (en) In-one-pond system together with water quality purification and agricultural industry function
CN102612883B (en) Saline discharge and alkali reduction concealed conduit device for saline-alkali soil
CN114382046B (en) Ecological-rock-soil cooperative structure for preventing and treating debris flow disasters
CN105804033B (en) Integral type W type agricultural ecological water-break irrigation canals and ditches
CN109912040A (en) The ecology pond systems of preventing and controlling agricultural area source pollution
CN207277518U (en) The staged greenery patches that a kind of rainwater on-site elimination utilizes
CN109930549A (en) A kind of restoration method for damaged ecosystem in steep-slope area in water-level-fluctuating zone of reservoir
CN209873714U (en) River bank protection structure for urban mountain area
CN209473216U (en) A kind of saline land greening system
CN213952092U (en) Cascaded soil and water conservation ecological slope protection structure
CN110106828A (en) A kind of ecological permeable dam suitable for small watershed in mountain river water quality strengthened purification
CN206245320U (en) A kind of rare earth slash protecting slope ecology system
CN206457321U (en) A kind of novel artificial Rain-fed wetland
CN206070498U (en) A kind of farmland submerged plant ecological canal for processing early-stage rainwater
CN108487418A (en) A kind of water and soil conservation structure of prevention soil erosion for loess region
CN108166448A (en) Administer the shore protection of riverbank pollution of area source

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190625

RJ01 Rejection of invention patent application after publication