CN109927734A - A kind of subway station for exempting from safety check, ticket system transfer with inter-city passenger rail station - Google Patents

A kind of subway station for exempting from safety check, ticket system transfer with inter-city passenger rail station Download PDF

Info

Publication number
CN109927734A
CN109927734A CN201910252025.3A CN201910252025A CN109927734A CN 109927734 A CN109927734 A CN 109927734A CN 201910252025 A CN201910252025 A CN 201910252025A CN 109927734 A CN109927734 A CN 109927734A
Authority
CN
China
Prior art keywords
subway
station
inter
city passenger
passenger rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910252025.3A
Other languages
Chinese (zh)
Inventor
张帅
张扬
何杰
贠毓
王明文
周海春
尚挺
王攀攀
徐荣华
李康
王晓欣
张艳
王冠龙
刘少朋
李强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201910252025.3A priority Critical patent/CN109927734A/en
Publication of CN109927734A publication Critical patent/CN109927734A/en
Pending legal-status Critical Current

Links

Landscapes

  • Devices For Checking Fares Or Tickets At Control Points (AREA)

Abstract

The invention discloses a kind of subway stations for exempting from safety check, ticket system transfer with inter-city passenger rail station, and subway station includes subway station main body (9);Subway station main body (9) includes subway paid area (16) and subway non-payment area (17);Subway station further includes connecting subway paid area and inter-city passenger rail to go out the transferring passage (10) of subway concourse, connect subway paid area and enter the station the transferring passage (12) in the Room under inter-city passenger rail into system;The outbound passenger of inter-city passenger rail can exempt from safety check by the transferring passage that connection subway paid area and inter-city passenger rail go out subway concourse and enter subway paid area;The outbound passenger of subway can be by exempting from safety check into the intercity Room of entering the station into the enter the station transferring passage in the Room of system under connection subway paid area and inter-city passenger rail.The pipelineization circulation of subway and inter-city passenger rail is realized by exclusive transferring passage, exempts from safety check and the transfer of a ticket system in long term, not only shortens transfer distance, but also remove duplicate security process from, the interchange efficiency between subway and inter-city passenger rail is substantially improved.

Description

A kind of subway station for exempting from safety check, ticket system transfer with inter-city passenger rail station
Technical field
The invention belongs to the comprehensive transportation hub field of structural design of subway and inter-city passenger rail, and in particular to it is a kind of with it is intercity Railway station building exempts from the subway station of safety check, ticket system transfer.
Background technique
Current medium-and-large-sized railway station building be all made of it is overhead wait, the distribution form that platform is ridden and ground is outbound, passenger flow The characteristics of upper entering and lower leaving is presented in circulation arrargement.Railway station building and matched subway station be provided in changing to it is respective into Outbound safe examination system, there are duplicate safety check processes, while realizing between subway and the inter-city passenger rail of public transport operation without long term Pipelineization recycles the transformation condition of transfer, integrated operation.
With being gradually increased for urban traffic pressure, accounting of the public transport in entire traffic is increasingly improved, existing Transfer mode in railway terminal between subway and railway can not adapt to passenger's exchange and multiply the demand that convenience increasingly increases.
Summary of the invention
For at least one of prior art the above defects or improvement requirements, the present invention provides a kind of and inter-city passenger rails Station exempt from safety check, a ticket system transfer subway station, by the outbound layer of railway station building add it is a set of under into system, can effectively contract The short distance for taking public transport interchange railway, improves interchange efficiency.Subway paid area and station are connected by transferring passage simultaneously The intercity of the outbound layer in room goes out subway concourse and to enter the station the Room, can with realize subway and inter-city passenger rail exempt from safety check, a ticket system is changed to, raising is changed Multiply efficiency.
To achieve the above object, according to one aspect of the present invention, it provides a kind of and inter-city passenger rail station and exempts from safety check, one The subway station of ticket system transfer, in which:
Subway station includes subway station main body;The subway station main body includes subway paid area and subway non-payment Area;
Subway station further includes that connection subway paid area with inter-city passenger rail goes out the transferring passage of subway concourse, connect subway paid area It enters the station the transferring passage in the Room under inter-city passenger rail into system;
The outbound passenger of inter-city passenger rail can exempt from safety check by the transferring passage that connection subway paid area and inter-city passenger rail go out subway concourse Into subway paid area;The outbound passenger of subway can be by entering the station the transfer in the Room under connection subway paid area and inter-city passenger rail into system Exempt from safety check into the intercity Room of entering the station in channel.
Preferably, the connection subway paid area and inter-city passenger rail go out setting subway in the transferring passage of subway concourse and enter the station lock Machine, subway and inter-city passenger rail unify after ticket system to cancel the subway and enter the station gate;
The outbound lock of subway is set in the transferring passage for connecting the Room of entering the station under subway paid area and inter-city passenger rail into system Machine.
Preferably, subway station further includes the transferring passage for connecting subway paid area and going out subway concourse with high-speed rail;The outbound trip of high-speed rail Visitor can exempt from safety check by the transferring passage that connection subway paid area and high-speed rail go out subway concourse and enter subway paid area.
Preferably, the both lateral sides of the subway station main body be equipped with it is intercity go out subway concourse and high-speed rail go out subway concourse, describedly The both lateral sides of iron car station owner's body are respectively provided with a connection subway paid area and with inter-city passenger rail go out the transferring passage of subway concourse, connect ground Iron paid area and high-speed rail go out the transferring passage of subway concourse.
Preferably, the connection subway paid area Yu inter-city passenger rail of lateral the same side of the subway station main body go out subway concourse The transferring passage that transferring passage, connection subway paid area and high-speed rail go out subway concourse locally shares a underpass, in overlooking state Under it is T-shaped.
Preferably, it is described connection subway paid area under inter-city passenger rail into system enter the station the Room transferring passage with connect subway The transferring passage, connection subway paid area and high-speed rail that paid area and inter-city passenger rail go out subway concourse go out part between the transferring passage of subway concourse Shared underpass is spatially staggered, is cross-shaped under overlooking state.
Preferably, the two connection subway paid areas Yu inter-city passenger rail of the both lateral sides of the subway station main body go out subway concourse Transferring passage, connection subway paid area and high-speed rail go out between the transferring passage of subway concourse locally shared underpass, in subway Offset one from another setting on the longitudinal direction of station main body.
Preferably, subway station further includes side station i.e. Transfer Hall, and connection subway non-payment area and side station are changed to The transferring passage in hall;Passenger can by connection subway non-payment area and side station, that is, Transfer Hall transferring passage in high-speed rail and It is quickly changed between subway.
Preferably, totally four sides are set in longitudinal both ends of the subway station main body, both lateral sides bi-directional symmetrical Station, that is, Transfer Hall.
Preferably, totally four companies are set in longitudinal both ends of the subway station main body, both lateral sides bi-directional symmetrical It is grounded iron non-payment area and side station, that is, Transfer Hall transferring passage, thus smooth docking each other in transverse direction.
Above-mentioned preferred feature can be combined with each other as long as they do not conflict with each other.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, have below beneficial to effect Fruit:
1, the subway station of the invention for exempting from safety check, ticket system transfer with inter-city passenger rail station, in the paid area of subway station Be arranged with the outbound layer of railway station building it is intercity go out the transferring passage that is connected of subway concourse and the Room of entering the station, be respectively set in channel subway into It stands gate and outbound gate, and then that realizes subway and inter-city passenger rail exempts from safety check transfer, while subway at a specified future date and inter-city passenger rail system After one ticket system, cancels the subway in transferring passage into and out of station gate, realize the integrated operation of subway and inter-city passenger rail.
2, the subway station of the invention for exempting from safety check, ticket system transfer with inter-city passenger rail station, meets public transport peace The demand for examining mutual trust and inter-city passenger rail public transport operation realizes that the pipeline of subway and inter-city passenger rail follows by exclusive transferring passage Ring exempts from safety check and the transfer of a ticket system in long term, not only shortens transfer distance, but also remove duplicate security process from, is substantially improved ground Interchange efficiency between iron and inter-city passenger rail.
3, the subway station of the invention for exempting from safety check, ticket system transfer with inter-city passenger rail station, has apparent technology first Into property, significant economy and very strong practicability can be designed in the synthesis railway traffic hinge containing subway and inter-city passenger rail In promoted, used for reference and applied.
Detailed description of the invention
Fig. 1 is the schematic diagram of the railway station building overhead waiting hall of ground third layer;
Fig. 2 is the schematic diagram of the railway station building station layer of the ground second layer;
Fig. 3 be ground floor railway station building go out subway concourse and it is of the invention exempt from safety check with inter-city passenger rail station, a ticket system is changed The Metro Station Structure schematic diagram multiplied;
Fig. 4 is that the of the invention and inter-city passenger rail station of underground first layer exempts from the subway station of safety check, ticket system transfer The schematic diagram of station hall layer;
Fig. 5 is that the of the invention and inter-city passenger rail station of subbasement exempts from the subway station of safety check, ticket system transfer The schematic diagram of station layer.
Description of symbols: overhead waiting hall 1, elevated ramp 2, inter-city passenger rail platform 3, high-speed rail platform 4, intercity subway concourse out 5, high-speed rail goes out subway concourse 6, enters the station the Room 7 under inter-city passenger rail into system, side station, that is, Transfer Hall 8, subway station main body 9, connection ground Iron paid area and inter-city passenger rail go out the transferring passage 10 of subway concourse, and connection subway paid area and high-speed rail go out the transferring passage 11 of subway concourse, It enters the station the transferring passage 12 in the Room under connection subway paid area and inter-city passenger rail into system, connecting subway non-payment area with side station is The transferring passage 13 of Transfer Hall, subway public area staircase group 14, subway public area elevator and T-type stair 15, subway paid area 16, subway non-payment area 17, subway battery limits 18.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.As long as in addition, technical characteristic involved in the various embodiments of the present invention described below Not constituting a conflict with each other can be combined with each other.The present invention is described in more detail With reference to embodiment.
It is as shown in Figure 1 the railway station building overhead waiting hall 1 of ground third layer, two sides are equipped with elevated ramp 2.Such as Fig. 2 institute It is shown as the railway station building station layer of the ground second layer, including inter-city passenger rail platform 3, high-speed rail platform 4 and side station, that is, Transfer Hall 8。
The railway station building for being illustrated in figure 3 ground floor goes out subway concourse and of the invention exempts from safety check, one with inter-city passenger rail station The subway bassinet structure of ticket system transfer, diagram have it is intercity go out subway concourse 5, high-speed rail goes out subway concourse 6, enter the station the Room 7 under inter-city passenger rail into system, side Station, that is, Transfer Hall 8, subway station main body 9.
Subway station includes subway station main body 9;The subway station main body 9 includes subway paid area 16 and non-pair of subway Take area 17;Subway station further includes that connection subway paid area and inter-city passenger rail go out the transferring passage 10 of subway concourse, connect subway and pay It enters the station the transferring passage 12 in the Room under area and inter-city passenger rail into system;The outbound passenger of inter-city passenger rail can by connection subway paid area with The transferring passage 10 that inter-city passenger rail goes out subway concourse exempts from safety check and enters subway paid area 16;The outbound passenger of subway can be paid by connection subway Exempt from safety check into the intercity Room of entering the station into the enter the station transferring passage 12 in the Room of system under expense area and inter-city passenger rail.The connection subway payment Area and inter-city passenger rail go out setting subway in the transferring passage 10 of subway concourse and enter the station gate, and subway is cancelled after unifying ticket system with inter-city passenger rail The subway enters the station gate;It is configured in the connection subway paid area and the transferring passage 12 for entering the station the Room into system under inter-city passenger rail The outbound gate of iron.The of the invention subway station for exempting from safety check, ticket system transfer with inter-city passenger rail station, in the paid area of subway station Be arranged with the outbound layer of railway station building it is intercity go out the transferring passage that is connected of subway concourse and the Room of entering the station, be respectively set in channel subway into It stands gate and outbound gate, and then that realizes subway and inter-city passenger rail exempts from safety check transfer, while subway at a specified future date and inter-city passenger rail system After one ticket system, cancels the subway in transferring passage into and out of station gate, realize the integrated operation of subway and inter-city passenger rail.
As shown in Figure 3-4, subway station further includes the transferring passage 11 for connecting subway paid area and going out subway concourse with high-speed rail;High-speed rail Outbound passenger can exempt from safety check by the transferring passage 11 that connection subway paid area and high-speed rail go out subway concourse and enter subway paid area 16.
As shown in Figure 3-4, the both lateral sides of the subway station main body 9 be equipped with it is intercity go out subway concourse 5 and high-speed rail go out subway concourse 6, the both lateral sides of the subway station main body 9 are respectively provided with the transfer that a connection subway paid area goes out subway concourse with inter-city passenger rail and lead to Road 10, connection subway paid area and high-speed rail go out the transferring passage 11 of subway concourse.Preferably, the subway station main body 9 is laterally same The connection subway paid area of side and inter-city passenger rail go out the transferring passage 10 of subway concourse, connect subway paid area and high-speed rail goes out subway concourse 11 part of transferring passage shares a underpass, T-shaped under overlooking state.Preferably, the connection subway paid area with Under inter-city passenger rail into system enter the station the Room transferring passage 12 with connect subway paid area and inter-city passenger rail goes out the transferring passage of subway concourse 10, it connects subway paid area and high-speed rail goes out underpass locally shared between the transferring passage 11 of subway concourse, be spatially staggered, It is cross-shaped under overlooking state.Preferably, two connection subway paid areas of the both lateral sides of the subway station main body 9 with The transferring passage 10, connection subway paid area and high-speed rail that inter-city passenger rail goes out subway concourse, which go out between the transferring passage 11 of subway concourse, locally to be shared Underpass, offset one from another setting on the longitudinal direction of subway station main body 9.
As in Figure 2-4, subway station further includes side station i.e. Transfer Hall 8, connection subway non-payment area and side station That is the transferring passage 13 of Transfer Hall;Passenger can pass through connection subway non-payment area and side station, that is, Transfer Hall transferring passage 13 quickly change between high-speed rail and subway.Preferably, two-way in longitudinal both ends of the subway station main body 9, both lateral sides It is symmetrical arranged totally four side station, that is, Transfer Halls 8.Preferably, longitudinal both ends in the subway station main body 9, transverse direction Totally four connection subway non-payment areas and side station, that is, Transfer Hall transferring passage 13 is arranged in two sides bi-directional symmetrical, thus Smooth docking each other in transverse direction.
The of the invention and inter-city passenger rail station for being illustrated in figure 5 subbasement exempts from the subway of safety check, ticket system transfer The station layer at station shows subway public area staircase group 14, subway public area elevator and T-type stair 15 and subway equipment in figure Area 18, the passenger of subway station body layer by subway public area staircase group 14, subway public area elevator and T-type stair 15 can on The of the invention and inter-city passenger rail station of underground first layer into Fig. 4 exempts from the subway concourse of the subway station of safety check, ticket system transfer Layer.
The subway station for exempting from safety check, ticket system transfer with inter-city passenger rail station of the invention, meets public transport safety check The demand of mutual trust and inter-city passenger rail public transport operation realizes that the pipeline of subway and inter-city passenger rail follows by exclusive transferring passage Ring exempts from safety check and the transfer of a ticket system in long term, not only shortens transfer distance, but also remove duplicate security process from, is substantially improved ground Interchange efficiency between iron and inter-city passenger rail.
The subway station for exempting from safety check, ticket system transfer with inter-city passenger rail station of the invention has apparent technologically advanced Property, significant economy and very strong practicability can be in the designs of the synthesis railway traffic hinge containing subway and inter-city passenger rail It promoted, used for reference and is applied.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, not to The limitation present invention, any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should all include Within protection scope of the present invention.

Claims (10)

1. a kind of subway station for exempting from safety check, ticket system transfer with inter-city passenger rail station, it is characterised in that:
Subway station includes subway station main body (9);The subway station main body (9) includes that subway paid area (16) and subway are non- Paid area (17);
Subway station further includes that connection subway paid area with inter-city passenger rail goes out the transferring passage (10) of subway concourse, connect subway paid area It enters the station the transferring passage (12) in the Room under inter-city passenger rail into system;
The outbound passenger of inter-city passenger rail can exempt from safety check by the transferring passage (10) that connection subway paid area and inter-city passenger rail go out subway concourse Into subway paid area (16);The outbound passenger of subway can be by entering the station the Room under connection subway paid area and inter-city passenger rail into system Transferring passage (12) exempts from safety check into the intercity Room of entering the station.
2. exempting from the subway station of safety check, ticket system transfer with inter-city passenger rail station as described in claim 1, it is characterised in that:
The connection subway paid area and inter-city passenger rail go out setting subway in the transferring passage (10) of subway concourse and enter the station gate, subway with Inter-city passenger rail unifies after ticket system to cancel the subway and enters the station gate;
The outbound lock of subway is set in the connection subway paid area and the transferring passage (12) in the Room of entering the station under inter-city passenger rail into system Machine, subway and inter-city passenger rail cancel the outbound gate of the subway after unifying ticket system.
3. exempting from the subway station of safety check, ticket system transfer with inter-city passenger rail station as described in claim 1, it is characterised in that:
Subway station further includes the transferring passage (11) for connecting subway paid area and going out subway concourse with high-speed rail;The outbound passenger of high-speed rail can pass through The transferring passage (11) that connection subway paid area and high-speed rail go out subway concourse exempts from safety check and enters subway paid area (16).
4. exempting from the subway station of safety check, ticket system transfer with inter-city passenger rail station as claimed in claim 3, it is characterised in that:
The both lateral sides of the subway station main body (9) are equipped with intercity subway concourse (5) and high-speed rail out and go out subway concourse (6), the subway The both lateral sides of station main body (9) are respectively provided with a connection subway paid area and inter-city passenger rail go out subway concourse transferring passage (10), Connection subway paid area and high-speed rail go out the transferring passage (11) of subway concourse.
5. exempting from the subway station of safety check, ticket system transfer with inter-city passenger rail station as claimed in claim 4, it is characterised in that:
The connection subway paid area and inter-city passenger rail of lateral the same side of the subway station main body (9) go out the transferring passage of subway concourse (10), the transferring passage (11) that connection subway paid area and high-speed rail go out subway concourse locally shares a underpass, in overlooking state Under it is T-shaped.
6. exempting from the subway station of safety check, ticket system transfer with inter-city passenger rail station as claimed in claim 5, it is characterised in that:
It is described connection subway paid area under inter-city passenger rail into system enter the station the Room transferring passage (12) with connect subway paid area Go out the transferring passage (10) of subway concourse with inter-city passenger rail, connect subway paid area and high-speed rail goes out office between the transferring passage (11) of subway concourse The shared underpass in portion, is spatially staggered, is cross-shaped under overlooking state.
7. exempting from the subway station of safety check, ticket system transfer with inter-city passenger rail station as claimed in claim 5, it is characterised in that:
The transfer that the two connection subway paid areas and inter-city passenger rail of the both lateral sides of the subway station main body (9) go out subway concourse is logical Road (10), connection subway paid area and high-speed rail go out underpass locally shared between the transferring passage (11) of subway concourse, in subway Offset one from another setting on the longitudinal direction of station main body (9).
8. exempting from the subway station of safety check, ticket system transfer with inter-city passenger rail station as described in claim 1, it is characterised in that:
Subway station further includes side station i.e. Transfer Hall (8), and connection subway non-payment area is changed with side station, that is, Transfer Hall Multiply channel (13);Passenger can by connection subway non-payment area and side station, that is, Transfer Hall transferring passage (13) in high-speed rail and It is quickly changed between subway.
9. exempting from the subway station of safety check, ticket system transfer with inter-city passenger rail station as claimed in claim 8, it is characterised in that:
Totally four side stations are arranged in longitudinal both ends of the subway station main body (9), both lateral sides bi-directional symmetrical to change Multiply hall (8).
10. exempting from the subway station of safety check, ticket system transfer with inter-city passenger rail station as claimed in claim 9, it is characterised in that:
It is non-that totally four connection subways are set in longitudinal both ends of the subway station main body (9), both lateral sides bi-directional symmetrical Paid area and side station, that is, Transfer Hall transferring passage (13), thus smooth docking each other in transverse direction.
CN201910252025.3A 2019-03-29 2019-03-29 A kind of subway station for exempting from safety check, ticket system transfer with inter-city passenger rail station Pending CN109927734A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910252025.3A CN109927734A (en) 2019-03-29 2019-03-29 A kind of subway station for exempting from safety check, ticket system transfer with inter-city passenger rail station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910252025.3A CN109927734A (en) 2019-03-29 2019-03-29 A kind of subway station for exempting from safety check, ticket system transfer with inter-city passenger rail station

Publications (1)

Publication Number Publication Date
CN109927734A true CN109927734A (en) 2019-06-25

Family

ID=66988811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910252025.3A Pending CN109927734A (en) 2019-03-29 2019-03-29 A kind of subway station for exempting from safety check, ticket system transfer with inter-city passenger rail station

Country Status (1)

Country Link
CN (1) CN109927734A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110758405A (en) * 2019-11-15 2020-02-07 中铁武汉勘察设计研究院有限公司 Transfer island system applied to station
CN115131883A (en) * 2022-06-29 2022-09-30 中铁第四勘察设计院集团有限公司 Mutual trust passing method for security check of state railway and subway
CN115393994A (en) * 2022-08-25 2022-11-25 中铁第四勘察设计院集团有限公司 Rapid security inspection passing system for transfer in non-payment area of rail transit
CN116092203A (en) * 2022-08-19 2023-05-09 荣耀终端有限公司 Travel method, device and storage medium based on riding card

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090117159A (en) * 2008-05-08 2009-11-12 한국철도기술연구원 Urban railway honey comb transit structure of station
CN101870294A (en) * 2010-06-28 2010-10-27 田耕 Banded transportation junction formed by paralleling parallel elevated road stations and elevated railway stations
CN201951455U (en) * 2010-08-26 2011-08-31 中铁二院工程集团有限责任公司 Same platform transfer station of inter-city passenger line and urban railway line
CN103661405A (en) * 2013-12-18 2014-03-26 中建一局集团第五建筑有限公司 Underground full-node transfer station for urban rail transit
WO2015118186A2 (en) * 2015-04-16 2015-08-13 Metrolab Mixed transport network station, automatic freight handling system and associated mixed transport network
CN106741016A (en) * 2016-12-19 2017-05-31 同济大学 Passenger transfer system and its method to set up in railway passenger station station
CN107059521A (en) * 2017-03-10 2017-08-18 西南交通大学 A kind of three-dimensional overlapping type transport hub construction in four layers of underground
CN107798645A (en) * 2016-08-31 2018-03-13 中铁第四勘察设计院集团有限公司 For setting the track traffic ticket processing system and method for city check-in system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090117159A (en) * 2008-05-08 2009-11-12 한국철도기술연구원 Urban railway honey comb transit structure of station
CN101870294A (en) * 2010-06-28 2010-10-27 田耕 Banded transportation junction formed by paralleling parallel elevated road stations and elevated railway stations
CN201951455U (en) * 2010-08-26 2011-08-31 中铁二院工程集团有限责任公司 Same platform transfer station of inter-city passenger line and urban railway line
CN103661405A (en) * 2013-12-18 2014-03-26 中建一局集团第五建筑有限公司 Underground full-node transfer station for urban rail transit
WO2015118186A2 (en) * 2015-04-16 2015-08-13 Metrolab Mixed transport network station, automatic freight handling system and associated mixed transport network
CN107798645A (en) * 2016-08-31 2018-03-13 中铁第四勘察设计院集团有限公司 For setting the track traffic ticket processing system and method for city check-in system
CN106741016A (en) * 2016-12-19 2017-05-31 同济大学 Passenger transfer system and its method to set up in railway passenger station station
CN107059521A (en) * 2017-03-10 2017-08-18 西南交通大学 A kind of three-dimensional overlapping type transport hub construction in four layers of underground

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110758405A (en) * 2019-11-15 2020-02-07 中铁武汉勘察设计研究院有限公司 Transfer island system applied to station
CN115131883A (en) * 2022-06-29 2022-09-30 中铁第四勘察设计院集团有限公司 Mutual trust passing method for security check of state railway and subway
CN115131883B (en) * 2022-06-29 2023-11-28 中铁第四勘察设计院集团有限公司 National railway and subway security check mutual trust passing method
CN116092203A (en) * 2022-08-19 2023-05-09 荣耀终端有限公司 Travel method, device and storage medium based on riding card
CN116092203B (en) * 2022-08-19 2023-10-20 荣耀终端有限公司 Travel method, device and storage medium based on riding card
CN115393994A (en) * 2022-08-25 2022-11-25 中铁第四勘察设计院集团有限公司 Rapid security inspection passing system for transfer in non-payment area of rail transit
CN115393994B (en) * 2022-08-25 2023-12-19 中铁第四勘察设计院集团有限公司 Rapid security inspection passing system for transfer in non-pay area of rail transit

Similar Documents

Publication Publication Date Title
CN109927734A (en) A kind of subway station for exempting from safety check, ticket system transfer with inter-city passenger rail station
CN109519001B (en) Urban comprehensive passenger transport hub combined security inspection system
CN116884099A (en) Automatic ticket vending and checking system
CN106004886A (en) Track traffic track connection station wire distribution system and operation method thereof
CN106585643A (en) Mobile railway station, matched rail network and combination system of the two
CN106741016A (en) Passenger transfer system and its method to set up in railway passenger station station
CN108609022B (en) Intermodal system and method of use thereof
CN102582630A (en) Urban viaduct type light rail public transportation system
DE10225967C1 (en) Multifunctional line for conveying people, materials, information, energy and vehicles has lines with modified magnetic strips for single units, and two track strips running on the lines formed below the lines
CN208630594U (en) A kind of intelligence rail station platform space structure
CN216139978U (en) National railway and subway transfer station
JP6433735B2 (en) 2-story rapid bus transportation system
Mohamad Rail Transportation in Kuala Lumpur
CN107139937B (en) A kind of subway system is used as the method and system at vacuum pipe traffic branch line and station
CN212654542U (en) Multi-traffic mode layered orthogonal airport transfer station
CN1424213A (en) Characteristic communications and transportation method and tools
JP2018083624A (en) Railway vehicle
Ambrożuk-Wesołowska Will the Rail Regulation (EU) 2021/782 Improve Passengers’ Legal Position?
CN211417244U (en) Station arrangement structure for mixed carriage train
CN105755917B (en) Two layers of people's car mutual of one kind and separation Public Transport Junction system
JP2002173021A (en) Rolling stock and transport system using it
CN109398369A (en) A kind of tramcar station and subway change to structure
CN212125099U (en) Two-four-line quick transfer structure for railway and urban rail transit
Hofman et al. ComplexTrans–global land transportation system The best way ahead for railways and roads is coherent cooperation, not the competition
JP3209963U (en) Railway vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190625