CN109853970B CN201910248522.6A CN201910248522A CN109853970B CN 109853970 B CN109853970 B CN 109853970B CN 201910248522 A CN201910248522 A CN 201910248522A CN 109853970 B CN109853970 B CN 109853970B
Authority
CN
China
Prior art keywords
connecting hole
piping
construction
unit
construction stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910248522.6A
Other languages
Chinese (zh)
Other versions
CN109853970A (en
Inventor
哈小平
孙钦浩
季华卫
贾红卫
彭莹
邓波
王雪健
张继龙
刘益安
邵娜
栗祥
常红宾
吴明谋
张波强
孟庆云
车佳秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201910248522.6A priority Critical patent/CN109853970B/en
Publication of CN109853970A publication Critical patent/CN109853970A/en
Application granted granted Critical
Publication of CN109853970B publication Critical patent/CN109853970B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Installation Of Indoor Wiring (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention relates to the field of buildings, in particular to building piping installation equipment, which comprises: the connecting unit is provided with a channel, and two ends of the channel are respectively provided with a first connecting hole and a second connecting hole; the first connecting hole is connected with a piping at a first construction stage, and the second connecting hole is connected with a piping at a second construction stage; and the sealing unit is arranged at the position of the second connecting hole and is used for sealing the second connecting hole in the first construction stage. The invention changes the technical situation that the traditional vertical piping is reserved to the outer surface of the floor slab, omits piping bending work flow, is convenient to construct, and solves the problem that the vertical line pipe cannot be well fixed; the problems that the length of the vertical section piping is considered when the vertical section piping is reserved and embedded are solved, the trouble of post treatment and the like due to poor control of the length of the piping is avoided, and the problem that the vertical piping falls into sundries such as concrete is effectively prevented; the problem that the vertical piping is easy to damage and break is solved, and the cost is saved.

Description

Building piping installation equipment and use method
Technical Field
The invention relates to the field of buildings, in particular to building piping installation equipment and a using method thereof.
Background
The traditional reserved pre-buried electric vertical piping is to reserve a pipeline to the outer surface of a floor slab, and a plastic cover is used for plugging a line pipe after concrete is poured so as to prevent impurities from falling into the pipeline to influence the later dredging threading; meanwhile, in order to prevent the line pipe from being broken and damaged, a mode is to screw a wooden box above the line box for protection, and another mode is to cover the line pipe by using a PVC sleeve, and concrete mortar is poured in the PVC to temporarily protect the line pipe. However, the existing construction and installation mode has more defects, affects the installation quality and efficiency of the later-stage piping, is complex in operation and is unfavorable for the related work of site construction safety, and the defects are as follows: 1. the wire pipe needs to be subjected to bending treatment, so that manpower and material resources are wasted to a certain extent, the construction is inconvenient, and the overall construction efficiency is reduced; 2. the length of the vertical section of the piping is considered, if the length is not well controlled, the post-treatment is troublesome; 3. the fixed installation of the vertical line pipe is not firm, and the skew damage is easy to cause in the concrete construction process; the line pipe is reserved on the outer surface of the floor slab, sundries such as concrete and the like are easy to fall into, the line pipe is easy to damage or break, and repair is very troublesome after damage; 4. the existing line pipe protection technology needs to additionally adopt materials such as wood, PVC or concrete mortar, so that the cost is additionally increased, the protection measures cannot be guaranteed, and meanwhile, the later-stage cleaning work of construction waste is increased; 5. the protection measures for the vertical piping reserved outside the floor slab are raised on the ground, so that collision between personnel and articles is easy to cause, and the site safety is affected to a certain extent; 6. in the later stage, the vertical piping is sometimes abandoned due to design and other reasons, and the treatment of the abandoned vertical piping is troublesome; 7. the piping process in the second construction stage in the later stage needs to be additionally subjected to relevant adjustment treatment, and the construction operation is inconvenient.
Disclosure of Invention
The invention provides the construction piping installation equipment and the use method, changes the technical situation that the traditional vertical piping is reserved to the outer surface of the floor slab, omits piping bending work flow, is convenient to construct, and solves the problem that the vertical line pipe cannot be well fixed; the problems that the length of the vertical section piping is considered during reservation and pre-embedding are solved, the trouble of post-treatment and the like caused by poor control of the length of the piping is avoided, and the phenomena of material waste and the like caused by poor control of the length of the vertical section are avoided; the problem that the vertical piping falls into sundries such as concrete is effectively prevented; the problem that the vertical piping is easy to damage and break is solved, the cost is saved, and the protection measures are effectively ensured; the problem of troublesome treatment caused by the abandoned vertical piping in the later period due to the design and the like is solved; the device avoids the possibility of collision between personnel and articles caused by the traditional vertical tubing technology, has a certain promotion effect on site safety construction, and solves the problems existing in the prior art.
The technical scheme adopted by the invention for solving the technical problems is as follows: a building piping installation apparatus comprising:
the connecting unit is provided with a channel, and two ends of the channel are respectively provided with a first connecting hole and a second connecting hole; the first connecting hole is connected with a pipe in a first construction stage, and the second connecting hole is connected with a pipe in a second construction stage;
and the sealing unit is arranged at the position of the second connecting hole and is used for sealing the second connecting hole in the first construction stage.
Preferably, the planes of the first connecting hole and the second connecting hole at two ends of the channel are arranged substantially perpendicular to each other, so as to connect the piping arranged substantially horizontally in the first construction stage and the piping arranged substantially vertically in the second construction stage.
Preferably, the first connecting hole and the second connecting hole are both provided with internal threads connected with a pipe joint, and the pipe joint is connected with the piping.
Preferably, the sealing unit includes a first sealing cover matched with the second connecting hole.
Preferably, the device further comprises an identification unit, wherein the identification unit is connected with the connection unit and is used for indicating the type of the piping connected with the second connection hole in the second construction stage.
Preferably, the identification unit comprises an identification rod in threaded connection with the connection unit, and the connection unit is provided with an identification rod connection hole.
Preferably, the marking rod connecting hole and the second connecting hole are positioned on the same plane of the surface of the connecting unit, the sealing unit further comprises a second sealing cover, and the marking rod connecting hole and the first sealing cover are covered by the second sealing cover.
Preferably, the surface of the connecting unit is provided with a clamping groove which is matched and connected with the second sealing cover.
Preferably, the marking rod is sleeved with a plastic protection tube, and the plastic protection tube is connected with the first sealing cover.
The application method of the construction tubing installation equipment comprises the following steps:
s1: in the first construction stage, the first connecting hole of the connecting unit is connected with a tubing in civil engineering through a tubing joint, and the position of the second connecting hole is determined according to the connection requirement of the tubing in the second construction stage;
s2: sealing the second connecting hole by using the first sealing cover, and clamping the second sealing cover in the clamping groove to finish the plugging operation;
s3: the marking rod is arranged in the marking rod connecting hole and is sleeved with a plastic protection tube;
s4: in the second construction stage, matching the piping with the second connecting hole according to the plastic protection pipe and/or the marking rod;
s5: and opening the second sealing cover and the first sealing cover, connecting the piping to the position of the second connecting hole, and taking down the marking rod to finish piping work in the second construction stage.
The structure has the beneficial effects that the technical situation that the traditional vertical piping is reserved to the outer surface of the floor slab is changed, the piping bending work flow is omitted, the construction is convenient, and the problem that the vertical line pipe cannot be well fixed is solved; the problems that the length of the vertical section piping is considered during reservation and pre-embedding are solved, the trouble of post-treatment and the like caused by poor control of the length of the piping is avoided, and the phenomena of material waste and the like caused by poor control of the length of the vertical section are avoided; the problem that the vertical piping falls into sundries such as concrete is effectively prevented; the problem that the vertical piping is easy to damage and break is solved, the cost is saved, and the protection measures are effectively ensured; the problem of troublesome treatment caused by the abandoned vertical piping in the later period due to the design and the like is solved; the possibility of collision between personnel and articles caused by the traditional vertical piping technology is avoided, and the method has a certain promotion effect on site safety construction.
Drawings
Fig. 1 is a schematic perspective view of the construction of the present invention after a first stage of construction.
Fig. 2 is a perspective view illustrating an exploded state of fig. 1.
Fig. 3 is a schematic perspective view of the construction of the second stage of the present invention.
Fig. 4 is a perspective view illustrating an exploded state of fig. 3.
Fig. 5 is a schematic structural view of the connection unit of the present invention.
Fig. 6 is a schematic diagram of the perspective state of fig. 5.
In the figure, 1, a connecting unit; 2. a channel; 3. a first connection hole; 4. a second connection hole; 5. piping; 6. Pipe connection; 7. a fastening bolt; 8. a first sealing cover; 9. a marking rod; 10. a marker link connection hole; 11. a second sealing cover; 12. a clamping groove; 13. a plastic protective tube; 14. bridging the ground wire connecting hole; 15. a through hole; 16. Reinforcing steel bars.
Detailed Description
In order to clearly illustrate the technical features of the present solution, the present invention will be described in detail below with reference to the following detailed description and the accompanying drawings.
As shown in fig. 1 to 6, the construction piping installation apparatus includes: the connecting unit 1, the connecting unit 1 forms a channel 2, and two ends of the channel 2 are respectively provided with a first connecting hole 3 and a second connecting hole 4; the first connecting hole 3 is connected with the pipe 5 in the first construction stage, and the second connecting hole 4 is connected with the pipe 5 in the second construction stage; and the sealing unit is arranged at the position of the second connecting hole 4 and is used for sealing the second connecting hole 4 in the first construction stage. The connecting unit can specifically select the form of the connecting box, the technical current situation that traditional vertical piping is reserved to the outer surface of the floor is changed in the design, piping bending work flow is omitted, vertical section piping is not required to be connected in the first construction stage, construction is convenient, the second connecting hole 4 on the connecting box is directly corresponding to the second construction stage, the piping 5 is installed, meanwhile, the sealing unit is equipped to seal and protect the second connecting hole 4 on the connecting box in the first construction stage, impurities are prevented from falling into the piping 5 to be installed subsequently, and the quality of piping installation in the whole construction process is guaranteed.
Considering the specific requirements of construction, the planes of the first connecting hole 3 and the second connecting hole 4 at the two ends of the channel 2 are arranged substantially perpendicular to each other so as to connect the piping 5 arranged substantially horizontally in the first construction stage and the piping 5 arranged substantially vertically in the second construction stage.
The first connecting hole 3 and the second connecting hole 4 are respectively provided with internal threads connected with the pipe joint 6, and the pipe joint 6 is connected with the pipe 5. When the pipe joint 6 is connected to the pipe 5, the pipe joint 6 is fitted with a fastening bolt 7, and the pipe 5 is reinforced with the fastening bolt 7 in order to further secure the stability of the connection of the pipe 5. In addition, it is conceivable to add a gasket washer at the junction of the outer surface of the junction box and the pipe joint 6 to further prevent foreign matter from entering the passage 2.
The sealing unit comprises a first sealing cap 8 cooperating with the second connecting hole 4. Plays a secondary plugging protection role on the second connecting hole 4 of the connecting unit, prevents sundries such as concrete and the like from falling into the construction process, and is convenient to clean sundries and disassemble in the later period and recyclable.
The device also comprises an identification unit which is connected with the connecting unit 1 and is used for indicating the type of the piping 5 connected with the second connecting hole 4 in the second construction stage. The identification unit can be used for identifying the position information of the connecting unit 1 and the related piping 5, so that the piping 5 is convenient to install in the subsequent second construction stage.
The marking unit comprises a marking rod 9 in threaded connection with the connecting unit 1, and the connecting unit 1 is provided with a marking rod connecting hole 10. The marking rod 9 is preferably a through-wire threaded rod or a steel nail, and the bottom end of the marking rod is preferably in threaded connection with the connecting unit for effective connection and fixation; the top end of the marking rod 9 is preferably marked with a mark or a related mark so as to later inquire about the related piping 5 information. The top end of the marking rod 9 can be slightly higher than the upper surface of the floor slab, and the height of the marking rod 9 reserved to the outer surface of the floor slab can be properly adjusted according to actual conditions in the later stage.
The marking rod connecting hole 10 and the second connecting hole 4 are positioned on the same plane of the surface of the connecting unit 1, the sealing unit further comprises a second sealing cover 11, and the marking rod connecting hole 10 and the first sealing cover 8 are covered by the second sealing cover 11. The main function of the second sealing cover 11 is to protect the connecting hole of the marking rod 9 and to secondarily protect the second connecting hole 4 so as to prevent sundries such as concrete from falling into the connecting hole; the shape and the size of the second sealing cover 11 are reasonably adjusted according to the information such as the size of the related piping 5, the thickness of the cast-in-place concrete slab and the like, so that the second connecting hole 4 is conveniently searched and matched in the second construction stage.
The surface of the connecting unit 1 is provided with a clamping groove 12 which is matched and connected with the second sealing cover 11. In order to facilitate the assembly and disassembly of the second sealing cover 11, a socket technology of the clamping groove 12 is used, and the clamping groove 12 and the related arrangement should meet the requirement that the second sealing cover 11 is reliably and fixedly connected with the connecting unit 1. In addition, a sealing cover bracket is additionally arranged according to actual needs.
The marking rod 9 is sleeved with a plastic protection tube 13, and the plastic protection tube 13 is connected with the first sealing cover 8. The top end of the plastic protection pipe 13 can be provided with relevant marks and marks for marking the information of the relevant piping 5 at the position so as to facilitate the installation of the piping 5 in the second construction stage, and meanwhile, the marking rod 9 is conveniently recovered in the later stage so as to reduce the project cost.
According to the actual construction requirement, the connecting unit 1 can be provided with the bridging ground wire connecting hole 14, and the bridging ground wire connecting hole 14 can be designed according to the actual situation and the design requirement. The hole is preferably slightly larger than the ground wire, and if the hole is not used, a hole plug is used for sealing.
In order to facilitate fixing the connection unit 1, the connection unit 1 is provided with a through hole 15, and a steel bar 16 can be penetrated into the through hole 15 so that the connection unit 1 is fixedly connected with a civil engineering bottom layer steel bar network, and meanwhile, the through hole 15 can also be used for connecting the connection unit 1 in a row for assembly (namely, installation expansion).
The application method of the construction tubing installation equipment comprises the following steps:
s1: in the first construction stage, the first connecting hole 3 of the connecting unit 1 is connected with the tubing 5 in civil engineering through the tubing 6, and the position of the second connecting hole 4 is determined according to the connection requirement of the tubing 5 in the second construction stage; the steel bar 16 passes through the through hole 15 of the connecting unit 1 and then is bound and fixed with the steel bar of the civil engineering bottom layer; after the pipe 5 and the pipe joint 6 are connected, the pipe can be further reinforced by using a fastening bolt 7;
s2: sealing the second connecting hole 4 by using the first sealing cover 8, clamping the second sealing cover 11 into the clamping groove 12, and completing the plugging operation;
s3: the marking rod 9 is arranged in the marking rod connecting hole 10 and is sleeved with a plastic protecting tube 13;
s4: in the second construction stage, the piping 5 and the second connection hole 4 are paired according to the plastic protection pipe 13 and/or the marking rod 9;
s5: the second sealing cover 11 and the first sealing cover 8 are opened, the piping 5 is connected to the position of the second connecting hole 4, the marking rod 9 is removed, and the piping 5 work in the second construction stage is completed.
The above embodiments are not to be taken as limiting the scope of the invention, and any alternatives or modifications to the embodiments of the invention will be apparent to those skilled in the art and fall within the scope of the invention.
The present invention is not described in detail in the present application, and is well known to those skilled in the art.

Claims (8)

1. A method of using a construction piping installation apparatus, the installation apparatus comprising:
the connecting unit is provided with a channel, and two ends of the channel are respectively provided with a first connecting hole and a second connecting hole; the first connecting hole is connected with the tubing in the first construction stage, the second connecting hole is connected with the tubing in the second construction stage, the planes of the first connecting hole and the second connecting hole at the two ends of the channel are mutually perpendicular to each other so as to connect the tubing horizontally arranged in the first construction stage and the tubing vertically arranged in the second construction stage, and the connecting unit selects a connecting box shape;
the sealing unit is arranged at the position of the second connecting hole and is used for sealing the second connecting hole in the first construction stage;
the using method comprises the following steps:
s1: in the first construction stage, the first connecting hole of the connecting unit is connected with a tubing in civil engineering through a tubing joint, and the position of the second connecting hole is determined according to the connection requirement of the tubing in the second construction stage; the steel bars pass through the through holes of the connecting units and then are bound and fixed with the steel bars at the bottom layer of the civil engineering; after the piping and the pipe joint are connected, fastening bolts can be used for further reinforcement;
s2: sealing the second connecting hole by using the first sealing cover, and clamping the second sealing cover in the clamping groove to finish the plugging operation;
s3: the marking rod is arranged in the marking rod connecting hole and is sleeved with a plastic protection tube;
s4: in the second construction stage, matching the piping with the second connecting hole according to the plastic protection pipe and/or the marking rod;
s5: and opening the second sealing cover and the first sealing cover, connecting the piping to the position of the second connecting hole, and taking down the marking rod to finish piping work in the second construction stage.
2. The method of using a construction piping installation apparatus according to claim 1, wherein the first connection hole and the second connection hole are each provided with an internal thread connected to a piping connection connected to the piping.
3. The method of using a construction piping installation apparatus according to claim 2, wherein said sealing unit includes a first sealing cover that mates with said second connection hole.
4. A method of using a construction pipe installation apparatus according to claim 3, further comprising an identification unit connected to the connection unit for indicating a pipe type to which the second connection hole is connected at the second construction stage.
5. The method of using a construction piping installation apparatus according to claim 4, wherein the marking unit includes a marking rod screwed to a connection unit provided with a marking rod connection hole.
6. The method of using a construction piping installation apparatus according to claim 5, wherein the sign bar connecting hole and the second connecting hole are located at the same plane position of the surface of the connecting unit, and the sealing unit further comprises a second sealing cover covering the sign bar connecting hole and the first sealing cover.
7. The method of using a construction piping installation apparatus according to claim 6, wherein the surface of the connection unit is provided with a clamping groove which is cooperatively connected with the second sealing cover.
8. The method of using a construction tubing installation apparatus according to claim 7, wherein said sign post is externally sleeved with a plastic protective tube, said plastic protective tube being connected to said first seal cap.
CN201910248522.6A 2019-03-29 2019-03-29 Building piping installation equipment and use method Active CN109853970B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910248522.6A CN109853970B (en) 2019-03-29 2019-03-29 Building piping installation equipment and use method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910248522.6A CN109853970B (en) 2019-03-29 2019-03-29 Building piping installation equipment and use method

Publications (2)

Publication Number Publication Date
CN109853970A CN109853970A (en) 2019-06-07
CN109853970B true CN109853970B (en) 2023-12-22

Family

ID=66902545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910248522.6A Active CN109853970B (en) 2019-03-29 2019-03-29 Building piping installation equipment and use method

Country Status (1)

Country Link
CN (1) CN109853970B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1479847A (en) * 2001-01-16 2004-03-03 曼弗雷德・阿尔莱 Fire block conduit coupler
CN101247029A (en) * 2008-03-27 2008-08-20 成都市第四建筑工程公司 Construction method for installing wire pipe and wire box on the wall
CN103562612A (en) * 2011-11-11 2014-02-05 株式会社开滋Sct Resin end-face butt joint, method for welding this joint, and piping member
CN205985836U (en) * 2016-08-31 2017-02-22 河南佳和高科电气设备股份有限公司 Novel electric wire box for electronic box
CN206053342U (en) * 2016-08-31 2017-03-29 山西四建集团有限公司 The T-shaped turning joint of pipe arrangement in honeycomb core cassette ceiling girt strip
CN210067479U (en) * 2019-03-29 2020-02-14 中建八局第一建设有限公司 Building piping erection equipment
CN212244736U (en) * 2020-05-25 2020-12-29 李志鹏 Anti-pollution filth bucket is used to gastroenterology

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3642525B1 (en) * 2003-11-14 2005-04-27 協同バルブ商事株式会社 Piping installation members and a set of piping installation members

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1479847A (en) * 2001-01-16 2004-03-03 曼弗雷德・阿尔莱 Fire block conduit coupler
CN101247029A (en) * 2008-03-27 2008-08-20 成都市第四建筑工程公司 Construction method for installing wire pipe and wire box on the wall
CN103562612A (en) * 2011-11-11 2014-02-05 株式会社开滋Sct Resin end-face butt joint, method for welding this joint, and piping member
CN205985836U (en) * 2016-08-31 2017-02-22 河南佳和高科电气设备股份有限公司 Novel electric wire box for electronic box
CN206053342U (en) * 2016-08-31 2017-03-29 山西四建集团有限公司 The T-shaped turning joint of pipe arrangement in honeycomb core cassette ceiling girt strip
CN210067479U (en) * 2019-03-29 2020-02-14 中建八局第一建设有限公司 Building piping erection equipment
CN212244736U (en) * 2020-05-25 2020-12-29 李志鹏 Anti-pollution filth bucket is used to gastroenterology

Also Published As

Publication number Publication date
CN109853970A (en) 2019-06-07

Similar Documents

Publication Publication Date Title
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN210049123U (en) Road and bridge crack reinforced structure
CN110821156A (en) Sinking type toilet hanging die structure and construction method thereof
CN103161313B (en) Connection method of main reinforcement of constructional column of infilled wall and framed girder
CN207110468U (en) A kind of shear wall joint part template reinforcing device
CN103015735A (en) Construction method for planting wall lacing bars after pre-burying of sleeve assemblies
CN102383601B (en) Method and device for leading pre-embedded pipes in concrete out of side wall joints
CN210067479U (en) Building piping erection equipment
CN109853970B (en) Building piping installation equipment and use method
CN100547181C (en) The construction technology that the wooden frame structure main body is connected with concrete foundation
CN109763571A (en) It is a kind of semicircle bolt snap ring assemblies and with its fix overhanging I-steel construction method
CN211279058U (en) Prefabricated assembled concrete structure fast-assembling sleeve built-in fitting
CN207063177U (en) Cast-in-place concrete floor hanging built-in fitting
CN206769379U (en) Shear wall formwork exempts from drilling construction structure
CN111236603A (en) Comprehensive construction method for steel plate mesh overhanging scaffold
CN210003941U (en) Detachable anti-seepage sleeve assembly
CN208534040U (en) A kind of location structure positioned for controlling pre-buried vertical casing
CN105888055A (en) External wall panel installation node
CN105863136A (en) Outer wallboard mounting node
JP5251074B2 (en) Repair method for reinforcing bars for concrete utility poles
CN110952792A (en) Regularization turnover elevator shaft horizontal protection structure and construction method thereof
CN205206281U (en) Novel regularization building outrigger is wall even device
CN218919908U (en) Assembled building pipeline gallows
CN113202102B (en) Unconstrained frame stud device for rock-fill dam panel construction and mounting method
CN212106574U (en) A pre-buried mounting for hoist and mount

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant