CN218919908U - Assembled building pipeline gallows - Google Patents
Assembled building pipeline gallows Download PDFInfo
- Publication number
- CN218919908U CN218919908U CN202223139989.3U CN202223139989U CN218919908U CN 218919908 U CN218919908 U CN 218919908U CN 202223139989 U CN202223139989 U CN 202223139989U CN 218919908 U CN218919908 U CN 218919908U
- Authority
- CN
- China
- Prior art keywords
- pull rods
- sleeve
- cross arm
- joint
- embedded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to a building member, in particular to an assembled building pipeline hanger, which comprises a cross arm, a plurality of pull rods and embedded parts matched with the pull rods one by one, wherein each embedded part comprises a horizontal circular plate and a vertical sleeve, the sleeve is provided with internal threads, and the upper ends of the pull rods are connected into the sleeve of the embedded part through joints, and the lower ends of the pull rods are connected with the cross arm; the upper part of the joint is provided with external threads for screwing the sleeve and the lower part of the joint is connected with the pull rod. The hanger is convenient to turn over, easy and convenient to assemble and disassemble, greatly saves construction period, and can be applied to assembly type buildings and common cast-in-situ structures.
Description
Technical Field
The utility model belongs to building components, and particularly relates to an assembled building pipeline hanging bracket.
Background
In the integrated construction of the pipeline of the assembly type building engineering, a large number of hanging frames are needed as bearing members for the components such as a bridge frame, a pipeline and the like, the construction time and energy proportion occupied by the construction of the hanging frames in the pipeline construction are large, and the hanging frames are installed at the later stage to cause the appearance and quality hidden trouble to the assembly type structure.
At present, the hanger construction is comparatively loaded down with trivial details, and the work procedures such as laser unwrapping wire, roof drilling, big gun nail is fixed, cross arm installation are included in the work progress, because of the great construction position of most building clear heights is higher, often need prepare a large amount of facilities of ascending a height, have dust pollution in the trompil of concrete roof trompil in addition, and the efficiency of construction is low, and the hanger also is difficult to reuse
Disclosure of Invention
In order to solve the problems, the utility model provides the integrated hanging bracket for the assembled building pipeline, which is convenient to turn around, convenient to assemble and disassemble, greatly saves the construction period and can be applied to assembled buildings and common cast-in-situ structures. The technical scheme adopted by the utility model is as follows:
the assembled building pipeline hanging bracket comprises a cross arm, a plurality of pull rods and embedded parts matched with the pull rods one by one, wherein each embedded part comprises a horizontal circular plate and a vertical sleeve, the sleeve is provided with internal threads, and the upper ends of the pull rods are connected into the sleeve of the embedded part through connectors, and the lower ends of the pull rods are connected with the cross arm; the upper part of the joint is provided with external threads for screwing the sleeve and the lower part of the joint is connected with the pull rod.
Above-mentioned assembled building pipeline gallows, be equipped with the rectangular hole of several that is used for the interlude pull rod one by one on the cross arm, the pull rod lower extreme is the external screw thread in order to fasten with rectangular hole with a pair of nut that arranges from top to bottom.
According to the assembled building pipeline hanging bracket, the rubber gasket is arranged between the nut and the cross arm, wherein the lower end of the pull rod is located below the nut, and the thickness of the rubber gasket is 8-15 mm.
Above-mentioned assembled building pipeline gallows, the lower part of joint is thread bush or horizontal link plate, corresponds the upper end of pull rod is external screw thread or connection roof.
The beneficial effects of the utility model are as follows: the hanger has the advantages that the connector and the embedded part are utilized, the disassembly and the assembly are quick and convenient, the work such as on-site drilling is not needed, the turnover utilization rate of the hanger is high, the hanger can be applied to assembly type buildings and common cast-in-situ structures, and the workload of on-site construction is reduced.
Drawings
FIG. 1 is a schematic view of a hanger of the present utility model;
FIG. 2 is a schematic view of the structure of the cross arm of the present utility model;
FIG. 3 is a schematic diagram showing the cooperation of the embedded part and the joint after pouring;
FIG. 4 is a schematic view of the connection of the tie rod and the cross arm according to the present utility model;
fig. 5 is a schematic view of a joint of the present utility model in the form of a joined roof.
In the figure: the steel plate is characterized in that the steel plate is composed of a nut 1, a cross arm 2, a pull rod 3, an embedded part 4, a connector 5, a long strip hole 6, a rubber gasket 7, an iron nail 8 and a template 10.
Detailed Description
The utility model is further explained below with reference to the drawings.
The utility model relates to an assembled building pipeline hanger, which is shown in fig. 1 and comprises a cross arm 2, a plurality of pull rods 3 and embedded parts 4 which are matched with the pull rods 3 one by one, wherein each embedded part 4 comprises a circular plate with the diameter of 60mm which is horizontally arranged and a sleeve with the length of 40mm which is vertically arranged, two or three or four circular holes with the diameter of 5mm are formed in the circular plate and are used for penetrating iron nails, and the sleeve is provided with internal threads. As shown in fig. 3, a template is firstly set up before concrete pouring, a layer of plastic protection film is paved on the template, then the embedded parts 4 are respectively propped against the template surface by iron nails 8, then concrete can be poured, the embedded parts 4 are fixed in a concrete structure, and the joints 5 can be screwed in sleeve openings of the embedded parts 4 after the template is removed. After the template is removed, the iron nails 8 can be exposed outside the concrete structure and can be cut off by a cutting machine or a pair of cutting pliers, so that the attractiveness is ensured, and the subsequent installation of the joint 5 is also facilitated.
The upper end of the pull rod 3 is connected to the inside of the sleeve of the embedded part 4 through a joint 5, and the lower end of the pull rod is connected with the cross arm 2; the upper part of the joint 5 is provided with external threads for screwing the sleeve and the lower part is connected with the pull rod 3. The connector 5 is smaller in size, can be installed with the embedded part 4 more quickly and accurately, and can greatly improve the bearing capacity of the hanging frame.
As shown in fig. 2, the cross arm 2 is provided with a plurality of strip holes 6 for one-to-one inserting the pull rod 3, the length of the strip holes 6 is 30mm, the width is 14mm, the interval is 150mm, and the lower end of the pull rod 3 is provided with external threads so as to be fastened and connected with the strip holes 6 by a pair of nuts 1 arranged up and down.
As shown in fig. 4, the above-mentioned assembled building pipeline gallows, be equipped with rubber packing ring 7 between nut 1 and the cross arm 2 that pull rod 3 lower extreme is located the below, rubber packing ring 7's thickness is 8~15mm, plays the cushioning effect, alleviates the impact to the pull rod upper and lower end junction when installing the pipeline, avoids vibrations or the connection inefficacy that the impact leads to, ensures gallows whole bears and life.
Above-mentioned assembled building pipeline gallows, the lower part that connects 5 is the thread bush, corresponds the upper end of pull rod 3 is external screw thread but the spiro union in connect 5, and threaded connection is swift, easy operation, can greatly improve installation effectiveness under the prerequisite of guaranteeing the bearing capacity. As shown in fig. 5, the lower part of the joint 5 can be a horizontal connecting top plate, and many of the tops of the pull rods 3 in the existing products are arc-shaped connecting plates, square or round connecting plates and the like, so that the universal pull rod fitting device has good universality by providing different types of joints 5 and adapting to various types of pull rods 3.
Claims (3)
1. An assembled building pipeline gallows which characterized in that: the embedded part comprises a cross arm (2), a plurality of pull rods (3), embedded parts (4) and iron nails (8), wherein the embedded parts (4) are matched with the pull rods (3) one by one, each embedded part (4) comprises a horizontal circular plate and a vertical sleeve, each sleeve is provided with internal threads, the upper ends of the pull rods (3) are connected into the sleeves of the embedded parts (4) through joints (5), and the lower ends of the pull rods are connected with the cross arm (2); the upper part of the joint (5) is provided with external threads for screwing the sleeve and the lower part of the joint is connected with the pull rod (3), and the embedded part (4) is nailed on the surface of the template (10) for concrete pouring by an iron nail (8);
the lower part of the joint (5) is provided with a threaded sleeve or a horizontal connecting plate, and the upper end corresponding to the pull rod (3) is provided with an external thread or a connecting top plate.
2. The fabricated building line hanger of claim 1, wherein: the cross arm (2) is provided with a plurality of strip holes (6) for inserting the pull rods (3) one by one, and the lower ends of the pull rods (3) are externally threaded so as to be fastened and connected with the strip holes (6) by a pair of nuts (1) which are arranged up and down.
3. The fabricated building line hanger of claim 2, wherein: a rubber gasket (7) is arranged between the nut (1) and the cross arm (2) at the lower end of the pull rod (3), and the thickness of the rubber gasket (7) is 8-15 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223139989.3U CN218919908U (en) | 2022-11-25 | 2022-11-25 | Assembled building pipeline gallows |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202223139989.3U CN218919908U (en) | 2022-11-25 | 2022-11-25 | Assembled building pipeline gallows |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218919908U true CN218919908U (en) | 2023-04-25 |
Family
ID=86042792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202223139989.3U Active CN218919908U (en) | 2022-11-25 | 2022-11-25 | Assembled building pipeline gallows |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218919908U (en) |
-
2022
- 2022-11-25 CN CN202223139989.3U patent/CN218919908U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110805257B (en) | Flower basket overhanging type section steel bearing beam structure and construction method | |
CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
CN218919908U (en) | Assembled building pipeline gallows | |
CN201428238Y (en) | Expansion sleeve type scaffold connecting part | |
CN108223924B (en) | Assembled shaft air pipe joint support | |
CN202165696U (en) | Cable bridge fixing support clamping device of joist steel | |
CN202108299U (en) | Segmented assembled water tank tower with adjustable height | |
CN112962856B (en) | Suspended ceiling mounting structure | |
CN212078673U (en) | Support type creeping formwork adhesion device | |
CN210739554U (en) | Stable form piping lane support convenient to installation | |
CN204879048U (en) | Novel pipeline support | |
CN211873507U (en) | Net rack bolt ball support connecting system | |
CN211286584U (en) | Construction protection system of attached scaffold | |
CN203188612U (en) | Beam frame type building template system | |
WO2019144571A1 (en) | Hoop-type connecting device for cylindrical stone dry hanging | |
CN206987410U (en) | A kind of adjustable guard rail fixed mount | |
CN202181614U (en) | Steel pipe fixing device for joist steel | |
CN203783092U (en) | Dowel bar regulating frame | |
CN203834680U (en) | Pre-buried sleeve nut for building | |
CN220319205U (en) | Support system for assembled bay window construction | |
CN212957567U (en) | Assembled enclosure scaffold | |
CN212957337U (en) | High stability balcony straight-bar guardrail | |
CN215595081U (en) | Anti-typhoon reinforcing device for container with suspended curtain wall | |
CN216867741U (en) | Flexible ceiling support fixing device of PSP steel-plastic composite pipe | |
CN220377903U (en) | Temporary protection device for roof |