CN210067479U - Building piping erection equipment - Google Patents
Building piping erection equipment Download PDFInfo
- Publication number
- CN210067479U CN210067479U CN201920425298.9U CN201920425298U CN210067479U CN 210067479 U CN210067479 U CN 210067479U CN 201920425298 U CN201920425298 U CN 201920425298U CN 210067479 U CN210067479 U CN 210067479U
- Authority
- CN
- China
- Prior art keywords
- piping
- connecting hole
- pipe
- hole
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims abstract description 51
- 238000007789 sealing Methods 0.000 claims abstract description 42
- 238000009434 installation Methods 0.000 claims description 16
- 230000008878 coupling Effects 0.000 claims description 9
- 238000010168 coupling process Methods 0.000 claims description 9
- 238000005859 coupling reaction Methods 0.000 claims description 9
- 230000003014 reinforcing effect Effects 0.000 claims 2
- 238000005452 bending Methods 0.000 abstract description 5
- 238000012805 post-processing Methods 0.000 abstract description 4
- 229910000831 Steel Inorganic materials 0.000 description 7
- 239000010959 steel Substances 0.000 description 7
- 238000005516 engineering process Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000012545 processing Methods 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000003550 marker Substances 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- -1 battens Substances 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Sink And Installation For Waste Water (AREA)
Abstract
The utility model belongs to the technical field of the building and specifically relates to building piping erection equipment, include: the connecting unit is provided with a channel, and two ends of the channel are respectively provided with a first connecting hole and a second connecting hole; the first connecting hole is connected with the pipe in the first construction stage, and the second connecting hole is connected with the pipe in the second construction stage; and the sealing unit is arranged at the position of the second connecting hole and used for sealing the second connecting hole in the first construction stage. The utility model changes the technical situation that the traditional vertical piping is reserved to the outer surface of the floor slab, saves the piping bending work flow, has convenient construction, and solves the problem that the vertical line pipe can not be well fixed; the problems that the length of a vertical section of piping is considered when the pre-embedding is reserved are solved, the troubles of poor post-processing and the like caused by poor control of the length of the piping are avoided, and the problem that the vertical piping falls into sundries such as concrete is effectively prevented; the problem of vertical piping damage rupture easily is solved, the cost is practiced thrift.
Description
Technical Field
The utility model belongs to the technical field of the building and specifically relates to building piping erection equipment.
Background
The traditional reserved pre-buried electrical vertical piping is characterized in that a pipeline is reserved on the outer surface of a floor slab, and a plastic cover is used for plugging a line pipe after concrete is poured so as to prevent sundries from falling into the pipeline and influencing later-stage dredging threading; meanwhile, in order to prevent the spool from being broken and damaged, the mode is that the box is covered with a wood box on the upper part of the spool, and the other mode is that the spool is covered with a PVC sleeve, and PVC internal pouring concrete mortar is used for temporarily protecting the spool. But there are more drawbacks in current construction mounting means, influence later stage piping installation quality and efficiency, complex operation and be unfavorable for the relevant work of site operation safety, specifically have the drawback as follows: 1. the wire pipe needs to be subjected to bending processing, so that manpower and material resources are wasted to a certain degree, the construction is inconvenient, and the overall construction efficiency is reduced; 2. the length of the vertical section of the pipe needs to be considered, and if the length is not well controlled, the post-processing is troublesome; 3. the vertical line pipe is not firmly fixed and installed, and is easy to incline and damage in the concrete construction process; the wire pipe is reserved on the outer surface of the floor slab, so that sundries such as concrete and the like can easily fall into the wire pipe, the wire pipe is easily damaged or broken, and the repair is very troublesome after the wire pipe is damaged; 4. the existing line pipe protection technology needs to additionally adopt materials such as battens, PVC or concrete mortar and the like, the cost is additionally increased, the protection measures cannot be guaranteed, and meanwhile, the post-cleaning work of construction waste is increased; 5. the protection measures for the vertical piping reserved outside the floor slab are all raised above the ground, so that the collision of personnel and objects is easily caused, and the field safety is influenced to a certain extent; 6. the vertical piping is sometimes discarded at a later stage due to reasons such as design, and the disposal of the discarded vertical piping is troublesome; 7. the piping process of the second construction stage in the later stage needs to be additionally adjusted and processed, and the construction operation is inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model provides a building piping erection equipment, has changed the technical current situation that traditional vertical piping reserved to the floor surface, has saved piping bending work flow, and construction convenience has solved the problem that vertical spool can not be fixed well; the problems that the length of the vertical section pipe is considered when the pre-embedding is reserved are solved, the troubles of post-processing and the like caused by poor control of the length of the pipe are avoided, and the phenomena of material waste and the like caused by poor control of the length of the vertical section are avoided; the problem that the vertical piping falls into sundries such as concrete is effectively solved; the problem that the vertical piping is easy to damage and break is solved, the cost is saved, and the protection measures are effectively guaranteed; the problem of processing trouble caused by abandonment of the vertical piping due to design and other reasons in the later period is solved; the possibility of collision of personnel and articles caused by the traditional vertical piping technology is avoided, certain promotion effect on site safety construction is achieved, and the problems in the prior art are solved.
The utility model discloses a solve the technical scheme that above-mentioned technical problem adopted and be: building piping erection equipment includes:
the connecting unit is provided with a channel, and two ends of the channel are respectively provided with a first connecting hole and a second connecting hole; the first connecting hole is connected with a pipe in a first construction stage, and the second connecting hole is connected with a pipe in a second construction stage;
and the sealing unit is arranged at the position of the second connecting hole and used for sealing the second connecting hole in a first construction stage.
Preferably, the planes of the first connecting hole and the second connecting hole at the two ends of the channel are arranged substantially perpendicular to each other so as to connect the pipe arranged substantially horizontally in the first construction stage and the pipe arranged substantially vertically in the second construction stage.
Preferably, the first connection hole and the second connection hole are provided with internal threads connected with a pipe joint, and the pipe joint is connected with the distribution pipe.
Preferably, the sealing unit includes a first sealing cover coupled to the second coupling hole.
Preferably, the system further comprises an identification unit, wherein the identification unit is connected with the connection unit and used for indicating the type of the pipe connected with the second connection hole in the second construction stage.
Preferably, the identification unit comprises an identification rod in threaded connection with the connecting unit, and the connecting unit is provided with an identification rod connecting hole.
Preferably, the marking rod connecting hole and the second connecting hole are located on the same plane of the surface of the connecting unit, the sealing unit further comprises a second sealing cover, and the marking rod connecting hole and the first sealing cover are covered by the second sealing cover.
Preferably, the surface of the connecting unit is provided with a clamping groove which is matched and connected with the second sealing cover.
Preferably, the sign pole overcoat is equipped with the plastic protection pipe, the plastic protection pipe with first sealed lid links to each other.
Preferably, the connecting unit is provided with a through hole, and a steel bar can penetrate into the through hole, so that the connecting unit is connected with the steel bar of the civil engineering bottom layer.
The utility model adopting the structure has the advantages that the technical situation that the traditional vertical piping is reserved to the outer surface of the floor is changed, the piping bending work flow is saved, the construction is convenient, and the problem that the vertical line pipe cannot be well fixed is solved; the problems that the length of the vertical section pipe is considered when the pre-embedding is reserved are solved, the troubles of post-processing and the like caused by poor control of the length of the pipe are avoided, and the phenomena of material waste and the like caused by poor control of the length of the vertical section are avoided; the problem that the vertical piping falls into sundries such as concrete is effectively solved; the problem that the vertical piping is easy to damage and break is solved, the cost is saved, and the protection measures are effectively guaranteed; the problem of processing trouble caused by abandonment of the vertical piping due to design and other reasons in the later period is solved; the possibility of collision of personnel and articles caused by the traditional vertical piping technology is avoided, and the construction method has certain promotion effect on site safety construction.
Drawings
Fig. 1 is a schematic view of the three-dimensional structure after the first construction stage of the present invention.
Fig. 2 is a perspective view of fig. 1 in an exploded state.
Fig. 3 is a schematic perspective view of the second construction stage of the present invention.
Fig. 4 is a perspective view of fig. 3 in an exploded state.
Fig. 5 is a schematic structural diagram of the connection unit of the present invention.
Fig. 6 is a schematic structural view of the perspective state of fig. 5.
In the figure, 1, a connecting unit; 2. a channel; 3. a first connection hole; 4. a second connection hole; 5. piping; 6. pipe connection; 7. fastening a bolt; 8. a first sealing cover; 9. an identification rod; 10. a marking rod connecting hole; 11. a second sealing cover; 12. a card slot; 13. a plastic protection tube; 14. bridging the ground wire connecting hole; 15. a through hole; 16. and (5) reinforcing steel bars.
Detailed Description
In order to clearly illustrate the technical features of the present invention, the present invention is explained in detail by the following embodiments in combination with the accompanying drawings.
As shown in fig. 1 to 6, the construction piping installation apparatus includes: the connecting unit 1, the connecting unit 1 forms the channel 2, there are first connecting holes 3 and second connecting holes 4 in both ends of the channel 2 separately; the first connecting hole 3 is connected with a pipe 5 in the first construction stage, and the second connecting hole 4 is connected with a pipe 5 in the second construction stage; and the sealing unit is arranged at the position of the second connecting hole 4 and is used for sealing the second connecting hole 4 in the first construction stage. The connecting block form can specifically be selected to the linkage cell, this kind of design has changed the technical current situation that traditional vertical piping reserved to the floor surface, save piping bending over work flow, need not connect vertical section piping at first construction stage, construction convenience, second connecting hole 4 on the direct corresponding connecting block of second construction stage installation piping 5 can, be equipped with simultaneously sealed unit and can carry out the shutoff protection to second connecting hole 4 on the connecting block at first construction stage, avoid falling into debris and influence the installation of follow-up piping 5, guarantee the quality of whole work progress piping installation.
In consideration of the specific requirements of construction, the planes of the first connection hole 3 and the second connection hole 4 at both ends of the passage 2 are arranged substantially perpendicular to each other to connect the piping 5 arranged substantially horizontally in the first construction stage and the piping 5 arranged substantially vertically in the second construction stage.
The first connection hole 3 and the second connection hole 4 are each provided with an internal thread connected to a pipe joint 6, and the pipe joint 6 is connected to a piping 5. When the pipe joint 6 is connected to the pipe 5, the pipe 5 is reinforced with the fastening bolt 7 by fitting the pipe joint 6 to the fastening bolt 7 in order to further secure the stability of the connection of the pipe 5. In addition, it is contemplated that a gasket may be added at the junction of the outer surface of the junction box and the pipe joint 6 to further prevent debris from entering the passageway 2.
The sealing unit includes a first sealing cover 8 fitted to the second coupling hole 4. Play secondary shutoff guard action to connecting element second connecting hole 4, prevent to fall into debris such as concrete in the work progress, the convenient clearance debris of later stage, be convenient for dismantle to but recycle.
The device also comprises an identification unit which is connected with the connecting unit 1 and used for indicating the type of the pipe 5 connected with the second connecting hole 4 in the second construction stage. The identification unit can be used to identify the position information of the connection unit 1 and the related piping 5, facilitating the installation of the piping 5 in the second construction stage.
The marking unit comprises a marking rod 9 in threaded connection with the connecting unit 1, and the connecting unit 1 is provided with a marking rod connecting hole 10. The marking rod 9 is preferably a harness cord threaded rod or a steel nail, and the bottom end of the marking rod is preferably connected and fixed with the connecting unit by screw thread; the top end of the mark rod 9 is preferably marked or attached with a relevant mark so as to inquire the information of the relevant piping 5 at a later period. 9 tops of marker post can be higher than the floor upper surface a little, and the later stage can be according to actual conditions suitable adjustment marker post 9 and reserve the height to the floor surface.
The marking rod connecting hole 10 and the second connecting hole 4 are located on the same plane position of the surface of the connecting unit 1, the sealing unit further comprises a second sealing cover 11, and the marking rod connecting hole 10 and the first sealing cover 8 are covered by the second sealing cover 11. The main function of the second sealing cover 11 is to protect the connecting hole of the marking rod 9, and to protect the second connecting hole 4 for the second time, so as to prevent the impurities such as concrete from falling into the connecting hole; the shape and size of the second sealing cover 11 can be reasonably adjusted according to the information such as the size of the related tubing 5 and the thickness of the cast-in-place concrete slab of the floor slab, and the second connecting hole 4 can be conveniently found and matched in the second construction stage.
The surface of the connecting unit 1 is provided with a clamping groove 12 which is matched and connected with the second sealing cover 11. In order to facilitate the mounting and dismounting of the second sealing cover 11, a socket technology of the clamping groove 12 is used here, and the size and the relative arrangement of the clamping groove 12 should satisfy the requirement of reliable and fixed connection between the second sealing cover 11 and the connection unit 1. In addition, a sealing cover bracket is added according to actual needs.
The sign pole 9 overcoat is equipped with plastic protection pipe 13, and plastic protection pipe 13 links to each other with first sealed lid 8. The 13 tops of plastic protection pipe also can set up relevant seal of a government organization in old china and sign, and the sign should be located relevant piping 5 information to piping 5 is installed in the second construction stage, and the sign pole 9 is retrieved to convenient later stage simultaneously, with reduction project cost.
According to actual construction requirements, the connecting unit 1 can be provided with a bridging ground wire connecting hole 14, and the bridging ground wire connecting hole 14 is designed according to actual conditions and design requirements. The hole is preferably slightly larger than the ground wire, and if the hole is not used, a hole plug is used for sealing.
In order to fix the connection unit 1 conveniently, the connection unit 1 is provided with a through hole 15, a steel bar 16 can penetrate into the through hole 15 so that the connection unit 1 can be fixedly connected with a civil engineering bottom layer steel bar network, and meanwhile, the through hole 15 can also be used as a row assembly (i.e. installation expansion) connection of the connection unit 1.
When in use, the method comprises the following steps:
s1: in the first construction stage, the first connecting hole 3 of the connecting unit 1 is connected with a pipe 5 in the civil engineering through a pipe joint 6, and the position of the second connecting hole 4 is determined according to the connecting requirement of the pipe 5 in the second construction stage; the steel bars 16 pass through the through holes 15 of the connecting units 1 and then are bound and fixed with the steel bars on the bottom layer of the civil engineering; after the pipe 5 and the pipe joint 6 are connected, the pipe can be further reinforced by using a fastening bolt 7;
s2: the first sealing cover 8 is used for sealing the second connecting hole 4, and the second sealing cover 11 is clamped in the clamping groove 12 to finish the plugging operation;
s3: installing the marking rod 9 into the marking rod connecting hole 10 and sleeving the plastic protection pipe 13;
s4: in the second construction stage, the matching of the tubing 5 and the second connecting hole 4 is carried out according to the plastic protection tube 13 and/or the marking rod 9;
s5: and (3) opening the second sealing cover 11 and the first sealing cover 8, connecting the pipe 5 to the position of the second connecting hole 4, and removing the mark rod 9 to finish the work of the pipe 5 in the second construction stage.
The above-mentioned specific embodiments can not be regarded as the restriction to the scope of protection of the utility model, to technical personnel in this technical field, it is right the utility model discloses any replacement improvement or transform that embodiment made all fall within the scope of protection of the utility model.
The parts of the present invention not described in detail are the known techniques of those skilled in the art.
Claims (10)
1. Building piping erection equipment, characterized by includes:
the connecting unit is provided with a channel, and two ends of the channel are respectively provided with a first connecting hole and a second connecting hole; the first connecting hole is connected with a pipe in a first construction stage, and the second connecting hole is connected with a pipe in a second construction stage;
and the sealing unit is arranged at the position of the second connecting hole and used for sealing the second connecting hole in a first construction stage.
2. The building piping installation apparatus according to claim 1, wherein the planes of the first connection hole and the second connection hole at both ends of the passage are arranged substantially perpendicular to each other to connect the piping arranged substantially horizontally at the first construction stage and the piping arranged substantially vertically at the second construction stage.
3. The building piping installation apparatus of claim 2, wherein each of the first connection hole and the second connection hole is provided with an internal thread to which a pipe joint connected to the piping is connected.
4. The construction piping installation apparatus according to any one of claims 1 to 3, wherein the sealing unit comprises a first sealing cover fitted to the second coupling hole.
5. The building piping installation apparatus according to claim 4, further comprising an identification unit connected to the connection unit for indicating a piping model for connecting the second connection hole at the second construction stage.
6. The building piping installation apparatus of claim 5, wherein the identification unit comprises an identification rod screw-coupled to a coupling unit provided with an identification rod coupling hole.
7. The building piping installation apparatus of claim 6, wherein the identification rod coupling hole and the second coupling hole are located at the same plane position of the surface of the coupling unit, and the sealing unit further comprises a second sealing cover covering the identification rod coupling hole and the first sealing cover.
8. The building pipe installation apparatus according to claim 7, wherein a surface of the connection unit is provided with a catching groove to be coupled with the second sealing cover.
9. The building pipe installation apparatus according to claim 7 or 8, wherein the identification rod is externally sleeved with a plastic protection pipe, and the plastic protection pipe is connected with the first sealing cover.
10. A building pipe installation apparatus according to claim 9, wherein said connection unit is provided with a through hole through which a reinforcing bar can be inserted so that the connection unit is connected to the reinforcing bar of the civil engineering floor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920425298.9U CN210067479U (en) | 2019-03-29 | 2019-03-29 | Building piping erection equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920425298.9U CN210067479U (en) | 2019-03-29 | 2019-03-29 | Building piping erection equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210067479U true CN210067479U (en) | 2020-02-14 |
Family
ID=69435404
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920425298.9U Expired - Fee Related CN210067479U (en) | 2019-03-29 | 2019-03-29 | Building piping erection equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210067479U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853970A (en) * | 2019-03-29 | 2019-06-07 | 中建八局第一建设有限公司 | Building piping installation equipment and application method |
-
2019
- 2019-03-29 CN CN201920425298.9U patent/CN210067479U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109853970A (en) * | 2019-03-29 | 2019-06-07 | 中建八局第一建设有限公司 | Building piping installation equipment and application method |
CN109853970B (en) * | 2019-03-29 | 2023-12-22 | 中建八局第一建设有限公司 | Building piping installation equipment and use method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061504B (en) | Concrete slab Pipe installing hole to be provided construction mould and construction method | |
CN209308060U (en) | A kind of embedding anchor bolts fixing device for installing | |
CN103161313B (en) | Connection method of main reinforcement of constructional column of infilled wall and framed girder | |
CN109695247B (en) | Deep foundation pit temporary pipeline comprehensive arrangement system and construction method | |
CN103485537A (en) | Construction method and structure of embedded reinforcement of super high-rise horizontal secondary structure | |
CN202913682U (en) | Embedded wall connecting piece | |
CN210067479U (en) | Building piping erection equipment | |
CN207110468U (en) | A kind of shear wall joint part template reinforcing device | |
CN102383601B (en) | Method and device for leading pre-embedded pipes in concrete out of side wall joints | |
CN109296138B (en) | Positioning device for post-planting steel bars of constructional column and construction method | |
CN107604938A (en) | A kind of security device chassis attachment means | |
CN211279058U (en) | Prefabricated assembled concrete structure fast-assembling sleeve built-in fitting | |
CN109763571A (en) | It is a kind of semicircle bolt snap ring assemblies and with its fix overhanging I-steel construction method | |
CN109853970B (en) | Building piping installation equipment and use method | |
KR100762012B1 (en) | Length variable pipe protect sleeve | |
CN207063177U (en) | Cast-in-place concrete floor hanging built-in fitting | |
CN204174910U (en) | A kind of wall-connecting device of scaffold | |
CN210003941U (en) | Detachable anti-seepage sleeve assembly | |
CN209339647U (en) | A kind of constructing device of the fragmentary concrete of fast pouring | |
JP5251074B2 (en) | Repair method for reinforcing bars for concrete utility poles | |
US8505251B1 (en) | System for routing conduit and related methods and apparatus | |
CN207863443U (en) | One kind being used for the fixed device of temporary component | |
CN105888055A (en) | External wall panel installation node | |
CN206205289U (en) | Rainwater hopper direct-buried reinforcing device | |
CN212106574U (en) | A pre-buried mounting for hoist and mount |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200214 |
|
CF01 | Termination of patent right due to non-payment of annual fee |