CN109850287A - Lightgage steel joist engaging support mechanism, control method and baling press - Google Patents

Lightgage steel joist engaging support mechanism, control method and baling press Download PDF

Info

Publication number
CN109850287A
CN109850287A CN201910291672.5A CN201910291672A CN109850287A CN 109850287 A CN109850287 A CN 109850287A CN 201910291672 A CN201910291672 A CN 201910291672A CN 109850287 A CN109850287 A CN 109850287A
Authority
CN
China
Prior art keywords
keel
conveying device
conveying
backgauge
executive item
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910291672.5A
Other languages
Chinese (zh)
Inventor
赵广印
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bazhou Cheng Long Keel Equipment Co Ltd
Original Assignee
Bazhou Cheng Long Keel Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bazhou Cheng Long Keel Equipment Co Ltd filed Critical Bazhou Cheng Long Keel Equipment Co Ltd
Priority to CN201910291672.5A priority Critical patent/CN109850287A/en
Publication of CN109850287A publication Critical patent/CN109850287A/en
Pending legal-status Critical Current

Links

Landscapes

  • Specific Conveyance Elements (AREA)

Abstract

The present invention relates to lightgage steel joist baling equipment technical field more particularly to lightgage steel joist engaging support mechanisms, control method and baling press.Lightgage steel joist engaging support mechanism includes the first conveying device, hooks material component and backgauge device;Backgauge device and executive item are successively spaced setting along the conveying direction of the first conveying device;When backgauge device is in evacuation state, the first keel are transported to the position of executive item by the first conveying device, and the executive item after landing can stop the keel;When backgauge device is in blocked state, the working end of backgauge device can stop the second keel;Executive item can lift the first keel close to the side of executive item when rising, and be fastened on the overturning of the first keel on the second keel.Control method is applied to above-mentioned lightgage steel joist engaging support mechanism;Baling press includes on above-mentioned lightgage steel joist engaging support mechanism.Lightgage steel joist engaging support mechanism, control method and baling press provided by the invention, low labor intensity, save manpower, and efficiency is higher.

Description

Lightgage steel joist engaging support mechanism, control method and baling press
Technical field
The present invention relates to lightgage steel joist baling equipment technical field more particularly to lightgage steel joist engaging support mechanisms, control method And baling press.
Background technique
Lightgage steel joist is common ceiling material in current building and finishing, and effect is the dress for being mounted on its surface Exterior material plays the role of hanging bracket.Lightgage steel joist is packaged after the completion of production, in order to store and transport later It is defeated.
Currently, being typically all manually to be packaged to lightgage steel joist, manually keel is matched two-by-two snap together first, Then the keel snapped together are manually put into parcel, then is manually wound and is packaged with adhesive tape.Wherein, keel are manually fastened Process needs worker to move keel, and labor intensity is high, and low efficiency.
To sum up, how to overcome drawbacks described above existing for the existing mode manually fastened to lightgage steel joist is this field Technical staff's technical problem urgently to be resolved.
Summary of the invention
It is existing to alleviate the purpose of the present invention is to provide a kind of lightgage steel joist engaging support mechanism, control method and baling press Labor intensity existing for the artificial mode fastened to lightgage steel joist in technology is high, and the technical issues of low efficiency.
Lightgage steel joist engaging support mechanism provided by the invention applied to baling press, including the first conveying device, hook material component With backgauge device, the hook material component includes the executive item that can be gone up and down;Wherein, the backgauge device and the executive item are described in The conveying direction of first conveying device is successively spaced setting, and first conveying device is used for the width direction along keel towards institute State executive item conveying keel;The backgauge device, which has, avoids and stops two states;When the backgauge device is in evacuation shape When state, the first keel can be transported to the position of the executive item, and the execution after landing by first conveying device Part can stop the first keel;When the backgauge device is in blocked state, the working end of the backgauge device can stop Second keel of the first conveying device conveying;The executive item can be by the first keel close to the one of the executive item when rising Side is lifted, and the executive item and the first conveying device mating reaction, can be overturn the first keel and is fastened on the second dragon On bone.
Preferably, as an embodiment, the hook material component includes hooking material motor, drive rod and cam, described Material motor is hooked for driving the drive rod around own axis, the drive rod is defeated perpendicular to first conveying device Send direction and parallel with the conveyor surface of first conveying device;The cam is fixed on the drive rod, the executive item On fitting is installed, the lower end of the fitting is abutted with the profile of the cam;The executive item is led with setting up and down Rail is slidably connected, and the fitting is able to drive the executive item along the lifting rail.
Preferably, as an embodiment, the is provided at the position of the first conveying device input terminal Two conveying devices and material-pulling device;Second conveying device is used to convey keel, and described second along the length direction of keel The conveying direction of conveying device is vertical with the conveying direction of first conveying device;The material-pulling device is set to described second Side of the conveying device far from first conveying device, the material-pulling device can be by the keel in second conveying device It shifts onto first conveying device.
Preferably, as an embodiment, the lightgage steel joist engaging support mechanism further includes controller and backgauge induction Device, the backgauge inductor and the executive item are set gradually along the conveying direction of first conveying device, the backgauge sense Answer device for incuding the first keel for contacting with the executive item and being stopped by the executive item;It is the backgauge inductor, described Backgauge device, the material-pulling device and first conveying device are electrically connected with the controller.
Preferably, as an embodiment, support is provided at the position of the first conveying device output end Expect that device and poking device, the material-supporting device include the first telescopic component, first telescopic component can be accepted when stretching out The keel of the first conveying device conveying mutually fastened;The poking device is for adjusting the keel mutually fastened described Position on first telescopic component, and after first telescopic component contraction, the keel energy on first telescopic component It falls.
Preferably, as an embodiment, the position of the material-supporting device is provided with lifting device, the liter Falling unit includes lifting platform and the second telescopic component, and second telescopic component is mounted on the lifting platform, the lifting platform It is able to drive the second telescopic component lifting;Second telescopic component can be accepted after stretching out from first telescopic component The keel fallen, and after second telescopic component contraction, the keel on second telescopic component can be fallen.
It preferably, as an embodiment, further include lifting device, it is defeated to be provided with third below the lifting platform Device is sent, the third conveying device is used for keel are defeated for accepting the keel fallen from second telescopic component It is sent to next station.
Correspondingly, the present invention provides a kind of control method of above-mentioned lightgage steel joist engaging support mechanism, the second conveying device Tail end is equipped with pusher inductor, the pusher inductor, the material-pulling device and first conveying device with the control Device electrical connection processed;
The described method includes:
Step a, when the keel in second conveying device trigger pusher inductor, the controller controls the pusher Device shifts keel in first conveying device onto, and first conveying device conveys keel toward the position of executive item, follows Ring carries out;
Step b triggers the backgauge inductor, the controller root when first keel are stopped by the executive item The backgauge device, which is controlled, according to the trigger signal of the backgauge inductor is converted to blocked state;
Step c, when second keel are stopped by the backgauge device, it is dynamic that the controller controls the hook material component Make so that the executive item rises, and controls first conveying device and stop conveying;
Step d, when first keel triggered by the executive item tilt predetermined angle, the controller controls institute It states the first conveying device to start to convey, and controls the backgauge device and be converted to evacuation state;
Step e, when first conveying device is gone over mutually fasten two keel by conveying below the executive item Later, the executive item decline.
Preferably, as an embodiment, support is provided at the position of the first conveying device output end Expect that device and poking device, the material-supporting device include the first telescopic component, the position close to the material-supporting device is provided with liter Falling unit, the lifting device include lifting platform and the second telescopic component, and the hook expects component, the poking device, the support Material device and the lifting device are electrically connected with the controller;
The method also includes following steps:
Step f, the controller record the hook material number for hooking material component, and the hook material number for hooking material component reaches The keel triggered when the default multiple for hooking material number reach on first telescopic component, and the controller controls the material toggling dress Set the predeterminated position keel on first telescopic component pushed on first telescopic component;
Step g, after the completion of the poking device material toggling, the controller controls first telescopic component and shrinks;
Step h, after keel are fallen on second telescopic component, the controller controls the lifting platform and declines a dragon The height of bone;
Step i, the controller records the hook material number for hooking material component, when the material toggling number of the poking device reaches To default material toggling number and when keel are fallen on second telescopic component, the controller controls the lifting platform and drops to most Bottom end;
Step j, after the lifting platform drops to lowermost end, the controller controls second telescopic component and shrinks.
The present invention also provides a kind of baling presses, including packing apparatus and above-mentioned lightgage steel joist engaging support mechanism;The packing Device is used to be packaged the keel of the lightgage steel joist engaging support mechanism output.
Compared with the prior art, the advantages of the present invention are as follows:
Provided by the present invention for the lightgage steel joist engaging support mechanism of baling press, including the first conveying device, hook material component and Backgauge device, wherein hook and be provided with the executive item that can be gone up and down, backgauge device and executive item in material component along the first conveying dress The conveying direction set successively is spaced setting.First conveying device is used to convey keel along the width direction of keel, enables keel It is enough to be moved along local width direction towards executive item;Backgauge device, which has, to be avoided and stops two states, when backgauge device is in When evacuation state, the first keel can be transported to the position of executive item by the first conveying device, and can be hindered after executive item landing Keep off the first keel;When backgauge device is in blocked state, the working end of backgauge device can stop the first conveying device to convey The second keel;The side for the close executive item for being able to drive the first keel during executive item rises is lifted, and is executed Part can cooperate with the first conveying device, so that the overturning of the first keel is to be fastened on the second keel.
The working principle of above-mentioned lightgage steel joist engaging support mechanism is as follows: the first conveying device is placed on first on its conveyor surface Keel are to when hooking the conveying of material component position, and backgauge device is in evacuation state, i.e. the working end of backgauge device will not hinder First keel are current, and when the first keel are transported at the executive item for hooking material component by the first conveying device, executive item has been located Position after landing is can stop the first keel;After first keel pass through, backgauge device is converted to blocked state to stop Second keel, at this point, the first keel are between executive item and backgauge device.
Executive item can trigger the side that the first keel being blocked are adjacent to, so that the first keel are with its other side Bottom edge is fulcrum to another side to overturn, and the first keel overturn certain angle and (can be set as needed, may be provided at 40 degree -50 Between degree, preferably 45 degree) after, the backgauge device in blocked state is converted into evacuation state, so that backgauge device is no longer Stop the second keel, at this point, the second keel can flip an angle with to be performed part under the conveying of the first conveying device The contact of first keel, meanwhile, the first keel still are continuing to overturn under the action of executive item, and the bottom of the first keel can be the The conveying of one conveying device moves forward together with the second keel under bicarinate promotion, and the flip angle of the first keel is super It can be slowly detained after crossing 90 degree to the second keel until being fastened on the second keel completely, realize the mutual fastening of two keel.
Therefore, lightgage steel joist engaging support mechanism provided by the invention, utilizes the mutual cooperation of the first conveying device and executive item Effect, realizes the fastening of two keel, moves keel without worker, reduce labor intensity, saves manpower, and efficiency compared with It is high.
Correspondingly, can be controlled using controller the present invention provides a kind of control method of lightgage steel joist engaging support mechanism The operation of lightgage steel joist engaging support mechanism, the degree of automation is higher, further reduced labor intensity, saves manpower.
It should be noted that control method provided by the invention, when beginning to ramp up, the first conveying device stops executive item Conveying, i.e. for the first keel in initial switching process, the part that the first keel are contacted with the first conveying device will not be because of the first dragon The overturning of bone and driven by the first conveying device and continue to move ahead, to avoid the first keel with by backgauge device stop second dragon Spacing between bone is excessive, and influences the first keel and bicarinate fastening;In addition, when bicarinate tilt angle reaches When predetermined angle (40-50 degree, preferably 45 degree), controller controls the first conveying device and starts to convey, while controlling backgauge device Evacuation state is converted to, thus, the part that the first keel and the second keel are contacted with the first conveying device will follow simultaneously The conveyor surface of one conveying device is mobile, at this point, the first keel have completed the inclination of predetermined angle, when the second keel are imperial to first When bone position is mobile, the first keel will not the second keel of pressure, thus, enable the first keel to be smoothly fastened on second On keel.
The present invention also provides a kind of baling presses, including above-mentioned lightgage steel joist engaging support mechanism, further include packing apparatus, are packaged Device can be packaged the keel exported by lightgage steel joist engaging support mechanism.
Therefore, baling press provided by the invention, be not only able to realize keel fastening, and can also make-up close complete dragon Bone is packaged, and labor intensity is reduced, and saves manpower, improves efficiency.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the overlooking structure diagram of baling press provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of baling press provided in an embodiment of the present invention;
Fig. 3 is the assembling structure schematic diagram of the second conveying device and material-pulling device provided in an embodiment of the present invention;
Fig. 4 is the first conveying device provided in an embodiment of the present invention and the assembling structure schematic diagram for hooking material component;
Fig. 5 is the assembling structure schematic diagram of material-supporting device provided in an embodiment of the present invention, poking device and lifting device;
Fig. 6 is the electric control schematic diagram of baling press provided in an embodiment of the present invention.
Icon: the first conveying device of 1-;2- hooks material component;The second conveying device of 3-;4- material-pulling device;5- control Device;6- material-supporting device;7- poking device;8- lifting device;9- third conveying device;
The first feeder motor of 11-;12- interlocking bar;13- conveyer belt;
21- executive item;22- fitting;23- backgauge device;24- guide rail;25- hooks material motor;26- drive rod; 27- cam;28- backgauge inductor;
The second feeder motor of 31-;32- roller;33- chain;34- striker plate;
41- pusher inductor;The second cylinder of 42-;
The first telescopic component of 61-;
71- third cylinder;The 4th cylinder of 72-;
81- lifting platform;The second telescopic component of 82-;83- lifting motor.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the orientation of the instructions such as term " on ", "lower", "vertical", "horizontal" Or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description of the present invention and simplification of the description, and It is not that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore It is not considered as limiting the invention.In addition, term " first ", " second ", " third " are used for description purposes only, and cannot manage Solution is indication or suggestion relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation " " connects Connect " it shall be understood in a broad sense, for example, it may be being fixedly connected, it may be a detachable connection, or be integrally connected;It can be machine Tool connection, is also possible to be electrically connected;It can be directly connected, two members can also be can be indirectly connected through an intermediary Connection inside part.For the ordinary skill in the art, above-mentioned term can be understood in the present invention with concrete condition Concrete meaning.
The present invention is described in further detail below through specific implementation examples and in conjunction with the accompanying drawings.
Referring to Fig. 1, Fig. 2 and Fig. 4, a kind of lightgage steel joist engaging support mechanism applied to baling press is present embodiments provided, is wrapped It includes the first conveying device 1, hook material component 2 and retractable backgauge device 23, wherein hook and be provided with and can go up and down in material component 2 Executive item 21, backgauge device 23 and executive item 21 are successively spaced setting along the conveying direction of the first conveying device 1.First conveying dress It sets 1 and conveys keel towards executive item 21 for the width direction along keel, keel are moved along local width direction;Gear Glassware part 23, which has, to be avoided and stops two states, and when backgauge device 23 is in evacuation state, the first conveying device 1 can be incited somebody to action First keel are transported to the position of executive item 21, and can stop the first keel after the landing of executive item 21;At backgauge device 23 When blocked state, the working end of backgauge device 23 can stop the second keel of the first conveying device 1 conveying;In executive item 21 The side that the close executive item 21 of the first keel is able to drive during rising is lifted, and executive item 21 can be with the first conveying Device 1 cooperates, so that the overturning of the first keel is to be fastened on the second keel.
The working principle of above-mentioned lightgage steel joist engaging support mechanism is as follows: the first conveying device 1 is placed on its conveyor surface For one keel to when hooking the conveying of material 2 position of component, backgauge device 23 is in evacuation state, the i.e. working end of backgauge device 23 not The first keel can be hindered current, when the first keel are transported at the executive item 21 for hooking material component 2 by the first conveying device 1, held Row part 21 has been in the position after landing can stop the first keel;After first keel pass through, backgauge device 23 is converted to Blocked state is to stop the second keel, at this point, the first keel are between executive item 21 and backgauge device 23.
Executive item 21 can trigger the side that the first keel being blocked are adjacent to, so that the first keel are another with its Side bottom edge is fulcrum to another side to overturn, and the first keel overturn certain angle and (can be set as needed, preferably 40 degree -50 degree Between) after, the backgauge device 23 in blocked state is converted into evacuation state, so that backgauge device 23 no longer stops second Keel, at this point, under the conveying of the first conveying device 1, the second keel can with be performed that part 21 flips an angle first Keel contact, meanwhile, the first keel still are continuing to overturn under the action of executive item 21, and the bottom of the first keel can be first The conveying of conveying device 1 moves forward together with the second keel under bicarinate promotion, and the flip angle of the first keel is super It can be slowly detained after crossing 90 degree to the second keel until being fastened on the second keel completely, realize the mutual fastening of two keel.
Therefore, lightgage steel joist engaging support mechanism provided in this embodiment utilizes the mutual of the first conveying device 1 and executive item 21 Mating reaction, realizes the fastening of two keel, moves keel without worker, reduces labor intensity, saves manpower, and imitate Rate is higher.
Preferably, referring to fig. 4, it is provided in lightgage steel joist engaging support mechanism provided in this embodiment and is slided with executive item 21 The guide rail 24 of connection, so that executive item 21 can be gone up and down along guide rail 24, i.e., guide rail 24 plays the guiding work to executive item 21 With ensure that the fastening validity of two keel so that the motion profile of executive item 21 is more stable.
Wherein, the conveyor surface of conveyer belt 13 can be horizontally disposed with, and guide rail 24 can be vertically arranged, so that two keel can be more preferable Ground mutually fastens.
It can be arranged in hooking material component 2 as a kind of driving method of executive item 21 with Fig. 6 referring to fig. 4 and hook material motor 25 With drive rod 26, drive drive rod 26 around own axis using material motor 25 is hooked, drive rod 26 is filled perpendicular to the first conveying 1 conveying direction and parallel with the conveyor surface of the first conveying device 1 is set, cam 27 is fixed on drive rod 26, in executive item 21 Upper installation fitting 22 abuts the lower end of fitting 22 with the profile of cam 27, thus, the rotation of drive rod 26 will drive thereon Cam 27 rotate, in turn so that fitting 22 drive executive item 21 moved up and down along guide rail 24;To which controller 5 can pass through Control hooks the rotation direction of material motor 25, to control the rotation direction of cam 27, and then controls executive item 21 and goes up and down along guide rail 24. Wherein, it can will hook material motor 25 and be set as servo motor, in order to adjust the direction and the speed that hook material motor 25 as needed.
Preferably, executive item 21 and cam 27 can be disposed as at least two, and makes executive item 21 and cam 27 1 One is corresponding, meanwhile, cam 27 is disposed as cylindrical structure equal in magnitude, in this way, first can be parallel to drive rod 26 The conveyor surface of conveying device 1 is arranged, and cam 27 is set as to be in any state and the contact position of fitting 22 Sustained height;In this way, all executive items 21 can be made with the lifting of identical speed, in order to make any position of keel Flip angle is all the same, improves the fastening effect of two keel.
Particularly, executive item 21 can be set to strip structure part, and opens up opening direction on strip structure part The reversed groove of the conveying direction of first conveying device 1 is not only able to smoothly be triggered keel using groove, and completed To keel trigger effect after, the hook that keel can voluntarily get rid of groove is held, only need to utilize strip structure part barrier effect, nothing Need other operations to separate executive item 21 and keel, convenient for simplifying structure.
Specifically, referring to Fig. 3, in settable second conveying device 3 of the input terminal of the first conveying device 1 and material-pulling device 4, Second conveying device 3 is used to convey keel along the length direction of keel, and the conveying direction of the second conveying device 3 and the first conveying fill Set 1 conveying direction it is vertical, and material-pulling device 4 is located at side of second conveying device 3 far from the first conveying device 1 so that Material-pulling device 4 can be shifted onto the first conveying device 1 from keel side by the keel in the second conveying device 3, be convenient for and upper one The keel feedway along keel length direction supply keel in station is used cooperatively, it is not necessary that keel are manually transported to light steel On keel engaging support mechanism.In actual work, keel are sent into the second conveying device 3 from the input terminal of the second conveying device 3, by the Two conveying devices 3 accept be sent into keel and by keel along keel length direction convey, when keel in place after, material-pulling device 4 It is shifted onto the first conveying device 1 from the side of keel by the keel in the second conveying device 3, reduces labor intensity, save Manpower improves efficiency.
Preferably, striker plate 34 can be set in the tail end of the second conveying device 3, to stop the second conveying using striker plate 34 The keel that device 3 conveys, prevent keel from crossing the position of suitable 4 pusher of material-pulling device under the conveying of the second conveying device 3, together When, moreover it is possible to so that keel are shifted onto the validity in the first conveying device 1 by material-pulling device 4, alleviation keel are pushed away askew by material-pulling device 4 The case where.
Preferably, can by backgauge device 23 with executive item 21 at a distance from the conveying direction of the first conveying device 1 and keel The ratio between width between 1.05-1.15, on the one hand, be not only the first dragon between backgauge device 23 and executive item 21 The overturning of bone leaves certain gap, and under the action of being in the backgauge device 23 of blocked state, the overturning of the first keel is smaller The second keel will not be touched when angle, can prevent generation the case where the second keel of pressure in overturning of the first keel, and because of the Backgauge device 23 can resist the first keel when one keel are overturn, and prevent the first keel from skidding because of overturning;On the other hand, exist After backgauge device 23 is converted to evacuation state, the second keel can be in contact with the first keel in time, so that the process of fastening is more Smoothly.
Referring to Fig. 6, settable controller 5 and backgauge inductor in lightgage steel joist engaging support mechanism provided in this embodiment 28, backgauge inductor 28 and executive item 21 are set gradually along the conveying direction of the first conveying device 1, i.e. backgauge inductor 28 In the side opposite with the conveying direction of the first conveying device 1 of executive item 21, backgauge inductor 28 is arranged close to executive item 21, Backgauge inductor 28 can be utilized to incude the keel that part 21 is contacted and be performed with executive item 21 and is stopped, thus, when the first dragon Bone can trigger backgauge inductor 28 afterwards in place.Backgauge inductor 28 and backgauge device 23 are electrically connected with controller 5, to keep off After material inductor 28 is triggered, controller 5 can control backgauge device 23 according to the trigger signal of backgauge inductor 28 and be converted to Blocked state.Wherein, backgauge inductor 28 may be configured as optoelectronic switch.
It can will hook material component 2 to be electrically connected with controller 5, to hook the hook material number of material component 2 using the record of controller 5.
Preferably, using the first cylinder as backgauge device 23, thus, controller 5 can be stretched by controlling the first cylinder The conversion of 23 state of backgauge device is realized in contracting.
As an embodiment, the cylinder barrel of the first cylinder can be fixed under the conveyor surface of the first conveying device 1 Side, its piston rod (as above-mentioned working end) can protrude from the conveyor surface of the first conveying device 1 after the elongation of the first cylinder, and then living The part that stopper rod protrudes from the conveyor surface of the first conveying device 1 can stop the second keel conveyed by the first conveying device 1, at this time First cylinder is blocked state;First cylinder shorten after its piston rod can be completely in the first conveying device 1 conveyor surface hereinafter, And then piston rod would not form keel and stop, the first cylinder is evacuation state at this time.
As another embodiment, the cylinder barrel of the first cylinder can be fixed on to the conveyor surface of the first conveying device 1 Top, the meeting of its piston rod is close to the conveyor surface of the first conveying device 1 can stop the first conveying device 1 after the elongation of the first cylinder On the second keel, at this time the first cylinder be blocked state;Its piston rod can be far from the first conveying device 1 after first cylinder shortens Conveyor surface, and then the enough keel in gap between piston rod and the conveyor surface of the first conveying device 1 pass through, and then piston rod is just Keel will not be formed and be stopped, the first cylinder is evacuation state at this time.
Wherein, controller 5 can be PLC or single-chip microcontroller.
Preferably, referring to Fig. 3, the second cylinder 42 can be set in material-pulling device 4, controller 5 can be by controlling the second gas Cylinder 42 elongates or shortens the piston rod of the second cylinder 42, i.e., using the piston rod of the second cylinder 42 by the second conveying device 3 On keel shift onto the first conveying device 1 of lightgage steel joist engaging support mechanism;Meanwhile controller 5 can be according to the second cylinder 42 Flexible number, record material-pulling device 4 pusher number.
Further, referring to fig. 4, can be arranged in the first conveying device 1 first feeder motor 11, the first transmission component and Conveyer belt 13 drives the first transmission component to operate, passes through the first transmission component driving conveying belt 13 using the first feeder motor 11 Operating conveys keel using conveyer belt 13, thus, controller 5 can be defeated to control by controlling the start and stop of the first feeder motor 11 Send conveying of the band 13 to keel.
Specifically, the first transmission component includes interlocking bar 12 and belt wheel, by the output shaft of the first feeder motor 11 and linkage Bar 12 is fixedly and coaxially connected, to drive interlocking bar 12 to rotate synchronously using the first feeder motor 11;Belt wheel is fixedly attached to connection In lever 12, and 13 sets of conveyer belt are operated on belt wheel by belt wheel driving conveying belt 13.Wherein, the first feeder motor 11 can It is set as servo motor, to adjust the revolving speed of the first feeder motor 11 as needed.
Specifically, referring to Fig. 3, if can be arranged in the second conveying device 3 second feeder motor 31, the second transmission component and Dry roller 32, drives the second transmission component to operate using the second feeder motor 31, drives 32 turns of roller by the second transmission component It is dynamic, keel are placed on roller 32, convey keel using roller 32, thus, controller 5 can be by controlling the second feeder motor 31 Start and stop control conveying of the roller 32 to keel.
Specifically, the second transmission component include chain 33, the first sprocket wheel and with one-to-one second sprocket wheel of roller 32, One sprocket wheel is fixed on the output shaft of the second feeder motor 31, and the second sprocket wheel is fixed on corresponding roller 32, by chain 33 are wound on the first sprocket wheel and the second sprocket wheel, drive the first sprocket wheel to rotate using the second feeder motor 31, and by chain 33 by the The power of one sprocket wheel passes to the second sprocket wheel, so that the second sprocket wheel rotates, and drives roller 32 to rotate by the second sprocket wheel.Wherein, Servo motor can be set by the second feeder motor 31, to adjust the revolving speed of the second feeder motor 31 as needed.
Preferably, referring to Fig. 6, pusher inductor 41, the second conveying device 3 can be installed in the tail end of the second conveying device 3 On keel in place after can trigger pusher inductor 41, after pusher inductor 41 is triggered, controller 5 control material-pulling device 4 Pusher improves the degree of automation.
Referring to fig. 2 and Fig. 5, settable material-supporting device 6 and material toggling dress at the position close to 1 output end of the first conveying device Set 7, wherein material-supporting device 6 includes the first telescopic component 61, and the first telescopic component 61 can accept the first conveying device when stretching out The keel of 1 conveying mutually fastened;Poking device 7 can stir keel to adjust the keel mutually fastened in the first telescopic component Position on 61, after the first telescopic component 61 is shunk, the keel on the first telescopic component 61 can be fallen, and entrance is next Link.
Further, controller 5 is electrically connected with poking device 7, is reached with the number of the keel on the first telescopic component Number to default one layer of keel constantly controls the movement of poking device 7, to utilize poking device 7 will be on the first telescopic component 61 Keel push the predetermined position on the first telescopic component 61, it is not necessary that one layer of keel are neatly artificially arranged in the second telescopic component 82 surface, high degree of automation reduce labor intensity, save manpower.
Further, lifting device 8 can be also set close to the position of material-supporting device 6, be provided with lifting in the lifting device 8 Platform 81 and the second telescopic component 82, the second telescopic component 82 is mounted on lifting platform 81, and lifting platform 81 is able to drive second and stretches Contracting component 82 is gone up and down;Second telescopic component 82 can accept the keel fallen from the first telescopic component 61 after stretching out, second is flexible After component 82 is shunk, the keel on the second telescopic component 82 can fall on next link.
Further, it can be positioned below third conveying device 9 in lifting platform 81, to accept using third conveying device 9 Keel are simultaneously transported to next station by the keel that fall from the second telescopic component 82, alleviate the labor intensity of manual handling.
Further, referring to Fig. 6, material-supporting device 6 and lifting device 8 can be electrically connected with controller 5;Work as poking device After the completion of 7 material togglings, the first telescopic component 61 can control to shrink for controller 5 so that the keel on the first telescopic component 61 fall on the On two telescopic components 82;After first telescopic component 61 is shunk, controller 5 controls the movement of lifting device 8 so that under lifting platform 81 The height of one keel drops.Poking device 7 is electrically connected with controller 5, to record the material toggling of poking device 7 using controller 5 Number, thus, reach default material toggling number (number of plies for the keel for needing to be packaged, can according to need to set) in material toggling number When, controller 5 starts timing, and timing length is at the end of timing, the first telescopic component 61 is opened, i.e., controller 5 is counted When at the end of, the keel on the first telescopic component 61 have been fallen on the second telescopic component 82, are risen at this point, controller 5 is controllable Falling unit 8 makes lifting platform 81 drop to lowermost end, in turn, completes the stacking to the keel of specific columns certain layer number.
The 5th several cylinders can be set in the first telescopic component 61, and by the predeterminated position on the first telescopic component 61 It is arranged on the piston rod of the 5th cylinder, thus, controller 5 can be shunk the 5th cylinder of control after the reset of third cylinder 71, from And the piston rod of the 5th cylinder does not just continue to support keel, in turn, keel can fall on second under the effect of gravity On telescopic component 82.
Also settable lifting motor 83, lead screw, nut and vertically arranged sliding rail in lifting device 8, by lifting motor 83 fixed settings, and the output shaft of lead screw and lifting motor 83 is fixedly and coaxially connected, i.e. the operating of lifting motor 83 can drive silk Thick stick rotation;Nut and lead screw are cooperated, and nut is fixedly connected with lifting platform 81, meanwhile, by lifting platform 81 and sliding rail It is slidably matched, nut can move up and down under the limitation of sliding rail with the rotation of lead screw, and then drive and move down on lifting platform 81 It is dynamic;Wherein, servo motor can be set by lifting motor 83.
Keel height of drop causes keel to misplace or damage very much greatly in order to prevent, by the initial bit of the second telescopic component 82 Setting the height difference setting between the first telescopic component 61 is lesser numerical value, therefore, every one layer of the undertaking of the second telescopic component 82 Keel lifting platform 81 just needs to decline the height of one layer of keel, to be able to maintain the second telescopic component 82 or fall in second flexible group The difference in height between keel and the first telescopic component 61 on part 82 prevents keel from being formed to material-supporting device 6 and interferes, to guarantee to hold in the palm Expect the normal work of device 6.
Controller 5 can control lifting motor 83 and operate after the 5th cylinder retracted for clearance, so that the driving of lifting motor 83 rises The height that platform 81 declines one layer of keel drops, and after declining preset times, controller 5 controls lifting motor 83 and drops to most bottom End.
Referring to Fig. 5, settable third cylinder 71, link block and the 4th cylinder 72 in the specific structure of poking device 7 will Third cylinder 71 is fixed at the top of material-supporting device 6, and link block is connect with the piston rod of third cylinder 71, and will connection Block is arranged in third cylinder 71 and the 4th cylinder 72 is fixed on to the lower section of link block close to one end of the first conveying device 1, and will The telescopic direction of 4th cylinder 72 is set as up and down direction;Controller 5 can directly be electrically connected with third cylinder 71 and the 4th cylinder 72 It connects, thus, controller 5 can be stretched the 4th cylinder 72 of control when the logarithm of the keel on material-supporting device 6 is the logarithm of one layer of keel Long, when the piston rod of the 4th cylinder 72 can stir the keel on the first telescopic component 61, third cylinder 71 shrinks (this process It can be realized by being delayed in controller 5, the piston rod that timing time is set as the 4th cylinder 72 at the end of timing can be stirred Keel on first telescopic component 61), so that the piston rod of third cylinder 71 is able to drive link block toward first flexible group Predeterminated position on part 61 is mobile, and in turn, the 4th cylinder 72 being fixed on link block just can drive keel toward first flexible group Predeterminated position on part 61 is mobile, until the predeterminated position being moved to keel on the first telescopic component 61.
Particularly, thin type cylinder can be set by the 4th cylinder 72.
Referring to Fig. 6, correspondingly, present embodiments providing a kind of control method of above-mentioned lightgage steel joist engaging support mechanism, the party Method includes the following steps:
Step a, when the keel in the second conveying device 3 trigger pusher inductor 41, controller 5 controls material-pulling device 4 will Keel are shifted onto the first conveying device 1, and the first conveying device 1 conveys keel toward the position of executive item 21, and circulation carries out;
Step b triggers backgauge inductor 28 when the first keel are performed when part 21 stops, and controller 5 incudes according to backgauge The trigger signal control backgauge device 23 of device 28 is converted to blocked state;
Step c, when the second keel are stopped by backgauge device 23, the control of controller 5 hooks the material movement of component 2 so that executive item 21 rise, and control the first conveying device 1 and stop conveying;
Step d, (can be real by 5 timing of controller when being performed the first keel that part 21 triggers and tilting predetermined angle It is existing), controller 5 controls the first conveying device 1 and starts to convey, and controls backgauge device 23 and be converted to evacuation state;
Step e, when the first conveying device 1 by mutually fasten two keel by below executive item 21 convey pass by after, Executive item 21 declines.
Step f, the record of controller 5 hook the hook material number of material component 2, and the hook material number for hooking material component 2 reaches default and hooks material The keel triggered when the multiple of number reach (can be realized) on the first telescopic component 61 by 5 timing of controller, and controller 5 controls Keel on first telescopic component 61 are pushed the predeterminated position on the first telescopic component 61 by poking device 7;
Step g, after the completion of 7 material toggling of poking device, controller 5 controls the first telescopic component 61 and shrinks;
Step h, after keel are fallen on the second telescopic component 82, controller controls the height that lifting platform 81 declines a keel Degree;
Step i, the record of controller 5 hook the hook material number of material component 2, dial when the material toggling number of poking device 7 reaches default Expect number (logarithm of the keel fastened in one layer of keel, can be set as needed) and keel are fallen on the second telescopic component 82 When, controller 5 controls lifting platform 81 and drops to lowermost end;
Step j, after lifting platform 81 drops to lowermost end, controller 5 controls the second telescopic component 82 and shrinks.
It should be noted that control method provided in this embodiment, executive item 21 is when beginning to ramp up, the first conveying device 1 stops conveying, i.e. for the first keel in initial switching process, part that the first keel are contacted with the first conveying device 1 will not be because The overturning of first keel and driven by the first conveying device 1 and continue to move ahead, hindered to avoid the first keel with by backgauge device 23 Spacing between second keel of gear is excessive, and influences the first keel and bicarinate fastening;In addition, bicarinate inclining when the When rake angle reaches predetermined angle (40-50 degree, preferably 45 degree), controller 5 controls the first conveying device 1 and starts to convey, simultaneously Control backgauge device 23 is converted to evacuation state, thus, the part that the first keel and the second keel are contacted with the first conveying device 1 The conveyor surface of the first conveying device 1 will be followed mobile simultaneously, at this point, the first keel have completed the inclination of predetermined angle, when When second keel are mobile to the first keel position, the first keel will not the second keel of pressure, thus, enable the first keel It is enough to be smoothly fastened on the second keel.
The present embodiment additionally provides a kind of baling press comprising packing apparatus and above-mentioned lightgage steel joist engaging support mechanism are packaged Device can be packaged the keel exported by lightgage steel joist engaging support mechanism.
Therefore, baling press provided in this embodiment, be not only able to realize keel fastening, and can also make-up close complete Keel are packaged, and labor intensity is reduced, and save manpower, improve efficiency.
In conclusion which overcome biographies the invention discloses a kind of lightgage steel joist engaging support mechanism, control method and baling press Many technological deficiencies of the artificial mode that lightgage steel joist is fastened of system.Lightgage steel joist provided in this embodiment fastens machine Structure, control method and baling press, reduce labor intensity, save manpower, and efficiency is higher.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

1. a kind of lightgage steel joist engaging support mechanism is applied to baling press, which is characterized in that including the first conveying device (1), hook material group Part (2) and backgauge device (23), hook material component (2) includes the executive item (21) that can be gone up and down;
Wherein, the backgauge device (23) and the executive item (21) along first conveying device (1) conveying direction successively Interval setting, first conveying device (1) are used to convey keel, phase towards the executive item (21) along the width direction of keel It is the first keel that two keel mutually fastened, which are in top, and being below is the second keel;
The backgauge device (23), which has, avoids and stops two states;When the backgauge device (23) is in evacuation state, First keel can be transported to the position of the executive item (21) by first conveying device (1), and described after landing is held Row part (21) can stop the first keel;When the backgauge device (23) is in blocked state, the backgauge device (23) Working end can stop the second keel of the first conveying device (1) conveying;The executive item (21) can be by first when rising Keel are lifted close to the side of the executive item (21), and the executive item (21) and first conveying device (1) are with cooperation With, can by the first keel overturn be fastened on the second keel.
2. lightgage steel joist engaging support mechanism according to claim 1, which is characterized in that hook material component (2) includes hooking material Motor (25), drive rod (26) and cam (27), hook material motor (25) is for driving the drive rod (26) around itself axis Line rotation, the drive rod (26) perpendicular to first conveying device (1) conveying direction and with first conveying device (1) conveyor surface is parallel;
The cam (27) is fixed on the drive rod (26), is equipped with fitting (22) on the executive item (21), described The lower end of fitting (22) is abutted with the profile of the cam (27);The executive item (21) and guide rail (24) setting up and down are sliding Dynamic connection, the fitting (22) are able to drive the executive item (21) and go up and down along the guide rail (24).
3. lightgage steel joist engaging support mechanism according to claim 1 or 2, which is characterized in that close to first conveying device (1) the second conveying device (3) and material-pulling device (4) are provided at the position of input terminal;
Second conveying device (3) is used to convey keel along the length direction of keel, and second conveying device (3) is defeated Send direction vertical with the conveying direction of first conveying device (1);The material-pulling device (4) is set to the second conveying dress The side of (3) far from first conveying device (1) is set, the material-pulling device (4) can will be on second conveying device (3) Keel shift on first conveying device (1).
4. lightgage steel joist engaging support mechanism according to claim 3, which is characterized in that further include controller (5) and backgauge sense Answer device (28), the backgauge inductor (28) and the executive item (21) along first conveying device (1) conveying direction according to Secondary setting, the backgauge inductor (28), which is used to incude, to be contacted with the executive item (21) and by the executive item (21) blocking First keel;
The backgauge inductor (28) and the backgauge device (23) are electrically connected with the controller (5).
5. lightgage steel joist engaging support mechanism according to claim 4, which is characterized in that close to first conveying device (1) Material-supporting device (6) and poking device (7) are provided at the position of output end, the material-supporting device (6) includes the first telescopic component (61), the dragon of the first conveying device (1) conveying mutually fastened can be accepted when first telescopic component (61) is stretched out Bone;The poking device (7) is used to adjust position of the keel mutually fastened on first telescopic component (61), and described After first telescopic component (61) is shunk, the keel on first telescopic component (61) can be fallen.
6. lightgage steel joist engaging support mechanism according to claim 5, which is characterized in that close to the position of the material-supporting device (6) It installing and is equipped with lifting device (8), the lifting device (8) includes lifting platform (81) and the second telescopic component (82), and described second Telescopic component (82) is mounted on the lifting platform (81), and the lifting platform (81) is able to drive second telescopic component (82) Lifting;Second telescopic component (82) can accept the keel fallen from first telescopic component (61), and institute after stretching out After stating the second telescopic component (82) contraction, the keel on second telescopic component (82) can be fallen.
7. lightgage steel joist engaging support mechanism according to claim 6, which is characterized in that the lower section of the lifting platform (81) is arranged Have third conveying device (10), the third conveying device (10) is used to accept to fall from second telescopic component (82) Keel, and for keel to be transported to next station.
8. a kind of control method of the described in any item lightgage steel joist engaging support mechanisms of claim 4-7, which is characterized in that second The tail end of conveying device (3) is equipped with pusher inductor (41), the pusher inductor (41), the material-pulling device (4) and institute The first conveying device (1) is stated to be electrically connected with the controller (5);
The described method includes:
Step a, second conveying device conveys keel along the length direction of keel, when on second conveying device (3) When keel trigger pusher inductor (41), the controller (5) controls the material-pulling device (4), and to shift keel onto described first defeated It send on device, first conveying device conveys keel toward the position of executive item (21), and circulation carries out;
Step b triggers the backgauge inductor (28), the control when first keel are stopped by the executive item (21) Device (5) controls the backgauge device (23) according to the trigger signal of the backgauge inductor (28) and is converted to blocked state;
Step c, when second keel are stopped by the backgauge device (23), the controller (5) controls the hook material group Part (2) acts so that the executive item (21) rises, and controls first conveying device (1) and stop conveying;
Step d, when first keel triggered by the executive item (21) tilt predetermined angle, controller (5) control It makes first conveying device (1) to start to convey, and controls the backgauge device (23) and be converted to evacuation state;
Step e, when first conveying device (1) was conveyed mutually fasten two keel by the executive item (21) lower section After going, executive item (21) decline.
9. control method according to claim 8, which is characterized in that close to the first conveying device (1) output end Material-supporting device (6) and poking device (7) are provided at position, the material-supporting device (6) includes the first telescopic component (61), close The position of the material-supporting device (6) is provided with lifting device (8), and the lifting device (8) includes that lifting platform (81) and second stretch Contracting component (82), hook material component (2), the poking device (7), the material-supporting device (6) and the lifting device (8) are equal It is electrically connected with the controller (5);
The method also includes following steps:
Step f, the controller (5) record the hook material number for hooking material component, and the hook material number for hooking material component (2) reaches Expect that the keel triggered when the multiple of number reach on first telescopic component (61) to default hook, controller (5) control The poking device (7) pushes the keel on first telescopic component (61) default on first telescopic component (61) Position;
Step g, after the completion of poking device (7) material toggling, the controller (5) controls first telescopic component (61) and receives Contracting;
Step h, after keel are fallen on second telescopic component (82), the controller (5) is controlled under the lifting platform (81) The height of one keel drops;
Step i, the controller (5) records the hook material number for hooking material component, when the material toggling number of the poking device (7) Reach default material toggling number and when keel are fallen on second telescopic component (82), the controller (5) controls the lifting Platform (81) drops to lowermost end;
Step j, after the lifting platform (81) drops to lowermost end, the controller (5) controls second telescopic component (82) It shrinks.
10. a kind of baling press, which is characterized in that including packing apparatus and the described in any item lightgage steel joist buttons of claim 1-7 Mechanism is closed, the packing apparatus is used to be packaged the keel of the lightgage steel joist engaging support mechanism output.
CN201910291672.5A 2019-04-11 2019-04-11 Lightgage steel joist engaging support mechanism, control method and baling press Pending CN109850287A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910291672.5A CN109850287A (en) 2019-04-11 2019-04-11 Lightgage steel joist engaging support mechanism, control method and baling press

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910291672.5A CN109850287A (en) 2019-04-11 2019-04-11 Lightgage steel joist engaging support mechanism, control method and baling press

Publications (1)

Publication Number Publication Date
CN109850287A true CN109850287A (en) 2019-06-07

Family

ID=66903872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910291672.5A Pending CN109850287A (en) 2019-04-11 2019-04-11 Lightgage steel joist engaging support mechanism, control method and baling press

Country Status (1)

Country Link
CN (1) CN109850287A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113232921A (en) * 2021-05-26 2021-08-10 广安北新建材有限公司 Receive limit fossil fragments and shift packing plant
CN113415639A (en) * 2021-07-22 2021-09-21 上海伺华精密机械有限公司 Automatic small bundle stacker of fossil fragments
CN114132740A (en) * 2021-12-16 2022-03-04 井冈山北新建材有限公司 Keel buffering type sheet combining system and method
CN115231284A (en) * 2021-11-09 2022-10-25 博锲思智能装备(青岛)有限公司 Automatic running water buckling mechanism of edge bone

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204078232U (en) * 2014-08-20 2015-01-07 泰山石膏股份有限公司 Lightgage steel joist automatic packaging system
CN204568772U (en) * 2015-03-25 2015-08-19 王威 A kind of metal joist automatic turning button discharge conveyor
CN105035391A (en) * 2015-08-20 2015-11-11 泰山石膏股份有限公司 Automatic packaging system for light steel keels
CN205022957U (en) * 2015-09-14 2016-02-10 泰山石膏股份有限公司 Light gauge steel autogiration lock device
CN106809419A (en) * 2015-11-27 2017-06-09 北新集团建材股份有限公司 Automatic flexible strapping machine structure
CN106882414A (en) * 2017-02-09 2017-06-23 李晓 Lightgage steel joist automation code bundle adhesive tape winding package equipment
CN108639476A (en) * 2018-06-22 2018-10-12 石家庄市梓起机电设备科技有限公司 Shaped steel packaging line
CN208530929U (en) * 2018-06-22 2019-02-22 石家庄市梓起机电设备科技有限公司 Fashioned iron overturns the fashioned iron packaging facilities to buckle device and containing the device
CN209852711U (en) * 2019-04-11 2019-12-27 霸州市成朗龙骨设备有限公司 Light gauge steel buckle mechanism and light gauge steel baling press

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204078232U (en) * 2014-08-20 2015-01-07 泰山石膏股份有限公司 Lightgage steel joist automatic packaging system
CN204568772U (en) * 2015-03-25 2015-08-19 王威 A kind of metal joist automatic turning button discharge conveyor
CN105035391A (en) * 2015-08-20 2015-11-11 泰山石膏股份有限公司 Automatic packaging system for light steel keels
CN205022957U (en) * 2015-09-14 2016-02-10 泰山石膏股份有限公司 Light gauge steel autogiration lock device
CN106809419A (en) * 2015-11-27 2017-06-09 北新集团建材股份有限公司 Automatic flexible strapping machine structure
CN106882414A (en) * 2017-02-09 2017-06-23 李晓 Lightgage steel joist automation code bundle adhesive tape winding package equipment
CN108639476A (en) * 2018-06-22 2018-10-12 石家庄市梓起机电设备科技有限公司 Shaped steel packaging line
CN208530929U (en) * 2018-06-22 2019-02-22 石家庄市梓起机电设备科技有限公司 Fashioned iron overturns the fashioned iron packaging facilities to buckle device and containing the device
CN209852711U (en) * 2019-04-11 2019-12-27 霸州市成朗龙骨设备有限公司 Light gauge steel buckle mechanism and light gauge steel baling press

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113232921A (en) * 2021-05-26 2021-08-10 广安北新建材有限公司 Receive limit fossil fragments and shift packing plant
CN113415639A (en) * 2021-07-22 2021-09-21 上海伺华精密机械有限公司 Automatic small bundle stacker of fossil fragments
CN115231284A (en) * 2021-11-09 2022-10-25 博锲思智能装备(青岛)有限公司 Automatic running water buckling mechanism of edge bone
CN114132740A (en) * 2021-12-16 2022-03-04 井冈山北新建材有限公司 Keel buffering type sheet combining system and method
CN114132740B (en) * 2021-12-16 2023-08-29 井冈山北新建材有限公司 Keel buffer type lamination system and method

Similar Documents

Publication Publication Date Title
CN109850287A (en) Lightgage steel joist engaging support mechanism, control method and baling press
CN104828489B (en) Continuous conveying method for support plate bogie continuous feeding plate conveying device
CN104494873B (en) A kind of dress joint sealing technique packing multi-brand barrel buttress and device
CN106218948B (en) The full-automatic packaging system of autoclave aerated concrete building block
CN109592445B (en) Efficient container body stacking system and method
CN105539916B (en) A kind of long tube automatic stacking equipment
CN110158978B (en) Full-automatic wall building system and wall building method
CN106241359A (en) A kind of high automatization turnover panel producing big specification dalle picks up board assembly line
CN205526709U (en) Box system of stacking
CN106241397A (en) Autoclave aerated concrete building block pallet-free stacking and stacking technology
CN209852711U (en) Light gauge steel buckle mechanism and light gauge steel baling press
US2642221A (en) Truck indexing mechanism
US2780340A (en) Turning device
CN106800190A (en) A kind of low level stacking tray library
CN112340352A (en) Steel bar shearing, storing and distributing system
CN209427710U (en) A kind of automation feeding device and storage battery production system
CN105752669B (en) Exempt from the brick block forming machine of supporting plate Automatic Code
CN213833709U (en) Sliding clamp of green brick unstacker
CN205708378U (en) Facilitate implementation the Wall or floor tile warehousing system of automatization's access
CN105712093B (en) Hinder steel device
CN210029048U (en) Feeding device and production system
CN107226355B (en) A kind of automatic stacking machine
CN215946611U (en) Material tray placing device with self-adaptive bearing height
CN109516198A (en) A kind of automation feeding device and storage battery production system
CN109665331A (en) What a kind of multilayer intersected fired brick piled bricks unloads brick device and its brick-unloading method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination