CN109798129A - A kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment - Google Patents

A kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment Download PDF

Info

Publication number
CN109798129A
CN109798129A CN201910028463.1A CN201910028463A CN109798129A CN 109798129 A CN109798129 A CN 109798129A CN 201910028463 A CN201910028463 A CN 201910028463A CN 109798129 A CN109798129 A CN 109798129A
Authority
CN
China
Prior art keywords
steel plate
slideway
steel
high frequency
frequency vibrating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910028463.1A
Other languages
Chinese (zh)
Inventor
操光伟
黎庶
李俊
王更峰
李行利
朱向阳
焦贤福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201910028463.1A priority Critical patent/CN109798129A/en
Publication of CN109798129A publication Critical patent/CN109798129A/en
Pending legal-status Critical Current

Links

Abstract

A kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment, including steel rack (1), pneumatic jacking device (5), it jacks slideway (7), high frequency vibrating tamper (4), gas compressor and electric cabinet, steel rack (1) is mounted on the back side of tunnel double-lining trolley steel template (10), pneumatic jacking device (5) is mounted on steel rack (1) bottom, jacking slideway (7) includes the installation sliding slot of slideway steel plate (8) and setting in (1) two inside of steel rack, pneumatic jacking device (5) is connect with gas compressor, it is connect at the top of the jacking cylinder column (6) of pneumatic jacking device (5) with slideway steel plate (8), high frequency vibrating tamper (4) bottom is fixed on slideway steel plate (8), high frequency vibrating tamper (4) top is plugged in two lining trolley steel templates (10), trolleys are served as a contrast with two at the top of high frequency vibrating tamper (4) Steel form (10) flush.It realizes tunnel double-lining concrete and is automatically inserted into formula and vibrate.

Description

A kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment
Technical field
The present invention relates to a kind of concrete vibrating device, more specifically to a kind of tunnel double-lining concrete is automatically inserted into Formula tamping equipment belongs to lining construction technical field.
Background technique
Currently, with the rapid development of China's high-speed rail, tunnel is more and more;With tunnel-liner quality and standardized construction It is required that being continuously improved, tunnel lining concrete quality requirement is higher and higher.
In traditional tunnel-liner technique, delivery pump pipe is installed by reinforcing again after the positioning of tunnel double-lining trolley, by mixed Solidifying soil drag pump send pre- mixed concrete to the two lining each split windows of trolley, is shaken when pouring each split window using hand-held Tamper vibrates, and is rushed to summit when pouring vaulted type using nature pump pressure.But since two lining vault reinforcing bars are intensive, vault is mixed Solidifying natives' work can not vibrate, thus there is a problem of not can guarantee vault concrete it is whether closely knit, so that there are huge quality peaces Congruent risk easily leads to tunnel-liner vault concrete and there is empty problem, therefore conventional tunnel lining process can not expire Foot construction demand;It is existing to avoid tunnel vault from tunnel vault concrete chip off-falling occur during Kong Dong ﹑ occur and preventing from runing from now on As, ensure that tunnel operation pacifies full ﹑ and effectively solves conventional tunnel lining cutting vault concrete porosity defect etc., become current urgent need to resolve The problem of.
Summary of the invention
It is an object of the invention to for existing tunnel double-lining vault concrete manually can not Zhen Dao ﹑ fully rely on coagulation Naturally the method for rushing to summit easily leads to the lining of vault two and comes to nothing and the significant security risks problems such as concrete leakiness native delivery pump, provides one kind Tunnel double-lining concrete is automatically inserted into formula tamping equipment.
To achieve the above object, the technical solution of the invention is as follows: a kind of tunnel double-lining concrete is automatically inserted into formula vibration Smash device, including steel rack, pneumatic jacking device, jacking slideway, high frequency vibrating tamper, gas compressor and electric cabinet, the steel machine Frame is mounted on the back side of tunnel double-lining trolley steel template, and the pneumatic jacking device is mounted on steel bottom of the frame center, described Jacking slideway include slideway steel plate and the installation sliding slot that the inside of steel rack two is set, the slideway steel plate and jacking sliding slot It is slidably connected, the pneumatic jacking device is connect with gas compressor by tracheae, the jacking cylinder column top of pneumatic jacking device It is connect with slideway steel plate, the high frequency vibrating tamper bottom is fixed on slideway steel plate, and high frequency vibrating tamper top is plugged on two linings In trolley steel template, trolley steel template flushes, the gas compressor and electric cabinet are served as a contrast with two at the top of high frequency vibrating tamper Connection.
Rubber seal is added between the two lining trolley steel templates and high frequency vibrating tamper, and rubber seal is close to In on high frequency vibrating tamper, the rubber seal is fixed in two lining trolley steel templates.
The slideway steel plate includes upper layer steel plate and lower layer's steel plate, and high frequency vibrating tamper bottom end is fixed on slideway steel plate On the steel plate of upper layer, jacking cylinder column top is connect with slideway steel plate lower layer steel plate.
Yielding rubber column is provided between the upper layer steel plate and lower layer's steel plate of the slideway steel plate.
Drawing switch is provided in the steel rack, the drawing switch is in the position and slideway steel plate bottom of steel rack Concordantly, drawing switch and slideway steel plate are hinged, and drawing switch is connect with electric cabinet.
Compared with prior art, the beneficial effects of the present invention are:
1, the present invention realizes that high frequency vibrating tamper, which is headed into concrete automatic control, to vibrate, to realize tunnel double-lining concrete certainly Dynamic internal vibration makes up tunnel double-lining arch concrete and is inserted into the blank vibrated;Solve presently, there are the lining of vault two it is de- Empty and concrete leakiness problem.
, the present invention by electric cabinet control it is automatic realize to jack vibrate, realize two lining vaults and vibrate automation, machinery Change, standardization.
, be molded into slurry The present invention reduces band, jacking is vibrated automatics control, is reduced operator, is saved Ren Gong ﹑ reduction work People's amount of labour is economic, practical, easy;Operation labor intensity and security risk are correspondingly reduced simultaneously, and improves construction efficiency And quality, improve tunnel high-altitude safe coefficient.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention.
Fig. 2 is top view of the present invention.
Fig. 3 is use state diagram of the present invention.
In figure, steel rack 1, yielding rubber column 2, rubber seal 3, high frequency vibrating tamper 4, pneumatic jacking device 5, jacking cylinder Column 6, jacks slideway 7, and slideway steel plate 8 connects bolt 9, two lining trolley steel templates 10.
Specific embodiment
Below in conjunction with Detailed description of the invention and specific embodiment, the present invention is described in further detail.
Referring to Fig. 1 to Fig. 3, a kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment, is related to lining construction mistake Concrete vibrates automatically in journey, including steel rack 1, pneumatic jacking device 5, jacking slideway 7, high frequency vibrating tamper 4, gas compressor and Electric cabinet.
Referring to Fig. 1 to Fig. 3, the steel rack 1 is mounted on the back side of tunnel double-lining trolley steel template 10, i.e. steel rack 1 Tunnel double-lining trolley steel template 10 is mounted on towards the face inside trolley, when installation keeps steel rack 1 closely connected to serve as a contrast trolley punching blocks in two 10 back side of plate.The pneumatic jacking device 5 is mounted on 1 bottom centre of steel rack;The jacking slideway 7 includes slideway steel plate 8 With the jacking sliding slot that 1 liang of inside of steel rack is arranged in, the slideway steel plate 8 is slidably connected with installation sliding slot, and slideway steel plate 8 can To be slided up and down along jacking sliding slot.The pneumatic jacking device 5 is connect with gas compressor by tracheae, pneumatic jacking device 5 The top of jacking cylinder column 6 connect with slideway steel plate 8;By gas compressor jacking cylinder column 6, while with sliding way steel plate 8 Rise in jacking sliding slot.4 bottom of high frequency vibrating tamper is fixed on slideway steel plate 8,4 top of high frequency vibrating tamper and two linings 10 flush of trolley steel template ensures that two lining concrete surfaces are smooth;Two herein serve as a contrast trolley steel templates 10 Tunnel double-lining concrete surface.Usual two linings trolley steel template 10 is 14mm, therefore selects super extractor at the top of high frequency vibrating tamper 4 1 steel surface 14mm of frame, so that 4 top of high frequency vibrating tamper and two lining 10 flushes of trolley steel template.The gas compressor It is connect with electric cabinet, high frequency vibrating tamper 4 is controlled by electric cabinet and is vibrated overall process, realize that internal vibration automatically controls.
Referring to Fig. 1 to Fig. 3, further, rubber is added between the two lining trolley steel templates 10 and high frequency vibrating tamper 4 Glue sealing ring 3, and rubber seal 3 is tightly attached on high frequency vibrating tamper 4, the rubber seal 3 is fixed on two lining trolley steel In template 10.Rubber seal 3 reduces 4 vibration force of high frequency vibrating tamper for spillage liquid during preventing high frequency vibrating tamper 4 from jacking Influence to two lining 10 rigidity of trolley steel template.
Referring to Fig. 1 to Fig. 3, further, the slideway steel plate 8 includes upper layer steel plate and lower layer's steel plate, the high frequency 4 bottom end of vibrating spear is fixed on 8 upper layer steel plate of slideway steel plate;Specifically, the lower end power circuit of high frequency vibrating tamper 4 passes through slideway The interstitial hole of 8 upper layer steel plate of steel plate, 4 lower end of high frequency vibrating tamper are fixed in the interstitial hole of 8 upper layer steel plate of slideway steel plate.Jack gas 6 top of cylinder column is connect with 8 lower layer's steel plate of slideway steel plate, and jacking cylinder column 6 is moved with sliding way steel plate 8.
Referring to Fig. 1 to Fig. 3, further, damping is provided between the upper layer steel plate and lower layer's steel plate of the slideway steel plate 8 Rubber column 2;Yielding rubber column 2 is attached by connection bolt 9 and the upper layer steel plate and lower layer's steel plate of slideway steel plate 8.Damping Rubber column 2 can effectively reduce influence of 4 vibration force of high frequency vibrating tamper to pneumatic jacking device 5 and steel rack 1.
Referring to Fig. 1 to Fig. 3, further, drawing switch is provided in the steel rack 1, the drawing switch exists The position of steel rack 1 is concordant with 8 bottom of slideway steel plate, and drawing switch and slideway steel plate 8 are hinged, and drawing switch and electric cabinet connect It connects.
Referring to Fig. 1 to Fig. 3, when construction, when two lining coagulations are poured to high frequency vibrating 4 position of tamper, click on electric cabinet Internal vibration system jacks button, and gas compressor is opened, jacking cylinder column 6 is pushed to rise, 8 upward sliding of slideway steel plate, Drawing switch pulls open, and high frequency vibrating tamper 4 heads into concrete;Then the internal vibration system clicked on electric cabinet is vibrated button Concrete vibrating is carried out, terminates to vibrate after concrete is made;Internal vibration system jacking button, high frequency vibrating are finally clicked again Tamper 4 decline, when high frequency vibrating tamper 4 drop to 8 bottom of slideway steel plate it is concordant with drawing switch when, slideway steel plate 8 extruding drawing Switch, so that drawing closes the switch, the drawing switch indication light on electric cabinet is lighted at this time, then under illustrating high frequency vibrating tamper 4 It is down to its top and two lining 10 flushes of trolley steel template, end of vibrating.
Referring to Fig. 1 to Fig. 3, the present invention is automatically controlled by electric cabinet realizes that the frequency conversion of plug-in type high frequency is vibrated, and improves two Serve as a contrast vault concrete porosity and concrete quality;And artificial less investment, worker's amount of labour is small, and greatly improves effect, together When also reduce high altitude operation risk.
The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be said that Specific implementation of the invention is only limited to these instructions.For those of ordinary skill in the art to which the present invention belongs, exist Under the premise of not departing from present inventive concept, a number of simple deductions or replacements can also be made, and above structure all shall be regarded as belonging to Protection scope of the present invention.

Claims (5)

1. a kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment, it is characterised in that: including steel rack (1), pneumatic jacking Device (5), jacking slideway (7), high frequency vibrating tamper (4), gas compressor and electric cabinet, the steel rack (1) are mounted on tunnel two On the back side for serving as a contrast trolley steel template (10), the pneumatic jacking device (5) is mounted on steel rack (1) bottom centre, the top Rising slideway (7) includes the installation sliding slot of slideway steel plate (8) and setting in the inside of steel rack (1) two, the slideway steel plate (8) and Jacking sliding slot is slidably connected, and the pneumatic jacking device (5) is connect with gas compressor by tracheae, pneumatic jacking device (5) It is connect at the top of jacking cylinder column (6) with slideway steel plate (8), described high frequency vibrating tamper (4) bottom is fixed on slideway steel plate (8) On, high frequency vibrating tamper (4) top is plugged in two lining trolley steel templates (10), serves as a contrast trolley steel with two at the top of high frequency vibrating tamper (4) Template (10) flush, the gas compressor are connect with electric cabinet.
2. a kind of tunnel double-lining concrete according to claim 1 is automatically inserted into formula tamping equipment, it is characterised in that: described Two lining trolley steel template (10) and high frequency vibrating tamper (4) between add rubber seal (3), and rubber seal (3) tightly It is affixed on high frequency vibrating tamper (4), the rubber seal (3) is fixed in two lining trolley steel templates (10).
3. a kind of tunnel double-lining concrete according to claim 1 is automatically inserted into formula tamping equipment, it is characterised in that: described Slideway steel plate (8) include upper layer steel plate and lower layer's steel plate, high frequency vibrating tamper (4) bottom end is fixed on slideway steel plate (8) On layer steel plate, jacking cylinder column (6) top is connect with slideway steel plate (8) lower layer steel plate.
4. a kind of tunnel double-lining concrete according to claim 3 is automatically inserted into formula tamping equipment, it is characterised in that: described Yielding rubber column (2) are provided between the upper layer steel plate and lower layer's steel plate of slideway steel plate (8).
5. a kind of tunnel double-lining concrete according to claim 1 is automatically inserted into formula tamping equipment, it is characterised in that: described Steel rack (1) on be provided with drawing switch, drawing switch is flat in the position of steel rack (1) and slideway steel plate (8) bottom Together, hingedly, drawing switch is connect with electric cabinet for drawing switch and slideway steel plate (8).
CN201910028463.1A 2019-01-11 2019-01-11 A kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment Pending CN109798129A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910028463.1A CN109798129A (en) 2019-01-11 2019-01-11 A kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910028463.1A CN109798129A (en) 2019-01-11 2019-01-11 A kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment

Publications (1)

Publication Number Publication Date
CN109798129A true CN109798129A (en) 2019-05-24

Family

ID=66558729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910028463.1A Pending CN109798129A (en) 2019-01-11 2019-01-11 A kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment

Country Status (1)

Country Link
CN (1) CN109798129A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110735537A (en) * 2019-10-31 2020-01-31 郭庆业 Construction machinery and construction method for foundation engineering of house-building foundations
CN115262979A (en) * 2022-08-01 2022-11-01 四川力思创机械有限公司 Pneumatic high-frequency vibrating rod

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08177395A (en) * 1994-12-22 1996-07-09 Ohbayashi Corp Lining concrete compaction device for tunnel construction method
CN107762532A (en) * 2016-08-23 2018-03-06 中铁十局集团第工程有限公司 Tunnel vault band mould grouting construction method
CN107882580A (en) * 2017-12-28 2018-04-06 中铁工程装备集团有限公司 Tunnel form chassis internal vibration device
CN108005683A (en) * 2017-11-01 2018-05-08 中铁隧道局集团有限公司 A kind of vault vibrating method of tunnel-liner
CN108825265A (en) * 2018-06-07 2018-11-16 中铁隧道股份有限公司 A kind of vault casting concrete automatic vibrating device of working jumbo for tunnel lining
CN209604032U (en) * 2019-01-11 2019-11-08 中铁十一局集团第四工程有限公司 A kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08177395A (en) * 1994-12-22 1996-07-09 Ohbayashi Corp Lining concrete compaction device for tunnel construction method
CN107762532A (en) * 2016-08-23 2018-03-06 中铁十局集团第工程有限公司 Tunnel vault band mould grouting construction method
CN108005683A (en) * 2017-11-01 2018-05-08 中铁隧道局集团有限公司 A kind of vault vibrating method of tunnel-liner
CN107882580A (en) * 2017-12-28 2018-04-06 中铁工程装备集团有限公司 Tunnel form chassis internal vibration device
CN108825265A (en) * 2018-06-07 2018-11-16 中铁隧道股份有限公司 A kind of vault casting concrete automatic vibrating device of working jumbo for tunnel lining
CN209604032U (en) * 2019-01-11 2019-11-08 中铁十一局集团第四工程有限公司 A kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110735537A (en) * 2019-10-31 2020-01-31 郭庆业 Construction machinery and construction method for foundation engineering of house-building foundations
CN115262979A (en) * 2022-08-01 2022-11-01 四川力思创机械有限公司 Pneumatic high-frequency vibrating rod
CN115262979B (en) * 2022-08-01 2023-12-22 四川力思创机械有限公司 Pneumatic high-frequency vibrating rod

Similar Documents

Publication Publication Date Title
CN109798129A (en) A kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment
CN108678010A (en) Prefabricated pipe gallery construction method
CN209604032U (en) A kind of tunnel double-lining concrete is automatically inserted into formula tamping equipment
CN108385986A (en) A kind of device and method ensureing constructional column reinforcement location
CN106223960B (en) High-speed rail major long tunnel inverted arch moves integrally mould bases construction
CN206591838U (en) Concrete vibrator
CN109882198A (en) A kind of tunnel double-lining concrete vibrating system construction method
CN109610842A (en) A kind of concrete jacking pump send construction method
CN207160559U (en) A kind of building form
CN109812281A (en) A kind of tunnel double-lining concrete is automatically inserted into the construction method of formula tamping equipment
CN201511489U (en) Sponge automatic foaming set pushing batch turning device
CN206035504U (en) Two lining bilateral synchronous concreting construction reposition of redundant personnel magazine attachments in tunnel
CN205714221U (en) A kind of Tunnel Second Lining vault is owed to dig place's teeming building structure
CN109707409A (en) A kind of tunnel double-lining concrete vibrating system
CN209163437U (en) A kind of climbing form
CN208347305U (en) A kind of template component poured for constructional column
CN209604031U (en) A kind of tunnel double-lining concrete vibrating system
CN215949483U (en) Module device suitable for long and short section vertical well lining
CN209509488U (en) A kind of concrete structure rail road hanging mobile form frame system against the wind
CN207033471U (en) Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template
CN105587053B (en) A kind of industrialization house wall bottom grouting construction method
CN204298829U (en) A kind of prosthetic device being applied to underground large discharge seepage
CN208105249U (en) Deep mud pit cast-in-situ bored pile
CN109488017A (en) A kind of concrete structure rail road hanging mobile form frame system and construction method against the wind
CN214359933U (en) Tower machine safety lock device that slowly steps

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination