CN204298829U - A kind of prosthetic device being applied to underground large discharge seepage - Google Patents

A kind of prosthetic device being applied to underground large discharge seepage Download PDF

Info

Publication number
CN204298829U
CN204298829U CN201420663064.5U CN201420663064U CN204298829U CN 204298829 U CN204298829 U CN 204298829U CN 201420663064 U CN201420663064 U CN 201420663064U CN 204298829 U CN204298829 U CN 204298829U
Authority
CN
China
Prior art keywords
prosthetic device
drill chuck
gear
large discharge
rotating shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420663064.5U
Other languages
Chinese (zh)
Inventor
楼晓礼
史广喜
毛志伟
吴国华
施凤英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chenglong Construction Group Co Ltd
Original Assignee
Chenglong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chenglong Construction Group Co Ltd filed Critical Chenglong Construction Group Co Ltd
Priority to CN201420663064.5U priority Critical patent/CN204298829U/en
Application granted granted Critical
Publication of CN204298829U publication Critical patent/CN204298829U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of prosthetic device being applied to underground large discharge seepage, prosthetic device comprises body, the end face of body is provided with concrete hopper, the right side of body is provided with handle, the left side of body is provided with discharging conversion equipment, the top of discharging conversion equipment is provided with positioning table, positioning table is provided with drill chuck, drill chuck connects positioning table by connecting rod, connecting rod comprises the second rotating shaft and expansion link, the inside of body is provided with motor, motor is provided with the first rotating shaft, first rotating shaft is connected with clutch, the top of clutch is provided with the first gear, first gear is connected with drive link by universal joint, the below of clutch is provided with the second gear, second gear is connected with screw rod, the bottom of body is provided with supporting mechanism.The utility model structure is simple, and practical, the boring and the cast that not only achieve prosthetic device are integrated in one, and safety when improve operation and flexibility, reduces the labour intensity of operator.

Description

A kind of prosthetic device being applied to underground large discharge seepage
Technical field
The utility model relates to a kind of prosthetic device being applied to underground large discharge seepage.
Background technology
Along with the development of science and technology and improving constantly of people's living standard, ground land used is more and more in short supply, and therefore the utilization of the underground space is developed rapidly, and mainly contains subterranean tunnel, underground parking, supermarket, underground etc.
Although the development of underground construction is very fast, also there are some problems, wherein large discharge seepage in underground is topmost hidden danger, and its degree of danger even can cause caving in of the underground space simultaneously.Though underground of the prior art fix tool kind is many, the labour intensity consumed is comparatively large, and operating efficiency is lower, and safety factor is not high.
Utility model content
The utility model object is for the deficiency existing for prior art and provides a kind of technical scheme being applied to the prosthetic device of underground large discharge seepage, by arranging drill chuck and discharging conversion equipment and realize the boring of prosthetic device and cast being integrated in one, not only reduce the labour intensity of constructor, and improve operating efficiency and work quality, substantially increase safety during construction, make the operation of prosthetic device more flexible, practicality is stronger.
In order to solve the problems of the technologies described above, the utility model adopts following technical scheme:
A kind of prosthetic device being applied to underground large discharge seepage, it is characterized in that: prosthetic device comprises body, the end face of body is provided with concrete hopper, concrete hopper is provided with end cap, the right side of body is provided with handle, handle is provided with speed governing button, handle is connected on body by slide mechanism, the left side of body is provided with discharging conversion equipment, discharging conversion equipment comprises crossover sub, crossover sub is fixedly connected on body by stationary pipes, connection tube is provided with in body, connection tube and stationary pipes match, the top of discharging conversion equipment is provided with positioning table, positioning table is provided with drill chuck, locating hole is provided with in drill chuck, intermediate plate is evenly distributed with around locating hole, the side of drill chuck is provided with screw cap hole, screw cap hole connects intermediate plate by synchronous screw rod, drill chuck connects positioning table by connecting rod, connecting rod comprises the second rotating shaft and expansion link, one end of second rotating shaft is fixedly connected on the bottom surface of drill chuck, the other end connection expansion link of the second rotating shaft, the inside of body is provided with motor, motor is by wire connection sliding block, and motor is provided with the first rotating shaft, the first rotating shaft is connected with clutch, the top of clutch is provided with the first gear, first gear is connected with drive link by universal joint, drive link connection expansion link, and the below of clutch is provided with the second gear, second gear is connected with screw rod, screw rod and connection tube match, and concrete hopper is connected on screw rod by feed pipe, and the bottom of body is provided with supporting mechanism, the evaporation of concrete moisture can be reduced by the end cap that closes after concrete loads concrete hopper, extend concrete service time, speed governing button on handle effectively can control the rotating speed of drill chuck, not only can improve the operating efficiency of drill bit, and can drill bit be protected, extend the application life of drill bit, motor connects the first gear and the second gear by clutch, when connection the first gear, drill chuck work is driven by drive link, realize holing to leakage, after boring, clutch connects the second gear, drive screw rod works, concrete in concrete hopper is transported to discharging conversion equipment by feed pipe by screw rod, achieve boring and pouring concrete be integrated in one, improve flexibility when operator uses, do not need artificial being lifted by drill chuck just can realize boring during boring, greatly reduce the labour intensity of operator, improve operating efficiency, the drill bit of different model size can be installed in drill chuck, carried intermediate plate to regulate, substantially increase the practicality of drill chuck.
Further, slide mechanism comprises stopper slot and slide block, stopper slot is positioned at body, slide block is fixedly connected on handle, and stopper slot and slide block match, and handle passes through slide block mobile link in stopper slot, the design of slide mechanism meets principle of human engineering, can realize handle to move up and down along body, the people being applicable to different height uses, and improves the comfort level of operator when operating.
Further, the side of drill chuck is provided with infrared camera, execute man-hour requirement constructor due to earth drilling to come back work, concrete grey under boring can fall into eyes, damage constructor, greatly reduce the efficiency of boring simultaneously, boring sites in curing can irradiate by infrared camera effectively, the eyes that instead of constructor are observed boring sites in curing, and then reduce the labour intensity of constructor.
Further, the side of body is provided with display window, the below of display window is provided with shift switch, motor start switch and display screen switch, by display screen switch opens display window, boring sites in curing is clearly presented on display window, and constructor can be holed by display window, improve drilling efficiency, reduce labour intensity, shift switch can realize drill mode and the conversion of cast pattern, substantially increases practicality and the flexibility of prosthetic device.
Further, supporting mechanism comprises fixed support and roller, fixed support is fixedly connected on the bottom surface of body, and fixed support is provided with chute, and roller is slidably connected on chute by locating part, when prosthetic device operationally, roller is pushed into the top of chute, can be fixed prosthetic device by fixed support, improve stability during work, when the mobile prosthetic device of needs, only roller need be pushed into chute bottom can promote prosthetic device like a cork.
Further, crossover sub is provided with interface, interface has been threaded seal closure, and when a use interface, remaining interface can be sealed by seal closure, prevents concrete from leaking.
Further, expansion link and drive link are slidably connected on positioning table, effectively can improve the boring scope of drill chuck, make boring more freedom and flexibility.
Further, the lower end of concrete hopper is tapered, and taper surface can make concrete hurtle down, and prevents concrete be deposited on the sidewall of concrete hopper and solidify, and then causes the blocking of feed pipe.
The utility model, owing to have employed technique scheme, has following beneficial effect:
1, motor connects the first gear and the second gear by clutch, when connection the first gear, drill chuck work is driven by drive link, realize holing to leakage, after boring, clutch connects the second gear, drive screw rod works, concrete in concrete hopper is transported to discharging conversion equipment by feed pipe by screw rod, achieve boring and pouring concrete be integrated in one, improve flexibility when operator uses, do not need artificial being lifted by drill chuck just can realize boring during boring, greatly reduce the labour intensity of operator, improve operating efficiency,
2, the design of slide mechanism meets principle of human engineering, can realize handle and move up and down along body, and the people being applicable to different height uses, and improves the comfort level of operator when operating;
3, execute man-hour requirement constructor due to earth drilling to come back work, concrete grey under boring can fall into eyes, constructor is damaged, greatly reduce the efficiency of boring simultaneously, boring sites in curing can irradiate by infrared camera effectively, the eyes that instead of constructor are observed boring sites in curing, and then reduce the labour intensity of constructor;
4, by display screen switch opens display window, boring sites in curing is clearly presented on display window, constructor can be holed by display window, improve drilling efficiency, reduce labour intensity, shift switch can realize drill mode and the conversion of cast pattern, substantially increases practicality and the flexibility of prosthetic device;
5, when prosthetic device operationally, roller is pushed into the top of chute, can be fixed prosthetic device by fixed support, improve stability during work, when the mobile prosthetic device of needs, only roller need be pushed into chute bottom can promote prosthetic device like a cork, improves flexibility and the practicality of prosthetic device.
The utility model structure is simple, and practical, the boring and the cast that not only achieve prosthetic device are integrated in one, and safety when improve operation and flexibility, reduces the labour intensity of operator.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail:
Fig. 1 is a kind of external structure schematic diagram being applied to the prosthetic device of underground large discharge seepage of the utility model;
Fig. 2 is internal construction schematic diagram of the present utility model;
Fig. 3 is the structural representation of drill chuck in the utility model;
Fig. 4 is the structural representation of discharging conversion equipment in the utility model.
In figure: 1-body; 2-concrete hopper; 3-discharging conversion equipment; 4-handle; 5-end cap; 6-speed governing button; 7-display window; 8-shift switch; 9-motor start switch; 10-display screen switch; 11-fixed support; 12-chute; 13-roller; 14-positioning table; 15-drill chuck; 16-infrared camera; 17-connecting rod; 18-feed pipe; 19-stopper slot; 20-slide block; 21-motor; 22-wire; 23-first rotating shaft; 24-clutch; 25-first gear; 26-drive link; 27-connection tube; 28-screw rod; 29-second gear; 30-locating hole; 31-intermediate plate; The synchronous screw rod of 32-; 33-screw cap hole; 34-second rotating shaft; 35-expansion link; 36-crossover sub; 37-stationary pipes; 38-interface; 39-seal closure.
Detailed description of the invention
As shown in Figures 1 to 4, the prosthetic device of underground large discharge seepage is applied to for the utility model is a kind of, prosthetic device comprises body 1, the end face of body 1 is provided with concrete hopper 2, concrete hopper 2 is provided with end cap 5, the lower end of concrete hopper 2 is tapered, taper surface can make concrete hurtle down, concrete is prevented to be deposited on the sidewall of concrete hopper 2 and to solidify, and then cause the blocking of feed pipe 18, the right side of body 1 is provided with handle 4, handle 4 is provided with speed governing button 6, handle 4 is connected on body 1 by slide mechanism, slide mechanism comprises stopper slot 19 and slide block 20, stopper slot 19 is positioned at body 1, slide block 20 is fixedly connected on handle 4, stopper slot 19 and slide block 20 match, handle 4 passes through slide block 20 mobile link in stopper slot 19, the design of slide mechanism meets principle of human engineering, handle 4 can be realized move up and down along body 1, the people being applicable to different height uses, improve the comfort level of operator when operating, the left side of body 1 is provided with discharging conversion equipment 3, discharging conversion equipment 3 comprises crossover sub 36, crossover sub 36 is provided with interface 38, interface 38 has been threaded seal closure 39, when a use interface 38, remaining interface 38 can be sealed by seal closure 39, prevent concrete from leaking, crossover sub 36 is fixedly connected on body 1 by stationary pipes 37, connection tube 27 is provided with in body 1, connection tube 27 and stationary pipes 37 match, the top of discharging conversion equipment 3 is provided with positioning table 14, positioning table 14 is provided with drill chuck 15, locating hole 30 is provided with in drill chuck 15, intermediate plate 31 is evenly distributed with around locating hole 30, the side of drill chuck 15 is provided with screw cap hole 33, screw cap hole 33 connects intermediate plate 31 by synchronous screw rod 32, drill chuck 15 connects positioning table 14 by connecting rod 17, connecting rod 17 comprises the second rotating shaft 34 and expansion link 35, one end of second rotating shaft 34 is fixedly connected on the bottom surface of drill chuck 15, the other end connection expansion link 35 of the second rotating shaft 34, the inside of body 1 is provided with motor 21, motor 21 is by wire 22 connection sliding block 20, motor 21 is provided with the first rotating shaft 23, first rotating shaft 23 is connected with clutch 24, the top of clutch 24 is provided with the first gear 25, first gear 25 is connected with drive link 26 by universal joint, drive link 26 connection expansion link 35, expansion link 35 and drive link 26 are slidably connected on positioning table 14, effectively can improve the boring scope of drill chuck 15, make boring more freedom and flexibility, the below of clutch 24 is provided with the second gear 29, second gear 29 is connected with screw rod 28, screw rod 28 and connection tube 27 match, concrete hopper 2 is connected on screw rod 28 by feed pipe 18, the side of drill chuck 15 is provided with infrared camera 16, execute man-hour requirement constructor due to earth drilling to come back work, concrete grey under boring can fall into eyes, constructor is damaged, greatly reduce the efficiency of boring simultaneously, boring sites in curing can irradiate by infrared camera 16 effectively, the eyes that instead of constructor are observed boring sites in curing, and then reduce the labour intensity of constructor, the side of body 1 is provided with display window 7, the below of display window 7 is provided with shift switch 8, motor start switch 9 and display screen switch 10, display window 7 is opened by display screen switch 10, boring sites in curing is made clearly to be presented on display window 7, constructor can be holed by display window 7, improve drilling efficiency, reduce labour intensity, shift switch 8 can realize the conversion of drill mode and cast pattern, substantially increase practicality and the flexibility of prosthetic device, the bottom of body 1 is provided with supporting mechanism, supporting mechanism comprises fixed support 11 and roller 13, fixed support 11 is fixedly connected on the bottom surface of body 1, fixed support 11 is provided with chute 12, roller 13 is slidably connected on chute 12 by locating part, when prosthetic device operationally, roller 13 is pushed into the top of chute 12, can be fixed prosthetic device by fixed support 11, improve stability during work, when the mobile prosthetic device of needs, only roller 13 need be pushed into chute 12 bottom can promote prosthetic device like a cork, the evaporation of concrete moisture can be reduced by the end cap 5 that closes after concrete loads concrete hopper 2, extend concrete service time, speed governing button 6 on handle 4 effectively can control the rotating speed of drill chuck 15, not only can improve the operating efficiency of drill bit, and can drill bit be protected, extend the application life of drill bit, motor 21 connects the first gear 25 and the second gear 29 by clutch 24, when connection the first gear 25, drill chuck 15 is driven to work by drive link 26, realize holing to leakage, after boring, clutch 24 connects the second gear 29, screw rod 28 is driven to work, concrete in concrete hopper 2 is transported to discharging conversion equipment 3 by feed pipe 18 by screw rod 28, achieve boring and pouring concrete be integrated in one, improve flexibility when operator uses, do not need artificial being lifted by drill chuck 15 just can realize boring during boring, greatly reduce the labour intensity of operator, improve operating efficiency, the drill bit of different model size can be installed in drill chuck 15, carried intermediate plate 31 to regulate, substantially increase the practicality of drill chuck 15.
These are only specific embodiment of the utility model, but technical characteristic of the present utility model is not limited thereto.Any based on the utility model, for realizing substantially identical technique effect, done ground simple change, equivalent replacement or modification etc., be all covered by among protection domain of the present utility model.

Claims (8)

1. one kind is applied to the prosthetic device of underground large discharge seepage, it is characterized in that: described prosthetic device comprises body, the end face of described body is provided with concrete hopper, described concrete hopper is provided with end cap, the right side of described body is provided with handle, described handle is provided with speed governing button, described handle is connected on described body by slide mechanism, the left side of described body is provided with discharging conversion equipment, described discharging conversion equipment comprises crossover sub, described crossover sub is fixedly connected on described body by stationary pipes, connection tube is provided with in described body, described connection tube and described stationary pipes match, the top of described discharging conversion equipment is provided with positioning table, described positioning table is provided with drill chuck, locating hole is provided with in described drill chuck, intermediate plate is evenly distributed with around described locating hole, the side of described drill chuck is provided with screw cap hole, described screw cap hole connects described intermediate plate by synchronous screw rod, described drill chuck connects described positioning table by connecting rod, described connecting rod comprises the second rotating shaft and expansion link, one end of described second rotating shaft is fixedly connected on the bottom surface of described drill chuck, the other end of described second rotating shaft connects described expansion link, the inside of described body is provided with motor, described motor is by wire connection sliding block, described motor is provided with the first rotating shaft, described first rotating shaft is connected with clutch, the top of described clutch is provided with the first gear, described first gear is connected with drive link by universal joint, described drive link connects described expansion link, the below of described clutch is provided with the second gear, described second gear is connected with screw rod, described screw rod and described connection tube match, described concrete hopper is connected on described screw rod by feed pipe, the bottom of described body is provided with supporting mechanism.
2. a kind of prosthetic device being applied to underground large discharge seepage according to claim 1, it is characterized in that: described slide mechanism comprises stopper slot and described slide block, described stopper slot is positioned at described body, described slide block is fixedly connected on described handle, described stopper slot and described slide block match, and described handle passes through described slide block mobile link in described stopper slot.
3. a kind of prosthetic device being applied to underground large discharge seepage according to claim 1, is characterized in that: the side of described drill chuck is provided with infrared camera.
4. a kind of prosthetic device being applied to underground large discharge seepage according to claim 1, is characterized in that: the side of described body is provided with display window, and the below of described display window is provided with shift switch, motor start switch and display screen switch.
5. a kind of prosthetic device being applied to underground large discharge seepage according to claim 1, it is characterized in that: described supporting mechanism comprises fixed support and roller, described fixed support is fixedly connected on the bottom surface of described body, described fixed support is provided with chute, and described roller is slidably connected on described chute by locating part.
6. a kind of prosthetic device being applied to underground large discharge seepage according to claim 1, is characterized in that: described crossover sub is provided with interface, and described interface has been threaded seal closure.
7. a kind of prosthetic device being applied to underground large discharge seepage according to claim 1, is characterized in that: described expansion link and described drive link are slidably connected on described positioning table.
8. a kind of prosthetic device being applied to underground large discharge seepage according to claim 1, is characterized in that: the lower end of described concrete hopper is tapered.
CN201420663064.5U 2014-11-07 2014-11-07 A kind of prosthetic device being applied to underground large discharge seepage Expired - Fee Related CN204298829U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420663064.5U CN204298829U (en) 2014-11-07 2014-11-07 A kind of prosthetic device being applied to underground large discharge seepage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420663064.5U CN204298829U (en) 2014-11-07 2014-11-07 A kind of prosthetic device being applied to underground large discharge seepage

Publications (1)

Publication Number Publication Date
CN204298829U true CN204298829U (en) 2015-04-29

Family

ID=53104379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420663064.5U Expired - Fee Related CN204298829U (en) 2014-11-07 2014-11-07 A kind of prosthetic device being applied to underground large discharge seepage

Country Status (1)

Country Link
CN (1) CN204298829U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442609A (en) * 2015-11-20 2016-03-30 山东送变电工程公司 Self-supporting chute device for pouring of foundation concrete
CN112695735A (en) * 2020-12-07 2021-04-23 内蒙古蒙草矿山科技有限责任公司 Chestnut calcium is sand column filling device for soil horizon

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442609A (en) * 2015-11-20 2016-03-30 山东送变电工程公司 Self-supporting chute device for pouring of foundation concrete
CN105442609B (en) * 2015-11-20 2017-06-23 山东送变电工程公司 Base concrete pours self-supporting chute device
CN112695735A (en) * 2020-12-07 2021-04-23 内蒙古蒙草矿山科技有限责任公司 Chestnut calcium is sand column filling device for soil horizon

Similar Documents

Publication Publication Date Title
CN206393834U (en) A kind of construction prefabricated drilling equipment of cement wall
CN105926596B (en) It is a kind of for stirring the agitating device and stirring means of ooze
CN204113111U (en) Double hydraulic pressure percussion-rotary drilling enters, churning unit head
CN204402355U (en) A kind of Improvement type horizontal directional drilling machine
CN101749026A (en) Grid reinforcing method of shield receiving or starting end head and shield receiving method
CN110630321A (en) Goaf on-well filling equipment and method thereof
CN204298829U (en) A kind of prosthetic device being applied to underground large discharge seepage
CN207348879U (en) Tailwater tunnel structure
CN104141455B (en) Drilling equipment and rig drilling method
CN206397435U (en) Drilling equipment is built in a kind of Portable city
CN206487148U (en) A kind of wall bolt hole slip casting capping tools
CN206955079U (en) Civil engineering feed device and its control system
CN205421258U (en) High water spray mud is pressed and is irritated concrete composite set
CN203499722U (en) Adjusting device of scraper conveyor
CN203411974U (en) Slope protection pile steel pipe allowing grouting condition to be seen
CN103075188B (en) Downhole waste rock filling equipment and filling method using same
CN203171881U (en) Convenient dust collector
CN205714091U (en) The device in analog band pressure grouting closure boring coal petrography crack
CN107762400B (en) Underground engineering hole pile driving construction is with moving forward and backward formula low clearance drilling machine
CN205288548U (en) Civil engineering construction waste processing apparatus
CN206816177U (en) reaming tool
CN208441776U (en) A kind of small-sized pile-formation machine of short formula
CN107091053A (en) Left and right displacement formula low clearance rig
CN206769807U (en) A kind of New type drilling device
CN206740126U (en) A kind of civil engineering servicing unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150429

Termination date: 20151107

EXPY Termination of patent right or utility model