CN206035504U - Two lining bilateral synchronous concreting construction reposition of redundant personnel magazine attachments in tunnel - Google Patents
Two lining bilateral synchronous concreting construction reposition of redundant personnel magazine attachments in tunnel Download PDFInfo
- Publication number
- CN206035504U CN206035504U CN201620962282.8U CN201620962282U CN206035504U CN 206035504 U CN206035504 U CN 206035504U CN 201620962282 U CN201620962282 U CN 201620962282U CN 206035504 U CN206035504 U CN 206035504U
- Authority
- CN
- China
- Prior art keywords
- lining
- hopper
- construction
- tunnel
- sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a two lining bilateral synchronous concreting construction reposition of redundant personnel magazine attachments in tunnel, includes hopper (1), the upper end of hopper (1) is provided with feed inlet (2), is provided with in the middle of hopper (1) bottom splitter box (3), and the symmetrical both sides in hopper (1) bottom are provided with feed pipe opening (4) respectively. Simple structure, it is easy and simple to handle, can effectually realize two lining bilateral symmetry nature concreting construction through the reposition of redundant personnel.
Description
Technical field
The utility model is related to a kind of shunting magazine attachment, and more specifically to a kind of tunnel double-lining both sides synchronously pour
Construction shunting magazine attachment, belongs to railway and highway tunnel lining technical field of construction.
Background technology
The construction of tunnel double-lining is related to the final construction quality of engineering, and its construction speed is also related to whole Tunnel Engineering
The cycle of construction.At present, the construction with major long tunnel at home increases, and the construction quality and construction period to tunnel double-lining will
Seek more and more higher.
During construction, tunnel double-lining require from the bottom up, the symmetrical pouring construction in the left and right sides.Existing traditional form of construction work is adopted
A side window is directly accessed with pump line to pour, wait pour height reach about 1m it is high after, then by tear open pipe shifting be filled to another side window,
Exchanging successively is carried out until vault.But, there is following substantially drawback in this form of construction work:1st, lining trolley complex structure,
Position is more to ask pump line to turn round, and in pumping procedure, generation plugging probability increases;2nd, the engineering time is longer, and effect is low, is mainly reflected in
Pump line left and right sides replaces disassembly process, and time-consuming;3rd, it is difficult to preferably control the symmetry of left and right sides construction, is also easy to produce bias, plus
Gu easily producing termination in the case of loosely runs mould phenomenon.Meanwhile, these problems can cause two lining concrete construction progresses to delay
Slowly, seriously delay the duration.
The content of the invention
The purpose of this utility model is to be difficult to a preferably control left side for what existing tunnel double-lining form of construction work was present
The symmetry of right side construction, the problems such as construction speed is slow, there is provided a kind of tunnel double-lining both sides synchronization pouring construction shunting hopper
Device.
For achieving the above object, technical solution of the present utility model is:A kind of tunnel double-lining both sides synchronously pour applies
Work point stream magazine attachment, including hopper, the upper end of the hopper is provided with charging aperture, and feed hopper bottom middle setting has splitter box,
The symmetrical both sides of feed hopper bottom are respectively arranged with the discharging mouth of pipe.
A diameter of 200mm of the discharging mouth of pipe.
The described discharging mouth of pipe is connected with chute.
Handle is provided with the top of the hopper.
Compared with prior art, the beneficial effects of the utility model are:
1st, simple structure, it is easy to operate, two lining Zygomorphy pouring constructions can be realized by shunting effectively.Construction
When, concrete is divided right and left by the utility model by splitter box 3, concrete is sent by the chute again through being connected with the discharging mouth of pipe
To left and right sides lining cutting window, so as to effectively realize two lining both sides while symmetry pouring construction by shunting.
2nd, mounting-dismounting programme greatly reduces, and saves the engineering time, and speed of application is fast, and effect is high.
Description of the drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is hopper installation schematic diagram.
In figure, hopper 1, charging aperture 2, splitter box 3, discharge the mouth of pipe 4, handle 5.
Specific embodiment
The utility model is described in further detail below in conjunction with description of the drawings and specific embodiment.
Referring to Fig. 1, a kind of tunnel double-lining both sides synchronization pouring construction shunting magazine attachment can realize two lining both sides synchronizations
Symmetrically and evenly casting concrete, including hopper 1.The upper end of the hopper 1 is provided with charging aperture 2, and 1 bottom middle setting of hopper has
Splitter box 3,1 bottom symmetrical both sides of hopper are respectively arranged with the discharging mouth of pipe 4.
Referring to Fig. 1, a diameter of 200mm of the discharging mouth of pipe 4.
Referring to Fig. 1, the described discharging mouth of pipe 4 is connected with chute.
Referring to Fig. 1, the top of the hopper 1 is provided with handle 5.Handle 5 is easy to lift dress.
Referring to Fig. 1-Fig. 2, during construction, concrete falls into bottom after entering material bin 1 by charging aperture 2, by the splitter box 3 of bottom
Concrete is divided right and left;Concrete is delivered to by the discharging mouth of pipe 4 of both sides, the chute again through being connected with the discharging mouth of pipe 4
Left and right sides lining cutting window, so that realize synchronous casting process.
Referring to Fig. 1-Fig. 2, the construction method of this shunting magazine attachment, comprise the following steps:
Step one, the mounting and fixing bracket above the lining trolley door frame make support height not little higher than both sides cloth window
In 1 meter, it is beneficial to the flowing of concrete, hopper 1 is placed on support and is fixed.Window herein to refer to and open one in template
Hole, for constructing, is commonly referred to as window.
Step 2, concrete is sent into the charging aperture 2 of hopper 1 by ground pump, by the splitter box 3 of 1 bottom of hopper by coagulation
Soil is separated to both sides.
Step 3, by chute at the both sides discharging mouth of pipe 4 by concrete conveyance to two side windows, so as to be poured simultaneously
Concrete construction.
Above content is with reference to specific preferred embodiment further detailed description of the utility model, it is impossible to
Identification is of the present utility model to be embodied as being confined to these explanations.For the ordinary skill of the utility model art
For personnel, without departing from the concept of the premise utility, some simple deduction or replace, said structure can also be made
Protection domain of the present utility model should be all considered as belonging to.
Claims (4)
1. a kind of tunnel double-lining both sides synchronization pouring construction shunts magazine attachment, it is characterised in that:Including hopper(1), the material
Bucket(1)Upper end be provided with charging aperture(2), hopper(1)Bottom middle setting has splitter box(3), hopper(1)Bottom symmetrical both sides
It is respectively arranged with the discharging mouth of pipe(4).
2. a kind of tunnel double-lining both sides synchronization pouring construction according to claim 1 shunts magazine attachment, it is characterised in that:
The discharging mouth of pipe(4)A diameter of 200mm.
3. a kind of tunnel double-lining both sides synchronization pouring construction according to claim 1 shunts magazine attachment, it is characterised in that:
The described discharging mouth of pipe(4)It is connected with chute.
4. a kind of tunnel double-lining both sides synchronization pouring construction according to claim 1 shunts magazine attachment, it is characterised in that:
The hopper(1)Top be provided with handle(5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620962282.8U CN206035504U (en) | 2016-08-26 | 2016-08-26 | Two lining bilateral synchronous concreting construction reposition of redundant personnel magazine attachments in tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620962282.8U CN206035504U (en) | 2016-08-26 | 2016-08-26 | Two lining bilateral synchronous concreting construction reposition of redundant personnel magazine attachments in tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206035504U true CN206035504U (en) | 2017-03-22 |
Family
ID=58305761
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620962282.8U Active CN206035504U (en) | 2016-08-26 | 2016-08-26 | Two lining bilateral synchronous concreting construction reposition of redundant personnel magazine attachments in tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206035504U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106437762A (en) * | 2016-08-26 | 2017-02-22 | 中铁十局集团第四工程有限公司 | Flow divided hopper device for synchronous pouring construction on two sides of tunnel secondary lining and construction method |
CN107091104A (en) * | 2017-06-20 | 2017-08-25 | 中铁隧道集团二处有限公司 | The concrete placings device and its installation method of single-track railway tunnel hogging wall lining platform building cart |
CN111173538A (en) * | 2020-01-20 | 2020-05-19 | 中建商品混凝土有限公司 | Pouring device for pouring tunnel secondary lining concrete |
-
2016
- 2016-08-26 CN CN201620962282.8U patent/CN206035504U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106437762A (en) * | 2016-08-26 | 2017-02-22 | 中铁十局集团第四工程有限公司 | Flow divided hopper device for synchronous pouring construction on two sides of tunnel secondary lining and construction method |
CN107091104A (en) * | 2017-06-20 | 2017-08-25 | 中铁隧道集团二处有限公司 | The concrete placings device and its installation method of single-track railway tunnel hogging wall lining platform building cart |
CN107091104B (en) * | 2017-06-20 | 2019-12-27 | 中铁隧道集团二处有限公司 | Concrete pouring device of single-track railway tunnel middle arch wall lining trolley and installation method thereof |
CN111173538A (en) * | 2020-01-20 | 2020-05-19 | 中建商品混凝土有限公司 | Pouring device for pouring tunnel secondary lining concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106437762A (en) | Flow divided hopper device for synchronous pouring construction on two sides of tunnel secondary lining and construction method | |
CN206035504U (en) | Two lining bilateral synchronous concreting construction reposition of redundant personnel magazine attachments in tunnel | |
CN104260185B (en) | Multifunctional concrete prefabricated components battery mould production equipment and production line | |
CN207131072U (en) | A kind of super thick shear wall corner template reinforcing device | |
CN104746639B (en) | A kind of installation method that the prefabricated window that floats is installed in composite wallboard | |
CN204298828U (en) | Foundation ditch concreting elephant trunk cushioning control structure | |
CN105927249B (en) | A kind of construction method for pouring tunnel double-lining self-compacting concrete | |
CN206467993U (en) | A kind of Overhanging Outside Scaffold I-steel sealing hole device | |
CN206971732U (en) | A kind of doubly-linked beam forms pouring structure | |
CN107803467A (en) | A kind of running gate system of large-scale valve casing class steel-casting | |
CN106499411B (en) | A kind of single-track tunnel macroportion inverted arch self-propelled suspension template and construction method | |
CN106836013A (en) | Ballasting method under closure section both sides bridge flexibility is asymmetric during cantilever construction | |
CN102425110A (en) | Cast-in-situ concrete construction method for full section of urban overpass box girder | |
CN102383352A (en) | Method for constructing foam lightweight concrete poured roadbed | |
CN208343130U (en) | A kind of dismoulding system of road surface cement brick | |
CN104746875B (en) | A kind of portable block-shaped discarded concrete pours device | |
CN209163447U (en) | A kind of tool-type mould bases of constructional column top one-piece casting | |
CN208743624U (en) | A kind of knitting machine main plate running gate system | |
CN206913378U (en) | It is a kind of can quickly pull the demoulding hollow wall plank of concrete rectangle duct drilling template | |
CN206329043U (en) | A kind of concrete shunts slot device | |
CN109113338A (en) | A kind of tool-type mould bases of constructional column top one-piece casting | |
CN105587053B (en) | A kind of industrialization house wall bottom grouting construction method | |
CN206448272U (en) | Roadbed side slope arched framework one-time-shaped mould | |
CN201874242U (en) | Quantitative foam concrete pouring machine | |
CN205437044U (en) | Casting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |