CN106836013A - Ballasting method under closure section both sides bridge flexibility is asymmetric during cantilever construction - Google Patents

Ballasting method under closure section both sides bridge flexibility is asymmetric during cantilever construction Download PDF

Info

Publication number
CN106836013A
CN106836013A CN201710164409.0A CN201710164409A CN106836013A CN 106836013 A CN106836013 A CN 106836013A CN 201710164409 A CN201710164409 A CN 201710164409A CN 106836013 A CN106836013 A CN 106836013A
Authority
CN
China
Prior art keywords
closure section
bridge
sides
closure
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710164409.0A
Other languages
Chinese (zh)
Other versions
CN106836013B (en
Inventor
潘旦光
付相球
程业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Beijing USTB
Original Assignee
University of Science and Technology Beijing USTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Beijing USTB filed Critical University of Science and Technology Beijing USTB
Priority to CN201710164409.0A priority Critical patent/CN106836013B/en
Publication of CN106836013A publication Critical patent/CN106836013A/en
Application granted granted Critical
Publication of CN106836013B publication Critical patent/CN106836013B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • E01D21/105Balanced cantilevered erection

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A kind of ballasting method under closure section both sides bridge flexibility is asymmetric when the present invention provides cantilever construction, belongs to technical field of bridge construction.The method is by setting up the FEM model of closure, the end function unit vertical force of bridge in closure section both sides, calculate the vertical displacement of end and balance position, obtain corresponding softness factor, then, control the balance weight of the side throwing of closure section two difference high and closure section both sides according to softness factor, and counterweight load shedding weight.The present invention is to closure section both sides in the case of flexibility asymmetric bridge, carrying out closing construction has incomparable superiority.This method makes bridge in the casting process that joins the two sections of a bridge, etc, and the absolute altitude of closure section both sides bridge is constant always, so as to be conducive to the alignment control of bridge, reduces the stress of closure section concrete.And this method also has calculating simple, it is easy to the advantages of engineering staff grasps.

Description

Ballasting method under closure section both sides bridge flexibility is asymmetric during cantilever construction
Technical field
The present invention relates to technical field of bridge construction, closure section both sides bridge flexibility during a kind of cantilever construction is particularly related to Ballasting method under asymmetric.
Background technology
Closure is the key link of bridge construction, the alignment control during closure be construction quality ensure it is crucial because Element, rational counterweight scheme can make bridge linear more preferably in bridge completion state, and stress is smaller.Counterweight on closure construction, Li Dinglun exists《China and foreign countries' highway》2014, (3):In 131-134《Continuous rigid frame bridge midspan closing counterweight effect analysis》, disclose Etc. weight, equal bending moments, etc. 3 kinds of ballasting methods of displacement counterweight.
Etc. the stressing conditions that weight, equal bending moments counterweight only account for bridge, for flexibility asymmetric bridge, do not account for The inconsistency that closure section both sides bridge deforms under closure section concrete gravity, so as to cause into bridge Linear Error and larger Closure section stress;The absolute altitude of unilateral closure section end does not become when considering to pour closure section concrete Deng displacement ballasting method Change, but do not account for closure section both sides bridge flexibility it is asymmetric in the case of, absolute altitude before closure control and how according to closure The weight concrete of section distributes the weight of both sides counterweight, and does not provide the control method of counterweight unloading.
Therefore, in the art, in the case of asymmetric for closure section both sides bridge flexibility, it is still desirable to a kind of two side throwing Height control, the control method with reassignment and counterweight unloading.
The content of the invention
Closure section both sides bridge flexibility is asymmetric when the technical problem to be solved in the present invention is to provide a kind of cantilever construction Under ballasting method.
The method comprises the following steps:
S1:Before closure, by finite element software, the FEM model of closure section both sides bridge is set up;
S2:In closure section both sides, the end of bridge applies unit vertical force respectively, and closure section both sides bridge end is calculated respectively Portion and the vertical displacement of balance position, obtain corresponding softness factor;
S3:According to gained softness factor in S2, closure section both sides bridge throws difference and closure section both sides high before calculating closure The balance weight of bridge;
S4:In closure section casting process, unloaded according to the classification that gained softness factor in S2 carries out closure section both sides counterweight Carry.
Wherein, the closure section both sides bridge of S3 throws difference high, is to utilize softness factor, according to closure section both sides closure Rear absolute altitude is identical to be calculated.
The closure section both sides bridge counterweight of S3, is to utilize softness factor, according to the absolute altitude after the closure of closure section both sides It is identical to be calculated.
The load shedding weight of S4, it is ensured that closure section both sides bridge absolute altitude is identical all the time in casting process and keeps not Become.
Above-mentioned technical proposal of the invention has the beneficial effect that:
This method makes the absolute altitude of closure section both sides bridge keep constant in closure section concreting process, so that bridge The linear of beam is identical before and after closure, is conducive to the alignment control of bridge, while reducing the stress of closure section concrete. Therefore, closure section construction when this method is applied to various flexibility asymmetric bridge cantilever methods is controlled, and calculates simple, it is easy to engineering Personnel grasp.
Brief description of the drawings
Ballasting method schematic diagram under closure section both sides bridge flexibility is asymmetric when Fig. 1 is cantilever construction of the invention;
Fig. 2 is embodiment of the present invention closure section construction schematic diagram, and unit is m in figure;
Fig. 3 is the drawing in Fig. 2 of the present invention, and unit is m in figure;
Fig. 4 is the FEM model before embodiment of the present invention closure.
Wherein:
1- closure sections left side bridge, 2- closure sections right side bridge, 3- left sides counterweight, 4- right sides counterweight, 5- closure sections, 6- are left Side bridge end, 7- right sides bridge end.
Specific embodiment
To make the technical problem to be solved in the present invention, technical scheme and advantage clearer, below in conjunction with accompanying drawing and tool Body embodiment is described in detail.
A kind of ballasting method under closure section both sides bridge flexibility is asymmetric when the present invention provides cantilever construction.
As shown in figure 1, in this method, closure section left side bridge 1 and closure section right side bridge 2 under condition of construction, are being closed The C points of imperial section left side bridge 1 apply left side counterweight 3, and the D points of closure section right side bridge 2 apply right side counterweight 4;Then, closed The concrete of imperial section 5 is poured, and in the casting process of closure section 5, left side counterweight 3 and right side counterweight 4 are progressively unloaded.
In the present invention, the method for balance weight and load shedding is as follows:
Before closure section 5 is constructed, the A points in left side bridge end 6 apply vertical unit force, obtain the vertical position of A points and C points Move, as softness factor δAAAnd δCA;B points in right side bridge end 7 apply unit vertical force, obtain the vertical of B points and D points Displacement, as softness factor δBBAnd δDB
Closure section weight concrete is known as G, and closure section beam sections at two sides respectively shares the weight of G/2, according to softness factor δAA、 δBBCan be in the hope of the vertical displacement U that is produced in closure section concrete gravity load action lower cantalever end A, BAA、UBBAnd vertical displacement Difference ΔABRespectively:
ΔAB=UAA-UBB
(3)
The throwing H high of 2 points of control closure section both sides cantilever end A, B before applying counterweightA、HBMeet:
HA-HBAB (4)
To make after applying counterweight 2 points of closure section both sides cantilever end A, B before sustained height, and closure section concreting The position of A points and B points keeps constant afterwards, then the weight G of counterweight is designed in closure section both sidesC、GDRespectively:
In closure section casting process, for closure section both sides bridge absolute altitude is constant during making closure section casting concrete, Then unloading loading capacity should meet:
In formula, Δ G is that closure section increases weight concrete, Δ GCFor C point counterweights unload loading capacity, Δ GDFor D points counterweight is unloaded Weight.
To verify the correctness of above-mentioned theory and the application in the construction of bridge cantilever method.Below in conjunction with specific implementation Example, the present invention will be described in further detail.
Certain variable cross-section prestressed concrete continuous beam, main bridge 610m long, girder is mixed for (55+5 × 100+55) m prestressing force Solidifying soil variable cross-section continuous beam, section is using single Room section of case three, main bridge box beam top board 27.0m wide, base plate 19.5m wide, the edge of a wing Cantilever 3.75m wide.Closure section construction schematic diagram is as shown in Fig. 2 closure section left side bridge 1 is single semi-girder simply supported beam, closure Section right side bridge 2 is for 5 across single semi-girder continuous beam, and the drawing of closure section 5 is as shown in Figure 3.Left side counterweight 3 and right side counterweight 4 away from The distance of closure section end is 3m.
FEM model is as shown in figure 4, by the A points in left side bridge end 6 and right side bridge end 7 before setting up closure B points apply vertical unit force, be calculated the vertical displacement of A, B, C, D point, as softness factor:
δAA=2.25 × 10-8M/N, δCA=1.83 × 10-8M/N, δBB=4.02 × 10-8M/N, δDB=3.34 × 10-8m/ N。
Closure section weight concrete G=1081680N, can be obtained in closure section concrete gravity by formula (1), (2), (3) The vertical displacement U that A, B are produced under load actionAA、UBBAnd vertical displacement difference ΔAB
I.e. control applying counterweight front boom terminal B position is thrown high throwing than cantilever end points location A and is higher by 9.64mm.
The weight G of design counterweight water tank is tried to achieve according to formula (5), (6)C、GDFor:
During closure section casting concrete, concrete density is 2450kg/m3, often pour 1m3Concrete, i.e. Δ G= During 24500N, loading capacity Δ G is unloaded by what formula (7), (8) can obtain C, D counterweightC、ΔGDRespectively:
The above is the preferred embodiment of the present invention, it is noted that for those skilled in the art For, on the premise of principle of the present invention is not departed from, some improvements and modifications can also be made, these improvements and modifications Should be regarded as protection scope of the present invention.

Claims (4)

1. the ballasting method under closure section both sides bridge flexibility is asymmetric during a kind of cantilever construction, it is characterised in that:Including such as Lower step:
S1:Before closure, by finite element software, the FEM model of closure section both sides bridge is set up;
S2:In closure section both sides, the end of bridge applies unit vertical force respectively, respectively calculate closure section both sides bridge end and The vertical displacement of balance position, obtains corresponding softness factor;
S3:According to gained softness factor in S2, closure section both sides bridge throws difference and closure section both sides bridge high before calculating closure Balance weight;
S4:In closure section casting process, the load shedding of closure section both sides counterweight is carried out according to gained softness factor in S2.
2. the ballasting method under closure section both sides bridge flexibility is asymmetric during cantilever construction according to claim 1, its It is characterised by:The closure section both sides bridge of the S3 throws difference high, is to utilize softness factor, according to closure section both sides closure Rear absolute altitude is identical to be calculated.
3. the ballasting method under closure section both sides bridge flexibility is asymmetric during cantilever construction according to claim 1, its It is characterised by:The closure section both sides bridge counterweight of the S3, is to utilize softness factor, after the closure of closure section both sides Absolute altitude is identical to be calculated.
4. the ballasting method under closure section both sides bridge flexibility is asymmetric during cantilever construction according to claim 1, its It is characterised by:The load shedding weight of the S4, it is ensured that closure section both sides bridge absolute altitude is identical all the time in casting process and protects Hold constant.
CN201710164409.0A 2017-03-20 2017-03-20 Ballasting method when cantilever construction under closure section both sides bridge flexibility asymmetry Active CN106836013B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710164409.0A CN106836013B (en) 2017-03-20 2017-03-20 Ballasting method when cantilever construction under closure section both sides bridge flexibility asymmetry

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710164409.0A CN106836013B (en) 2017-03-20 2017-03-20 Ballasting method when cantilever construction under closure section both sides bridge flexibility asymmetry

Publications (2)

Publication Number Publication Date
CN106836013A true CN106836013A (en) 2017-06-13
CN106836013B CN106836013B (en) 2018-09-25

Family

ID=59130964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710164409.0A Active CN106836013B (en) 2017-03-20 2017-03-20 Ballasting method when cantilever construction under closure section both sides bridge flexibility asymmetry

Country Status (1)

Country Link
CN (1) CN106836013B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385536A (en) * 2018-04-02 2018-08-10 中冶建工集团有限公司 A kind of ballast method that the rigid structure of bridge closes up
CN110230270A (en) * 2019-06-14 2019-09-13 中国铁建大桥工程局集团有限公司 The high porous big span length of pier joins continuous steel frame imbalance section cantilever casting construction engineering method
CN111636310A (en) * 2020-06-22 2020-09-08 中铁二十三局集团第三工程有限公司 Construction method for weight-bearing concrete of asymmetric cable-stayed bridge
CN112195797A (en) * 2020-08-21 2021-01-08 中铁五局集团第四工程有限责任公司 Closure construction method for continuous beam bridge
CN113408027A (en) * 2021-06-16 2021-09-17 中铁大桥勘测设计院集团有限公司 Bridge closure gap attitude quantitative counterweight adjustment method
CN113494055A (en) * 2021-08-10 2021-10-12 中建市政工程有限公司 Double-locking structure for closure section of long-span bridge and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050073986A (en) * 2004-01-13 2005-07-18 (주)씨씨엘 코리아 Upper steel anckorage of steel box girder for incremental launching method
CN101761034A (en) * 2010-03-25 2010-06-30 中国建筑第六工程局有限公司 Construction method of side block straight-line segment of cantilever-concreting continuous beam
CN102493362A (en) * 2011-11-24 2012-06-13 中铁二十三局集团有限公司 Construction method for midspan closure segment of longspan continuous rigid frame bridge
RU2498005C1 (en) * 2012-05-31 2013-11-10 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Method to close span and levelling device for realisation of this method
CN105484158A (en) * 2015-12-02 2016-04-13 中交路桥建设有限公司 Asymmetrical casting construction method of side span of rigid frame bridge with extra high piers and long span length

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050073986A (en) * 2004-01-13 2005-07-18 (주)씨씨엘 코리아 Upper steel anckorage of steel box girder for incremental launching method
CN101761034A (en) * 2010-03-25 2010-06-30 中国建筑第六工程局有限公司 Construction method of side block straight-line segment of cantilever-concreting continuous beam
CN102493362A (en) * 2011-11-24 2012-06-13 中铁二十三局集团有限公司 Construction method for midspan closure segment of longspan continuous rigid frame bridge
RU2498005C1 (en) * 2012-05-31 2013-11-10 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Method to close span and levelling device for realisation of this method
CN105484158A (en) * 2015-12-02 2016-04-13 中交路桥建设有限公司 Asymmetrical casting construction method of side span of rigid frame bridge with extra high piers and long span length

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108385536A (en) * 2018-04-02 2018-08-10 中冶建工集团有限公司 A kind of ballast method that the rigid structure of bridge closes up
CN108385536B (en) * 2018-04-02 2020-04-14 中冶建工集团有限公司 Weight pressing method for folding rigid frame of bridge
CN110230270A (en) * 2019-06-14 2019-09-13 中国铁建大桥工程局集团有限公司 The high porous big span length of pier joins continuous steel frame imbalance section cantilever casting construction engineering method
CN111636310A (en) * 2020-06-22 2020-09-08 中铁二十三局集团第三工程有限公司 Construction method for weight-bearing concrete of asymmetric cable-stayed bridge
CN111636310B (en) * 2020-06-22 2022-01-25 中铁二十三局集团第三工程有限公司 Construction method for weight-bearing concrete of asymmetric cable-stayed bridge
CN112195797A (en) * 2020-08-21 2021-01-08 中铁五局集团第四工程有限责任公司 Closure construction method for continuous beam bridge
CN112195797B (en) * 2020-08-21 2022-08-19 中铁五局集团华南工程有限责任公司 Closure construction method for continuous beam bridge
CN113408027A (en) * 2021-06-16 2021-09-17 中铁大桥勘测设计院集团有限公司 Bridge closure gap attitude quantitative counterweight adjustment method
CN113408027B (en) * 2021-06-16 2022-07-08 中铁大桥勘测设计院集团有限公司 Bridge closure gap attitude quantitative counterweight adjustment method
CN113494055A (en) * 2021-08-10 2021-10-12 中建市政工程有限公司 Double-locking structure for closure section of long-span bridge and construction method

Also Published As

Publication number Publication date
CN106836013B (en) 2018-09-25

Similar Documents

Publication Publication Date Title
CN106836013A (en) Ballasting method under closure section both sides bridge flexibility is asymmetric during cantilever construction
CN106193588B (en) A kind of method pouring building post-cast strip and pour mould
CN203856478U (en) Lining trolley applicable to tunnel with variable fracture surface
CN106869503A (en) A kind of concreting method of concrete heat-insulating curtain wall
CN103669228B (en) Self-propelled moveable formwork camber method of adjustment
CN104314013A (en) Double suspension arm construction method of ultra-asymmetry combined beam
CN111414656A (en) Segmental casting method and analysis method for large-volume radiation-proof concrete wall
CN103437285B (en) Full space support cast-in-place box beam construction technology
CN206035504U (en) Two lining bilateral synchronous concreting construction reposition of redundant personnel magazine attachments in tunnel
CN209584848U (en) Seam prototype template and casting system are reserved in a kind of assembled cushion cap pier stake
CN107152112A (en) A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region
CN209509482U (en) A kind of indoor wall formwork for placing preventing deformation
CN209066293U (en) A kind of flexible suspension for long-span arch bridge main girder construction
CN110837667A (en) Soil filling method based on steel corrugated plate bridge reinforcement
CN203113174U (en) CRTSIII pattern plat type ballastless track self-compacting concrete filling tool
CN107938907A (en) A kind of inclined roof exempts from formwork construction method
CN202207775U (en) Reinforcement tool used in large-scale investment cast piece coating
CN207244957U (en) A kind of modularization Prefabricated stacking floor for being used to drop plate region
CN205976472U (en) Pour mould of building post -cast strip
CN209478471U (en) Waterproofness slab thickness control block makes mold
CN208163916U (en) A kind of producing device of hybrid beam
CN207934255U (en) A kind of prefabricated composite wallboard for exempting from formwork
CN205876346U (en) Integral template of pouring of tunnel invert and short side wall
CN208363626U (en) Super high-rise building template back arris shoring
CN207244960U (en) A kind of Prefabricated stacking floor with tool-typed formwork for being used to drop plate region

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant