CN109778708A - A kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device - Google Patents

A kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device Download PDF

Info

Publication number
CN109778708A
CN109778708A CN201910162722.XA CN201910162722A CN109778708A CN 109778708 A CN109778708 A CN 109778708A CN 201910162722 A CN201910162722 A CN 201910162722A CN 109778708 A CN109778708 A CN 109778708A
Authority
CN
China
Prior art keywords
plate
seat
span
longitudinal
top plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910162722.XA
Other languages
Chinese (zh)
Inventor
曹晗
申爱华
李坤
姬明辉
丁仕洪
周宏庚
杨少杰
王子松
时尚
赵小辉
王雨舟
付明珠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Steel Structure Construction Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Steel Structure Construction Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Steel Structure Construction Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201910162722.XA priority Critical patent/CN109778708A/en
Publication of CN109778708A publication Critical patent/CN109778708A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction devices, it include the longitudinal-moving device and jacking-drawing device being used in conjunction with each other, longitudinal-moving device includes left and right counter-force seat, pre-embedded bolt mounting hole is distributed with respectively on left and right counter-force seat, the rear end of left counter-force seat is equipped with limit top plate by pin shaft, pipe bending cylinder is installed on the support of limit top plate two sides, fixing seat is equipped with by pin shaft on right counter-force seat, strut and tie is installed, the other end of strut and tie is equipped with top plate in fixing seat;Jacking-drawing device includes the top pulling seat being used in conjunction with each other and fulcrum bearing, and the one end for pushing up pulling seat is equipped with installation fixation hole, and support base is equipped with mounting hole, and support base is equipped with top and draws oil cylinder.The configuration of the present invention is simple is easy to make, is easy for construction, and longitudinal-moving device realizes the unstressed closure of girder steel for accurately adjusting mouth longitudinal bias of joining the two sections of a bridge, etc for adjusting girder steel longitudinal direction mileage position, jacking-drawing device.

Description

A kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device
Technical field:
The present invention relates to a kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction devices, are mainly used for large span Continuous truss cable-stayed bridge Middle span closing belongs to the design and construction field of bridge.
Background technique:
When cable-stayed bridge midspan closing is constructed, there are mainly two types of construction methods: one kind is that penalty method is joined the two sections of a bridge, etc, and one kind is unstressed The closure of state method.The two methods are all made of control closure slip of the tongue difference in implementation process and join the two sections of a bridge, etc.It is required that right before closure Closure mouth both ends have installed the relative status between cantilever beam and have carried out accurate adjustment control, meet closing construction dimensional accuracy and want It asks.
Summary of the invention:
The object of the invention is to remedy the disadvantages of known techniques, provides a kind of Large-Span Continuous steel truss cable-stayed bridge span centre Join the two sections of a bridge, etc longitudinal deviation correction device, and structure is simple, is easy to make, is easy for construction, and longitudinal-moving device is for adjusting girder steel longitudinal direction mileage position It sets, jacking-drawing device realizes the unstressed closure of girder steel for accurately adjusting mouth longitudinal bias of joining the two sections of a bridge, etc.
The present invention is achieved by the following technical solutions:
A kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device, it is characterised in that: include phase interworking The longitudinal-moving device and jacking-drawing device used is closed, the longitudinal-moving device includes left and right counter-force seat, is divided on the left and right counter-force seat Pre-embedded bolt mounting hole is not distributed with, the rear end of the left counter-force seat is equipped with limit top plate, the spacing top by pin shaft Pipe bending cylinder is installed on the support of plate two sides, fixing seat is equipped with by pin shaft on the right counter-force seat, in the fixing seat It is equipped with one horizontally disposed and towards the strut and tie of left counter-force seat, the other end of the strut and tie is equipped with top plate;It draws on the top Device includes the top pulling seat being used in conjunction with each other and fulcrum bearing, and the top pulling seat is hollow structure, and two sides are respectively equipped with Mutual corresponding fixed plate, the one end of the top pulling seat are equipped with installation fixation hole, and the support base is equipped with mounting hole, described Support base is equipped with top and draws oil cylinder.
The longitudinal-moving device and jacking-drawing device is mounted on side by side respectively on two king-towers and girder steel to be joined the two sections of a bridge, etc, and can be one Group is used alone or multiple groups are used cooperatively.
The limit top plate is a plate body structure, and end is equipped with the fixation hole installed with support thereafter, and front end is set There are top plate, and a top plate upper end limit guide plate with outward extension, in the top plate above the limit guide plate and strut and tie Guide groove cooperation.
The support includes a vertical mounting plate, and the bottom end of the mounting plate is welded as a whole with counter-force seat is done, The front end face of the mounting plate is equipped with pipe bending cylinder, is equipped with and adds between the bottom end of the mounting plate and left counter-force seat upper surface Strengthening tendons plate is cooperated between the rear end face upper end of the mounting plate and fixed seat lateral surface by connecting rib.
The end of the strut and tie and top plate weld, and the side with the distribution of strut and tie circumferencial direction is additionally provided on top plate Plate, and be welded to connect between side plate and strut and tie.
Stiffener plate is equipped between the outer end face and top pulling seat of the fixed plate.
It is two that oil cylinder is drawn on the top, and the middle part of the support base is equipped with partition, and the both ends of the surface of the partition are pacified respectively Oil cylinder is drawn equipped with mutual corresponding top.
The longitudinal-moving device is for adjusting girder steel longitudinal direction mileage position, and the jacking-drawing device is for accurately adjusting the mouth that joins the two sections of a bridge, etc Longitudinal bias;Vertical shift system is arranged using damper built-in fitting in the longitudinal-moving device, assists girder steel vertical shift.Unilateral side uses two liquid It presses jack as incremental launching device, overcomes girder steel frictional force, realize that vertical equity is mobile;The jacking-drawing device is mainly used for accurately Adjustment closure mouth longitudinal bias and vertical accurate adjustment use.
The invention has the advantages that
1, each device uses steel plate welding production, and the production is simple and convenient, and field condition can meet production and require.
2, base-plate and existed concrete bridge bridge pier built-in fitting or girder steel bolt hole group need to only be connected by bolt when installing It connects, it is easy for assemble or unload, main structure will not be damaged.
3, closure section rod piece is design size, does not need to carry out avoiding the destruction to closure rod piece with cutting, realizes steel The unstressed closure of beam, ensure that the stabilization of girder steel and suspension cable.
Detailed description of the invention:
Fig. 1 is the invention patent longitudinal-moving device illustraton of model.
Fig. 2 is the invention patent longitudinal-moving device plan view.
Fig. 3 is the invention patent longitudinal-moving device elevation.
Fig. 4 is the invention patent jacking-drawing device plan view.
Fig. 5 is the invention patent jacking-drawing device elevation.
Specific embodiment:
Referring to attached drawing.
A kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device, it is characterised in that: include phase interworking The longitudinal-moving device and jacking-drawing device used is closed, the longitudinal-moving device includes left and right counter-force seat, is divided on the left and right counter-force seat Pre-embedded bolt mounting hole is not distributed with, the rear end of the left counter-force seat is equipped with limit top plate, the spacing top by pin shaft Pipe bending cylinder is installed on the support of plate two sides, fixing seat is equipped with by pin shaft on the right counter-force seat, in the fixing seat It is equipped with one horizontally disposed and towards the strut and tie of left counter-force seat, the other end of the strut and tie is equipped with top plate;It draws on the top Device includes the top pulling seat being used in conjunction with each other and fulcrum bearing, and the top pulling seat is hollow structure, and two sides are respectively equipped with Mutual corresponding fixed plate, the one end of the top pulling seat are equipped with installation fixation hole, and the support base is equipped with mounting hole, described Support base is equipped with top and draws oil cylinder.
The longitudinal-moving device and jacking-drawing device is mounted on side by side respectively on two king-towers and girder steel to be joined the two sections of a bridge, etc, and can be one Group is used alone or multiple groups are used cooperatively.
The limit top plate is a plate body structure, and end is equipped with the fixation hole installed with support thereafter, and front end is set There are top plate, and a top plate upper end limit guide plate with outward extension, in the top plate above the limit guide plate and strut and tie Guide groove cooperation.
The support includes a vertical mounting plate, and the bottom end of the mounting plate is welded as a whole with counter-force seat is done, The front end face of the mounting plate is equipped with pipe bending cylinder, is equipped with and adds between the bottom end of the mounting plate and left counter-force seat upper surface Strengthening tendons plate is cooperated between the rear end face upper end of the mounting plate and fixed seat lateral surface by connecting rib.
The end of the strut and tie and top plate weld, and the side with the distribution of strut and tie circumferencial direction is additionally provided on top plate Plate, and be welded to connect between side plate and strut and tie.
Stiffener plate is equipped between the outer end face and top pulling seat of the fixed plate.
It is two that oil cylinder is drawn on the top, and the middle part of the support base is equipped with partition, and the both ends of the surface of the partition are pacified respectively Oil cylinder is drawn equipped with mutual corresponding top.
Counter-force seat (2) is reliably connected with king-tower and girder steel respectively;Pushing tow oil overhold (1) is placed between counter-force seat, strut and tie Adjustment guarantees horizontal power transmission, and pin diameter is smaller than aperture, it is ensured that normal displacement;
A kind of jacking-drawing device in Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device, by fulcrum bearing (7), Top pulling seat (8) is fixed on closure mouth beam-ends rod piece top surface by high-strength bolt respectively, draws oil overhold (6) to be placed in device not by that will push up Pushing tow and the conversion to function is drawn are realized with position, accurately to adjust the increase or diminution of closure mouth axial clearance, are met Closing construction needs.

Claims (7)

1. a kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device, it is characterised in that: include to cooperate The longitudinal-moving device and jacking-drawing device used, the longitudinal-moving device include left and right counter-force seat, on the left and right counter-force seat respectively Pre-embedded bolt mounting hole is distributed with, the rear end of the left counter-force seat is equipped with limit top plate, the limit top plate by pin shaft Pipe bending cylinder is installed on the support of two sides, fixing seat is equipped with by pin shaft on the right counter-force seat, is pacified in the fixing seat Horizontally disposed and towards the strut and tie of left counter-force seat equipped with one, the other end of the strut and tie is equipped with top plate;The top loads Setting includes the top pulling seat being used in conjunction with each other and fulcrum bearing, and the top pulling seat is hollow structure, and two sides are respectively equipped with phase The one end of mutual corresponding fixed plate, the top pulling seat is equipped with installation fixation hole, and the support base is equipped with mounting hole, the branch Support seat is equipped with top and draws oil cylinder.
2. Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device according to claim 1, it is characterised in that: The longitudinal-moving device and jacking-drawing device is mounted on side by side respectively on two king-towers and girder steel to be joined the two sections of a bridge, etc, and can individually be made for one group With or multiple groups be used cooperatively.
3. Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device according to claim 1, it is characterised in that: The limit top plate is a plate body structure, and end is equipped with the fixation hole installed with support thereafter, and front end is equipped with top plate, and Top plate upper end limit guide plate with outward extension, the limit guide plate cooperate with the guide groove in the top plate above strut and tie.
4. Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device according to claim 1, it is characterised in that: The support includes a vertical mounting plate, and the bottom end of the mounting plate is welded as a whole with counter-force seat is done, the installation The front end face of plate is equipped with pipe bending cylinder, and stiffener plate is equipped between the bottom end of the mounting plate and left counter-force seat upper surface, Cooperated between the rear end face upper end of the mounting plate and fixed seat lateral surface by connecting rib.
5. Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device according to claim 1, it is characterised in that: The end of the strut and tie and top plate weld, and the side plate with the distribution of strut and tie circumferencial direction are additionally provided on top plate, and side plate It is welded to connect between strut and tie.
6. Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device according to claim 1, it is characterised in that: Stiffener plate is equipped between the outer end face and top pulling seat of the fixed plate.
7. Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device according to claim 1, it is characterised in that: It is two that oil cylinder is drawn on the top, and the middle part of the support base is equipped with partition, and the both ends of the surface of the partition are separately installed with mutually Draw oil cylinder in corresponding top.
CN201910162722.XA 2019-03-05 2019-03-05 A kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device Withdrawn CN109778708A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910162722.XA CN109778708A (en) 2019-03-05 2019-03-05 A kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910162722.XA CN109778708A (en) 2019-03-05 2019-03-05 A kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device

Publications (1)

Publication Number Publication Date
CN109778708A true CN109778708A (en) 2019-05-21

Family

ID=66486263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910162722.XA Withdrawn CN109778708A (en) 2019-03-05 2019-03-05 A kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device

Country Status (1)

Country Link
CN (1) CN109778708A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110239570A (en) * 2019-07-05 2019-09-17 谢力 A kind of overhead rail train docking facilities using fluid cylinder
CN110820601A (en) * 2019-10-24 2020-02-21 中铁四局集团有限公司 Longitudinal constraint and displacement control method for large-span continuous steel truss girder cable-stayed bridge
CN112030764A (en) * 2020-09-04 2020-12-04 中铁六局集团有限公司 Top-pulling device and method for adjusting closure opening of steel truss girder
CN113430933A (en) * 2021-08-06 2021-09-24 盐城市兴都市政工程建设有限公司 Concrete continuous beam cable-stayed bridge longitudinal deviation correcting device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493348A (en) * 2011-12-14 2012-06-13 中铁大桥局股份有限公司 Transverse limitation and correction device for incremental launching of bridge
CN203334191U (en) * 2013-06-30 2013-12-11 中铁一局集团有限公司 Steel truss girder jointing rod piece clearance adjusting device
CN108842621A (en) * 2018-05-21 2018-11-20 中交二航局第二工程有限公司 Girder steel closes up interval regulating process
CN209508820U (en) * 2018-12-11 2019-10-18 中铁四局集团有限公司 A kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device
CN110820601A (en) * 2019-10-24 2020-02-21 中铁四局集团有限公司 Longitudinal constraint and displacement control method for large-span continuous steel truss girder cable-stayed bridge

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493348A (en) * 2011-12-14 2012-06-13 中铁大桥局股份有限公司 Transverse limitation and correction device for incremental launching of bridge
CN203334191U (en) * 2013-06-30 2013-12-11 中铁一局集团有限公司 Steel truss girder jointing rod piece clearance adjusting device
CN108842621A (en) * 2018-05-21 2018-11-20 中交二航局第二工程有限公司 Girder steel closes up interval regulating process
CN209508820U (en) * 2018-12-11 2019-10-18 中铁四局集团有限公司 A kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device
CN110820601A (en) * 2019-10-24 2020-02-21 中铁四局集团有限公司 Longitudinal constraint and displacement control method for large-span continuous steel truss girder cable-stayed bridge

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110239570A (en) * 2019-07-05 2019-09-17 谢力 A kind of overhead rail train docking facilities using fluid cylinder
CN110239570B (en) * 2019-07-05 2020-09-11 谢力 Air rail train butt joint device adopting fluid cylinder
CN110820601A (en) * 2019-10-24 2020-02-21 中铁四局集团有限公司 Longitudinal constraint and displacement control method for large-span continuous steel truss girder cable-stayed bridge
CN110820601B (en) * 2019-10-24 2021-07-30 中铁四局集团有限公司 Longitudinal constraint and displacement control method for large-span continuous steel truss girder cable-stayed bridge
CN112030764A (en) * 2020-09-04 2020-12-04 中铁六局集团有限公司 Top-pulling device and method for adjusting closure opening of steel truss girder
CN113430933A (en) * 2021-08-06 2021-09-24 盐城市兴都市政工程建设有限公司 Concrete continuous beam cable-stayed bridge longitudinal deviation correcting device

Similar Documents

Publication Publication Date Title
CN109778708A (en) A kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device
JP4985540B2 (en) Vertical beam system for mobile work vehicles for cantilever installation
CN102352604A (en) Truss sheet unit of steel truss girder, steel truss girder structure and mounting method thereof
CN209508820U (en) A kind of Large-Span Continuous steel truss cable-stayed bridge Middle span closing longitudinal deviation correction device
CN109914266A (en) A kind of Large Steel pipeline overhead lifting vertical shift and promote construction method of installation
CN111254759A (en) Suspension type single rail
CN103194973B (en) Novel spliced truss for bridge construction and construction method
CN208563082U (en) A kind of combination girder stayed-cable bridge with thickening end bay floorings
CN110820566A (en) Corrugated steel web part bearing type hanging basket suspension casting construction method
CN109235167A (en) A kind of beam-rail integration medium-and low-speed maglev track girder
CN203583378U (en) Floor plate truss trolley for mounting bridge deck slab of composite structure bridge
CN202787085U (en) Steel box girder large segment connection matching device with position adjusting function
CN209511294U (en) A kind of novel aerial member support structure
CN201268557Y (en) Assembled railless gantry crane
CN201605111U (en) Combined type gantry crane
CN110820567A (en) Bearing type hanging basket for PC box girder part with corrugated steel web plate
CN214783198U (en) Novel horizontal longitudinal connecting system for three-split steel box girder
CN103061417A (en) Connection node of steel reinforced concrete composite beam and concrete-filled steel tubular column
CN211420740U (en) Track is assembled to well low-speed magnetic levitation girder steel
CN109797984B (en) Variable-curvature multipurpose steering device for external prestressed tendons
CN108755973B (en) H-shaped steel embedded system at cantilever beam construction joint part
CN205276683U (en) Two pin composite truss
CN2911007Y (en) Gate with double-arch structure
CN110965406A (en) Track is assembled to well low-speed magnetic levitation girder steel
CN104612039B (en) Assembled steel one bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190521