CN108755973B - H-shaped steel embedded system at cantilever beam construction joint part - Google Patents

H-shaped steel embedded system at cantilever beam construction joint part Download PDF

Info

Publication number
CN108755973B
CN108755973B CN201810798157.1A CN201810798157A CN108755973B CN 108755973 B CN108755973 B CN 108755973B CN 201810798157 A CN201810798157 A CN 201810798157A CN 108755973 B CN108755973 B CN 108755973B
Authority
CN
China
Prior art keywords
shaped steel
construction joint
casting section
cantilever beam
joint part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810798157.1A
Other languages
Chinese (zh)
Other versions
CN108755973A (en
Inventor
邵寅松
李兵生
王伟
李毅
李鹏
闫亚团
余涛
李守富
王宵宇
张扬
李艳
王腾
王凯
徐盼
郑兴
许胜�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Bureau Group Co Ltd
Original Assignee
China Construction Third Bureau Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Construction Engineering Co Ltd filed Critical China Construction Third Bureau Construction Engineering Co Ltd
Priority to CN201810798157.1A priority Critical patent/CN108755973B/en
Publication of CN108755973A publication Critical patent/CN108755973A/en
Application granted granted Critical
Publication of CN108755973B publication Critical patent/CN108755973B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4157Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B2001/4192Connecting devices specially adapted for embedding in concrete or masonry attached to concrete reinforcing elements, e.g. rods or wires

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The invention discloses an H-shaped steel pre-burying system for a construction joint part of an overhanging beam, which comprises a first casting section and a second casting section, wherein a construction joint is formed between the first casting section and the second casting section, H-shaped steel is pre-buried at the construction joint part, two ends of the H-shaped steel are respectively arranged in the first casting section and the second casting section, an upper tooling fixing bracket is arranged on the upper side of the H-shaped steel, and a lower tooling fixing bracket is arranged on the lower side of the H-shaped steel. According to the invention, H-shaped steel of different types is pre-embedded with the cantilever beam part, and additional ribs are added, so that the problem of continuous structure of the construction joint part is solved by the shearing resistance of the H-shaped steel and the performance of the reinforcing steel together; the system accelerates the construction speed of the structure, meets the requirements of subsequent decoration to the greatest extent, saves the construction period, improves the construction efficiency, and has certain application value for the construction method of the cantilever beam.

Description

H-shaped steel embedded system at cantilever beam construction joint part
Technical Field
The invention relates to the technical field of building construction, in particular to an H-shaped steel pre-burying system for a cantilever beam construction joint part.
Background
With the development of the building level, the trend of driving the development of peripheral economy by the commercial development is more and more obvious. In the development of commercial building plates, the situation that the special-shaped effect is adopted to improve the commercial value is more and more common, the special-shaped effect is required to be achieved by adopting the overhanging structure in the structural design, and the overhanging structure becomes a construction heavy difficulty. Aiming at the situation, the method is obtained through continuous on-site investigation, analysis and comparison, and the method adopts the measure of embedding the H-shaped steel at the construction joint part of the cantilever beam, so that the problem that the cantilever beam cannot be kept at the construction joint is solved, the requirement of subsequent decoration can be met to the maximum extent, the construction period is saved, the construction efficiency is improved, and the method has a certain application value for the construction method of the cantilever beam.
Disclosure of Invention
The invention aims to solve the technical problem of providing the H-shaped steel pre-burying system for the construction joint part of the cantilever beam, which not only solves the problem that the cantilever beam cannot be kept at the construction joint, but also can meet the requirement of subsequent decoration to the maximum extent, saves the construction period, improves the construction efficiency, and has a certain application value for the construction method of the cantilever beam.
The technical problems to be solved by the invention are realized by the following technical scheme:
the utility model provides a cantilever beam construction joint position H shaped steel pre-buried system, cantilever beam includes first casting section and second casting section, first casting section with form the construction joint between the second casting section the pre-buried H shaped steel of construction joint department, the both ends of H shaped steel are arranged in respectively first casting section with in the second casting section, H shaped steel upside is provided with upper portion toolization fixed bolster, downside is provided with lower part toolization fixed bolster.
Preferably, in the above technical solution, the upper tooling fixing support includes an additional bar welded and connected, a vertical welded bar, and a horizontal welded bar, and the additional bar is connected with the H-section steel.
Preferably, in the above technical solution, the lower tooling fixing support includes an additional bar welded to the lower tooling fixing support, a vertical welded bar, and a horizontal welded bar, and the additional bar is connected to the H-section steel.
Preferably, in the above technical solution, the upper tooling fixing bracket and the lower tooling fixing bracket have the same structure, and are symmetrically arranged on the upper side and the lower side of the H-shaped steel.
Preferably, in the above technical solution, the first casting section is integrally provided with the main beam.
Preferably, in the above technical solution, the first casting section is perpendicular to the main beam and integrally provided.
Preferably, in the above technical solution, the length of the H-shaped steel extending into the first casting section is 1/4 of the total length of the first casting section.
Preferably, in the above technical solution, the pre-buried position of the H-shaped steel is the lower part of two rows of ribs.
Preferably, in the above technical solution, the horizontal steel bars and the horizontal steel bars are welded with the upper and lower steel bars of the cantilever beam.
Preferably, in the above technical solution, the H-section steel 5 can transversely pass through the construction joint 4.
The technical scheme of the invention has the following beneficial effects:
the invention provides an H-shaped steel pre-burying system for a construction joint part of an overhanging beam, which solves the problem of continuous structure of the construction joint part by pre-burying H-shaped steel of different types with the overhanging beam part and adding additional ribs together with the shearing resistance of the H-shaped steel and the performance of the reinforcing steel. Compared with the traditional overhanging part which cannot be reserved with a construction joint, the system accelerates the construction speed of the structure, meets the requirements of subsequent decoration and fitment to the maximum extent, saves the construction period, improves the construction efficiency, and has a certain application value for the construction method of the overhanging beam.
Drawings
Fig. 1 is a schematic cross-sectional view of an H-section steel embedding system at a cantilever beam construction joint part of the invention.
Fig. 2 is a schematic view of the connection of the additional bar of the present invention to the H-section steel.
Fig. 3 is a schematic view of an upper fixing bracket of the H-steel of the present invention.
Fig. 4 is a schematic view of the lower fixing bracket of the H-section steel of the present invention.
Detailed Description
Specific embodiments of the invention are described in detail below to facilitate a further understanding of the invention.
Fig. 1 is a schematic cross-sectional view of an H-section steel embedding system at a cantilever beam construction joint part of the invention. Fig. 2 is a schematic view of the connection of the additional bar of the present invention to the H-section steel. As shown in the figure:
the cantilever beam 1 consists of two parts, namely a first casting section 2 and a second casting section 3 (namely the length of the first casting and the length of the second casting). A construction joint 4 is formed between the first casting section 2 and the second casting section 3, and H-shaped steel 5 is pre-buried at the construction joint 4, that is to say, the H-shaped steel 5 can transversely penetrate through the construction joint 4. And, the both ends of H shaped steel 5 are arranged in first casting section 2 and second casting section 3 respectively, and H shaped steel 5 upside is provided with upper portion instrument fixed bolster, and the downside is provided with lower part instrument fixed bolster.
Because the stress of the construction joint part is weakest, the H-shaped steel 5 is pre-buried at the construction joint 4, the additional ribs 6,H are placed on the upper part of the H-shaped steel 5, the length 7 of the H-shaped steel 5 extending into the first casting section 2 is 1/4 of the length of the first casting section 2, and the problem of structural continuity of the construction joint part is jointly solved through the shearing resistance of the H-shaped steel and the performance of the reinforcing steel.
Fig. 3 is a schematic view of an upper fixing bracket of the H-steel of the present invention. Fig. 4 is a schematic view of the lower fixing bracket of the H-section steel of the present invention. Please refer to fig. 3 and fig. 4 together. In detail:
the upper tooling fixing support comprises: the additional bars 6 are welded and connected, the vertical welding bars 8 and the horizontal welding bars 9 are welded, and the additional bars 6 are connected with the H-shaped steel 5. The lower tooling fixing support comprises an additional rib 6, a vertical welding reinforcing steel bar 10 and a horizontal welding reinforcing steel bar 11 which are welded and connected, and the additional rib 6 is connected with the H-shaped steel 5. Preferably, the upper tooling fixing bracket and the lower tooling fixing bracket have the same structure and are symmetrically arranged on the upper side and the lower side of the H-shaped steel 5.
The first casting section 2 is integrally provided with the main girder 12, i.e. integrally cast. Preferably, the first casting section 2 is disposed perpendicular to the main beam 12. The embedded length 7 of the H-shaped steel 5 extending into the first casting section 2 is 1/4 of the total length of the first casting section 2. And from the embedded height, the embedded position of the H-shaped steel 5 is the lower part of two rows of ribs. Of course, the present invention is not limited thereto, and those skilled in the art can reasonably adjust the above data according to the needs.
The horizontal steel bars 9 and 11 are welded with the upper and lower steel bars of the cantilever beam 1.
Although the present invention has been described with reference to the above embodiments, it should be understood that the present invention is not limited thereto, and that various changes and modifications may be made by those skilled in the art without departing from the spirit and scope of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims (8)

1. The H-shaped steel pre-burying system for the construction joint part of the cantilever beam is characterized in that the cantilever beam (1) comprises a first casting section (2) and a second casting section (3), a construction joint (4) is formed between the first casting section (2) and the second casting section (3), H-shaped steel (5) is pre-buried at the construction joint (4), two ends of the H-shaped steel (5) are respectively arranged in the first casting section (2) and the second casting section (3), and an upper tooling fixing bracket is arranged on the upper side of the H-shaped steel (5) and a lower tooling fixing bracket is arranged on the lower side of the H-shaped steel (5);
the upper tooling fixing support comprises an additional rib (6), a first vertical welding steel bar (8) and a first horizontal welding steel bar (9) which are connected in a welding mode, and the additional rib (6) is connected with the H-shaped steel (5);
the lower tooling fixing support comprises an additional rib (6), a second vertical welding steel bar (10) and a second horizontal welding steel bar (11) which are connected in a welding mode, and the additional rib (6) is connected with the H-shaped steel (5).
2. The cantilever beam construction joint part H-shaped steel pre-burying system according to claim 1, wherein the upper tooling fixing support and the lower tooling fixing support are identical in structure and symmetrically arranged on the upper side and the lower side of the H-shaped steel (5).
3. The cantilever beam construction joint part H-shaped steel pre-burying system according to claim 1, wherein said first casting section (2) is integrally arranged with a main beam (12).
4. The cantilever beam construction joint part H-shaped steel pre-burying system according to claim 1, wherein said first casting section (2) is perpendicular to and integrally provided with a main beam (12).
5. The cantilever beam construction joint part H-shaped steel pre-burying system according to claim 1, wherein the pre-burying length (7) of the H-shaped steel (5) extending into the first casting section (2) is 1/4 of the total length of the first casting section (2).
6. The H-beam embedded system of the cantilever beam construction joint part according to claim 1, wherein the embedded position of the H-beam (5) is the lower part of two rows of ribs.
7. The cantilever beam construction joint part H-shaped steel pre-burying system according to claim 1, wherein the first horizontal welding steel bars (9) and the second horizontal welding steel bars (11) are welded with the upper part and the lower part of the cantilever beam (1).
8. The cantilever beam construction joint part H-shaped steel pre-burying system according to claim 1, wherein said H-shaped steel (5) can transversely pass through said construction joint (4).
CN201810798157.1A 2018-07-19 2018-07-19 H-shaped steel embedded system at cantilever beam construction joint part Active CN108755973B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810798157.1A CN108755973B (en) 2018-07-19 2018-07-19 H-shaped steel embedded system at cantilever beam construction joint part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810798157.1A CN108755973B (en) 2018-07-19 2018-07-19 H-shaped steel embedded system at cantilever beam construction joint part

Publications (2)

Publication Number Publication Date
CN108755973A CN108755973A (en) 2018-11-06
CN108755973B true CN108755973B (en) 2024-03-01

Family

ID=63970574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810798157.1A Active CN108755973B (en) 2018-07-19 2018-07-19 H-shaped steel embedded system at cantilever beam construction joint part

Country Status (1)

Country Link
CN (1) CN108755973B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114482301A (en) * 2022-02-13 2022-05-13 贵州建工集团有限公司 Shear-resistant construction joint structure of cantilever beam and construction method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0345620A2 (en) * 1988-06-07 1989-12-13 Hans-Peter Dr.-Ing. Andrä Concrete beam with t-beam form
JPH09316995A (en) * 1995-12-06 1997-12-09 Tokyu Koken Kk Connection method of precast concrete cantilever floor and precast concrete handrail board
CN201261916Y (en) * 2008-09-09 2009-06-24 贵阳铝镁设计研究院 Late poured band structure adopting profiled bar short beam to improve shear force
JP2010180622A (en) * 2009-02-05 2010-08-19 Ohbayashi Corp Column-beam joint structure, and column-beam joint method
CN101818577A (en) * 2009-07-29 2010-09-01 兰州理工大学 Reinforcing method of plate type overhanging component
JP2013036174A (en) * 2011-08-04 2013-02-21 Taisei Corp Reinforcement structure for column-beam connection part
CN204781354U (en) * 2015-07-10 2015-11-18 上海思纳建筑规划设计有限公司 Shaped steel shear key connection structure of building movement joint
CN206667590U (en) * 2017-04-28 2017-11-24 青岛建安建设集团有限公司 Shear wall is encorbelmented girder construction
CN207392451U (en) * 2017-09-26 2018-05-22 江西省中宁建筑工程有限公司 A kind of building armored concrete overhangs girder construction
CN208733829U (en) * 2018-07-19 2019-04-12 中建三局集团有限公司 A kind of Cantilever Beams construction joint position H profile steel embedded system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0345620A2 (en) * 1988-06-07 1989-12-13 Hans-Peter Dr.-Ing. Andrä Concrete beam with t-beam form
JPH09316995A (en) * 1995-12-06 1997-12-09 Tokyu Koken Kk Connection method of precast concrete cantilever floor and precast concrete handrail board
CN201261916Y (en) * 2008-09-09 2009-06-24 贵阳铝镁设计研究院 Late poured band structure adopting profiled bar short beam to improve shear force
JP2010180622A (en) * 2009-02-05 2010-08-19 Ohbayashi Corp Column-beam joint structure, and column-beam joint method
CN101818577A (en) * 2009-07-29 2010-09-01 兰州理工大学 Reinforcing method of plate type overhanging component
JP2013036174A (en) * 2011-08-04 2013-02-21 Taisei Corp Reinforcement structure for column-beam connection part
CN204781354U (en) * 2015-07-10 2015-11-18 上海思纳建筑规划设计有限公司 Shaped steel shear key connection structure of building movement joint
CN206667590U (en) * 2017-04-28 2017-11-24 青岛建安建设集团有限公司 Shear wall is encorbelmented girder construction
CN207392451U (en) * 2017-09-26 2018-05-22 江西省中宁建筑工程有限公司 A kind of building armored concrete overhangs girder construction
CN208733829U (en) * 2018-07-19 2019-04-12 中建三局集团有限公司 A kind of Cantilever Beams construction joint position H profile steel embedded system

Also Published As

Publication number Publication date
CN108755973A (en) 2018-11-06

Similar Documents

Publication Publication Date Title
CN205171747U (en) Prefabricated assembled shear force wall perps connection structure
CN105484388A (en) Prefabricated assembly type shear wall vertical slit connecting structure and construction method thereof
CN203716336U (en) Sheet steel shear wall punched in side edges
CN201634998U (en) Template of pier column of bridge
CN105568788A (en) Two-line rail girder of maglev rail-holding rail transit
CN105544372A (en) Magnetic levitation encircled track traffic double-line track beam
CN108755973B (en) H-shaped steel embedded system at cantilever beam construction joint part
CN101831869A (en) Connecting structure of combined beam and concrete bearing cross beam
CN205276073U (en) Two line track roof beams of rail formula track traffic are embraced in magnetic suspension
CN114032715A (en) Magnetic suspension track panel
CN103321137B (en) Groove-shaped bridge beam
CN205975381U (en) Continuous rigid frame bridge closure section top pushes away reaction frame structure
CN109629350A (en) The concrete track beam and its construction method that empty iron stressed seamless connects
CN214739017U (en) Steel tube bundle combined shear wall and steel beam connecting device
CN105568789A (en) Two-line rail girder of maglev rail-holding rail transit
CN202577158U (en) Hyperbolic cable tower cross beam adjusting bracket
CN205329438U (en) Two line track roof beams of rail formula track traffic are embraced in magnetic suspension
CN205329437U (en) Two line track roof beams of rail formula track traffic are embraced in magnetic suspension
CN214615228U (en) Block assembled rail top air duct for underground station
CN211420740U (en) Track is assembled to well low-speed magnetic levitation girder steel
CN211364328U (en) A adjustment type base for installation of contact net channel in tunnel
CN210032327U (en) Cantilever steel beam and concrete column joint structure
CN217026513U (en) Magnetic suspension track panel
CN210766210U (en) Double-line prestressed concrete track beam structure of suspension type monorail transit system
CN209307867U (en) Framed bent and bracket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant