CN109767185A - A kind of measurement control method and computer equipment based on inspection of engineering quality - Google Patents

A kind of measurement control method and computer equipment based on inspection of engineering quality Download PDF

Info

Publication number
CN109767185A
CN109767185A CN201811634764.0A CN201811634764A CN109767185A CN 109767185 A CN109767185 A CN 109767185A CN 201811634764 A CN201811634764 A CN 201811634764A CN 109767185 A CN109767185 A CN 109767185A
Authority
CN
China
Prior art keywords
engineering
value table
quality
inspection
tables
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811634764.0A
Other languages
Chinese (zh)
Inventor
卢飞明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Hua Min Tongda Information Technology Co Ltd
Original Assignee
Fujian Hua Min Tongda Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Hua Min Tongda Information Technology Co Ltd filed Critical Fujian Hua Min Tongda Information Technology Co Ltd
Priority to CN201811634764.0A priority Critical patent/CN109767185A/en
Publication of CN109767185A publication Critical patent/CN109767185A/en
Pending legal-status Critical Current

Links

Abstract

The present invention provides a kind of measurement control method based on inspection of engineering quality, engineering is carried out works division, and bind its corresponding quality control table;Bill of quantities is collected, determines engineering metering 0# account;Inspection data in quality control table is judged whether construction quality meets the requirements according to engineering discipline;If meeting, allow to carry out intermediate metering;If not meeting, do not allow to carry out intermediate metering, until meeting;Based on contract content is measured, and generates payment statement later;The present invention also provides a kind of computer equipments, improve working efficiency.

Description

A kind of measurement control method and computer equipment based on inspection of engineering quality
Technical field
The present invention relates to a kind of measurement control method and computer equipment based on inspection of engineering quality.
Background technique
Engineering metering work be engineering construction project expenses managing and controlling work in core link, and control work quality, One of basic means of progress, gage work are also direct basis and the foundation of payment, the warp of direct relation owner and contractor Ji interests, and engineering metering has to comply with demand of technical standard, it is necessary to it just can be carried out after supervising engineer inspects for acceptance qualification Metering, the foundation that the quality inspection data checked and accepted then is measured as centre, as the important support condition of metering.And current item Inspection work of the mesh for the quality inspection data in metering process passes through people after traditional paper document printout The mode of work inspection audit need to submit quality inspection file attachment amount big, manually check work because metering engineering structure is various Amount is big, need to expend a large amount of labours, and manually check inefficiency, mistakes and omissions easily occurs in review process, cause audit time big It is big to increase.
Summary of the invention
The technical problem to be solved in the present invention, be to provide it is a kind of by the measurement control method of inspection of engineering quality and based on Machine equipment is calculated, working efficiency is improved.
One of present invention is achieved in that a kind of measurement control method based on inspection of engineering quality, comprising:
Engineering is carried out works division, and binds its corresponding quality control table by step 1;
Step 2 collects bill of quantities, determines engineering metering 0# account;
Inspection data in quality control table is judged whether construction quality meets the requirements according to engineering discipline by step 3;
If meeting, allow to carry out intermediate metering;If not meeting, do not allow to carry out intermediate metering, until meeting;
Step 4, based on contract content is measured, and generates payment statement later.
Further, the step 2 is further specifically: collects bill of quantities, determines engineering metering 0# account, and root Inventory project amount is checked according to construction drawing, and inventory project amount is audited.
Further, the quality inspection table generating method specifically:
Step A1, a normal value table is established according to acceptance specification;
Step A2, normal value table is established into incidence relation with tables of original record and quality control table respectively;
Step A3, the corresponding relationship between tables of original record and quality control table is established;
Step A4, tables of original record citation criteria value table fills in inspection data;
Step A5, the inspection data in tables of original record is referenced in quality control table.
Further, the step A1 is further specifically: determine whether the acceptance specification updates, if not updating, Normal value table is then established according to current acceptance specification;If updating, then normal value table is established according to updated acceptance specification.
Further, the step A4 is further specifically: the content of normal value table is tested, if meeting examination Specification, then tables of original record citation criteria value table fills in inspection data;If not meeting acceptance specification, then modify, later Tables of original record citation criteria value table fills in inspection data.
The two of the present invention are achieved in that a kind of computer equipment, including memory, processor and are stored in memory Computer program that is upper and can running on a processor, the processor perform the steps of when executing described program
Engineering is carried out works division, and binds its corresponding quality control table by step 1;
Step 2 collects bill of quantities, determines engineering metering 0# account;
Inspection data in quality control table is judged whether construction quality meets the requirements according to engineering discipline by step 3;
If meeting, allow to carry out intermediate metering;If not meeting, do not allow to carry out intermediate metering, until meeting;
Step 4, based on contract content is measured, and generates payment statement later.
Further, the step 2 is further specifically: collects bill of quantities, determines engineering metering 0# account, and root Inventory project amount is checked according to construction drawing, and inventory project amount is audited.
Further, the quality inspection table generating method specifically:
Step A1, a normal value table is established according to acceptance specification;
Step A2, normal value table is established into incidence relation with tables of original record and quality control table respectively;
Step A3, the corresponding relationship between tables of original record and quality control table is established;
Step A4, tables of original record citation criteria value table fills in inspection data;
Step A5, the inspection data in tables of original record is referenced in quality control table.
Further, the step A1 is further specifically: determine whether the acceptance specification updates, if not updating, Normal value table is then established according to current acceptance specification;If updating, then normal value table is established according to updated acceptance specification.
Further, the step A4 is further specifically: the content of normal value table is tested, if meeting examination Specification, then tables of original record citation criteria value table fills in inspection data;If not meeting acceptance specification, then modify, later Tables of original record citation criteria value table fills in inspection data.
The present invention has the advantage that a kind of measurement control method and computer equipment based on inspection of engineering quality, real The intelligent checks function of existing computation payment data reduces the examination amount of computation payment data, improve audit accuracy and Working efficiency.
Detailed description of the invention
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the method for the present invention execution flow chart.
Specific embodiment
The present invention is based on the measurement control methods of inspection of engineering quality, comprising:
Engineering is carried out works division, and binds its corresponding quality control table by step 1;
Step 2 collects bill of quantities, determines engineering metering 0# account, and carry out to inventory project amount according to construction drawing Review, and inventory project amount is audited;
Inspection data in quality control table is judged whether construction quality meets the requirements according to engineering discipline by step 3;
If meeting, allow to carry out intermediate metering;If not meeting, do not allow to carry out intermediate metering, until meeting;
Step 4, based on contract content is measured, and generates payment statement later.
The quality inspection table generating method specifically:
Step A1, it determines whether the acceptance specification updates, if not updating, is then established and standardized according to current acceptance specification It is worth table;If updating, then normal value table is established according to updated acceptance specification;
Step A2, normal value table is established into incidence relation with tables of original record and quality control table respectively;
Step A3, the corresponding relationship between tables of original record and quality control table is established;
Step A4, the content of normal value table is tested, if meeting acceptance specification, then tables of original record citation criteria Value table fills in inspection data;If not meeting acceptance specification, then modify, tables of original record citation criteria value table is filled in later Inspection data;
Step A5, the inspection data in tables of original record is referenced in quality control table, and verifies check number therein According to if wrong, then modifying;It is no, then it completes.
Computer equipment of the present invention, including memory, processor and storage can be run on a memory and on a processor Computer program, the processor performs the steps of when executing described program
Engineering is carried out works division, and binds its corresponding quality control table by step 1;
Step 2 collects bill of quantities, determines engineering metering 0# account, and carry out to inventory project amount according to construction drawing Review, and inventory project amount is audited;
Inspection data in quality control table is judged whether construction quality meets the requirements according to engineering discipline by step 3;
If meeting, allow to carry out intermediate metering;If not meeting, do not allow to carry out intermediate metering, until meeting;
Step 4, based on contract content is measured, and generates payment statement later.
The quality inspection table generating method specifically:
Step A1, it determines whether the acceptance specification updates, if not updating, is then established and standardized according to current acceptance specification It is worth table;If updating, then normal value table is established according to updated acceptance specification;
Step A2, normal value table is established into incidence relation with tables of original record and quality control table respectively;
Step A3, the corresponding relationship between tables of original record and quality control table is established;
Step A4, the content of normal value table is tested, if meeting acceptance specification, then tables of original record citation criteria Value table fills in inspection data;If not meeting acceptance specification, then modify, tables of original record citation criteria value table is filled in later Inspection data;
Step A5, the inspection data in tables of original record is referenced in quality control table, and verifies check number therein According to if wrong, then modifying;It is no, then it completes.
A kind of specific embodiment of the present invention:
Built-in engineering structure divides template and correlation engineering specification in Quality Inspection System, and to all types of works institutes Defined quality inspection table carries out system binding, is made whether to meet the condition criterion of specification to the inspection data in table, The conclusion for whether meeting metered condition obtained;
2, metering system and quality control system share a set of engineering structure and divide, and are divided by engineering structure by metering system System is connected with Quality Inspection System, uses two systems data interchange mutually.
3, (fail to pass through examination) when construction quality does not meet code requirement, system does not allow then to carry out metering work Make, when only inspection of engineering quality data is met the requirements, open system gage work permission, while related personnel examines stoichiometric number According to when can be associated with and check corresponding quality guarantee file;It realizes the automated metering management mode that quality control is combined with metering, passes through quality It checks on to metering, while to measure as the means for controlling quality.
Although specific embodiments of the present invention have been described above, those familiar with the art should be managed Solution, we are merely exemplary described specific embodiment, rather than for the restriction to the scope of the present invention, it is familiar with this The technical staff in field should be covered of the invention according to modification and variation equivalent made by spirit of the invention In scope of the claimed protection.

Claims (10)

1. a kind of measurement control method based on inspection of engineering quality, it is characterised in that: include:
Engineering is carried out works division, and binds its corresponding quality control table by step 1;
Step 2 collects bill of quantities, determines engineering metering 0# account;
Inspection data in quality control table is judged whether construction quality meets the requirements according to engineering discipline by step 3;
If meeting, allow to carry out intermediate metering;If not meeting, do not allow to carry out intermediate metering, until meeting.
2. a kind of measurement control method based on inspection of engineering quality according to claim 1, it is characterised in that: the step Rapid 2 further specifically: collect bill of quantities, determine engineering metering 0# account, and according to construction drawing to inventory project amount into Row review, and inventory project amount is audited.
3. a kind of measurement control method based on inspection of engineering quality according to claim 1, it is characterised in that: the matter Amount examines table generating method specifically:
Step A1, a normal value table is established according to acceptance specification;
Step A2, normal value table is established into incidence relation with tables of original record and quality control table respectively;
Step A3, the corresponding relationship between tables of original record and quality control table is established;
Step A4, tables of original record citation criteria value table fills in inspection data;
Step A5, the inspection data in tables of original record is referenced in quality control table.
4. a kind of measurement control method based on inspection of engineering quality according to claim 3, it is characterised in that: the step Rapid A1 is further specifically: determines whether the acceptance specification updates, if not updating, is then established and advised according to current acceptance specification Typical value table;If updating, then normal value table is established according to updated acceptance specification.
5. a kind of measurement control method based on inspection of engineering quality according to claim 3, it is characterised in that: the step Rapid A4 is further specifically: the content of normal value table is tested, if meeting acceptance specification, then original record table reference is advised Typical value table fills in inspection data;If not meeting acceptance specification, then modify, tables of original record citation criteria value table is filled out later Write inspection data.
6. a kind of computer equipment including memory, processor and stores the meter that can be run on a memory and on a processor Calculation machine program, it is characterised in that: the processor performs the steps of when executing described program
Engineering is carried out works division, and binds its corresponding quality control table by step 1;
Step 2 collects bill of quantities, determines engineering metering 0# account;
Inspection data in quality control table is judged whether construction quality meets the requirements according to engineering discipline by step 3;
If meeting, allow to carry out intermediate metering;If not meeting, do not allow to carry out intermediate metering, until meeting;
Step 4, based on contract content is measured, and generates payment statement later.
7. a kind of computer equipment according to claim 6, it is characterised in that: the step 2 is further specifically: collect Bill of quantities determines engineering metering 0# account, and is checked according to construction drawing inventory project amount, and to inventory engineering Amount is audited.
8. a kind of computer equipment according to claim 6, it is characterised in that: the quality inspection table generating method is specific Are as follows:
Step A1, a normal value table is established according to acceptance specification;
Step A2, normal value table is established into incidence relation with tables of original record and quality control table respectively;
Step A3, the corresponding relationship between tables of original record and quality control table is established;
Step A4, tables of original record citation criteria value table fills in inspection data;
Step A5, the inspection data in tables of original record is referenced in quality control table.
9. a kind of computer equipment according to claim 8, it is characterised in that: the step A1 is further specifically: really Whether the fixed acceptance specification updates, if not updating, then establishes normal value table according to current acceptance specification;If updating, then Normal value table is established according to updated acceptance specification.
10. a kind of computer equipment according to claim 8, it is characterised in that: the step A4 is further specifically: will The content of normal value table is tested, if meeting acceptance specification, then tables of original record citation criteria value table fills in inspection data; If not meeting acceptance specification, then modify, tables of original record citation criteria value table fills in inspection data later.
CN201811634764.0A 2018-12-29 2018-12-29 A kind of measurement control method and computer equipment based on inspection of engineering quality Pending CN109767185A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811634764.0A CN109767185A (en) 2018-12-29 2018-12-29 A kind of measurement control method and computer equipment based on inspection of engineering quality

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811634764.0A CN109767185A (en) 2018-12-29 2018-12-29 A kind of measurement control method and computer equipment based on inspection of engineering quality

Publications (1)

Publication Number Publication Date
CN109767185A true CN109767185A (en) 2019-05-17

Family

ID=66452572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811634764.0A Pending CN109767185A (en) 2018-12-29 2018-12-29 A kind of measurement control method and computer equipment based on inspection of engineering quality

Country Status (1)

Country Link
CN (1) CN109767185A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110276551A (en) * 2019-06-21 2019-09-24 中海油安全技术服务有限公司 Engineering construction project quality management-control method and system
CN112669019A (en) * 2021-01-31 2021-04-16 四川沿江攀宁高速公路有限公司 Engineering data automatic filing method based on engineering quantity list and quality inspection data correlation interaction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080275714A1 (en) * 2007-05-01 2008-11-06 David Frederick Martinez Computerized requirement management system
CN102073632A (en) * 2009-07-18 2011-05-25 苏州鼎思科技有限公司 Comprehensive construction management knowledge base data structure for construction engineering
CN107330634A (en) * 2017-07-20 2017-11-07 浙江之江工程项目管理有限公司 A kind of engineering supervision inspection of quality actual measurement actual quantities method and its system
CN108564283A (en) * 2018-04-16 2018-09-21 南京金寓信息科技有限公司 Construction quality rating database construction method based on BIM
CN109064126A (en) * 2018-07-18 2018-12-21 长江勘测规划设计研究有限责任公司 Hydroelectric project metrical information management method based on quality driving

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080275714A1 (en) * 2007-05-01 2008-11-06 David Frederick Martinez Computerized requirement management system
CN102073632A (en) * 2009-07-18 2011-05-25 苏州鼎思科技有限公司 Comprehensive construction management knowledge base data structure for construction engineering
CN107330634A (en) * 2017-07-20 2017-11-07 浙江之江工程项目管理有限公司 A kind of engineering supervision inspection of quality actual measurement actual quantities method and its system
CN108564283A (en) * 2018-04-16 2018-09-21 南京金寓信息科技有限公司 Construction quality rating database construction method based on BIM
CN109064126A (en) * 2018-07-18 2018-12-21 长江勘测规划设计研究有限责任公司 Hydroelectric project metrical information management method based on quality driving

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘永明等: "项目总承包部成本管理策划与控制", 《公路》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110276551A (en) * 2019-06-21 2019-09-24 中海油安全技术服务有限公司 Engineering construction project quality management-control method and system
CN112669019A (en) * 2021-01-31 2021-04-16 四川沿江攀宁高速公路有限公司 Engineering data automatic filing method based on engineering quantity list and quality inspection data correlation interaction

Similar Documents

Publication Publication Date Title
Liu et al. Automatically updating maintenance information from a BIM database
Marzouk et al. Bridge information modeling in sustainable bridge management
CN109784689B (en) Power grid infrastructure project report data processing method
CN101174208A (en) Method for implementing software assembly line platform
CN108154314A (en) Engineering project budget needed for the completion of projects method and terminal device
CN106845925A (en) Engineering based on the BIM amount of calculating quickly and project high in the clouds collaborative platform soon is to amount method
CN104281523B (en) A kind of demand Testability Analysis method and system
Lee Review of existing energy retrofit tools
CN109034904A (en) A kind of Engineering Cost Consulting service implementation method
CN109767185A (en) A kind of measurement control method and computer equipment based on inspection of engineering quality
CN106651653A (en) Intelligent power distribution network project auxiliary management system
CN108038616A (en) A kind of work transmission line analysis of prices method
CN109214907A (en) A kind of financial audit system Internet-based
CN111340257A (en) Optimization method and system for maintenance plan of power transmission equipment based on risk analysis
JPWO2022009715A5 (en)
CN115797104A (en) Multi-path informatization identification method for business expansion installation
TWI328196B (en) Calculator of human reliability index-standard process, chrisp
Garcia et al. Integrating functional metrics, COCOMO II and earned value analysis for software projects using PMBoK
CN114331507B (en) Pricing method and system suitable for railway engineering
KR101547030B1 (en) Method and apparatus for assessing constructability of international construction projects
RU2726832C1 (en) Engineering data management system
CN111105140A (en) Comprehensive risk assessment method for running state of power distribution network
CN105139114A (en) Automatic compiling method for annual operation mode of power grid in district or county
CN109066649A (en) A kind of Power System Interconnection regional development degree assessment method and device
CN115423379B (en) Confidence evaluation method, system, terminal and storage medium based on traceability information

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190517