CN109034904A - A kind of Engineering Cost Consulting service implementation method - Google Patents
A kind of Engineering Cost Consulting service implementation method Download PDFInfo
- Publication number
- CN109034904A CN109034904A CN201810867782.7A CN201810867782A CN109034904A CN 109034904 A CN109034904 A CN 109034904A CN 201810867782 A CN201810867782 A CN 201810867782A CN 109034904 A CN109034904 A CN 109034904A
- Authority
- CN
- China
- Prior art keywords
- cost
- audit
- service
- consultation
- engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0201—Market modelling; Market analysis; Collecting market data
- G06Q30/0206—Price or cost determination based on market factors
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The invention discloses a kind of Engineering Cost Consultings to service implementation method, is related to Construction Technology field, comprising the following steps: receive customer consignment, link up with client and understand research engineering situation;Engineering Cost Consulting work outline is write according to project situation, is exchanged views and is reached common understanding with consigner according to work of consultation outline content;It requires to set up project team according to work outline, then comes into effect specific works plan, form advisory opinion, formulate Engineering Cost Consulting service steps, and carry out opinion with reviewing authority and exchange, determine final result;Consultation Achievements report or position paper are formed, report or position paper are handed over to consigner and filed.Solve the problems, such as that project cost budget error is big, facilitating user to encounter problems in Engineering Cost Consulting service can quickly be modified, and make the more acurrate reasonable of building cost control.
Description
Technical field
The present invention relates to Construction Technology field, in particular to a kind of Engineering Cost Consulting services implementation method.
Background technique
Project cost refers to the construction price of engineering, embodies the full payment spent needed for carrying out an engineering construction, work
Journey can be specially house, road, bridge etc..Technical staff seeks advice from according to the budget that project situation carries out project cost, with right
The total cost of truth, engineering of engineering construction is understood and is supervised.
The prior art includes a plurality of contract in this document generally according to inventory file in engineering signing contract acquisition contract
Interior inventory, every inventory include at least one inventory feature.Inventory is subdivision to entire engineering, such as by building construction
Engineering Division be multiple metopes construction inventory, inventory feature be inventory attribute, such as metope inventory feature include size,
Color, position etc..Each inventory, each inventory feature are corresponding with specific price metering method, when inventory file in contract
When determining, project cost is also determined.
But in the work progress of engineering, often occur construction fault and need to construct again loss, should be in practical need
Ask the loss for increasing sub- engineering and building materials market price there is a situation where fluctuating, so that project cost cost occurrence is changed,
And with the change of cost, it will cause the change of cost, although final Audit data can be timely updated at present,
But it is detrimental to user's searching and wherein the cost categories of deviation occurs between audit and budget, there is room for improvement.
Summary of the invention
The purpose of the present invention is to provide a kind of Engineering Cost Consultings to service implementation method, and user is facilitated to consult in project cost
It askes and encounters problems and can quickly be modified in service, make the more acurrate reasonable of building cost control.
Above-mentioned purpose of the invention has the technical scheme that
A kind of Engineering Cost Consulting service implementation method, comprising the following steps:
Step 1 receives customer consignment, links up with client and understands research engineering situation;
Step 2 writes Engineering Cost Consulting work outline according to project situation, is handed over according to work of consultation outline content and consigner
Opinion is changed to reach common understanding;
Step 3 requires to set up project team according to work outline, then comes into effect specific works plan, forms advisory opinion,
Engineering Cost Consulting service steps are formulated, and carries out opinion with reviewing authority and exchanges, determine final result;
Step 4 forms Consultation Achievements report or position paper, and report or position paper are handed over to consigner and filed;
The implementation specific works plan includes the establishment of bill of quantities and bid contrul valence scheme, construction stage process cost
The implementation of control program and the establishment of final account for completed project audit scheme;
The Engineering Cost Consulting service steps include the construction project cost consultation service preparation stage, construction project cost consultation
It services implementation phase and the stage is completed in construction project cost consultation service.
By using above-mentioned technical proposal, Engineering Cost Consulting service is subjected to rationalization subdivision, keeps each step all specific
It implements, the work of each step can be monitored, facilitate user to find and wherein the cost of deviation occur between audit and budget
Classification and reason formulate more reasonable accurate project cost.
Whether determining work of consultation outline of exchanging views in the step 2 with consigner needs to adjust, and needs to adjust and then weighs
Work of consultation outline is newly write or modified, does not need the establishment that adjustment then directly carries out project team according to work of consultation outline.
By using above-mentioned technical proposal, the formulation work outline stage carries out opinion with consigner and exchanges, it can be ensured that consults
The general orientation that services outline does not deviate by engineering project is ask, later stage work is avoided biggish deviation occur.
Opinion is carried out with reviewing authority in the step 3 and exchanges whether determining advisory opinion report needs to adjust, without adjusting
Whole then directly to form Consultation Achievements report or position paper, needing the case where adjusting includes: that only need to adjust to form new advisory opinion
Or achievement;It needs to do for supplement work, forms project team, form new implementation plan.
By using above-mentioned technical proposal, opinion is carried out with reviewing authority before forming Consultation Achievements report and is exchanged, it can
The Consultation Achievements that obtain rapidly and efficiently are reported, can either be avoided being repeated several times and be modified, and can report Consultation Achievements to supplement
It is more perfect, by building cost control in more acurrate range.
The establishment of the bill of quantities and bid contrul valence scheme includes determining bill of quantities and bid contrul valence side
The basis of compilation of case;It programs and provides three phases for establishment preparation, documentation and Outcome Document.
By using above-mentioned technical proposal, first formulate basis of compilation, then by according to execute, establishment bill of quantities and
When bid contrul valence, turn of the market can be held in detail, obtain accurate data.
The implementation of the construction stage process cost Control scheme includes determining cost consultation service foundation, bill of quantities
Audit, the audit of bid contrul valence, the audit of bidding document, the audit of tender documents commercial bid, the audit of construction contract, set
Cost change audit caused by meter change or scene are changed, claim and the audit of counterclaim, the audit and engineering of concealed work
Scheduled fun payment audit.
By using above-mentioned technical proposal, construction stage process cost Control can be more fully by building cost control
In relatively low range, project cost can be saved.
The establishment of the final account for completed project audit scheme includes determining that engineering account foundation, formulation engineering account are former
Then and establishment engineering account content.
The construction project cost consultation service preparation stage includes:
A. it consults construction project cost consultation and services bidding document, cost consultation service contract, linked up with consigner, understand quilt
Cost consultation service item basic condition determines consulting purpose, consultancy scope, consulting emphasis and the spy of cost consultation service item
Different item;
B. it is investigated before carrying out cost consultation service, whether critical item has cost consultation conditions of service;
C. consigner's data inventory that need to be provided is provided to construction unit, construction unit is supervised to prepare cost consultation service phase in time
Pass data, and according to relevant regulations, it is desirable that construction unit makes written commitment to authenticity, the integrality of the data of offer;
D. investigation before being serviced according to cost consultation, works out and reports to a higher authorities for approval cost consultation service implementation, including consulting target,
Consultancy scope, reference content, consulting emphasis and requirement, the method for consulting and counter-measure, period planning and people initiative;
E. personnel are deployed, cost consultation service group is set up, the cost consultation service division of labor are carried out, by approved cost consultation service
Embodiment issues each cost consultation attendant;
F. cost consultation Service Training is carried out, cost consultation attendant is arranged to carry out the preparation before cost consultation service.
By using above-mentioned technical proposal, construction project cost consultation service preparation is done it is specific and comprehensive, after being
The work of phase is laid a good foundation, and preparation is made to be made more rational and orderly, can be shortened service cycle, and is reduced engineering and is made
Valence.
Construction project cost consultation service implementation phase includes:
A. construction project scene is moved into, cost consultation service meet-and-greet is held, illustrates that cost consultation service is intended to, it is single to listen to construction
Contact is established to the related introduction of construction project in position;
B. it receives cost consultation and services material requested, check the integrality of cost consultation service profile in time and supervise construction unit
Improve data needed for cost consultation services;
C. cost consultation service routine is formulated, and collects and improve cost consultation service testimonial material, prospecting on this basis now
Field carries out cost consultation record, consults construction unit's opinion to written the problem of discovery in cost consultation service process, improves and makes
Valence counseling services program;
D. subdivisional work is evaluated, summarizes the problem of finding in cost consultation service process.
By using above-mentioned technical proposal, data, summary problem are improved in cost consultation service implementation phase site inspection,
Counseling services are made more perfect, guarantees being normally carried out for each link, reduces problem.
The construction project cost consultation service completes the stage and includes:
A. it writes audit report first draft and solicits construction unit's opinion, audit report first draft requirement reaction content is complete, audit is demonstrate,proved
According to abundant, evaluation is accurate;
B. audit testimonial material, audit logging, audit evidence obtaining, review procedure, examination draft, and scheduling are arranged, it is whole
Manage into consultation;
C. it consults in audit report first draft call for proposals responsible person opinion Hou Fa construction unit, after obtaining feedback, provides just
Formula audit report;
D. the information process- work of audit data is carried out, information that treated is included into service company's information material library;
E. the service return visit work after the completion of construction project audit business is carried out, collects and files consigner to cost consultation service
The evaluation opinion of quality.
By using above-mentioned technical proposal, cost consultation service completes the stage, carries out follow-up work, accomplish to start well and end well,
Give client better service experience.
In conclusion the invention has the following advantages:
1, the present invention is distinguished the work of each step by the way that Engineering Cost Consulting service is carried out sequencing, stepwise, clear
The action of each step can encounter problems in intuitive Engineering Cost Consulting service and show, quickly and easily carry out
It solves, is found in service process conducive to user and the cost categories of deviation occur between audit and budget, make building cost control
It is more acurrate reasonable.
2, Engineering Cost Consulting service of the present invention is able to carry out sufficient preliminary preparation in implementation process, including
Standard is formulated in the collection and arrangement of data, makes Engineering Cost Consulting service implementation is more reasonable can be according to one is adequately theoretical
It is more convincing according to based on, keep project cost budget more acurrate.
3, in implementation process, the ending of especially each step can be with other for Engineering Cost Consulting service of the present invention
Relevant unit carries out the communication of result of implementation or makes related summary, implement each step can, it is ensured that consulting clothes
Business result more meets reality.
Detailed description of the invention
Fig. 1 is counseling services implementation procedure schematic diagram of the present invention.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
In the description of the invention, it is to be understood that term " center ", "upper", "lower", "front", "rear",
The orientation or positional relationship of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on attached drawing institute
The orientation or positional relationship shown is merely for convenience of description the invention and simplifies description, rather than indication or suggestion is signified
Device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to the present invention
Limitation.
Construction overall process cost Control refers to that whole costs of the project since bill of quantities establishment to Engineering Settlement are consulted
Service is ask, including bid and tender for construction project and holds the service content of contract signing phase of giving out a contract for a project: such as examination bidding prequalification
Relevant provision in file, bidding document and construction, supervisory contract in terms of oil tank project cost proposes conductive suggestion.Consulting
Work includes but is not limited to) the following contents:
(1), bill of quantities and control valence establishment
Believed according to the correlometer value document of construction drawing, existing industry standard and country or project location, material price
The establishment bill of quantities such as breath and control valence establishment;
(2), it determines building cost control target, formulates control detailed rules for the implementation;
(3), engineering fund using plan and consumption of main materials are worked out according to project progress;
(4), it completes workload monthly magazine by the moon for being responsible for reporting unit in charge of construction to audit, and proposes of that month payment recommendation;
(5), design alteration, Site visa-an important chain etc. are audited and expense occurs to obtain, it is corresponding to adjust cost Control target, and provide and make to owner
Valence controls dynamic analysis report;
(6), the same owner of meeting, supervisor etc. appraise and decide workload to construction site;
(7), the partitioned project clearing completed stage by stage are appraised and decided in time, and a whole set of final report is provided and general expenses summarizes friendship owner
It achieves;
(8), provide be related to commission consulting the artificial of engineering project, material, the cost informations such as equipment and with building cost control phase
Other services closed;
(9), engineering account
According to the valuation of engineering contract and corresponding construction project law, regulation, standard criterion, country or project location text
Every valid certificates material that part, bidding document, construction drawing, scene occur audits project cost, by construction drawing and phase
Pass data carries out reconnaissance trip, metering review, establishment Engineering cost audit report, and establishment final account for completed project provides final account for completed project report
Accuse book;
(10), cooperation owner's finished item finance final account for completed project work;
(11), cooperation owner completes the construction project cost auditing work of auditing department.
Implementation method is serviced for Engineering Cost Consulting, as shown in Fig. 1, comprising the following steps:
Step 1 receives customer consignment, links up with client and understands research engineering situation.
Step 2 writes Engineering Cost Consulting work outline according to project situation, according to work of consultation outline content and commission
Side, which exchanges views, to reach common understanding, and during exchanging views with consigner, determines whether work of consultation outline needs to adjust, needs to adjust
It is whole, work of consultation outline is rewritten or modified, adjustment is not needed and then directly carries out project team according to work of consultation outline
It sets up.
Step 3 requires to set up project team according to work outline, then comes into effect specific works plan, forms consulting
Opinion formulates Engineering Cost Consulting service steps, and carries out opinion with reviewing authority and exchange, and determines final result.It is single with audit
Position carries out the determining advisory opinion of opinion exchange and reports whether need to adjust, and without adjustment, then directly formation Consultation Achievements are reported or anticipate
See book, needing the case where adjusting includes two kinds: the first only need to adjust to form new advisory opinion or achievement;Second need
Work is doed for supplement, project team is formed, forms new implementation plan.
Step 4 forms Consultation Achievements report or position paper, and report or position paper are handed over to consigner and filed.
Wherein, implementing specific works plan includes the establishment of bill of quantities and bid contrul valence scheme, construction stage mistake
The implementation of journey cost Control scheme and the establishment of final account for completed project audit scheme:
The establishment of bill of quantities and bid contrul valence scheme includes determining the establishment of bill of quantities and bid contrul valence scheme
Foundation;It programs and provides three phases for establishment preparation, documentation and Outcome Document.
Bill of quantities and the essential implementation of bid contrul valence establishment have: conscientiously reading Project design drawing, fully understand
Engineering design content;Data needed for obtaining establishment.
Construction stage process cost Control scheme is implemented including determining the careful of cost consultation service foundation, bill of quantities
Core, the audit of bid contrul valence, the audit of bidding document, the audit of tender documents commercial bid, the audit of construction contract, design become
More or caused cost change audit, claim and the audit of counterclaim, the audit and project progress of concealed work are changed in scene
Money payment audit.
Construction stage process cost Control essential implementation has: all kinds of engineering regular meetings participated on time, grasp engineering construction dynamic,
Audit opinion is proposed for the problem in process of construction;In Process of Engineering Construction, all kinds of engineering datas are collected in time, are
Auditing for construction completion account audit is ready;Design alteration expense is audited, design alteration includes that all kinds of designs in work progress become
More with the technical change such as scene change, to the effect that property of the variation in relation to part, absolute altitude, baseline, position, ruler
It is very little;The audit of concealed work, concealed work refer to the work that ground, electric pipeline, water and heat provision pipeline etc. need to cover, cover
Journey;The audit of scheduled fun is primarily referred to as in the construction process, every expense that project entity is calculated by the engineering quantity completed month by month
The fund that unit in charge of construction is appropriated with summation.
Final account for completed project audit scheme establishment include determine engineering account according to, formulate engineering account principle with
And establishment engineering account content.
Control of the project management to project cost is cost Control final stage, mainly by project examination personnel's root
According to the related regulation in construction contract, bidding document, economical drive, relative quota, completion information and country or place be according to
According to verifying the final account for completed project submitted to a higher level for approval or revision.Auditing for construction completion account audit essential implementation has: checking and approving project amount;Hold material valence
Difference adjustment is closed;Various data, bill and change attestation are checked, project cost is verified;Engineering technological economy is referred in review process
Mark is calculated and is analyzed and researched.
Engineering Cost Consulting service steps include the construction project cost consultation service preparation stage, construction project cost consultation
It services implementation phase and the stage is completed in construction project cost consultation service.
The construction project cost consultation service preparation stage includes:
A. it consults construction project cost consultation and services bidding document, cost consultation service contract, linked up with consigner, understand quilt
Cost consultation service item basic condition determines consulting purpose, consultancy scope, consulting emphasis and the spy of cost consultation service item
Different item;
B. it is investigated before carrying out cost consultation service, whether critical item has cost consultation conditions of service;
C. consigner's data inventory that need to be provided is provided to construction unit, construction unit is supervised to prepare cost consultation service phase in time
Pass data, and according to relevant regulations, it is desirable that construction unit makes written commitment to authenticity, the integrality of the data of offer;
D. investigation before being serviced according to cost consultation, works out and reports to a higher authorities for approval cost consultation service implementation, including consulting target,
Consultancy scope, reference content, consulting emphasis and requirement, the method for consulting and counter-measure, period planning and people initiative;
E. personnel are deployed, cost consultation service group is set up, the cost consultation service division of labor are carried out, by approved cost consultation service
Embodiment issues each cost consultation attendant;
F. cost consultation Service Training is carried out, cost consultation attendant is arranged to carry out the preparation before cost consultation service.
Construction project cost consultation service implementation phase includes:
A. construction project scene is moved into, cost consultation service meet-and-greet is held, illustrates that cost consultation service is intended to, it is single to listen to construction
Contact is established to the related introduction of construction project in position;
B. it receives cost consultation and services material requested, check the integrality of cost consultation service profile in time and supervise construction unit
Improve data needed for cost consultation services;
C. cost consultation service routine is formulated, and collects and improve cost consultation service testimonial material, prospecting on this basis now
Field carries out cost consultation record, consults construction unit's opinion to written the problem of discovery in cost consultation service process, improves and makes
Valence counseling services program;
D. subdivisional work is evaluated, summarizes the problem of finding in cost consultation service process.
The construction project cost consultation service completes the stage and includes:
A. it writes audit report first draft and solicits construction unit's opinion, audit report first draft requirement reaction content is complete, audit is demonstrate,proved
According to abundant, evaluation is accurate;
B. audit testimonial material, audit logging, audit evidence obtaining, review procedure, examination draft, and scheduling are arranged, it is whole
Manage into consultation;
C. it consults in audit report first draft call for proposals responsible person opinion Hou Fa construction unit, after obtaining feedback, provides just
Formula audit report;
D. the information process- work of audit data is carried out, information that treated is included into service company's information material library;
E. the service return visit work after the completion of construction project audit business is carried out, collects and files consigner to cost consultation service
The evaluation opinion of quality.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this
All by the protection of Patent Law in the scope of the claims of invention.
Claims (9)
1. a kind of Engineering Cost Consulting services implementation method, which comprises the following steps:
Step 1 receives customer consignment, links up with client and understands research engineering situation;
Step 2 writes Engineering Cost Consulting work outline according to project situation, is handed over according to work of consultation outline content and consigner
Opinion is changed to reach common understanding;
Step 3 requires to set up project team according to work outline, then comes into effect specific works plan, forms advisory opinion,
Engineering Cost Consulting service steps are formulated, and carries out opinion with reviewing authority and exchanges, determine final result;
Step 4 forms Consultation Achievements report or position paper, and report or position paper are handed over to consigner and filed;
The implementation specific works plan includes the establishment of bill of quantities and bid contrul valence scheme, construction stage process cost
The implementation of control program and the establishment of final account for completed project audit scheme;
The Engineering Cost Consulting service steps include the construction project cost consultation service preparation stage, construction project cost consultation
It services implementation phase and the stage is completed in construction project cost consultation service.
2. a kind of Engineering Cost Consulting according to claim 1 services implementation method, it is characterised in that: in the step 2
Whether need to adjust with consigner's determining work of consultation outline of exchanging views, needs to adjust and then rewrite or modify work of consultation
Outline does not need the establishment that adjustment then directly carries out project team according to work of consultation outline.
3. a kind of Engineering Cost Consulting according to claim 1 services implementation method, it is characterised in that: in the step 3
Opinion is carried out with reviewing authority and exchanges whether determining advisory opinion report needs to adjust, and then directly forms Consultation Achievements without adjustment
Report or position paper, needing the case where adjusting includes: that only need to adjust to form new advisory opinion or achievement;It needs to do for supplement work
Make, forms project team, form new implementation plan.
4. a kind of Engineering Cost Consulting according to claim 1 services implementation method, it is characterised in that: the project amount is clear
Single and bid contrul valence scheme establishment includes determining the basis of compilation of bill of quantities and bid contrul valence scheme;It programs
Prepare for establishment, three phases are provided in documentation and Outcome Document.
5. a kind of Engineering Cost Consulting according to claim 1 services implementation method, it is characterised in that: the construction stage
The implementation of process cost Control scheme includes determining cost consultation service foundation, the audit of bill of quantities, bid contrul valence
Audit, the audit of bidding document, the audit of tender documents commercial bid, the audit of construction contract, design alteration or scene change are drawn
Cost change audit, the claim risen is audited with the audit of counterclaim, the audit of concealed work and progress payment payment.
6. a kind of Engineering Cost Consulting according to claim 1 services implementation method, which is characterized in that the final account for completed project
The establishment of audit scheme includes determining engineering account foundation, formulate engineering account principle and working out Engineering Settlement to examine
Core content.
7. a kind of Engineering Cost Consulting according to claim 1 services implementation method, which is characterized in that the construction project
Cost consultation service the preparation stage include:
A. it consults construction project cost consultation and services bidding document, cost consultation service contract, linked up with consigner, understand quilt
Cost consultation service item basic condition determines consulting purpose, consultancy scope, consulting emphasis and the spy of cost consultation service item
Different item;
B. it is investigated before carrying out cost consultation service, whether critical item has cost consultation conditions of service;
C. consigner's data inventory that need to be provided is provided to construction unit, construction unit is supervised to prepare cost consultation service phase in time
Pass data, and according to relevant regulations, it is desirable that construction unit makes written commitment to authenticity, the integrality of the data of offer;
D. investigation before being serviced according to cost consultation, works out and reports to a higher authorities for approval cost consultation service implementation, including consulting target,
Consultancy scope, reference content, consulting emphasis and requirement, the method for consulting and counter-measure, period planning and people initiative;
E. personnel are deployed, cost consultation service group is set up, the cost consultation service division of labor are carried out, by approved cost consultation service
Embodiment issues each cost consultation attendant;
F. cost consultation Service Training is carried out, cost consultation attendant is arranged to carry out the preparation before cost consultation service.
8. a kind of Engineering Cost Consulting according to claim 1 services implementation method, which is characterized in that the construction project
Cost consultation service implementation phase include:
A. construction project scene is moved into, cost consultation service meet-and-greet is held, illustrates that cost consultation service is intended to, it is single to listen to construction
Contact is established to the related introduction of construction project in position;
B. it receives cost consultation and services material requested, check the integrality of cost consultation service profile in time and supervise construction unit
Improve data needed for cost consultation services;
C. cost consultation service routine is formulated, and collects and improve cost consultation service testimonial material, prospecting on this basis now
Field carries out cost consultation record, consults construction unit's opinion to written the problem of discovery in cost consultation service process, improves and makes
Valence counseling services program;
D. subdivisional work is evaluated, summarizes the problem of finding in cost consultation service process.
9. a kind of Engineering Cost Consulting according to claim 1 services implementation method, which is characterized in that the construction project
Cost consultation service complete the stage include:
A. it writes audit report first draft and solicits construction unit's opinion, audit report first draft requirement reaction content is complete, audit is demonstrate,proved
According to abundant, evaluation is accurate;
B. audit testimonial material, audit logging, audit evidence obtaining, review procedure, examination draft, and scheduling are arranged, it is whole
Manage into consultation;
C. it consults in audit report first draft call for proposals responsible person opinion Hou Fa construction unit, after obtaining feedback, provides just
Formula audit report;
D. the information process- work of audit data is carried out, information that treated is included into service company's information material library;
E. the service return visit work after the completion of construction project audit business is carried out, collects and files consigner to cost consultation service
The evaluation opinion of quality.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810867782.7A CN109034904A (en) | 2018-08-02 | 2018-08-02 | A kind of Engineering Cost Consulting service implementation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810867782.7A CN109034904A (en) | 2018-08-02 | 2018-08-02 | A kind of Engineering Cost Consulting service implementation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109034904A true CN109034904A (en) | 2018-12-18 |
Family
ID=64647786
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810867782.7A Pending CN109034904A (en) | 2018-08-02 | 2018-08-02 | A kind of Engineering Cost Consulting service implementation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109034904A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111461526A (en) * | 2020-03-30 | 2020-07-28 | 北京中一鼎合工程造价咨询有限公司 | Construction cost consultation service implementation method and system |
CN111950986A (en) * | 2020-08-18 | 2020-11-17 | 山东泰和建设管理有限公司 | Cost consultation business process management method and system |
CN112862434A (en) * | 2021-01-29 | 2021-05-28 | 北京城建勘测设计研究院有限责任公司 | Auditing system based on multi-dimensional complex service |
CN113408998A (en) * | 2021-02-05 | 2021-09-17 | 浙江安防职业技术学院 | Construction cost consultation service implementation method and system |
CN115034911A (en) * | 2022-07-05 | 2022-09-09 | 广州高新工程顾问有限公司 | BIM-based whole-process cost consultation service method and system |
CN116362680A (en) * | 2023-03-21 | 2023-06-30 | 广东精信工程造价咨询有限公司 | Management method and system for engineering consultation service |
-
2018
- 2018-08-02 CN CN201810867782.7A patent/CN109034904A/en active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111461526A (en) * | 2020-03-30 | 2020-07-28 | 北京中一鼎合工程造价咨询有限公司 | Construction cost consultation service implementation method and system |
CN111950986A (en) * | 2020-08-18 | 2020-11-17 | 山东泰和建设管理有限公司 | Cost consultation business process management method and system |
CN112862434A (en) * | 2021-01-29 | 2021-05-28 | 北京城建勘测设计研究院有限责任公司 | Auditing system based on multi-dimensional complex service |
CN112862434B (en) * | 2021-01-29 | 2024-03-01 | 北京城建勘测设计研究院有限责任公司 | Auditing system based on multi-dimensional complex business |
CN113408998A (en) * | 2021-02-05 | 2021-09-17 | 浙江安防职业技术学院 | Construction cost consultation service implementation method and system |
CN115034911A (en) * | 2022-07-05 | 2022-09-09 | 广州高新工程顾问有限公司 | BIM-based whole-process cost consultation service method and system |
CN115034911B (en) * | 2022-07-05 | 2023-06-02 | 广州高新工程顾问有限公司 | BIM-based whole-process cost consultation service method and system |
CN116362680A (en) * | 2023-03-21 | 2023-06-30 | 广东精信工程造价咨询有限公司 | Management method and system for engineering consultation service |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109034904A (en) | A kind of Engineering Cost Consulting service implementation method | |
Berg | Water utility benchmarking | |
CN103136626B (en) | The online management method of engineering project | |
CN103679373A (en) | Full chain budget data processing system and method for production infrastructure standard cost system | |
Das | Project management and control | |
KR20060085736A (en) | Web-based demand side management evaluation system for analysing cost effect in the electric power industry | |
Weston et al. | Financial and Operational Bundling Strategies for Sustainable Micro-Grid Business Models | |
CN117057835A (en) | Auxiliary analysis method and system for power grid engineering cost | |
KR102648702B1 (en) | A method for evaluating the optimal ess feasibility based on the characterictics of business demand | |
CN107451745A (en) | A kind of foundation key element of architectural engineering base number of a tender preparation method and the preparation method | |
Zinaman et al. | The status and outlook of distributed generation public policy in Mexico | |
Bondarenko et al. | Developing methodological approaches to financial and economic planning at oil and gas enterprises | |
Ots | Practical Implementation of Price Regulation in Energy Sector | |
Doloi | Project Schedule Management in Developing Countries | |
Le | A bim-database-integrated system for evaluating building life-cycle costs using a multi-parametric model | |
Aryani et al. | Site Plan Analysis Based on Measured and Unmeasured Criteria for Housing Development According to Investor Assessment | |
Bhat | Factors Influencing Time and Cost Overruns In Indian Construction Projects | |
Ahmed | Life Cycle Cost Analysis and Value Engineering and their Usage in the United Arab Emirates: A Case Study of Residential Buildings in Al Ain | |
ADDIS | MEASURING THE PERFORMANCE OF PUBLIC BUILDING PROJECTS USING EARNED VALUE ANALYSIS: A CASE STUDY ON DEBRE MARKOS UNIVERSITY PUBLIC BUILDING PROJECTS | |
Ou et al. | Participatory irrigation management: promoting community-based water user associations in the Piyuan canal rehabilitation project | |
Pinard | Road Management Policy: An Approach to the evaluation of road agency performance | |
Shalaby | A decision support system for the re-equilibrium of PPP contracts | |
Cabibel et al. | How to improve water services performance | |
Ajayi et al. | Strategies to minimize construction delay: mathematical analysis | |
Atkinson et al. | Alternative service delivery options for municipalities in the rural areas: Kamiesberg local municipality case study |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181218 |