CN114331507B - Pricing method and system suitable for railway engineering - Google Patents

Pricing method and system suitable for railway engineering Download PDF

Info

Publication number
CN114331507B
CN114331507B CN202111556804.6A CN202111556804A CN114331507B CN 114331507 B CN114331507 B CN 114331507B CN 202111556804 A CN202111556804 A CN 202111556804A CN 114331507 B CN114331507 B CN 114331507B
Authority
CN
China
Prior art keywords
data
ebs
wbs
engineering
qlist
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111556804.6A
Other languages
Chinese (zh)
Other versions
CN114331507A (en
Inventor
王万齐
解亚龙
耿重阳
鲍榴
任凯
林长青
潘洪海
晁棉镖
吴明杰
陈志�
张旭
刘红峰
刘红良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Railway Sciences Corp Ltd CARS
Institute of Computing Technologies of CARS
Beijing Jingwei Information Technology Co Ltd
Original Assignee
China Academy of Railway Sciences Corp Ltd CARS
Institute of Computing Technologies of CARS
Beijing Jingwei Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Railway Sciences Corp Ltd CARS, Institute of Computing Technologies of CARS, Beijing Jingwei Information Technology Co Ltd filed Critical China Academy of Railway Sciences Corp Ltd CARS
Priority to CN202111556804.6A priority Critical patent/CN114331507B/en
Publication of CN114331507A publication Critical patent/CN114331507A/en
Application granted granted Critical
Publication of CN114331507B publication Critical patent/CN114331507B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a pricing method and a system suitable for railway engineering, wherein the pricing method comprises the following steps: acquiring railway WBS basic data, railway EBS basic data and Qlist basic data, establishing a railway engineering pricing database, and establishing a mapping relation, wherein the mapping relation comprises the following steps: establishing a mapping relation between the WBS data and inspection batch data, establishing a mapping relation between the EBS data and the WBS data, and establishing a mapping relation between the EBS data and the QList data; and acquiring engineering data, and calculating the total valuation by using the established mapping relation. The invention can effectively improve the efficiency of the labor checking and pricing, and realizes one-key type labor checking and pricing calculation for using less field workload in the later period through the configuration of the corresponding relation in the earlier period.

Description

Pricing method and system suitable for railway engineering
Technical Field
The invention relates to the technical field of railway engineering pricing, in particular to a pricing method and a pricing system suitable for railway engineering.
Background
Prior art foundation
The EBS (Engineering entity decomposition) divides the Engineering entity according to the minimum construction, and comprises an IFD (Engineering face definition) code, an EBS (Engineering entity decomposition) Structure code and an Engineering entity decomposition system of construction design basic information (such as pile length, pile diameter, concrete masonry square and the number of reinforcing steel bars). The BIM alliance of railways has released 'the guide of decomposition of the entity structure of railway engineering', and provides basic data of the decomposition of the engineering entity for the verification of engineering pricing.
The WBS (Work Breakdown Down Structure) comprises a WBS Structure code, a subsection and an associated check batch and an engineering task Breakdown system of a construction record table in order to realize engineering functions or complete Work tasks which need to be completed in sequence by entity construction. 2018, the construction quality acceptance standard of each specialty, and provides basic data information for subsection and itemized inspection lots and construction record tables.
The Qlist (Bill of qualites List) is a document compiled by the tenderer under unified rules with the respective construction experience, skill and project management levels, and the relevant information of the investigation. And the engineering list system comprises Qlist structure codes, engineering characteristics, operation contents, engineering total amount and unit price. The State railway administration published the Specification of railway engineering volume List in 2018.
Existing project pricing method
The checking and pricing refers to the general name of checking and accepting the qualified project quantity or work in the construction process, metering, checking and accepting, and metering the project quantity or work, and is the basis for handling the settlement of the project price. The railway engineering project has the characteristics of large scale, long construction period, complex geological conditions, more engineering specialties, large investment, more factors influencing cost control and the like, and the labor checking and pricing are key links of contract management and engineering cost control and are highly valued by all units. The method has the advantages that the labor checking and pricing work is standardized, the labor checking and pricing management of engineering projects is enhanced, the engineering construction cost can be reasonably controlled, and the production progress and quality control can be effectively promoted.
At present, a project quantity list (Qlist) pricing mode is generally adopted in railway engineering, the main core of the method is that the project quantity is provided by bidders, and each bidder carries out independent quotation by combining respective construction experience, technology and project management level under unified rules and relevant information of research. The main work flow of the current work verification and pricing is as follows: firstly, technicians at each work point of a construction unit count the field finished real object project amount in the pricing period, and report the calculated amount to a project planning part after the calculation is finished. The planning part converts the field real object engineering quantity into the work content of an engineering quantity list, compiles a verification pricing list and an application form, and reports to the master after the project responsible person signs and confirms. After receiving the application of the check-up pricing, the master supervision office audits the work content of each work point in the check-up pricing list by a supervision engineer, mainly audits whether the content object is completed or not and whether the data such as the check batch are complete or not, and confirms the signature and reports to the master supervision office after the audit is completed. And the chief supervision department carries out approval and reports to the construction unit for verification after the verification is correct. At present, the price-counting work of the validators mainly adopts manual statistics, compilation and calculation or adopts single software to compile the price-counting list of the validators.
The existing project pricing defect
The phenomena of virtual work inspection and over work inspection are frequently prohibited.
According to the file specification of a railway construction project inspection pricing method, the inspection pricing is subject to legal and honest principles, the prior labor and the later pricing are carried out according to a specified program, and the false inspection pricing is forbidden; the 'railway basic construction fund management method' stipulates that the fact that the price of the construction worker needs to be checked is that the construction unit and the supervision unit check and verify the price table of the construction worker compiled by the construction unit, and the overestimation of the common test, the preliminary test and the virtual test is forbidden. In the actual work, some units can complete the assessment target, and the construction units and the related working personnel of the supervision units can perform virtual inspection and over inspection through various means. The excessive inspection of the virtual inspection worker causes the inspection quantity to exceed the original design or contract qualification quantity, the project payment is paid in advance, the contract is not performed seriously by the contract organization, the residual project is difficult to advance, and the adverse effect of the sharp increase of the project cost is caused.
The efficiency of the work of checking and pricing is low.
The existing manual counting, compiling and calculating the work efficiency of the experimenter pricing list is low, firstly, the efficiency is not high when each work point technician counts the completion condition of material objects one by one, secondly, the plan department worker converts the construction material objects one by one into the work content of the engineering quantity list, and a pile of a bridge is used as a column, firstly, the bridge is required to be determined to check a grand bridge, a large bridge or a medium-small bridge, and the bridge is also required to be determined to be a complex grand bridge or a common grand bridge, and after the information is determined, the pile is required to be on the ground or on the water through turning over a drawing, and the pile diameter, the pile length and other information. And the supervision project check is to check the data of the inspection lot and the like one by one, so that the working efficiency is low and the time consumption is long.
The inspection pricing monitoring mechanism is deficient.
The scale of the project in the railway project is large, the contract amount of one construction standard section is generally twenty to thirty billion, and the construction length can also reach twenty kilometers to forty kilometers. Therefore, the supervision engineer and the construction unit are not enough to know the site by the experimenter and the charge person. Therefore, after the on-site supervision engineer checks, the chief engineer and the construction unit can directly sign the signature and do not check the signature; and secondly, even if the construction unit and the supervision unit check the project quantity on site, most of the time, the construction unit and the supervision unit walk on site to pass the site, and the auditing function cannot be really realized. And the virtual inspection and the over inspection during the evaluation work of the inspection occur. And because the paper edition of the pricing information of the verification can not form the work of information sharing, only a planning part and part of leaders for mastering pricing content in the pricing work of the verification are provided, and a transparent supervision mechanism and means are lacked to ensure that the pricing work of the verification is reasonably carried out in compliance.
The capacity of planning personnel of a construction unit needs to be improved integrally.
Along with the increase of railway construction projects year by year, along with the loss of talents of construction units, even technicians who are not in the past for one year are responsible for the work of checking and pricing, and due to the lack of construction common sense and experience, errors of parameters related to a project amount list, errors of data logic relations and the like occur during the filling of a work-piece checking and pricing table. The business personnel lack the reasons of inaccurate construction general knowledge engineering quantity verification, unreal report data, untight working procedure and the like, so that the project cost management is disordered. Serious hidden danger is buried for project cost management.
Therefore, in order to solve the defects in the conventional checking pricing, a pricing method and a pricing system which can improve the pricing efficiency and realize automatic one-key completion and are suitable for railway engineering are needed.
Disclosure of Invention
One object of the present invention is to provide a pricing method suitable for railway engineering, the method comprising the method steps of:
acquiring railway WBS basic data, railway EBS basic data and Qlist basic data, establishing a railway engineering pricing database, wherein,
the railway engineering pricing database comprises: WBS data, EBS data and Qlist data, wherein the WBS data is constructed by adding a first level code and a plurality of different first node levels on the railway WBS basic data;
adding a second hierarchical code and a plurality of different second node hierarchies on the railway EBS basic data to construct EBS data;
adding a third node level on the Qlist basic data to construct Qlist data;
establishing a mapping relation, comprising: establishing a mapping relation between the WBS data and inspection batch data, establishing a mapping relation between the EBS data and the WBS data, and establishing a mapping relation between the EBS data and the QList data;
and acquiring engineering data, and calculating the total valuation by using the established mapping relation.
In some preferred embodiments, the WBS data and the inspection lot data are mapped to satisfy the following relationship:
DW={SW 1 ,SW 2 ,SW 3 ,...SW n },
SW={IL 1 ,IL 2 ,IL 3 ,...IL N },
DW is subsection engineering data in WBS data, SW is subsection engineering data in WBS data, and IL is inspection batch data; n is a natural number, and N is a layer number.
When the inspection batch data display is completely finished, the project data are completely finished;
and when the project data display is completely finished, the project data of the partial project are completely finished.
In some preferred embodiments, the mapping relationship between the EBS data and the WBS data satisfies the following relationship:
A={B 1 ,B 2 ,B 3 ....B N },
B∈{DW 1 ,DW 2 ,DW 3 ..DW N },
wherein A is the whole engineering data in EBS data, B is the component data in EBS data, DW is the subsection engineering data in WBS data; and when the display of the branch engineering data is finished, displaying the component data, counting the finished component data, and listing the component data in a pricing range.
In some preferred embodiments, the mapping relationship between the EBS and the QList data satisfies the following relationship:
A∈{Q A1 、Q A2 、Q A3 ....Q AN },
B∈{Q N1 、Q N2 、Q N3 ...Q NN },
wherein A is the whole engineering data in the EBS data, B is the component data in the EBS data, Q A1 、Q A2 、Q A3 、…、Q AN Is the first level in the third node level in the QList data; q N1 、Q N2 、Q N3 、…、Q NN Is the nth level in the level of the third node in the QList data.
In some preferred embodiments, the total engineering price is calculated by using the mapping relationship between the EBS data and the QList data.
In some preferred embodiments, the total project price is calculated by:
T=∑t 1 +t 2 +t 3 +....+t n
t n =q n ×p n
wherein q is n Is an engineering quantity, p n Is a unit price of t n Is the total price of the components, and n is a natural number.
Another object of the present invention is to provide a pricing system for railway engineering, the system comprising: a railway engineering pricing database, comprising:
WBS data, EBS data, and Qlist data, wherein,
adding a first level code and a plurality of different first node levels on the railway WBS basic data to construct WBS data;
adding a second hierarchical code and a plurality of different second node hierarchies on the basic railway EBS data to construct EBS data;
adding a third level code and a plurality of different third node levels on the Qlist basic data to construct Qlist data;
the WBS data, EBS data and Qlist data mapping module comprises: establishing a mapping relation between the WBS data and inspection batch data, establishing a mapping relation between the EBS data and the WBS data, and establishing a mapping relation between the EBS data and the QList data;
and the pricing module is used for acquiring engineering data and calculating the total pricing amount by utilizing the established mapping relation.
In some preferred embodiments, the WBS data and the inspection lot data are mapped to satisfy the following relationship:
DW={SW 1 ,SW 2 ,SW 3 ,...SW n },
SW={IL 1 ,IL 2 ,IL 3 ,...IL N },
wherein DW is subsection engineering data in WBS data, SW is subsection engineering data in WBS data, and IL is inspection batch data;
when the inspection batch data display is completely finished, the project data are completely finished;
and when the project data display is completely finished, the project data of the partial project are completely finished.
In some preferred embodiments, the mapping relationship between the EBS data and the WBS data satisfies the following relationship:
A={B 1 ,B 2 ,B 3 ....B N },
B∈{DW 1 ,DW 2 ,DW 3 ..DW N },
wherein A is the whole engineering data in EBS data, B is the component data in EBS data, DW is the partial engineering data in WBS data,
and when the display of the branch engineering data is finished, the display of the component data is finished, and the finished component data is counted and listed in the pricing range.
In some preferred embodiments, the mapping relationship between the EBS and the QList data satisfies the following relationship:
A∈{Q A1 、Q A2 、Q A3 ....Q AN },
B∈{Q N1 、Q N2 、Q N3 ...Q NN },
wherein A is the whole engineering data in the EBS data, and B is the component in the EBS dataData, Q A1 、Q A2 、Q A3 、…、Q AN Is the first level in the third node level in the QList data; q N1 、Q N2 、Q N3 、…、Q NN Is the Nth level in the third node level in the QList data;
calculating a total engineering price by using the mapping relation between the EBS data and the QList data, and calculating by the following method:
T=∑t 1 +t 2 +t 3 +....+t n
t n =q n ×p n
wherein q is n Is an engineering quantity, p n Is a unit price of t n Is the total price of the component.
In another aspect of the present invention, there is provided a pricing system for railway engineering, the system comprising: comprising a processor and a memory, said memory having stored therein computer instructions for executing the computer instructions stored in said memory, the system implementing the steps of the method as described above when said computer instructions are executed by the processor.
Yet another aspect of the invention provides a computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the steps of the method as set forth above.
The invention provides a pricing method and a pricing system suitable for railway engineering, which are characterized in that a railway engineering pricing database is established on the basis of the existing EBS basic data, WBS basic data and Qlist data, a mapping method is established for the established EBS data, WBS data and Qlist data in the railway engineering pricing database, the EBS completion state is judged according to the WBS task completion state, the Qlist is subjected to labor checking pricing calculation according to the EBS completion state, and then the pricing list calculation is automatically completed.
The invention realizes the automatic checking, data checking and checking pricing calculation and statistics of the engineering entities by the pricing method based on the railway engineering entities EBS, WBS and Qlist, solves the phenomena of virtual checking and over-checking in the engineering checking pricing, improves the checking pricing efficiency, and realizes the one-key checking pricing calculation by using less field workload in the later period through the configuration of the corresponding relationship in the earlier period.
It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the invention, as claimed.
Drawings
Further objects, features and advantages of the present invention will become apparent from the following description of embodiments of the invention, with reference to the accompanying drawings, in which:
fig. 1 schematically shows a flow chart of a pricing method suitable for railway engineering according to the invention.
Fig. 2 is a schematic diagram of WBS decomposition data for professional bridge construction according to an embodiment of the present invention.
Fig. 3 is a schematic diagram illustrating key node data in sections and subsections obtained by WBS decomposition established by a bridge and culvert specialty in an embodiment of the present invention.
FIG. 4 is a diagram illustrating EBS decomposition data for professional bridge construction according to an embodiment of the present invention.
FIG. 5 is a diagram illustrating Qlist decomposition data for specialized bridge construction according to an embodiment of the present invention.
Fig. 6 is a schematic diagram illustrating a mapping relationship established by a bridge and culvert specialization in an embodiment of the present invention.
FIG. 7 illustrates a flow chart of a validation pricing in one embodiment of the invention.
Detailed Description
The objects and functions of the present invention and methods for accomplishing the same will be apparent by reference to the exemplary embodiments. However, the present invention is not limited to the exemplary embodiments disclosed below; it can be implemented in various forms. The nature of the description is merely to assist those skilled in the relevant art in a comprehensive understanding of the specific details of the invention.
Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings. In the drawings, the same reference numerals denote the same or similar parts, or the same or similar steps.
The railway engineering price checking and pricing method aims at solving the defects that in the prior art, the pricing efficiency is low and mistakes are easy to make due to the fact that a railway engineering price checking and pricing mode is manually carried out. According to one embodiment of the invention, a pricing method for railway engineering is provided, comprising the following method steps:
and S101, establishing a railway engineering pricing database.
And acquiring railway WBS basic data, railway EBS basic data and Qlist basic data, and establishing a railway engineering pricing database.
The railway engineering pricing database is established on the basis of the existing railway WBS basic data, railway EBS basic data and Qlist basic data. The established railway engineering pricing database comprises WBS data, EBS data and Qlist data.
WBS data
On the basis of the railway WBS basic data, a first level code is added, and a plurality of different first node levels are added to construct WBS data.
In some embodiments, the WBS data is added with partial, itemized key node data and hierarchical coding on the basis of 2018 professional construction quality acceptance mark templates. And the key node data information in the parts and the items shows that the related engineering entities are finished after the node is finished.
The WBS hierarchy code needs to be compiled according to different specialties and different node hierarchy codes. Encoded as the EBS, WBS, and Qlist mapping bases. In the embodiment, taking bridge specialization as an example, as shown in fig. 2, a schematic diagram of WBS decomposition data established by bridge specialization in an embodiment of the present invention is shown, and as shown in fig. 3, a schematic diagram of key node data in parts and subentries obtained by WBS decomposition established by bridge specialization in an embodiment of the present invention is shown.
EBS data
And adding a second hierarchical code and a plurality of different second node hierarchies on the basic data of the railway EBS to construct the EBS data.
In some embodiments, the EBS data is the content of adding a hierarchical code, whether a node can be copied, whether an entity node (overall project) maintains mileage, whether a node name can be modified, and the like on the basic data of the "railway engineering entity structure decomposition guideline" of the railway BIM alliance. The EBS hierarchy code needs to be compiled according to different specialties and different node hierarchy codes. And the mapping base codes are used as EBS, WBS and Qlist mapping base codes. In the embodiment, taking bridge specialization as an example, as shown in fig. 4, a schematic diagram of EBS decomposition data established by bridge specialization in an embodiment of the present invention is shown.
Qlist data
And adding a third node level on the Qlist basic data to construct Qlist data.
In some embodiments, the Qlist data is added to the content of the railway engineering volume inventory specification, and the Qlist hierarchical code needs to be compiled according to different specialties and different node hierarchical codes. And the mapping base codes are used as EBS, WBS and Qlist mapping base codes. Fig. 5 is a schematic diagram of Qlist decomposition data established by the bridge and culvert specialization in an embodiment of the present invention.
And step S102, establishing a mapping relation.
According to the invention, the WBS data and the inspection batch data are mapped, the EBS data and the WBS data are mapped, and the EBS data and the QList data are mapped. Specifically, the mapping relationship is as follows:
WBS data and test batch data mapping
The WBS data and the inspection batch data establish a mapping relation which satisfies the following relation:
DW={SW 1 ,SW 2 ,SW 3 ,...SW n },
SW={IL 1 ,IL 2 ,IL 3 ,...IL N },
wherein DW is subsection engineering data in WBS data, SW is subsection engineering data in WBS data, and IL is inspection batch data; n is a natural number, and N is a layer number.
When the inspection batch data display is completely finished, the project data are completely finished;
and when the project data display is completely finished, the project data are completely finished.
WBS data includes a part (DW), a subinterval project (SW), and an Inspection Lot (IL). The inspection batch driving partial item completion state is realized through data mapping logics such as WBS and inspection batch.
EBS data to WBS data mapping
The mapping relation between the EBS data and the WBS data is established and meets the following relation:
A={B 1 ,B 2 ,B 3 ....B N },
B∈{DW 1 ,DW 2 ,DW 3 ..DW N },
wherein A is the whole engineering data in EBS data, B is the component data in EBS data, DW is the partial engineering data in WBS data,
and when the display of the branch engineering data is finished, the display of the component data is finished, and the finished component data is counted and listed in the pricing range.
For example, a certain engineering entity a (overall engineering) is composed of several types of components B, and the completion of the completion state of the engineering entity (overall engineering) in the EBS is driven by WBS task completion through EBS and WBS data mapping logic, that is, the component B corresponds to a WBS division engineering DW, and if the DW is completed, the component B is completed, and the component B can be priced.
EBS and QList data mapping
The mapping relation between the EBS and the QList data satisfies the following relation:
A∈{Q A1 、Q A2 、Q A3 ....Q AN },
B∈{Q N1 、Q N2 、Q N3 ...Q NN },
wherein A is the whole engineering data in the EBS data, B is the component data in the EBS data, Q A1 、Q A2 、Q A3 、…、Q AN Is the first level in the third node level in the QList data; q N1 、Q N2 、Q N3 、…、Q NN Is the nth level in the level of the third node in the QList data.
And calculating the cost of the finished engineering entity through EBS and QList data mapping, thereby completing the work of checking the labor and pricing.
When the mapping relationship between the EBS template and the QList template is established, the engineering entity and the engineering quantity list are required to be associated to establish a corresponding relationship. Taking bridge and culvert specialties as an example, the bridge A needs to correspond to a grand bridge in a project quantity list, and simultaneously needs to correspond to a next-level complex grand bridge of the grand bridge, and the corresponding relation needs to be established between the two levels. And a certain pile B in the bridge corresponds to one of a dug pile, a drilled pile or a sunk pile in the engineering quantity list. An item of onshore concrete or offshore concrete in the next level of bored pile. And mapping is realized through the EBS and QList data mapping realization mode and the corresponding relation of the hierarchical codes.
Finally, the mapping tables of EBS data and QList data are established as shown in Table 1. The table lists only the whole engineering data and the component data in the partial EBS data and the corresponding engineering quantity list, and those skilled in the art can understand that the corresponding data table can be obtained only according to the mapping relationship of the present invention.
Table 1 mapping table of EBS data and QList data for bridge specialties as an example
Note: the table shows the entire engineering data and the component data in only a part of the EBS data.
Figure BDA0003419019070000091
/>
Figure BDA0003419019070000101
/>
Figure BDA0003419019070000111
/>
Figure BDA0003419019070000121
/>
Figure BDA0003419019070000131
According to the invention, according to the railway engineering pricing database: and establishing a mapping relation among the EBS data, the WBS data and the Qlist data. And when the branch in the WBS, the inspection lot associated with the project and the construction record table are finished, representing that the branch project is finished, and representing that the project entity associated with the project is finished after the node project in the project is finished according to the project construction sequence. And establishing a corresponding association relation between the EBS template and the Qlist template, wherein the associated Qlist data enters a checking pricing range after the engineering entity is finished, and otherwise, the associated Qlist data cannot enter the checking pricing calculation range. Fig. 6 is a schematic diagram of a mapping relationship established by a bridge and culverts in an embodiment of the present invention.
And step S103, checking the labor and calculating the price.
And acquiring engineering data, and calculating the total valuation by using the established mapping relation.
Calculating a total engineering price by using the mapping relation between the EBS data and the QList data, and calculating by the following method:
T=∑t 1 +t 2 +t 3 +....+t n
t n =q n ×p n
wherein q is n Is an engineering quantity, p n Is a unit price of t n Is the total price of the component.
And after the construction unit enters the field, establishing corresponding data according to a design drawing and a project amount list, selecting a corresponding specialty, and establishing EBS data according to the construction drawing. And synchronously inputting each constructed design quantity when the EBS data is established, wherein the design quantity calculation rule is subject to the engineering quantity inventory calculation rule. And selecting specific partial items in the WBS, inspection lots and construction record table data according to the template corresponding relation provided by each decomposition construction system, and setting a key node process. And associating the content of the Qlsit engineering quantity list, and selecting specific sub-category characteristics, unit price and total price in the engineering quantity list. After the recording is finished, a railway engineering pricing database provided by the invention is established, a mapping relation is established between WBS data and inspection batch data, a mapping relation is established between EBS data and WBS data, and a mapping relation is established between EBS data and QList data.
After the corresponding relation among the EBS, the WBS and the Qlist is established, the mapping relation is used for one-key automatic checking and pricing. And completing the project of expressing the items through the examination and approval and the construction record form associated with the project of expressing the items. The pricing method suitable for railway engineering provided by the invention realizes automatic production of the price-checking pricing targets, automatic statistics of the inspection batches and automatic production of the price-checking pricing tables through the incidence relation among the three. FIG. 7 is a flow chart illustrating the process of validating pricing in one embodiment of the present invention.
The above description has been given in detail for a pricing method for railway engineering according to the present invention, and the following description is given in detail for a pricing system for railway engineering according to the present invention.
The pricing system suitable for railway engineering provided by the invention comprises: the system comprises a railway engineering pricing database, a WBS data, EBS data and Qlist data mapping module and a pricing module.
The invention establishes a railway engineering pricing database on the basis of the existing technologies of railway WBS basic data, railway EBS basic data and Qlist basic data. The established railway engineering pricing database comprises WBS data, EBS data and Qlist data.
A railway engineering pricing database.
WBS data
On the basis of the railway WBS basic data, a first level code is added, and a plurality of different first node levels are added to construct WBS data.
In some embodiments, the WBS data is added with branch, itemized key node data and hierarchical coding on the basis of 2018 professional construction quality acceptance mark templates. And the key node data information in the branches and the items represents that the associated engineering entities are completed after the nodes are completed.
The WBS hierarchical code needs to be compiled according to different specialties and different node hierarchical codes. Encoded as the EBS, WBS, and Qlist mapping bases.
EBS data
And adding a second hierarchical code and a plurality of different second node hierarchies on the basic railway EBS data to construct EBS data.
In some embodiments, the EBS data is the content of adding a hierarchical code, whether a node can be copied, whether an entity node (overall project) maintains mileage, whether a node name can be modified, and the like on the basic data of the "railway engineering entity structure decomposition guideline" of the railway BIM alliance. The EBS hierarchy code needs to be compiled according to different specialties and different node hierarchy codes. Encoded as the EBS, WBS, and Qlist mapping bases.
Qlist data
And adding a third node level on the Qlist basic data to construct Qlist data.
In some embodiments, the Qlist data is added to the content of the railway engineering volume inventory specification, and the Qlist hierarchical code needs to be compiled according to different specialties and different node hierarchical codes. Encoded as the EBS, WBS, and Qlist mapping bases.
WBS data, EBS data and Qlist data mapping module.
According to the invention, the WBS data and the inspection batch data are mapped, the EBS data and the WBS data are mapped, and the EBS data and the QList data are mapped. The specific mapping relationship is as follows:
WBS data to test batch data mapping
The WBS data and the inspection batch data establish a mapping relation which satisfies the following relation:
DW={SW 1 ,SW 2 ,SW 3 ,...SW n },
SW={IL 1 ,IL 2 ,IL 3 ,...IL N },
wherein DW is subsection engineering data in WBS data, SW is subsection engineering data in WBS data, and IL is inspection batch data;
when the inspection batch data display is completely finished, the project data are completely finished;
and when the project data display is completely finished, the project data of the partial project are completely finished.
WBS data includes a part (DW), a subinterval project (SW), and an Inspection Lot (IL). The inspection batch driving subsection completion state is realized through data mapping logics such as WBS and inspection batch.
EBS data to WBS data mapping
The mapping relation between the EBS data and the WBS data is established and meets the following relation:
A={B 1 ,B 2 ,B 3 ....B N },
B∈{DW 1 ,DW 2 ,DW 3 ..DW N },
wherein A is the whole engineering data in EBS data, B is the component data in EBS data, DW is the partial engineering data in WBS data,
and when the display of the branch engineering data is finished, displaying the component data, counting the finished component data, and listing the component data in a pricing range.
For example, in a certain engineering entity a (overall engineering) composed of several types of components B, the completion of the WBS task driving the completion state of the engineering entity (overall engineering) in the EBS is realized through the EBS and WBS data mapping logic, that is, the component B corresponds to the WBS division engineering DW, and if the DW is completed, the component B is completed, and the component B can be priced.
EBS and QList data mapping
The mapping relation between the EBS and the QList data satisfies the following relation:
A∈{Q A1 、Q A2 、Q A3 ....Q AN },
B∈{Q N1 、Q N2 、Q N3 ...Q NN },
wherein A is the whole engineering data in the EBS data, B is the component data in the EBS data, Q A1 、Q A2 、Q A3 、…、Q AN Is the first level in the third node level in the QList data; q N1 、Q N2 、Q N3 、…、Q NN Is the nth level in the third node level in the QList data.
And through EBS and QList data mapping, the calculation cost of the finished engineering entity is realized, and thus the work of checking and pricing is completed.
When the mapping relationship between the EBS template and the QList template is established, the engineering entity and the engineering quantity list are required to be associated to establish a corresponding relationship. Taking bridge and culvert specialties as an example, the bridge A needs to correspond to a grand bridge in a project quantity list, and simultaneously needs to correspond to a next-level complex grand bridge of the grand bridge, and the corresponding relation needs to be established between the two levels. And a certain pile B in the bridge corresponds to one of a dug pile, a drilled pile or a sunk pile in the engineering quantity list. An item of onshore concrete or offshore concrete in the next level of bored pile. And mapping is realized through the EBS and QList data mapping realization mode and the corresponding relation of the hierarchical codes.
And a pricing module.
And the system is used for acquiring engineering data and calculating the total valuation by utilizing the established mapping relation.
Calculating a total engineering price by using the mapping relation between the EBS data and the QList data, and calculating by the following method:
T=∑t 1 +t 2 +t 3 +....+t n
t n =q n ×p n
wherein q is n Is an engineering quantity, p n Is a unit price of t n Is the total price of the component.
And after the construction unit enters the field, establishing corresponding data according to a design drawing and a project amount list, selecting a corresponding specialty, and establishing EBS data according to the construction drawing. And synchronously inputting each constructed design quantity when the EBS data is established, wherein the design quantity calculation rule is subject to the engineering quantity inventory calculation rule. And selecting specific partial items, inspection lots and construction record table data in the WBS according to the template corresponding relation provided by each decomposition construction system, and setting a key node process. And associating the content of the Qlsit engineering quantity list, and selecting specific sub-category characteristics, unit price and total price in the engineering quantity list. After the recording is finished, establishing a railway engineering pricing database provided by the invention, establishing a mapping relation between WBS data and inspection batch data, establishing a mapping relation between EBS data and WBS data, and establishing a mapping relation between EBS data and QList data.
After the corresponding relation among the EBS, the WBS and the Qlist is established, the mapping relation is used for one-key automatic checking and pricing. And completing the project of expressing the items through the examination and approval and the construction record form associated with the project of expressing the items. The pricing system suitable for railway engineering provided by the invention realizes automatic production of the price-checking pricing target, automatic statistics of the inspection lot and automatic production of the price-checking pricing table through the incidence relation among the three.
In accordance with the method described above, the present invention also provides a pricing system for railway engineering, the system comprising a computer device including a processor and a memory, the memory having stored therein computer instructions, the processor being configured to execute the computer instructions stored in the memory, the system implementing the steps of the method as described above when the computer instructions are executed by the processor.
Embodiments of the present invention further provide a computer-readable storage medium, on which a computer program is stored, where the computer program is executed by a processor to implement the foregoing steps of the edge computing server deployment method. The computer readable storage medium may be a tangible storage medium such as Random Access Memory (RAM), memory, read Only Memory (ROM), electrically programmable ROM, electrically erasable programmable ROM, registers, floppy disks, hard disks, removable storage disks, CD-ROMs, or any other form of storage medium known in the art.
The pricing method and the pricing system suitable for railway engineering provided by the invention are characterized in that a railway engineering pricing database is established on the basis of the existing EBS basic data, WBS basic data and Qlist data, a mapping method is established for the established EBS data, WBS data and Qlist data in the railway engineering pricing database, the EBS completion state is judged according to the WBS task completion state, the Qlist is subjected to labor checking pricing calculation according to the EBS completion state, and then the pricing list calculation is automatically completed.
The invention realizes the automatic calculation and statistics of checking, data checking and checking of the engineering entity, and the automatic calculation and statistics of the checking and pricing of the engineering entity by the pricing method based on the EBS, WBS and Qlist of the railway engineering entity, solves the phenomena of virtual checking and over-checking in the engineering checking and pricing, improves the efficiency of checking and pricing, and realizes one-key type checking and pricing calculation by using less field workload in the later period through the configuration of the corresponding relationship in the earlier period.
Those of ordinary skill in the art will appreciate that the various illustrative components, systems, and methods described in connection with the embodiments disclosed herein may be implemented as hardware, software, or combinations of both. Whether this is done in hardware or software depends upon the particular application and design constraints imposed on the solution. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the present invention. When implemented in hardware, it may be, for example, an electronic circuit, an Application Specific Integrated Circuit (ASIC), suitable firmware, plug-in, function card, or the like. When implemented in software, the elements of the invention are the programs or code segments used to perform the required tasks. The program or code segments may be stored in a machine-readable medium or transmitted by a data signal carried in a carrier wave over a transmission medium or a communication link.
It is to be understood that the invention is not limited to the specific arrangements and instrumentality described above and shown in the drawings. A detailed description of known methods is omitted herein for the sake of brevity. In the above embodiments, several specific steps are described and shown as examples. However, the method processes of the present invention are not limited to the specific steps described and illustrated, and those skilled in the art can make various changes, modifications and additions or change the order between the steps after comprehending the spirit of the present invention.
Features that are described and/or illustrated with respect to one embodiment may be used in the same way or in a similar way in one or more other embodiments and/or in combination with or instead of the features of the other embodiments in the present invention.
Other embodiments of the invention will be apparent to those skilled in the art from consideration of the specification and practice of the invention disclosed herein. It is intended that the specification and examples be considered as exemplary only, with a true scope and spirit of the invention being indicated by the following claims.

Claims (4)

1. A pricing method for railway engineering, characterized in that the method comprises the following method steps:
railway WBS basic data, railway EBS basic data and Qlist basic data are obtained, a railway engineering pricing database is established, wherein,
the railway engineering pricing database includes: WBS data, EBS data, and Qlist data, wherein,
adding a first level code and a plurality of different first node levels on the railway WBS basic data to construct WBS data;
adding a second hierarchical code and a plurality of different second node hierarchies on the railway EBS basic data to construct EBS data;
adding a third node level on the Qlist basic data to construct Qlist data;
establishing a mapping relation, comprising: establishing a mapping relation between the WBS data and inspection batch data, establishing a mapping relation between the EBS data and the WBS data, and establishing a mapping relation between the EBS data and the Qlist data;
acquiring engineering data, and calculating a total valuation by using the established mapping relation;
the WBS data and the inspection batch data establish a mapping relation which satisfies the following relation:
Figure QLYQS_1
Figure QLYQS_2
wherein, the first and the second end of the pipe are connected with each other,DWfor the subdivision engineering data in the WBS data,SWfor the project data in the WBS data,ILfor checking batch data, N is a natural number, and N is a layer number;
when the inspection batch data display is completely finished, the project data are completely finished;
when the project data display is completely finished, the project data of the partial project are completely finished;
the mapping relation between the EBS data and the WBS data satisfies the following relation:
Figure QLYQS_3
Figure QLYQS_4
wherein A is the whole engineering data in the EBS data, B is the component data in the EBS data,DWfor the part of the engineering data in the WBS data,
when the display of the sub-project data is finished, the display of the component data is finished, and the finished component data is counted and listed in a pricing range;
the mapping relation between the EBS and the Qlist data satisfies the following relation:
Figure QLYQS_5
Figure QLYQS_6
wherein A is the whole engineering data in the EBS data, B is the component data in the EBS data, Q A1 、Q A2 、Q A3 、…、Q AN Is the first level in the third node level in the Qlist data; q N1 、Q N2 、Q N3 、…、Q NN Is the Nth level in the third node level in the QList data;
calculating the total engineering price by using the mapping relation between the EBS data and the Qlist data;
the total project price is calculated as follows:
Figure QLYQS_7
,/>
Figure QLYQS_8
wherein q is n Is an engineering quantity, p n Is a unit price of t n Is the total price of the components, and n is a natural number.
2. Pricing system for railway engineering, characterized in that it comprises: a railway engineering pricing database, comprising:
WBS data, EBS data, and Qlist data, wherein,
on the basis of railway WBS basic data, adding a first level code and a plurality of different first node levels to construct WBS data;
adding a second hierarchical code and a plurality of different second node hierarchies on the railway EBS basic data to construct EBS data;
adding a third level code and a plurality of different third node levels on the Qlist basic data to construct Qlist data;
the WBS data, EBS data and Qlist data mapping module comprises: establishing a mapping relation between the WBS data and inspection batch data, establishing a mapping relation between the EBS data and the WBS data, and establishing a mapping relation between the EBS data and the QList data;
the pricing module is used for acquiring engineering data and calculating the total pricing amount by utilizing the established mapping relation;
the WBS data and the inspection batch data establish a mapping relation which satisfies the following relation:
Figure QLYQS_9
Figure QLYQS_10
wherein the content of the first and second substances,DWfor the subdivision engineering data in the WBS data,SWfor the project data in the WBS data,ILfor checking batch data, N is a natural number, and N is a layer number;
when the inspection batch data display is completely finished, the project data are completely finished;
when the project data display is completely finished, all project data are finished;
the mapping relation between the EBS data and the WBS data satisfies the following relation:
Figure QLYQS_11
Figure QLYQS_12
wherein A is the whole engineering data in the EBS data, B is the component data in the EBS data,DWfor the subdivision engineering data in the WBS data,
when the display of the sub-project data is finished, the display of the component data is finished, and the finished component data is counted and listed in the pricing range;
the mapping relation between the EBS and the Qlist data meets the following relation:
Figure QLYQS_13
Figure QLYQS_14
wherein A is the whole engineering data in the EBS data, B is the component data in the EBS data, Q A1 、Q A2 、Q A3 、…、Q AN Is the first level in the third node level in the Qlist data; q N1 、Q N2 、Q N3 、…、Q NN Is the Nth level in the third node level in the Qlist data;
calculating a total engineering price by using the mapping relation between the EBS data and the Ql ist data;
the total project price is calculated as follows:
Figure QLYQS_15
Figure QLYQS_16
wherein q is n Is an engineering quantity, p n Is a unit price of t n Is the total price of the components, and n is a natural number.
3. Pricing system for railway engineering, comprising a processor and a memory, characterized in that the memory has stored therein computer instructions for executing the computer instructions stored in the memory, the system realizing the steps of the method according to claim 1 when the computer instructions are executed by the processor.
4. A computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the steps of the method as claimed in claim 1.
CN202111556804.6A 2021-12-17 2021-12-17 Pricing method and system suitable for railway engineering Active CN114331507B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111556804.6A CN114331507B (en) 2021-12-17 2021-12-17 Pricing method and system suitable for railway engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111556804.6A CN114331507B (en) 2021-12-17 2021-12-17 Pricing method and system suitable for railway engineering

Publications (2)

Publication Number Publication Date
CN114331507A CN114331507A (en) 2022-04-12
CN114331507B true CN114331507B (en) 2023-04-18

Family

ID=81051763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111556804.6A Active CN114331507B (en) 2021-12-17 2021-12-17 Pricing method and system suitable for railway engineering

Country Status (1)

Country Link
CN (1) CN114331507B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117151617A (en) * 2023-07-31 2023-12-01 北京梦诚科技有限公司 Method and system for checking work receiving party based on part attribute

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109409840A (en) * 2018-10-31 2019-03-01 广西路桥工程集团有限公司 A kind of Highway Project management system and method combined based on BIM with WBS
CN110222445B (en) * 2019-06-13 2020-02-21 四川省交通勘察设计研究院有限公司 BIM and design information based integration, collaborative design and delivery method and system
CN111859522A (en) * 2020-08-11 2020-10-30 长沙垚森工程科技有限公司 BIM-based highway engineering rapid construction cost method
CN113094794B (en) * 2021-04-21 2022-04-15 四川省交通建设集团股份有限公司 Automatic metering and accounting method and system based on BIM and GIS technology
CN113343338B (en) * 2021-06-08 2022-02-18 四川省交通勘察设计研究院有限公司 Method and system for associating work breakdown structure and BIM (building information modeling) component in traffic field

Also Published As

Publication number Publication date
CN114331507A (en) 2022-04-12

Similar Documents

Publication Publication Date Title
Thal Jr et al. Estimation of cost contingency for air force construction projects
Forcada et al. Rework in highway projects
CN108519972A (en) A kind of legal risk determination method, device and the computer equipment of contract terms
CN113868753B (en) Intelligent metering method and device for building engineering, computing equipment and storage medium
CN103646315A (en) Method and device for data processing in electricity bureau engineering project workflow
CN112669019A (en) Engineering data automatic filing method based on engineering quantity list and quality inspection data correlation interaction
CN114971597B (en) BIM-based calculated amount and metering payment road cost calculation system and method
Hyari et al. Detection model for unbalanced pricing in construction projects: A risk-based approach
Twort et al. Civil engineering project management
CN114331507B (en) Pricing method and system suitable for railway engineering
Choi et al. Holistic performance evaluation of highway design-build projects
US20070156270A1 (en) Method for monitoring and controlling the construction of an engineering project
Smith Project cost estimating
Dzeng et al. Automating schedule review for expressway construction
Melnyk et al. Digitalization in the Construction Industry: The Case of Documentation and Invoicing in Tunneling
Wani et al. Evaluating the use of contractor-performed test results in highway construction and material acceptance decisions
Cartlidge Estimator's Pocket Book
CN112883139A (en) Automatic checking method for spatial data and service data based on GIS vector calculation
Muhwezi et al. Impact of design flaws on cost overruns in road construction projects in Uganda
Canesi et al. Risk Assessment in Sustainable Infrastructure Development Projects: A Tool for Mitigating Cost Overruns
Serag et al. Reconciliation of owner and contractor views in heavy construction projects
Peng et al. Using Online Simulation Technique for Revenue-Based Value for Money Assessment Model in PPP Project.
CN117851412B (en) Highway engineering list compiling method and system based on BIM
CN116051290A (en) Railway engineering investment management method, system and storage medium
Bovsunovskaya et al. Auditing the estimated cost of construction of transport infrastructure facilities

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant