CN105139114A - Automatic compiling method for annual operation mode of power grid in district or county - Google Patents

Automatic compiling method for annual operation mode of power grid in district or county Download PDF

Info

Publication number
CN105139114A
CN105139114A CN201510500607.0A CN201510500607A CN105139114A CN 105139114 A CN105139114 A CN 105139114A CN 201510500607 A CN201510500607 A CN 201510500607A CN 105139114 A CN105139114 A CN 105139114A
Authority
CN
China
Prior art keywords
mode
annual
task
electrical network
county
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510500607.0A
Other languages
Chinese (zh)
Inventor
黄向前
桂前进
黄太贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Anqing Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Anqing Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Anqing Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510500607.0A priority Critical patent/CN105139114A/en
Publication of CN105139114A publication Critical patent/CN105139114A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses an automatic compiling method for an annual operation mode of a power grid in a district or county. The automatic compiling method comprises the steps of storing basic data of the annular operation mode of the power grid through establishing a data storage server group; compiling a standard according to the annual operation mode of the power grid, customizing a compiling content template, establishing a correlation relationship between the template and the basic data, matching the basic data which are reserved in the data storage server into the template in an automatic matching manner, and automatically generating a compiling content; through investigating and analyzing an annual mode compiling process of the power grid in the district or county, constructing a compiling work model according to an engineering model, a task set model and a task unit model, simulating a compiling process, an auditing process and a gathering process in the compiling operation in a task flow manner, and finishing an annular mode compiling operation standard process in a customized state information mechanism control mode; and after all tasks are processed, an annular mode report of the power grid in the district or county is automatically gathered and formed, thereby effectively improving operation efficiency and automatic level.

Description

A kind of robotization preparation method for ground county electrical network annual running mode
Technical field
The present invention is the automatic preparation method of ground county's electrical network annual running mode, belongs to dispatching automation of electric power systems technical field.
Background technology
Annual running mode material is the technical guide of dispatching of power netwoks operation, power grid construction and electrical network production management, the wherein combing work gain and loss of prior year, determine the Main way of Operation of Electric Systems in the current year, construction and production, for the work in every of electrical network provides decision-making foundation, scientific and reasonable annual running mode material is the important leverage of power network safety operation.
Annual running mode authorized strength work is the normality sex work that China's electrical network at different levels all needs to carry out every year, and involve a wide range of knowledge, complicacy is high, to work quality and ageing requirement very high; Wherein involve a large amount of data messages, true, accurate, reliable data message is the basis of establishment annual running mode.
For a long time, China's electrical network at different levels attaches great importance to annual mode authorized strength work, also have accumulated abundant practical experience, define good workflow, in order to the authorized strength work of specification annual running mode, formulate relevant regulations, specify that specific requirement, such as: " guiding rules of power system safety and stability ", " State Grid Corporation of China's power system safety and stability computational rules " and " county electrical network annual running mode establishment specification ", for ensureing that the quality of establishment annual running mode report serves vital effect.
Present stage, in annual mode authorized strength work, electrical network at different levels distributes establishment task by experience, and all departments are responsible for the establishment of related content, carries out collecting, gathering and examination after working out again, and does not have the way to manage of standard and easy organizational tool; And find after annual running mode authorized strength work is analyzed, the framework of the annual running mode of annual establishment is substantially shaped, the workout content in different year is just distinguished in emphasis to some extent according to the change of power network development situation, possesses identical and similarity to a great extent.
Therefore, the present invention proposes a kind of for ground county electrical network annual running mode material robotization preparation method, this is closely connected with administration of power networks flow process with computer technology at power system safety and stability analytical calculation, the new try that theoretical research and practice working experience accumulation basis is made.
Summary of the invention
For a robotization preparation method for ground county electrical network annual running mode, it is characterized in that, comprise the following steps:
Step 1: build database server group, store, collect and manage the basic data of establishment electrical network annual running mode, comprise the data such as electrical network scale, electrical network production run data, electric grid secondary proterctive equipment data, maintenance scheduling for power systems, electrical network capital construction operation plan, and data management mechanism and data Checking Mechanism are provided, real-time check and correction are carried out to electrical network production run data, guarantees that preserved data are authentic and valid;
Step 2: set up engineering, task-set and TU task unit three layer model, investigation, the analytically annual mode compilation process of county's electrical network, abstract modeling is carried out to annual mode authorized strength work, build engineering-task-set-TU task unit three layer model, in conjunction with workout content dividing condition and the division of labor of actual electric network department, authorized strength work is divided into: prior year operation of power networks is summed up, operation of power networks in the current year is analyzed, urban distribution network operating analysis, relay protected operation is analyzed, dispatching automation operating analysis, communication of power system operating analysis, monitoring of tools operating analysis, County Power Grid annual running mode summary, annual mode receives the large set of tasks of money 7, each set of tasks comprises some TU task units, the corresponding concrete workout content of each TU task unit, realize controlling the procedure of workout content in TU task unit content association mode,
Step 3: build annual running mode establishment template, annual mode content is exported in conjunction with basic data, based on electrical network annual running mode establishment specification, partition modeling is carried out to electrical network annual running mode workout content, in conjunction with actual Planning procedure, workout content is divided into nine major parts, 40 chapters and sections, 48 data forms and 10 figures, in conjunction with microcomputer modelling technology with chapters and sections and form for base unit builds corresponding basic masterplate, set up masterplate and basic data mapping relations, realize the automatic generation of annual mode content;
Step 4: establishment responsible official, newly-built or customization engineering, by specifying with reference to year, by application program automatically by annual for correspondence mode content replication and the basic data of data server group described in extraction step 1 replaces corresponding contents after analyzing automatically, obtain electrical network annual running mode content in the current year; Masterplate is provided with reference to then using application program to give tacit consent in year if do not specify;
Step 5: star up engineering, all task-set are dispensed to corresponding department immediately, are divided task-set by department head, each TU task unit are assigned to concrete operations personnel executable operations; Operating personnel only need that the workout content corresponding to TU task unit is examined, error correction, can complete editing; Undertaken auditing rear submission responsible official by leader after end to gather;
Step 6: realize standardization effort flow process with self-defined status information mechanism, sets up overall flow controlling mechanism and task-set flow control mechanism and TU task unit controlling mechanism mode and realizes the independent operating of engineering-task-set-TU task unit and jointly control;
Step 7: automatically gather, application program is according to the incidence relation of engineering-task-set-TU task unit and TU task unit and workout content, automatically the task that all departments operating personnel perform end is gathered, and carry out layout according to established masterplate sortord, form the annual mode of intactly county's electrical network and report;
Step 8: gather the annual mode of derivation and work out material.
Further, realize setting up the abstract task model of annual running mode authorized strength work, realize the control of standardization Planning procedure with three layer model in conjunction with self-defined status information controlling mechanism.
Further, the tool elephant completing county's electrical network annual running mode workout content over the ground splits modeling work, realizes the management to workout content in TU task unit correspondence establishment chapters and sections mode.
Beneficial effect of the present invention is as follows: the present invention proposes the standardization flow process model construction of county's electrical network annual running mode authorized strength work and the partition modeling work of workout content over the ground first, realizes standardized stream process control and the robotization establishment of county's electrical network annual running mode authorized strength work over the ground; Institute's tool advantage has: data unified management and check, ensures that data are authentic and valid; Build standard masterplate according to ground county electrical network annual running mode establishment specification, ensure the unitarity of all workout contents; Adopt standardization effort Row control technology, ensure authorized strength work high efficiency and accuracy; Achieve the robotization establishment of ground county's electrical network annual running mode authorized strength work, improve the efficiency of annual mode authorized strength work, reduce the difficulty of authorized strength work, effectively strengthen the standardization of authorized strength work, significant to guarantee power grid security, stable, high-quality, economical operation.
Accompanying drawing explanation
Fig. 1 is the process flow diagram of a kind of robotization preparation method for ground county electrical network annual running mode of the present invention.
Embodiment
With accompanying drawing, content of the present invention is described below in conjunction with specific embodiments.
Refer to Fig. 1, Fig. 1 is the process flow diagram of a kind of robotization preparation method for ground county electrical network annual running mode of the present invention.
The invention discloses a kind of robotization preparation method for ground county electrical network annual running mode: by setting up data storage server group, rolling storage 5 years electrical network annual running mode basic datas; According to electrical network annual running mode establishment specification, customization workout content masterplate, and to be associated with basic data relation for masterplate, in Auto-matching mode, the basic data that data storage server group retains is matched in masterplate, automatically generates workout content; Investigate by the year of county's electrical network over the ground mode compilation process, analyze, with engineering,---task-set---TU task unit three layer model carries out model construction to authorized strength work in proposition, the task flowing mode of taking is simulated in annual mode authorized strength work and is worked out, audits, the process such as to gather, and completes the realization of annual mode authorized strength work standardization flow process with self-defined status information mechanism control task state; After all tasks have been processed, automatically collect formation ground county electrical network year mode and reported; Achieve the robotization establishment of ground county electrical network annual running mode, effectively improve work efficiency and automatization level.
Its concrete steps are:
Step 1: build database server group, store, collect and manage the basic data of establishment electrical network annual running mode, comprise the data such as electrical network scale, electrical network production run data, electric grid secondary proterctive equipment data, maintenance scheduling for power systems, electrical network capital construction operation plan;
Step 2: set up engineering, task-set and TU task unit three layer model, provides data management mechanism and data Checking Mechanism, carries out real-time check and correction, guarantee that preserved data are authentic and valid to electrical network production run data;
Step 3: build annual running mode establishment template, annual mode content is exported in conjunction with basic data, based on electrical network annual running mode establishment specification, partition modeling is carried out to electrical network annual running mode workout content, in conjunction with actual Planning procedure, workout content is divided into nine major parts: 40 chapters and sections, 48 data forms and 10 figures, build corresponding basic masterplate with chapters and sections and form for base unit in conjunction with microcomputer modelling technology, provide corresponding vectorgraph charting to manage for figure;
Step 4: establishment responsible official, newly-built or customization engineering, abstract modeling is carried out to annual mode authorized strength work, build engineering-task-set-TU task unit three layer model, in conjunction with workout content dividing condition and the division of labor of actual electric network department, authorized strength work is divided into: prior year operation of power networks is summed up, operation of power networks in the current year is analyzed, urban distribution network operating analysis, relay protected operation is analyzed, dispatching automation operating analysis, communication of power system operating analysis, monitoring of tools operating analysis, County Power Grid annual running mode summary, annual mode receives the large set of tasks of money 7, each set of tasks comprises some TU task units, the corresponding concrete workout content of each TU task unit,
Step 5: star up engineering, allocating task collection, realize standardization effort flow process with self-defined status information mechanism, set up overall flow controlling mechanism and task-set flow control mechanism and TU task unit controlling mechanism mode and realize the independent operating of engineering-task-set-TU task unit and jointly control;
Step 6: complete standardized stream process control with self-defined status information mechanism, can specify during the newly-built establishment task of establishment responsible official with reference to annual, application program, automatically by annual for correspondence mode content replication and the basic data of the described data server group of extraction step (1) replaces corresponding contents after analyzing automatically, obtains electrical network annual running mode content in the current year; Masterplate is provided with reference to then using application program to give tacit consent in year if do not specify;
Step 7: automatically gather, form annual mode material according to model interaction relation, establishment responsible official starts Planning procedure, and all task-set are dispensed to corresponding department immediately, by department head, task-set is divided, each TU task unit is assigned to concrete operations personnel and performs compilation operation; Undertaken auditing rear submission responsible official by leader after operation terminates to gather;
Step 8: gather the annual mode of derivation and work out material.
Realize setting up the abstract task model of annual running mode authorized strength work, realize the control of standardization Planning procedure with three layer model in conjunction with self-defined status information controlling mechanism.
The tool elephant completing county's electrical network annual running mode workout content over the ground splits modeling work, realizes the management to workout content in TU task unit correspondence establishment chapters and sections mode.
In step 8, consult the ground county electrical network annual running mode material having completed establishment at any time in client, provide WORD, PDF derives.
Beneficial effect of the present invention is as follows: the present invention proposes the standardization flow process model construction of county's electrical network annual running mode authorized strength work and the partition modeling work of workout content over the ground first, realizes standardized stream process control and the robotization establishment of county's electrical network annual running mode authorized strength work over the ground; Institute's tool advantage has: data unified management and check, ensures that data are authentic and valid; Build standard masterplate according to ground county electrical network annual running mode establishment specification, ensure the unitarity of all workout contents; Adopt standardization effort Row control technology, ensure authorized strength work high efficiency and accuracy; Achieve the robotization establishment of ground county's electrical network annual running mode authorized strength work, improve the efficiency of annual mode authorized strength work, reduce the difficulty of authorized strength work, effectively strengthen the standardization of authorized strength work, significant to guarantee power grid security, stable, high-quality, economical operation.
Above-described embodiment is only briefly describe the preferred embodiment of the present invention; not scope of the present invention is limited; under not departing from the present invention and designing the prerequisite of spirit; the various distortion that those of ordinary skill in the art make technical scheme of the present invention and improvement, all should fall in protection domain that claims of the present invention determines.

Claims (3)

1., for a robotization preparation method for ground county electrical network annual running mode, it is characterized in that, comprise the following steps:
Step 1: build database server group, store, collect and manage the basic data of establishment electrical network annual running mode, comprise the data such as electrical network scale, electrical network production run data, electric grid secondary proterctive equipment data, maintenance scheduling for power systems, electrical network capital construction operation plan, and data management mechanism and data Checking Mechanism are provided, real-time check and correction are carried out to electrical network production run data, guarantees that preserved data are authentic and valid;
Step 2: set up engineering, task-set and TU task unit three layer model, investigation, the analytically annual mode compilation process of county's electrical network, abstract modeling is carried out to annual mode authorized strength work, build engineering-task-set-TU task unit three layer model, in conjunction with workout content dividing condition and the division of labor of actual electric network department, authorized strength work is divided into: prior year operation of power networks is summed up, operation of power networks in the current year is analyzed, urban distribution network operating analysis, relay protected operation is analyzed, dispatching automation operating analysis, communication of power system operating analysis, monitoring of tools operating analysis, County Power Grid annual running mode summary, annual mode receives the large set of tasks of money 7, each set of tasks comprises some TU task units, the corresponding concrete workout content of each TU task unit, realize controlling the procedure of workout content in TU task unit content association mode,
Step 3: build annual running mode establishment template, annual mode content is exported in conjunction with basic data, based on electrical network annual running mode establishment specification, partition modeling is carried out to electrical network annual running mode workout content, in conjunction with actual Planning procedure, workout content is divided into nine major parts, 40 chapters and sections, 48 data forms and 10 figures, in conjunction with microcomputer modelling technology with chapters and sections and form for base unit builds corresponding basic masterplate, set up masterplate and basic data mapping relations, realize the automatic generation of annual mode content;
Step 4: establishment responsible official, newly-built or customization engineering, by specifying with reference to year, by application program automatically by annual for correspondence mode content replication and the basic data of data server group described in extraction step 1 replaces corresponding contents after analyzing automatically, obtain electrical network annual running mode content in the current year; Masterplate is provided with reference to then using application program to give tacit consent in year if do not specify;
Step 5: star up engineering, all task-set are dispensed to corresponding department immediately, are divided task-set by department head, each TU task unit are assigned to concrete operations personnel executable operations; Operating personnel only need that the workout content corresponding to TU task unit is examined, error correction, can complete editing; Undertaken auditing rear submission responsible official by leader after end to gather;
Step 6: realize standardization effort flow process with self-defined status information mechanism, sets up overall flow controlling mechanism and task-set flow control mechanism and TU task unit controlling mechanism mode and realizes the independent operating of engineering-task-set-TU task unit and jointly control;
Step 7: automatically gather, application program is according to the incidence relation of engineering-task-set-TU task unit and TU task unit and workout content, automatically the task that all departments operating personnel perform end is gathered, and carry out layout according to established masterplate sortord, form the annual mode of intactly county's electrical network and report;
Step 8: gather the annual mode of derivation and work out material.
2. require described a kind of ground county's electrical network annual running mode robotization preparation method according to right 1, it is characterized in that, realize setting up the abstract task model of annual running mode authorized strength work, realize the control of standardization Planning procedure with three layer model in conjunction with self-defined status information controlling mechanism.
3. require affiliated a kind of ground county's electrical network annual running mode robotization preparation method according to right 1, it is characterized in that, the tool elephant completing county's electrical network annual running mode workout content over the ground splits modeling work, realizes the management to workout content in TU task unit correspondence establishment chapters and sections mode.
CN201510500607.0A 2015-08-14 2015-08-14 Automatic compiling method for annual operation mode of power grid in district or county Pending CN105139114A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510500607.0A CN105139114A (en) 2015-08-14 2015-08-14 Automatic compiling method for annual operation mode of power grid in district or county

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510500607.0A CN105139114A (en) 2015-08-14 2015-08-14 Automatic compiling method for annual operation mode of power grid in district or county

Publications (1)

Publication Number Publication Date
CN105139114A true CN105139114A (en) 2015-12-09

Family

ID=54724454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510500607.0A Pending CN105139114A (en) 2015-08-14 2015-08-14 Automatic compiling method for annual operation mode of power grid in district or county

Country Status (1)

Country Link
CN (1) CN105139114A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107146166A (en) * 2017-04-24 2017-09-08 国网江西省电力公司经济技术研究院 Accessory system is planned in a kind of distribution
CN112288262A (en) * 2020-10-26 2021-01-29 泰华智慧产业集团股份有限公司 City management flat automatic dispatching method based on supervision grid and business grid

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101527454A (en) * 2009-04-27 2009-09-09 国网电力科学研究院 Method for automatically generating annual running mode report of power grid

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101527454A (en) * 2009-04-27 2009-09-09 国网电力科学研究院 Method for automatically generating annual running mode report of power grid

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李碧君等: "《电网年度运行方式自动优化计算与报告生成系统》", 《电力系统自动化》 *
舒新建等: "《电力通信网年度运行方式辅助设计系统》", 《电力信息与通信技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107146166A (en) * 2017-04-24 2017-09-08 国网江西省电力公司经济技术研究院 Accessory system is planned in a kind of distribution
CN107146166B (en) * 2017-04-24 2020-12-01 国网江西省电力公司经济技术研究院 Distribution network planning auxiliary system
CN112288262A (en) * 2020-10-26 2021-01-29 泰华智慧产业集团股份有限公司 City management flat automatic dispatching method based on supervision grid and business grid

Similar Documents

Publication Publication Date Title
CN111143915A (en) Steel structure modular installation method based on Tekla software platform
Liu et al. Automatically updating maintenance information from a BIM database
CN105069524B (en) Planned dispatching optimization method based on big data analysis
CN104951905A (en) Equipment dynamic ledger management system
CN108932589A (en) A kind of IT application in enterprises project implementation management system
CN103268531B (en) A kind of energy diode platform for energy centre
CN105574593B (en) Track state static detection and control system and method based on cloud computing and big data
CN105427041A (en) Standardized maintenance method for reconstruction and extension information point table of running substation
CN108971807A (en) A kind of site welding construction technology intelligent management control method and management system
CN113807747A (en) Enterprise budget management maturity evaluation system
CN109740206A (en) A kind of element type curtain wall parametric modeling and project amount statistical method based on BIM
CN109726499A (en) Reinforcement construction management method based on BIM technology
CN111582696A (en) Engineering construction scheduling management method
CN106789347B (en) method for realizing alarm correlation and network fault diagnosis based on alarm data
CN105119282A (en) On-line calculation system and method for theoretical line loss of power grid
CN102662655B (en) The structure system and method for version
CN105139114A (en) Automatic compiling method for annual operation mode of power grid in district or county
CN117057335B (en) Intelligent generation method for four pre-schemes of flood control in drainage basin
CN104317907A (en) Method for processing data used for assessing railway transport capacity
CN109903008A (en) A kind of subway work construction project progress visualization managing and control system and management-control method
CN116630082A (en) Method and device for allocating production resources, electronic equipment and storage medium
CN116128270A (en) Power grid operation plan management method and device for multi-source data fusion
CN107093018A (en) Communication engineering project information method for visualizing and device based on health model
CN106295144A (en) A kind of medical data acquisition method of quality control
KR20020008644A (en) The construction management system and the service method using the system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151209

WD01 Invention patent application deemed withdrawn after publication