CN109767104A - The engineering test task start method and computer equipment divided based on WBS - Google Patents

The engineering test task start method and computer equipment divided based on WBS Download PDF

Info

Publication number
CN109767104A
CN109767104A CN201811636562.XA CN201811636562A CN109767104A CN 109767104 A CN109767104 A CN 109767104A CN 201811636562 A CN201811636562 A CN 201811636562A CN 109767104 A CN109767104 A CN 109767104A
Authority
CN
China
Prior art keywords
wbs
node
engineering
divides
parameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811636562.XA
Other languages
Chinese (zh)
Other versions
CN109767104B (en
Inventor
黄晓景
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Hua Min Tongda Information Technology Co Ltd
Original Assignee
Fujian Hua Min Tongda Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Hua Min Tongda Information Technology Co Ltd filed Critical Fujian Hua Min Tongda Information Technology Co Ltd
Priority to CN201811636562.XA priority Critical patent/CN109767104B/en
Publication of CN109767104A publication Critical patent/CN109767104A/en
Application granted granted Critical
Publication of CN109767104B publication Critical patent/CN109767104B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of engineering test task start method divided based on WBS, comprising: creates the WBS instance system that example is divided with WBS, it includes multiple WBS instant nodes with hierarchical relationship that every WBS, which divides example,;Parameter detecting rule under each instant node is set in system in advance according to professional standard;Frequency detecting rule under each WBS instant node is set in the system;It fills in WBS and divides the actual engineering quantity of example, star up engineering divides Detection task, system calculates the amount detection of the parameter to be detected of specific component under each node according to engineering quantity, parameter detecting rule and frequency detecting rule automatically, forms Detection task list;Engineering Division Detection task is received by testing inspection system, the Detection task list for needing to detect the parameter under each node is found according to the type of detection parameters, it is detected according to task form and fills in data, test data is passed to WBS procedure-node automatically and applies for checking and examination, realize that data are traced to the source, it is ensured that data are true, accurate.

Description

The engineering test task start method and computer equipment divided based on WBS
Technical field
The present invention relates to a kind of engineering test task start methods and computer equipment divided based on WBS.
Background technique
In construction projects, testing inspection planning system and engineering unit branch subitem system are separation, according to engineering Unit branch subitem system partition time publication Detection task gives testing inspection system, and testing inspection system starts to be examined later It surveys, and all the elements detected is all sent to engineering unit branch subitem system, by engineering unit branch subitem system Association saves one by one, and such engineering detecting data can not be traceable to the specific portion of corresponding engineering, and artificial judgement is associated with manual Coherent detection data are to engineering entity position, this detection method, exist to the objectivity, authenticity, accuracy of detection data Certain disturbing factor.
Summary of the invention
One of the technical problem to be solved in the present invention is to provide a kind of based on the test of engineering type WBS partition structure tree The method of task start, it is automatic to realize that data are traced to the source, it is ensured that objectivity, authenticity, the accuracy of detection data.
One of the technical problem to be solved in the present invention is achieved in that a kind of based on engineering type WBS partition structure tree The method of test mission starting, includes the following steps:
Step 1, creation WBS instance system, the interior WBS instance system includes that WBS divides example, and each WBS is drawn Point example includes a plurality of WBS instant nodes with hierarchical relationship;
Step 2, the parameter detecting being arranged in system in advance under each instant node according to professional standard rule, the ginseng Number detected rule includes specifying parameter type to be detected to specific component;
Step 3, the frequency detecting being arranged under each WBS instant node in system rule;
Step 4 fills in WBS and divides the actual engineering quantity of example, and star up engineering divides Detection task, and system is according to filling in Engineering quantity, parameter detecting rule and frequency detecting rule calculate the parameter to be detected of specific component under each node automatically Amount detection, formed node under corresponding Detection task list;
Step 5 receives Engineering Division Detection task by testing inspection system, is found respectively according to the type of detection parameters The Detection task list for needing to detect the parameter under node is detected according to task form and is filled in data, and test data is certainly It is dynamic to be passed to corresponding WBS procedure-node and apply for checking and examination.
Further, the creation mode of the WBS division example in the step 1 is specific as follows: previously according to professional standard Creating, there is the WBS of WBS tree hierarchical relationship to divide template, and it includes a plurality of WBS every template nodes that each WBS, which divides template, And the WBS instant node title needed according to WBS every template node modification, realize that WBS divides the creation of example;
Wherein, the WBS every template node is created according to tree structure form, is at least wrapped from high to low by level Include stage node locating for contract section node, engineering, construction unit node, partitioned project node, subdivisional work node, sub- subitem work Cheng Jiedian and working procedure node, the WBS every template node determine whether the working procedure in most sub- grade according to the actual situation Subunit node and sub- branch's node are added before node.
Further, the professional standard is highway engineering, municipal works, marine traffic engineering, house construction engineering, railway work Journey, railway traffic engineering, hydraulic and hydroelectric engineering or the professional standard of nuclear power engineering setting.
The second technical problem to be solved by the present invention is to provide a kind of base computer equipment, automatic to realize that data are traced to the source, Ensure the objectivity, authenticity, accuracy of detection data.
The second technical problem to be solved by the present invention is achieved in that a kind of computer equipment, including memory, processing On a memory and the computer program that can run on a processor, when processor execution described program, is realized for device and storage Following procedure:
Step 1, creation WBS instance system, the interior WBS instance system includes that WBS divides example, and each WBS is drawn Point example includes a plurality of WBS instant nodes with hierarchical relationship;
Step 2, the parameter detecting being arranged in system in advance under each instant node according to professional standard rule, the ginseng Number detected rule includes specifying parameter type to be detected to specific component;
Step 3, the frequency detecting being arranged under each WBS instant node in system rule;
Step 4 fills in WBS and divides the actual engineering quantity of example, and star up engineering divides Detection task, and system is according to filling in Engineering quantity, parameter detecting rule and frequency detecting rule calculate the parameter to be detected of specific component under each node automatically Amount detection, formed node under corresponding Detection task list;
Step 5 receives Engineering Division Detection task by testing inspection system, is found respectively according to the type of detection parameters The Detection task list for needing to detect the parameter under node is detected according to task form and is filled in data, and test data is certainly It is dynamic to be passed to corresponding WBS procedure-node and apply for checking and examination.
Further, the creation mode of the WBS division example in the step 1 is specific as follows: previously according to professional standard Creating, there is the WBS of WBS tree hierarchical relationship to divide template, and it includes a plurality of WBS every template nodes that each WBS, which divides template, And the WBS instant node title needed according to WBS every template node modification, realize that WBS divides the creation of example;
Wherein, the WBS every template node is created according to tree structure form, is at least wrapped from high to low by level Include stage node locating for contract section node, engineering, construction unit node, partitioned project node, subdivisional work node, sub- subitem work Cheng Jiedian and working procedure node, the WBS every template node determine whether the working procedure in most sub- grade according to the actual situation Subunit node and sub- branch's node are added before node.
Further, the professional standard is highway engineering, municipal works, marine traffic engineering, house construction engineering, railway work Journey, railway traffic engineering, hydraulic and hydroelectric engineering or the professional standard of nuclear power engineering setting.
The present invention has the advantage that using WBS plan as key foundation, according to the difference of engineering type, various types work Sequence nodal test test parameters and the otherness for detecting frequency, setting WBS procedure-node parameter detecting rule, pass through WBS node It divides and executes starting to distribute testing inspection task, start Test Detection Work, testing inspection system receives corresponding test inspection Testing inspection result is simultaneously returned to corresponding WBS node by survey task, and test data is passed to WBS procedure-node automatically and applies for checking and examination, it is ensured that work Cheng Shiti testing inspection frequency, the authenticity of testing inspection data in building course.
Detailed description of the invention
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the method for the present invention execution flow chart.
Specific embodiment
As shown in Figure 1, a kind of engineering test task start method divided based on WBS of the invention, is included the following steps:
Step 1, creation WBS instance system, the interior WBS instance system includes that WBS divides example, and each WBS is drawn Point example includes a plurality of WBS instant nodes with hierarchical relationship;
Step 2, the parameter detecting being arranged in system in advance under each instant node according to professional standard rule, the ginseng Number detected rule includes that parameter type to be detected, such as the concreting under a certain highway engineering are specified to specific component Parameter type to be detected, which is arranged, in node Subgrade Compaction etc.;
Step 3, the frequency detecting being arranged under each WBS instant node in system rule, such as in a certain coagulation Soil pours under node, by specification one frequency detecting rule of setting are as follows: 200 meters of two-way traffics detect 4 Subgrade Compactions;
Step 4 fills in WBS and divides the actual engineering quantity of example, and star up engineering divides Detection task, and system is according to filling in Engineering quantity, parameter detecting rule and frequency detecting rule calculate the parameter to be detected of specific component under each node automatically Amount detection, formed node under corresponding Detection task list, such as according to an engineering quantity be 1km Four-Lane Road, correspond to Parameter detecting rule be Subgrade Compaction parameter detecting type, frequency detecting rule is that 200 meters of two-way traffics detect 4 points, then System calculates automatically according to above data needs amount detection for 40 points, forms a corresponding Detection task list;
Step 5 receives Engineering Division Detection task by testing inspection system, is found respectively according to the type of detection parameters The Detection task list for needing to detect the parameter under node is detected according to task form and is filled in data, and test data is certainly It is dynamic to be passed to corresponding WBS procedure-node and apply for checking and examination.
In a preferred embodiment, the creation mode of the WBS division example in the step 1 is specific as follows: previously according to There is the WBS of WBS tree hierarchical relationship to divide template for professional standard creation, and it includes a plurality of WBS moulds that each WBS, which divides template, Plate node, and the WBS instant node title needed according to WBS every template node modification, realize that WBS divides the creation of example;
Wherein, the WBS every template node is created according to tree structure form, is at least wrapped from high to low by level Include stage node locating for contract section node, engineering, construction unit node, partitioned project node, subdivisional work node, sub- subitem work Cheng Jiedian and working procedure node, the WBS every template node determine whether the working procedure in most sub- grade according to the actual situation Subunit node and sub- branch's node are added before node.
The professional standard is highway engineering, municipal works, marine traffic engineering, house construction engineering, railway engineering, track friendship The professional standard of logical engineering, hydraulic and hydroelectric engineering or nuclear power engineering setting.
Method based on aforementioned present invention, computer equipment of the invention are achieved in that a kind of computer equipment, packet The computer program that includes memory, processor and storage on a memory and can run on a processor, the processor execute Following procedure is realized when described program:
Step 1, creation WBS instance system, the interior WBS instance system includes that WBS divides example, and each WBS is drawn Point example includes a plurality of WBS instant nodes with hierarchical relationship;
Step 2, the parameter detecting being arranged in system in advance under each instant node according to professional standard rule, the ginseng Number detected rule includes that parameter type to be detected, such as the concreting under a certain highway engineering are specified to specific component Parameter type to be detected, which is arranged, in node Subgrade Compaction etc.;
Step 3, the frequency detecting being arranged under each WBS instant node in system rule, such as in a certain coagulation Soil pours under node, by specification one frequency detecting rule of setting are as follows: 200 meters of two-way traffics detect 4 Subgrade Compactions;
Step 4 fills in WBS and divides the actual engineering quantity of example, and star up engineering divides Detection task, and system is according to filling in Engineering quantity, parameter detecting rule and frequency detecting rule calculate the parameter to be detected of specific component under each node automatically Amount detection, formed node under corresponding Detection task list, such as according to an engineering quantity be 1km Four-Lane Road, correspond to Parameter detecting rule be Subgrade Compaction parameter detecting type, frequency detecting rule is that 200 meters of two-way traffics detect 4 points, then System calculates automatically according to above data needs amount detection for 40 points, forms a corresponding Detection task list;
Step 5 receives Engineering Division Detection task by testing inspection system, is found respectively according to the type of detection parameters The Detection task list for needing to detect the parameter under node is detected according to task form and is filled in data, and test data is certainly It is dynamic to be passed to corresponding WBS procedure-node and apply for checking and examination.
In a preferred embodiment, the creation mode of the WBS division example in the step 1 is specific as follows: previously according to There is the WBS of WBS tree hierarchical relationship to divide template for professional standard creation, and it includes a plurality of WBS moulds that each WBS, which divides template, Plate node, and the WBS instant node title needed according to WBS every template node modification, realize that WBS divides the creation of example;
Wherein, the WBS every template node is created according to tree structure form, is at least wrapped from high to low by level Include stage node locating for contract section node, engineering, construction unit node, partitioned project node, subdivisional work node, sub- subitem work Cheng Jiedian and working procedure node, the WBS every template node determine whether the working procedure in most sub- grade according to the actual situation Subunit node and sub- branch's node are added before node.
The professional standard is highway engineering, municipal works, marine traffic engineering, house construction engineering, railway engineering, track friendship The professional standard of logical engineering, hydraulic and hydroelectric engineering or nuclear power engineering setting.
The present invention is using WBS plan as key foundation, according to the difference of engineering type, the detection test of various types procedure-node Parameter and the otherness for detecting frequency preset WBS procedure-node parameter detecting rule and detection frequency rule, pass through WBS Node division executes starting to distribute testing inspection task, starts Test Detection Work, and testing inspection system receives corresponding examination It tests Detection task and testing inspection result is returned into corresponding WBS node, test data is passed to WBS procedure-node automatically and applies for checking and examination, nothing Association need to be manually searched, data can be realized and trace to the source, reduces manual operation bring error rate, it is ensured that engineering entity was being built Testing inspection frequency, the authenticity and accuracy of testing inspection data in journey improve engineering efficiency.
Although specific embodiments of the present invention have been described above, those familiar with the art should be managed Solution, we are merely exemplary described specific embodiment, rather than for the restriction to the scope of the present invention, it is familiar with this The technical staff in field should be covered of the invention according to modification and variation equivalent made by spirit of the invention In scope of the claimed protection.

Claims (6)

1. a kind of engineering test task start method divided based on WBS, characterized by the following steps:
Step 1, creation WBS instance system, the interior WBS instance system includes that WBS divides example, and each WBS divides real Example includes a plurality of WBS instant nodes with hierarchical relationship;
Step 2, the parameter detecting being arranged in system in advance under each instant node according to professional standard rule, the parameter inspection Gauge then includes specifying parameter type to be detected to specific component;
Step 3, the frequency detecting being arranged under each WBS instant node in system rule;
Step 4 fills in the WBS division actual engineering quantity of example, and star up engineering divides Detection task, and system is according to the work filled in Number of passes amount, parameter detecting rule and frequency detecting rule calculate the inspection of the parameter to be detected of specific component under each node automatically Quantitation forms corresponding Detection task list under node;
Step 5 receives Engineering Division Detection task by testing inspection system, finds each node according to the type of detection parameters The lower Detection task list for needing to detect the parameter, is detected according to task form and is filled in data, test data passes automatically Enter WBS procedure-node to apply for checking and examination.
2. the engineering test task start method according to claim 1 divided based on WBS, it is characterised in that: the step The creation mode that WBS in rapid 1 divides example is specific as follows: having WBS tree hierarchical relationship previously according to professional standard creation WBS divides template, and it includes a plurality of WBS every template nodes that each WBS, which divides template, and is repaired according to the WBS every template node Change the WBS instant node title of needs, realizes that WBS divides the creation of example;
Wherein, the WBS every template node is created according to tree structure form, includes at least conjunction from high to low by level Stage node, construction unit node locating for same Duan Jiedian, engineering, partitioned project node, subdivisional work node, sub- subdivisional work section Point and working procedure node, the WBS every template node determine whether the working procedure node in most sub- grade according to the actual situation Before add subunit node and sub- branch's node.
3. the engineering test task start method according to claim 1 or 2 divided based on WBS, it is characterised in that: described The professional standard is highway engineering, municipal works, marine traffic engineering, house construction engineering, railway engineering, railway traffic engineering, water conservancy Hydroelectric project or the professional standard of nuclear power engineering setting.
4. a kind of computer equipment including memory, processor and stores the meter that can be run on a memory and on a processor Calculation machine program, it is characterised in that: the processor realizes following procedure when executing described program:
Step 1, creation WBS instance system, the interior WBS instance system includes that WBS divides example, and each WBS divides real Example includes a plurality of WBS instant nodes with hierarchical relationship;
Step 2, the parameter detecting being arranged in system in advance under each instant node according to professional standard rule, the parameter inspection Gauge then includes specifying parameter type to be detected to specific component;
Step 3, the frequency detecting being arranged under each WBS instant node in system rule;
Step 4 fills in the WBS division actual engineering quantity of example, and star up engineering divides Detection task, and system is according to the work filled in Number of passes amount, parameter detecting rule and frequency detecting rule calculate the inspection of the parameter to be detected of specific component under each node automatically Quantitation forms corresponding Detection task list under node;
Step 5 receives Engineering Division Detection task by testing inspection system, finds each node according to the type of detection parameters The lower Detection task list for needing to detect the parameter, is detected according to task form and is filled in data, test data passes automatically Enter WBS procedure-node to apply for checking and examination.
5. computer equipment according to claim 1, it is characterised in that: the WBS in the step 1 divides the creation of example Mode is specific as follows: previously according to professional standard creation there is the WBS of WBS tree hierarchical relationship to divide template, each WBS is drawn Point template includes a plurality of WBS every template nodes, and the WBS instant node title needed according to WBS every template node modification, real Existing WBS divides the creation of example;
Wherein, the WBS every template node is created according to tree structure form, includes at least conjunction from high to low by level Stage node, construction unit node locating for same Duan Jiedian, engineering, partitioned project node, subdivisional work node, sub- subdivisional work section Point and working procedure node, the WBS every template node determine whether the working procedure node in most sub- grade according to the actual situation Before add subunit node and sub- branch's node.
6. computer equipment according to claim 4 or 5, it is characterised in that: the professional standard be highway engineering, What municipal works, marine traffic engineering, house construction engineering, railway engineering, railway traffic engineering, hydraulic and hydroelectric engineering or nuclear power engineering were set Professional standard.
CN201811636562.XA 2018-12-29 2018-12-29 Engineering test task starting method based on WBS division and computer equipment Active CN109767104B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811636562.XA CN109767104B (en) 2018-12-29 2018-12-29 Engineering test task starting method based on WBS division and computer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811636562.XA CN109767104B (en) 2018-12-29 2018-12-29 Engineering test task starting method based on WBS division and computer equipment

Publications (2)

Publication Number Publication Date
CN109767104A true CN109767104A (en) 2019-05-17
CN109767104B CN109767104B (en) 2023-02-28

Family

ID=66453051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811636562.XA Active CN109767104B (en) 2018-12-29 2018-12-29 Engineering test task starting method based on WBS division and computer equipment

Country Status (1)

Country Link
CN (1) CN109767104B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116127137A (en) * 2022-11-15 2023-05-16 蜀道投资集团有限责任公司 Highway engineering structure tree construction method, electronic equipment and computer readable medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050149573A1 (en) * 2000-05-09 2005-07-07 Serrano-Morales Carlos A. Approach for re-using business rules
CN103377411A (en) * 2012-04-27 2013-10-30 国际商业机器公司 Method and system for generating WBS model data
CN105160406A (en) * 2015-09-02 2015-12-16 中联重科股份有限公司 Detection data processing method, apparatus and system of engineering mechanical equipment
CN107622355A (en) * 2017-09-30 2018-01-23 长江勘测规划设计研究有限责任公司 Project cluster work progress digital management system and method
CN108563206A (en) * 2018-04-17 2018-09-21 西安交通大学 A kind of production process control method based on flow instance

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050149573A1 (en) * 2000-05-09 2005-07-07 Serrano-Morales Carlos A. Approach for re-using business rules
CN103377411A (en) * 2012-04-27 2013-10-30 国际商业机器公司 Method and system for generating WBS model data
CN105160406A (en) * 2015-09-02 2015-12-16 中联重科股份有限公司 Detection data processing method, apparatus and system of engineering mechanical equipment
CN107622355A (en) * 2017-09-30 2018-01-23 长江勘测规划设计研究有限责任公司 Project cluster work progress digital management system and method
CN108563206A (en) * 2018-04-17 2018-09-21 西安交通大学 A kind of production process control method based on flow instance

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116127137A (en) * 2022-11-15 2023-05-16 蜀道投资集团有限责任公司 Highway engineering structure tree construction method, electronic equipment and computer readable medium
CN116127137B (en) * 2022-11-15 2023-12-08 蜀道投资集团有限责任公司 Highway engineering structure tree construction method, electronic equipment and computer readable medium

Also Published As

Publication number Publication date
CN109767104B (en) 2023-02-28

Similar Documents

Publication Publication Date Title
CN102033969B (en) Water supply network management system and method
CN110263416A (en) A kind of gas ductwork leakage detection method and device based on emulation technology
CN111062081A (en) Underground continuous wall construction method based on BIM technology
CN111191307B (en) Earthwork virtual construction method based on BIM+GIS technology
CN108843977A (en) The real-time leakage loss analysis method of water supply network, equipment, system and storage medium
CN109711645B (en) Pipeline construction data management system and method based on two-dimensional code
CN115218129A (en) Water supply network leakage monitoring method, computer device and storage medium
KR102496592B1 (en) System and method for managing earthwork data, and a recording medium having computer readable program for executing the method
CN109800502A (en) A kind of zone marker method, apparatus and electronic equipment
CN108020649A (en) A kind of method of definite karst big spring feed channel and intensity
CN109784840A (en) A kind of construction survey automatic data collection processing method being associated with engineering structure task
CN109767104A (en) The engineering test task start method and computer equipment divided based on WBS
CN108491403B (en) ArcGIS-based site selection method for mountainous area construction land
KR101097414B1 (en) Pipe vibration estimation method
Mair et al. Improving incomplete water distribution system data
CN107832424A (en) A kind of Underground Pipeline Data nucleus correcting system and method
Gransberg Using a New Zealand performance specification to evaluate US chip seal performance
CN111091235A (en) Method and device for determining incoming and outgoing line paths of substation area of transformer substation
Wang et al. A real-time online structure-safety analysis approach consistent with dynamic construction schedule of underground caverns
CN110634186A (en) Arch cover method underground excavation construction method based on BIM
CN113627877A (en) Hydrogeological analysis method and device for mountain comprehensive pipe gallery and storage medium
CN117236723B (en) Method and device for defining surrounding environment influence range of karst region construction engineering construction
CN103883883B (en) A kind of non-technical water water balance test method
CN115267861B (en) Automatic driving fusion positioning precision testing method and device and electronic equipment
CN115170750B (en) Runoff simulation correction method and system for 3D water environment map

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant