CN109767104A - The engineering test task start method and computer equipment divided based on WBS - Google Patents
The engineering test task start method and computer equipment divided based on WBS Download PDFInfo
- Publication number
- CN109767104A CN109767104A CN201811636562.XA CN201811636562A CN109767104A CN 109767104 A CN109767104 A CN 109767104A CN 201811636562 A CN201811636562 A CN 201811636562A CN 109767104 A CN109767104 A CN 109767104A
- Authority
- CN
- China
- Prior art keywords
- wbs
- node
- engineering
- divides
- parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention provides a kind of engineering test task start method divided based on WBS, comprising: creates the WBS instance system that example is divided with WBS, it includes multiple WBS instant nodes with hierarchical relationship that every WBS, which divides example,;Parameter detecting rule under each instant node is set in system in advance according to professional standard;Frequency detecting rule under each WBS instant node is set in the system;It fills in WBS and divides the actual engineering quantity of example, star up engineering divides Detection task, system calculates the amount detection of the parameter to be detected of specific component under each node according to engineering quantity, parameter detecting rule and frequency detecting rule automatically, forms Detection task list;Engineering Division Detection task is received by testing inspection system, the Detection task list for needing to detect the parameter under each node is found according to the type of detection parameters, it is detected according to task form and fills in data, test data is passed to WBS procedure-node automatically and applies for checking and examination, realize that data are traced to the source, it is ensured that data are true, accurate.
Description
Technical field
The present invention relates to a kind of engineering test task start methods and computer equipment divided based on WBS.
Background technique
In construction projects, testing inspection planning system and engineering unit branch subitem system are separation, according to engineering
Unit branch subitem system partition time publication Detection task gives testing inspection system, and testing inspection system starts to be examined later
It surveys, and all the elements detected is all sent to engineering unit branch subitem system, by engineering unit branch subitem system
Association saves one by one, and such engineering detecting data can not be traceable to the specific portion of corresponding engineering, and artificial judgement is associated with manual
Coherent detection data are to engineering entity position, this detection method, exist to the objectivity, authenticity, accuracy of detection data
Certain disturbing factor.
Summary of the invention
One of the technical problem to be solved in the present invention is to provide a kind of based on the test of engineering type WBS partition structure tree
The method of task start, it is automatic to realize that data are traced to the source, it is ensured that objectivity, authenticity, the accuracy of detection data.
One of the technical problem to be solved in the present invention is achieved in that a kind of based on engineering type WBS partition structure tree
The method of test mission starting, includes the following steps:
Step 1, creation WBS instance system, the interior WBS instance system includes that WBS divides example, and each WBS is drawn
Point example includes a plurality of WBS instant nodes with hierarchical relationship;
Step 2, the parameter detecting being arranged in system in advance under each instant node according to professional standard rule, the ginseng
Number detected rule includes specifying parameter type to be detected to specific component;
Step 3, the frequency detecting being arranged under each WBS instant node in system rule;
Step 4 fills in WBS and divides the actual engineering quantity of example, and star up engineering divides Detection task, and system is according to filling in
Engineering quantity, parameter detecting rule and frequency detecting rule calculate the parameter to be detected of specific component under each node automatically
Amount detection, formed node under corresponding Detection task list;
Step 5 receives Engineering Division Detection task by testing inspection system, is found respectively according to the type of detection parameters
The Detection task list for needing to detect the parameter under node is detected according to task form and is filled in data, and test data is certainly
It is dynamic to be passed to corresponding WBS procedure-node and apply for checking and examination.
Further, the creation mode of the WBS division example in the step 1 is specific as follows: previously according to professional standard
Creating, there is the WBS of WBS tree hierarchical relationship to divide template, and it includes a plurality of WBS every template nodes that each WBS, which divides template,
And the WBS instant node title needed according to WBS every template node modification, realize that WBS divides the creation of example;
Wherein, the WBS every template node is created according to tree structure form, is at least wrapped from high to low by level
Include stage node locating for contract section node, engineering, construction unit node, partitioned project node, subdivisional work node, sub- subitem work
Cheng Jiedian and working procedure node, the WBS every template node determine whether the working procedure in most sub- grade according to the actual situation
Subunit node and sub- branch's node are added before node.
Further, the professional standard is highway engineering, municipal works, marine traffic engineering, house construction engineering, railway work
Journey, railway traffic engineering, hydraulic and hydroelectric engineering or the professional standard of nuclear power engineering setting.
The second technical problem to be solved by the present invention is to provide a kind of base computer equipment, automatic to realize that data are traced to the source,
Ensure the objectivity, authenticity, accuracy of detection data.
The second technical problem to be solved by the present invention is achieved in that a kind of computer equipment, including memory, processing
On a memory and the computer program that can run on a processor, when processor execution described program, is realized for device and storage
Following procedure:
Step 1, creation WBS instance system, the interior WBS instance system includes that WBS divides example, and each WBS is drawn
Point example includes a plurality of WBS instant nodes with hierarchical relationship;
Step 2, the parameter detecting being arranged in system in advance under each instant node according to professional standard rule, the ginseng
Number detected rule includes specifying parameter type to be detected to specific component;
Step 3, the frequency detecting being arranged under each WBS instant node in system rule;
Step 4 fills in WBS and divides the actual engineering quantity of example, and star up engineering divides Detection task, and system is according to filling in
Engineering quantity, parameter detecting rule and frequency detecting rule calculate the parameter to be detected of specific component under each node automatically
Amount detection, formed node under corresponding Detection task list;
Step 5 receives Engineering Division Detection task by testing inspection system, is found respectively according to the type of detection parameters
The Detection task list for needing to detect the parameter under node is detected according to task form and is filled in data, and test data is certainly
It is dynamic to be passed to corresponding WBS procedure-node and apply for checking and examination.
Further, the creation mode of the WBS division example in the step 1 is specific as follows: previously according to professional standard
Creating, there is the WBS of WBS tree hierarchical relationship to divide template, and it includes a plurality of WBS every template nodes that each WBS, which divides template,
And the WBS instant node title needed according to WBS every template node modification, realize that WBS divides the creation of example;
Wherein, the WBS every template node is created according to tree structure form, is at least wrapped from high to low by level
Include stage node locating for contract section node, engineering, construction unit node, partitioned project node, subdivisional work node, sub- subitem work
Cheng Jiedian and working procedure node, the WBS every template node determine whether the working procedure in most sub- grade according to the actual situation
Subunit node and sub- branch's node are added before node.
Further, the professional standard is highway engineering, municipal works, marine traffic engineering, house construction engineering, railway work
Journey, railway traffic engineering, hydraulic and hydroelectric engineering or the professional standard of nuclear power engineering setting.
The present invention has the advantage that using WBS plan as key foundation, according to the difference of engineering type, various types work
Sequence nodal test test parameters and the otherness for detecting frequency, setting WBS procedure-node parameter detecting rule, pass through WBS node
It divides and executes starting to distribute testing inspection task, start Test Detection Work, testing inspection system receives corresponding test inspection
Testing inspection result is simultaneously returned to corresponding WBS node by survey task, and test data is passed to WBS procedure-node automatically and applies for checking and examination, it is ensured that work
Cheng Shiti testing inspection frequency, the authenticity of testing inspection data in building course.
Detailed description of the invention
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the method for the present invention execution flow chart.
Specific embodiment
As shown in Figure 1, a kind of engineering test task start method divided based on WBS of the invention, is included the following steps:
Step 1, creation WBS instance system, the interior WBS instance system includes that WBS divides example, and each WBS is drawn
Point example includes a plurality of WBS instant nodes with hierarchical relationship;
Step 2, the parameter detecting being arranged in system in advance under each instant node according to professional standard rule, the ginseng
Number detected rule includes that parameter type to be detected, such as the concreting under a certain highway engineering are specified to specific component
Parameter type to be detected, which is arranged, in node Subgrade Compaction etc.;
Step 3, the frequency detecting being arranged under each WBS instant node in system rule, such as in a certain coagulation
Soil pours under node, by specification one frequency detecting rule of setting are as follows: 200 meters of two-way traffics detect 4 Subgrade Compactions;
Step 4 fills in WBS and divides the actual engineering quantity of example, and star up engineering divides Detection task, and system is according to filling in
Engineering quantity, parameter detecting rule and frequency detecting rule calculate the parameter to be detected of specific component under each node automatically
Amount detection, formed node under corresponding Detection task list, such as according to an engineering quantity be 1km Four-Lane Road, correspond to
Parameter detecting rule be Subgrade Compaction parameter detecting type, frequency detecting rule is that 200 meters of two-way traffics detect 4 points, then
System calculates automatically according to above data needs amount detection for 40 points, forms a corresponding Detection task list;
Step 5 receives Engineering Division Detection task by testing inspection system, is found respectively according to the type of detection parameters
The Detection task list for needing to detect the parameter under node is detected according to task form and is filled in data, and test data is certainly
It is dynamic to be passed to corresponding WBS procedure-node and apply for checking and examination.
In a preferred embodiment, the creation mode of the WBS division example in the step 1 is specific as follows: previously according to
There is the WBS of WBS tree hierarchical relationship to divide template for professional standard creation, and it includes a plurality of WBS moulds that each WBS, which divides template,
Plate node, and the WBS instant node title needed according to WBS every template node modification, realize that WBS divides the creation of example;
Wherein, the WBS every template node is created according to tree structure form, is at least wrapped from high to low by level
Include stage node locating for contract section node, engineering, construction unit node, partitioned project node, subdivisional work node, sub- subitem work
Cheng Jiedian and working procedure node, the WBS every template node determine whether the working procedure in most sub- grade according to the actual situation
Subunit node and sub- branch's node are added before node.
The professional standard is highway engineering, municipal works, marine traffic engineering, house construction engineering, railway engineering, track friendship
The professional standard of logical engineering, hydraulic and hydroelectric engineering or nuclear power engineering setting.
Method based on aforementioned present invention, computer equipment of the invention are achieved in that a kind of computer equipment, packet
The computer program that includes memory, processor and storage on a memory and can run on a processor, the processor execute
Following procedure is realized when described program:
Step 1, creation WBS instance system, the interior WBS instance system includes that WBS divides example, and each WBS is drawn
Point example includes a plurality of WBS instant nodes with hierarchical relationship;
Step 2, the parameter detecting being arranged in system in advance under each instant node according to professional standard rule, the ginseng
Number detected rule includes that parameter type to be detected, such as the concreting under a certain highway engineering are specified to specific component
Parameter type to be detected, which is arranged, in node Subgrade Compaction etc.;
Step 3, the frequency detecting being arranged under each WBS instant node in system rule, such as in a certain coagulation
Soil pours under node, by specification one frequency detecting rule of setting are as follows: 200 meters of two-way traffics detect 4 Subgrade Compactions;
Step 4 fills in WBS and divides the actual engineering quantity of example, and star up engineering divides Detection task, and system is according to filling in
Engineering quantity, parameter detecting rule and frequency detecting rule calculate the parameter to be detected of specific component under each node automatically
Amount detection, formed node under corresponding Detection task list, such as according to an engineering quantity be 1km Four-Lane Road, correspond to
Parameter detecting rule be Subgrade Compaction parameter detecting type, frequency detecting rule is that 200 meters of two-way traffics detect 4 points, then
System calculates automatically according to above data needs amount detection for 40 points, forms a corresponding Detection task list;
Step 5 receives Engineering Division Detection task by testing inspection system, is found respectively according to the type of detection parameters
The Detection task list for needing to detect the parameter under node is detected according to task form and is filled in data, and test data is certainly
It is dynamic to be passed to corresponding WBS procedure-node and apply for checking and examination.
In a preferred embodiment, the creation mode of the WBS division example in the step 1 is specific as follows: previously according to
There is the WBS of WBS tree hierarchical relationship to divide template for professional standard creation, and it includes a plurality of WBS moulds that each WBS, which divides template,
Plate node, and the WBS instant node title needed according to WBS every template node modification, realize that WBS divides the creation of example;
Wherein, the WBS every template node is created according to tree structure form, is at least wrapped from high to low by level
Include stage node locating for contract section node, engineering, construction unit node, partitioned project node, subdivisional work node, sub- subitem work
Cheng Jiedian and working procedure node, the WBS every template node determine whether the working procedure in most sub- grade according to the actual situation
Subunit node and sub- branch's node are added before node.
The professional standard is highway engineering, municipal works, marine traffic engineering, house construction engineering, railway engineering, track friendship
The professional standard of logical engineering, hydraulic and hydroelectric engineering or nuclear power engineering setting.
The present invention is using WBS plan as key foundation, according to the difference of engineering type, the detection test of various types procedure-node
Parameter and the otherness for detecting frequency preset WBS procedure-node parameter detecting rule and detection frequency rule, pass through WBS
Node division executes starting to distribute testing inspection task, starts Test Detection Work, and testing inspection system receives corresponding examination
It tests Detection task and testing inspection result is returned into corresponding WBS node, test data is passed to WBS procedure-node automatically and applies for checking and examination, nothing
Association need to be manually searched, data can be realized and trace to the source, reduces manual operation bring error rate, it is ensured that engineering entity was being built
Testing inspection frequency, the authenticity and accuracy of testing inspection data in journey improve engineering efficiency.
Although specific embodiments of the present invention have been described above, those familiar with the art should be managed
Solution, we are merely exemplary described specific embodiment, rather than for the restriction to the scope of the present invention, it is familiar with this
The technical staff in field should be covered of the invention according to modification and variation equivalent made by spirit of the invention
In scope of the claimed protection.
Claims (6)
1. a kind of engineering test task start method divided based on WBS, characterized by the following steps:
Step 1, creation WBS instance system, the interior WBS instance system includes that WBS divides example, and each WBS divides real
Example includes a plurality of WBS instant nodes with hierarchical relationship;
Step 2, the parameter detecting being arranged in system in advance under each instant node according to professional standard rule, the parameter inspection
Gauge then includes specifying parameter type to be detected to specific component;
Step 3, the frequency detecting being arranged under each WBS instant node in system rule;
Step 4 fills in the WBS division actual engineering quantity of example, and star up engineering divides Detection task, and system is according to the work filled in
Number of passes amount, parameter detecting rule and frequency detecting rule calculate the inspection of the parameter to be detected of specific component under each node automatically
Quantitation forms corresponding Detection task list under node;
Step 5 receives Engineering Division Detection task by testing inspection system, finds each node according to the type of detection parameters
The lower Detection task list for needing to detect the parameter, is detected according to task form and is filled in data, test data passes automatically
Enter WBS procedure-node to apply for checking and examination.
2. the engineering test task start method according to claim 1 divided based on WBS, it is characterised in that: the step
The creation mode that WBS in rapid 1 divides example is specific as follows: having WBS tree hierarchical relationship previously according to professional standard creation
WBS divides template, and it includes a plurality of WBS every template nodes that each WBS, which divides template, and is repaired according to the WBS every template node
Change the WBS instant node title of needs, realizes that WBS divides the creation of example;
Wherein, the WBS every template node is created according to tree structure form, includes at least conjunction from high to low by level
Stage node, construction unit node locating for same Duan Jiedian, engineering, partitioned project node, subdivisional work node, sub- subdivisional work section
Point and working procedure node, the WBS every template node determine whether the working procedure node in most sub- grade according to the actual situation
Before add subunit node and sub- branch's node.
3. the engineering test task start method according to claim 1 or 2 divided based on WBS, it is characterised in that: described
The professional standard is highway engineering, municipal works, marine traffic engineering, house construction engineering, railway engineering, railway traffic engineering, water conservancy
Hydroelectric project or the professional standard of nuclear power engineering setting.
4. a kind of computer equipment including memory, processor and stores the meter that can be run on a memory and on a processor
Calculation machine program, it is characterised in that: the processor realizes following procedure when executing described program:
Step 1, creation WBS instance system, the interior WBS instance system includes that WBS divides example, and each WBS divides real
Example includes a plurality of WBS instant nodes with hierarchical relationship;
Step 2, the parameter detecting being arranged in system in advance under each instant node according to professional standard rule, the parameter inspection
Gauge then includes specifying parameter type to be detected to specific component;
Step 3, the frequency detecting being arranged under each WBS instant node in system rule;
Step 4 fills in the WBS division actual engineering quantity of example, and star up engineering divides Detection task, and system is according to the work filled in
Number of passes amount, parameter detecting rule and frequency detecting rule calculate the inspection of the parameter to be detected of specific component under each node automatically
Quantitation forms corresponding Detection task list under node;
Step 5 receives Engineering Division Detection task by testing inspection system, finds each node according to the type of detection parameters
The lower Detection task list for needing to detect the parameter, is detected according to task form and is filled in data, test data passes automatically
Enter WBS procedure-node to apply for checking and examination.
5. computer equipment according to claim 1, it is characterised in that: the WBS in the step 1 divides the creation of example
Mode is specific as follows: previously according to professional standard creation there is the WBS of WBS tree hierarchical relationship to divide template, each WBS is drawn
Point template includes a plurality of WBS every template nodes, and the WBS instant node title needed according to WBS every template node modification, real
Existing WBS divides the creation of example;
Wherein, the WBS every template node is created according to tree structure form, includes at least conjunction from high to low by level
Stage node, construction unit node locating for same Duan Jiedian, engineering, partitioned project node, subdivisional work node, sub- subdivisional work section
Point and working procedure node, the WBS every template node determine whether the working procedure node in most sub- grade according to the actual situation
Before add subunit node and sub- branch's node.
6. computer equipment according to claim 4 or 5, it is characterised in that: the professional standard be highway engineering,
What municipal works, marine traffic engineering, house construction engineering, railway engineering, railway traffic engineering, hydraulic and hydroelectric engineering or nuclear power engineering were set
Professional standard.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811636562.XA CN109767104B (en) | 2018-12-29 | 2018-12-29 | Engineering test task starting method based on WBS division and computer equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811636562.XA CN109767104B (en) | 2018-12-29 | 2018-12-29 | Engineering test task starting method based on WBS division and computer equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109767104A true CN109767104A (en) | 2019-05-17 |
CN109767104B CN109767104B (en) | 2023-02-28 |
Family
ID=66453051
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811636562.XA Active CN109767104B (en) | 2018-12-29 | 2018-12-29 | Engineering test task starting method based on WBS division and computer equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109767104B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116127137A (en) * | 2022-11-15 | 2023-05-16 | 蜀道投资集团有限责任公司 | Highway engineering structure tree construction method, electronic equipment and computer readable medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050149573A1 (en) * | 2000-05-09 | 2005-07-07 | Serrano-Morales Carlos A. | Approach for re-using business rules |
CN103377411A (en) * | 2012-04-27 | 2013-10-30 | 国际商业机器公司 | Method and system for generating WBS model data |
CN105160406A (en) * | 2015-09-02 | 2015-12-16 | 中联重科股份有限公司 | Detection data processing method, apparatus and system of engineering mechanical equipment |
CN107622355A (en) * | 2017-09-30 | 2018-01-23 | 长江勘测规划设计研究有限责任公司 | Project cluster work progress digital management system and method |
CN108563206A (en) * | 2018-04-17 | 2018-09-21 | 西安交通大学 | A kind of production process control method based on flow instance |
-
2018
- 2018-12-29 CN CN201811636562.XA patent/CN109767104B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050149573A1 (en) * | 2000-05-09 | 2005-07-07 | Serrano-Morales Carlos A. | Approach for re-using business rules |
CN103377411A (en) * | 2012-04-27 | 2013-10-30 | 国际商业机器公司 | Method and system for generating WBS model data |
CN105160406A (en) * | 2015-09-02 | 2015-12-16 | 中联重科股份有限公司 | Detection data processing method, apparatus and system of engineering mechanical equipment |
CN107622355A (en) * | 2017-09-30 | 2018-01-23 | 长江勘测规划设计研究有限责任公司 | Project cluster work progress digital management system and method |
CN108563206A (en) * | 2018-04-17 | 2018-09-21 | 西安交通大学 | A kind of production process control method based on flow instance |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116127137A (en) * | 2022-11-15 | 2023-05-16 | 蜀道投资集团有限责任公司 | Highway engineering structure tree construction method, electronic equipment and computer readable medium |
CN116127137B (en) * | 2022-11-15 | 2023-12-08 | 蜀道投资集团有限责任公司 | Highway engineering structure tree construction method, electronic equipment and computer readable medium |
Also Published As
Publication number | Publication date |
---|---|
CN109767104B (en) | 2023-02-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102033969B (en) | Water supply network management system and method | |
CN110263416A (en) | A kind of gas ductwork leakage detection method and device based on emulation technology | |
CN111062081A (en) | Underground continuous wall construction method based on BIM technology | |
CN111191307B (en) | Earthwork virtual construction method based on BIM+GIS technology | |
CN108843977A (en) | The real-time leakage loss analysis method of water supply network, equipment, system and storage medium | |
CN109711645B (en) | Pipeline construction data management system and method based on two-dimensional code | |
CN115218129A (en) | Water supply network leakage monitoring method, computer device and storage medium | |
KR102496592B1 (en) | System and method for managing earthwork data, and a recording medium having computer readable program for executing the method | |
CN109800502A (en) | A kind of zone marker method, apparatus and electronic equipment | |
CN108020649A (en) | A kind of method of definite karst big spring feed channel and intensity | |
CN109784840A (en) | A kind of construction survey automatic data collection processing method being associated with engineering structure task | |
CN109767104A (en) | The engineering test task start method and computer equipment divided based on WBS | |
CN108491403B (en) | ArcGIS-based site selection method for mountainous area construction land | |
KR101097414B1 (en) | Pipe vibration estimation method | |
Mair et al. | Improving incomplete water distribution system data | |
CN107832424A (en) | A kind of Underground Pipeline Data nucleus correcting system and method | |
Gransberg | Using a New Zealand performance specification to evaluate US chip seal performance | |
CN111091235A (en) | Method and device for determining incoming and outgoing line paths of substation area of transformer substation | |
Wang et al. | A real-time online structure-safety analysis approach consistent with dynamic construction schedule of underground caverns | |
CN110634186A (en) | Arch cover method underground excavation construction method based on BIM | |
CN113627877A (en) | Hydrogeological analysis method and device for mountain comprehensive pipe gallery and storage medium | |
CN117236723B (en) | Method and device for defining surrounding environment influence range of karst region construction engineering construction | |
CN103883883B (en) | A kind of non-technical water water balance test method | |
CN115267861B (en) | Automatic driving fusion positioning precision testing method and device and electronic equipment | |
CN115170750B (en) | Runoff simulation correction method and system for 3D water environment map |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |