CN107832424A - A kind of Underground Pipeline Data nucleus correcting system and method - Google Patents
A kind of Underground Pipeline Data nucleus correcting system and method Download PDFInfo
- Publication number
- CN107832424A CN107832424A CN201711113895.XA CN201711113895A CN107832424A CN 107832424 A CN107832424 A CN 107832424A CN 201711113895 A CN201711113895 A CN 201711113895A CN 107832424 A CN107832424 A CN 107832424A
- Authority
- CN
- China
- Prior art keywords
- data
- underground pipeline
- pipeline data
- inspection
- topological relation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 28
- 238000007689 inspection Methods 0.000 claims abstract description 63
- 230000002159 abnormal effect Effects 0.000 claims abstract description 23
- 230000008676 import Effects 0.000 claims abstract description 18
- 238000012216 screening Methods 0.000 claims description 3
- 230000005856 abnormality Effects 0.000 claims description 2
- 230000001568 sexual effect Effects 0.000 claims description 2
- 238000012986 modification Methods 0.000 description 4
- 230000004048 modification Effects 0.000 description 4
- 238000012552 review Methods 0.000 description 4
- 238000011835 investigation Methods 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 239000003034 coal gas Substances 0.000 description 1
- 239000000567 combustion gas Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/248—Presentation of query results
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
- G06F16/258—Data format conversion from or to a database
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Databases & Information Systems (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Primary Health Care (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Human Resources & Organizations (AREA)
- General Health & Medical Sciences (AREA)
- Health & Medical Sciences (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Computational Linguistics (AREA)
- Pipeline Systems (AREA)
Abstract
This application provides a kind of Underground Pipeline Data nucleus correcting system and method, including:Data import modul, for obtaining Underground Pipeline Data;Database, for receiving and preserving Underground Pipeline Data;Topological relation checks module, for carrying out topological relation inspection to the Underground Pipeline Data, judges that the Underground Pipeline Data is abnormal with the presence or absence of topological relation;Data integrity checks module, for carrying out data integrity inspection to the Underground Pipeline Data, judges that the Underground Pipeline Data is abnormal with the presence or absence of data integrity;Data outliers check module, for carrying out data outliers inspection to the Underground Pipeline Data, judge that the Underground Pipeline Data whether there is data outliers;Problem report generation module, for abnormal topological relation, data integrity exception or data outliers be present when the Underground Pipeline Data, generate data problem form.Underground Pipeline Data nucleus correcting system disclosed in the present application and method, ensure the accuracy and integrality of data.
Description
Technical field
The application is related to underground pipeline information technical field, more particularly to a kind of Underground Pipeline Data nucleus correcting system and side
Method.
Background technology
City Buried Pipeline is the important component of infrastructure, is the material base that city is depended on for existence and development,
It is referred to as " lifeline " in city.Because the underground piping of the government utility such as water, oil, coal gas, telecommunications, cable is all in ground surface
Under lay crisscrossly, cause the intricate of subterranean pipe line network.In urban construction, often there is gas pipe, originally
The underground utilities such as water pipe, communication cable are dug disconnected.To ensure the safety in utilization of underground utilities, improve underground utilities dynamic and manage
Correctness and validity, it is necessary to improve the quality control of Underground Pipeline Data.
Existing Underground Pipeline Data acquisition method:Pipeline surveying personnel by recorded on mobile device generaI investigation pipe point or
The attribute information of pipeline.Although sense of responsibility and careful degree of the real reliability of pipeline information dependent on census enumerator,
A small number of pipeline informations are still suffered from due to census enumerator itself fills in or operated error situation caused by the reason such as lack of standardization.For this
Class error in data, comprehensively reliable check process carrys out calibration data to neither one on mobile device.It is and complete in data acquisition
Cheng Hou, before owner's unit is submitted to, lack specialization, the pipeline data nucleus correcting system of procedure carries out data
Further check, so as to which problem present in data can not be found in time.
The content of the invention
This application provides a kind of Underground Pipeline Data nucleus correcting system and method, facilitate the check of Underground Pipeline Data, carry
The correctness and validity of high Underground Pipeline Data.
According to the embodiment of the present application in a first aspect, this application provides a kind of Underground Pipeline Data nucleus correcting system, it is used for
Underground Pipeline Data is checked, and the system includes:
Data import modul, for obtaining Underground Pipeline Data;
Database, for receiving and preserving the Underground Pipeline Data;
Topological relation checks module, for carrying out topological relation inspection to the Underground Pipeline Data, judges the underground
Pipeline data are abnormal with the presence or absence of topological relation;
Data integrity checks module, for carrying out data integrity inspection to the Underground Pipeline Data, described in judgement
Underground Pipeline Data is abnormal with the presence or absence of data integrity;
Data outliers check module, for carrying out data outliers inspection to the Underground Pipeline Data, described in judgement
Underground Pipeline Data whether there is data outliers;
Problem report generation module, for topological relation to be abnormal, data integrity is different when the Underground Pipeline Data is present
Normal or data outliers, generate data problem form.
Optionally, in above-mentioned Underground Pipeline Data nucleus correcting system, the system also includes:
Line module, user's function is logged in and distinguished for user.
Optionally, in above-mentioned Underground Pipeline Data nucleus correcting system, the system also includes:
Abnormal examination selecting module is complete to the inspection of Underground Pipeline Data progress topological relation, data for selecting
Property inspection and/or data outliers inspection.
Optionally, in above-mentioned Underground Pipeline Data nucleus correcting system, the topological relation checks that module includes:
Topological relation checks selecting module, the project to be checked for screening topological relation inspection.
Optionally, in above-mentioned Underground Pipeline Data nucleus correcting system, the data integrity checks that module includes:
Data integrity checks selecting module, for the garbled data integrity checking project to be checked.
In above-mentioned Underground Pipeline Data nucleus correcting system, the data import modul includes:
Pipe point import modul, for obtaining the pipe point data in Underground Pipeline Data;
Pipeline import modul, for obtaining the pipeline data in Underground Pipeline Data.
According to the embodiment of the present application in a first aspect, checking system based on the Underground Pipeline Data that the embodiment of the present application provides
System, the embodiment of the present application additionally provide a kind of Underground Pipeline Data check method, the described method comprises the following steps:
Obtain Underground Pipeline Data;
Receive and preserve the Underground Pipeline Data;
Topological relation inspection is carried out to the Underground Pipeline Data, judges that the Underground Pipeline Data closes with the presence or absence of topology
System is abnormal;
Data integrity inspection is carried out to the Underground Pipeline Data, judges that the Underground Pipeline Data whether there is data
Complete sexual abnormality;
Data outliers inspection is carried out to the Underground Pipeline Data, judges that the Underground Pipeline Data whether there is data
Exceptional value;
When the Underground Pipeline Data has abnormal topological relation, data integrity exception or data outliers, generation number
According to problem form.
Optionally, it is described to receive and gone back after preserving the Underground Pipeline Data in above-mentioned Underground Pipeline Data check method
Including:
Selection carries out topological relation inspection, data integrity inspection and/or data outliers to the Underground Pipeline Data
Check.
Optionally, it is described that topological relation is carried out to the Underground Pipeline Data in above-mentioned Underground Pipeline Data check method
Also include before checking:
Screen the topological relation inspection project to be checked.
Optionally, it is described that data exception is carried out to the Underground Pipeline Data in above-mentioned Underground Pipeline Data check method
Value also includes before checking:
The garbled data integrity checking project to be checked.
From above technical method, a kind of Underground Pipeline Data nucleus correcting system and method that the application provides, by data
Import system, system carries out topological relation inspection, data integrity inspection or data outliers inspection to data, for problematic
Data creation data problem form.Census enumerator can carry out live review according to data problem form, according to showing for data
Field truth carries out the modification of initial data, and amended data are imported in data nucleus correcting system into the school for carrying out a new round
Core, check can be identified as final census data storehouse after passing through, and then ensure the accuracy and integrality of data.
It should be appreciated that the general description and following detailed description of the above are only exemplary and explanatory, not
The application can be limited.
Brief description of the drawings
In order to illustrate more clearly of the technical scheme of the application, letter will be made to the required accompanying drawing used in embodiment below
Singly introduce, it should be apparent that, for those of ordinary skills, without having to pay creative labor,
Other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of structural representation for Underground Pipeline Data nucleus correcting system that the embodiment of the present application provides;
Fig. 2 is a kind of structure flow chart for Underground Pipeline Data check method that the embodiment of the present application provides.
Embodiment
Here exemplary embodiment will be illustrated in detail, its example is illustrated in the accompanying drawings.Following description is related to
During accompanying drawing, unless otherwise indicated, the same numbers in different accompanying drawings represent same or analogous key element.Following exemplary embodiment
Described in embodiment do not represent and the consistent all embodiments of the present invention.On the contrary, they be only with it is such as appended
The example of the consistent apparatus and method of some aspects being described in detail in claims, of the invention.
Referring to accompanying drawing 1, the basic structure of the Underground Pipeline Data nucleus correcting system provided the figure shows the embodiment of the present application.
The Underground Pipeline Data nucleus correcting system that the embodiment of the present application provides includes data import modul 1, database 2, topological relation inspection
Module 3, data integrity check that module 4, data outliers check module 5 and problem report generation module 6.
Data import modul 1, for obtaining Underground Pipeline Data.Underground pipelines data include draining, feedwater, electric power, communication,
Combustion gas, heating power, industry and the major class of integrated pipe canal eight, each major class is again corresponding to include some groups, as shown in the table, but not office
It is limited to the form of following table:
Preferably, Underground Pipeline Data is imported with EXCEL or MDB etc. form.In the application embodiment,
The importing of data can be imported respectively according to different major classes.Pipe point and pipeline are Underground Pipeline Data important features, to fill
Its feature of partite transport, data import modul can be divided into pipe point import modul and pipeline import modul, pipe point import modul, for obtaining
Take the pipe point data in Underground Pipeline Data;Pipeline import modul, for obtaining the pipeline data in Underground Pipeline Data.
Database 2, for receiving and preserving the Underground Pipeline Data.After Underground Pipeline Data import system, preserve extremely
Database, data are checked, data are modified the problem of to after inspection, will finally be checked the data passed through and be preserved
To database, the final data for generaI investigation.
Topological relation checks module 3, for carrying out topological relation inspection to the Underground Pipeline Data, judges the underground
Pipeline data are abnormal with the presence or absence of topological relation.Topological relation inspection includes:With the presence or absence of coincidence pipe point;With the presence or absence of isolated pipe
Point;Pipeline is with the presence or absence of coincidence pipeline;Pipe point is numbered with the presence or absence of repetition;Pipeline is with the presence or absence of repetition numbering etc..
With the presence or absence of coincidence pipe point:Check in storage data with the presence or absence of pipe point is overlapped, overlap pipe point refer to two points away from
From less than certain setting value, such as:0.1cm, it is defaulted as two inspection shafts and overlaps.
With the presence or absence of isolated pipe point:Check that isolated pipe point, which refers to the point pipeline, not to be had with the presence or absence of isolated pipe point in storage data
With the presence of with other point pipeline annexations, be an acnode.
Pipeline is with the presence or absence of coincidence pipeline:Check in storage data with the presence or absence of pipeline is overlapped, overlap pipeline and refer to two pipes
The distance of line is less than certain setting value.
Pipe point is numbered with the presence or absence of repetition:Check in depositary management point data and numbered with the presence or absence of repetition, the pipe in database
Point data and pipe point numbering must be one-to-one relations.
Pipeline is numbered with the presence or absence of repetition:Check and numbered in storage pipeline data with the presence or absence of repetition, the pipe in database
Line number evidence and pipeline numbering must be one-to-one relations.
Data integrity checks module 4, for carrying out data integrity inspection to the Underground Pipeline Data, described in judgement
Underground Pipeline Data is abnormal with the presence or absence of data integrity.Data integrity inspection includes pipe point integrity checking and pipeline is complete
Property inspection.Pipe point integrity checking:For the attribute information of pipe point.
Data outliers check module 5, for carrying out data outliers inspection to the Underground Pipeline Data, described in judgement
Underground Pipeline Data whether there is data outliers.Data outliers inspection mainly checks pipe point and the well that pipeline data include
Depth and altitude data, if exceptional value be present.
Problem report generation module 6, for topological relation to be abnormal, data integrity is different when the Underground Pipeline Data is present
Normal or data outliers, generate data problem form.After Underground Pipeline Data checks, it will generation problem form, when
When examined buried pipe line number data are of problems, it will list the problem of data are present.
The Underground Pipeline Data nucleus correcting system that the application provides, topological relation inspection is carried out to the Underground Pipeline Data of importing
Look into, data integrity inspection or data outliers inspection, data check pass through, it may be determined that it is complete, accurate for the data, it can make
For final data storehouse;Data are checked not by the way that system will generate data problem form, and census enumerator is showed according to problem form
Check, census enumerator form new data according to the actual line conditions in scene after being modified to database, then via being
Unite and new pipeline data are carried out with the check of a new round, until checking by being final pipeline data, and then ensure data
Accuracy and integrality.The Underground Pipeline Data nucleus correcting system that the application provides, support multiple format data to check, while also prop up
The export of a variety of data formats is held, facilitates census enumerator or surveyor to carry out quality of data inspection, it is effective to ensure that data are accurate
True property and integrality, form provides foundation for the field review of census enumerator the problem of generation, census enumerator can be helped quickly to look for
Where to problem, scene review efficiency is improved.
The Underground Pipeline Data nucleus correcting system provided for further optimisation technique scheme, the embodiment of the present application, in addition to use
Family module, user's function is logged in and distinguished for user.According to user's function, user can be divided into census enumerator and Nei industry people
Member, census enumerator generally carries out the collection of Underground Pipeline Data, the Underground Pipelines Database of collection is submitted into surveyor, interior
Industry personnel are checked by Underground Pipeline Data nucleus correcting system to the pipeline data that census enumerator submits, meanwhile, it will check
Caused problem data form feeds back to census enumerator in journey, and census enumerator carries out field review according to data sheet, for existing
Field actual conditions carry out time update to problem data, and amended new database is submitted into surveyor.Surveyor according to
The data that system is carried out according to the data newly submitted are checked, and check the final data storehouse for being defined as generaI investigation after passing through.
Also include abnormal examination selecting module in the Underground Pipeline Data nucleus correcting system that the embodiment of the present application provides, it is abnormal
Check that selecting module is used to select to carry out topological relation inspection, data integrity inspection and/or number to the Underground Pipeline Data
According to exceptional value inspection.For certain a Underground Pipeline Data, select complete to the Underground Pipeline Data topological relation inspection, data
Property inspection or data outliers check while check, it is single inspection or mixing check, can be selected by way of choosing
Select.
In the Underground Pipeline Data nucleus correcting system that the embodiment of the present application provides, topological relation checks that module includes:Topology
Relation checks selecting module, the project to be checked for screening topological relation inspection., can according to the characteristics of Underground Pipeline Data
It is made whether to whether there is repetition volume with the presence or absence of coincidence pipeline, pipe point in the presence of coincidence pipe point, with the presence or absence of isolated pipe point, pipeline
Number, pipeline with the presence or absence of repeat numbering etc. self-defined inspection.
In the Underground Pipeline Data nucleus correcting system that the embodiment of the present application provides, data integrity checks that module includes:Number
According to integrity checking selecting module, for the garbled data integrity checking project to be checked.Such as screen pipeline numbering, key element
Type, ground elevation, shaft bottom depth, pipeline type etc..
Corresponding, the embodiment of the present application additionally provides a kind of Underground Pipeline Data check method, for buried pipe line number
According to check, as shown in Figure 2, comprise the following steps:
S101:Obtain Underground Pipeline Data.
S102:Receive and preserve the Underground Pipeline Data.
S103:Topological relation inspection is carried out to the Underground Pipeline Data, judges that the Underground Pipeline Data whether there is
Topological relation is abnormal.
S104:Data integrity inspection is carried out to the Underground Pipeline Data, judges whether the Underground Pipeline Data is deposited
It is abnormal in data integrity.
S105:Data outliers inspection is carried out to the Underground Pipeline Data, judges whether the Underground Pipeline Data is deposited
In data outliers.
S106:When the Underground Pipeline Data has abnormal topological relation, data integrity exception or data outliers, life
Into described problem form.
Preferably, it is described to the buried pipe line number in the Underground Pipeline Data check method that the embodiment of the present application provides
According to carry out topological relation inspection before also include:Screen the topological relation inspection project to be checked.
Preferably, it is described to the buried pipe line number in the Underground Pipeline Data check method that the embodiment of the present application provides
According to carry out data outliers inspection before also include:The garbled data integrity checking project to be checked.
Each embodiment in this specification is described by the way of progressive, identical similar portion between each embodiment
Divide mutually referring to what each embodiment stressed is the difference with other embodiment, and related part is referring to side
The part explanation of method embodiment.Those skilled in the art will easily think after the application of specification and practice here is considered
To other embodiments of the application.The application is intended to any modification, purposes or the adaptations of the application, these
Modification, purposes or adaptations follow the general principle of the application and not applied in the art including the application
Common knowledge or conventional techniques.Description and embodiments are considered only as exemplary, the true scope and essence of the application
God is pointed out by following claim.
It should be appreciated that the precision architecture that the application is not limited to be described above and is shown in the drawings, and
And various modifications and changes can be being carried out without departing from the scope.Scope of the present application is only limited by appended claim.
Claims (10)
1. a kind of Underground Pipeline Data nucleus correcting system, checked for Underground Pipeline Data, it is characterised in that the system includes:
Data import modul, for obtaining Underground Pipeline Data;
Database, for receiving and preserving the Underground Pipeline Data;
Topological relation checks module, for carrying out topological relation inspection to the Underground Pipeline Data, judges the underground utilities
Data are abnormal with the presence or absence of topological relation;
Data integrity checks module, for carrying out data integrity inspection to the Underground Pipeline Data, judges the underground
Pipeline data are abnormal with the presence or absence of data integrity;
Data outliers check module, for carrying out data outliers inspection to the Underground Pipeline Data, judge the underground
Pipeline data whether there is data outliers;
Problem report generation module, for having that topological relation is abnormal, data integrity is abnormal when the Underground Pipeline Data or
Data outliers, generate data problem form.
2. Underground Pipeline Data nucleus correcting system according to claim 1, it is characterised in that the system also includes:
Line module, user's function is logged in and distinguished for user.
3. Underground Pipeline Data nucleus correcting system according to claim 1, it is characterised in that the system also includes:
Abnormal examination selecting module, for selecting to carry out the Underground Pipeline Data topological relation inspection, data integrity inspection
Look into and/or data outliers inspection.
4. Underground Pipeline Data nucleus correcting system according to claim 1, it is characterised in that the topological relation checks module
Include:
Topological relation checks selecting module, the project to be checked for screening topological relation inspection.
5. Underground Pipeline Data nucleus correcting system according to claim 1, it is characterised in that the data integrity checks mould
Block includes:
Data integrity checks selecting module, for the garbled data integrity checking project to be checked.
6. Underground Pipeline Data nucleus correcting system according to claim 1, it is characterised in that the data import modul bag
Include:
Pipe point import modul, for obtaining the pipe point data in Underground Pipeline Data;
Pipeline import modul, for obtaining the pipeline data in Underground Pipeline Data.
7. a kind of Underground Pipeline Data check method, checked for Underground Pipeline Data, it is characterised in that methods described include with
Lower step:
Obtain Underground Pipeline Data;
Receive and preserve the Underground Pipeline Data;
Topological relation inspection is carried out to the Underground Pipeline Data, judges that the Underground Pipeline Data is different with the presence or absence of topological relation
Often;
Data integrity inspection is carried out to the Underground Pipeline Data, judges that the Underground Pipeline Data is complete with the presence or absence of data
Sexual abnormality;
Data outliers inspection is carried out to the Underground Pipeline Data, judges that the Underground Pipeline Data whether there is data exception
Value;
When the Underground Pipeline Data has abnormal topological relation, data integrity exception or data outliers, generation data are asked
Inscribe form.
8. Underground Pipeline Data check method according to claim 7, it is characterised in that described to receive and preserve describedly
Also include after underground pipelines data:
Selection carries out topological relation inspection, data integrity inspection and/or data outliers inspection to the Underground Pipeline Data.
9. Underground Pipeline Data check method according to claim 7, it is characterised in that described to the buried pipe line number
According to carry out topological relation inspection before also include:
Screen the topological relation inspection project to be checked.
10. Underground Pipeline Data check method according to claim 7, it is characterised in that described to the underground utilities
Data also include before carrying out data outliers inspection:
The garbled data integrity checking project to be checked.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711113895.XA CN107832424A (en) | 2017-11-13 | 2017-11-13 | A kind of Underground Pipeline Data nucleus correcting system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711113895.XA CN107832424A (en) | 2017-11-13 | 2017-11-13 | A kind of Underground Pipeline Data nucleus correcting system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107832424A true CN107832424A (en) | 2018-03-23 |
Family
ID=61655268
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711113895.XA Pending CN107832424A (en) | 2017-11-13 | 2017-11-13 | A kind of Underground Pipeline Data nucleus correcting system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107832424A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110083901A (en) * | 2019-04-17 | 2019-08-02 | 北京讯腾智慧科技股份有限公司 | Burning line method of calibration and device |
CN110362726A (en) * | 2019-07-11 | 2019-10-22 | 中国水利水电科学研究院 | A kind of urban underground water drainage pipe network data supplement improving method and system |
CN117289355A (en) * | 2023-09-26 | 2023-12-26 | 广东大湾工程技术有限公司 | Underground pipeline detection data processing method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103699634A (en) * | 2013-12-20 | 2014-04-02 | 保定金迪地下管线探测工程有限公司 | Database creation method and database creation system for one-stop pipeline detection |
CN103761405A (en) * | 2014-02-17 | 2014-04-30 | 福州市勘测院 | Three-dimensional underground integrated pipelines auto-generating system with error self-checking function |
-
2017
- 2017-11-13 CN CN201711113895.XA patent/CN107832424A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103699634A (en) * | 2013-12-20 | 2014-04-02 | 保定金迪地下管线探测工程有限公司 | Database creation method and database creation system for one-stop pipeline detection |
CN103761405A (en) * | 2014-02-17 | 2014-04-30 | 福州市勘测院 | Three-dimensional underground integrated pipelines auto-generating system with error self-checking function |
Non-Patent Citations (1)
Title |
---|
翟奎修: ""浅析淄博市地下管线数据接收前的相关检查"", 《城建档案》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110083901A (en) * | 2019-04-17 | 2019-08-02 | 北京讯腾智慧科技股份有限公司 | Burning line method of calibration and device |
CN110362726A (en) * | 2019-07-11 | 2019-10-22 | 中国水利水电科学研究院 | A kind of urban underground water drainage pipe network data supplement improving method and system |
CN117289355A (en) * | 2023-09-26 | 2023-12-26 | 广东大湾工程技术有限公司 | Underground pipeline detection data processing method |
CN117289355B (en) * | 2023-09-26 | 2024-05-07 | 广东大湾工程技术有限公司 | Underground pipeline detection data processing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107563019B (en) | Urban distributed hydrological model digitization method for complex underlying surface | |
CN107832424A (en) | A kind of Underground Pipeline Data nucleus correcting system and method | |
US20160071059A1 (en) | Infrastructure management, model, and deliverable creation system and method of use | |
CN105701264A (en) | Automatic construction method for underground pipe network | |
Wang et al. | A patch‐based cellular automaton for simulating land‐use changes at fine spatial resolution | |
CN109697333B (en) | Detection method and device of pipeline detection database and electronic equipment | |
CN102087753A (en) | Rapid three-dimensional mapping moulding method for ground and underground pipe network | |
CN106203796B (en) | A kind of actual measurement actual quantities method marked in situ based on engineering electronic drawing | |
Quintero et al. | Development of synthetic rating curves: Case study in Iowa | |
CN103927604A (en) | Oil gas pipeline integrity data technology implementation method | |
CN111191330B (en) | Method and system for problem discovery in pipeline integrated design | |
Chew et al. | Daily model calibration with water loss estimation and localization using continuous monitoring data in water distribution networks | |
Macea et al. | Improvement of axle load spectra characterization by a mixture of three distributions | |
CN107169294A (en) | The secondary judgement processing method of Excel forms in a kind of ATS for Environmental Test | |
Ma et al. | Subway tunnel construction settlement analysis based on the combination of numerical Simulation and neural network | |
CN115577005A (en) | Digital management method, system and storage medium for mountain pipeline data | |
CN105046024A (en) | Forming device and method for completion survey map of oil and gas pipeline | |
US8548758B1 (en) | Computer readable medium for calculating maximum allowable operating pressure and maximum operating pressure of a pipeline | |
CN109767104A (en) | The engineering test task start method and computer equipment divided based on WBS | |
Thorin et al. | Value of historical ground data for large infrastructure projects | |
Diettrich et al. | SciGRID_gas: The final IGGIELGNC-3 gas transmission network data set | |
Brinkgreve et al. | Automatic Finite Element Modelling and Parameter Determination for Geotechnical Design | |
CN107871209A (en) | A kind of method of the underground utilities auxiliary programming examination & approval based on GIS | |
CN108563671A (en) | A kind of data of one-stop three-dimensional Electromagnetic Survey of Underground Pipelines build library system | |
CN108734807A (en) | Natural gas line marker peg method for inspecting and terminal device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180323 |