Background technique
Actual measurement actual quantities refers to using measuring tool, as on-the-spot test, measure obtained from can actual response product quality
A kind of method of data.Construction project actual measurement actual quantities refers to according to correlated quality acceptance specification, and construction quality control errors are existed
A kind of method within specification allowed band.
Architectural engineering drawing is intended to indicate that interior of building deployment scenarios, outer shape, and finishing, construction, construction
It is required that etc. contents related drawing, such as plane structure chart, floor plan.It is the foundation for examining construction-engineering project;It is producing
In the process, it is the foundation of stock and construction;When completion of works, it is equally the foundation of quality inspection and acceptance.Build work
Journey electronic drawing is utilizing works graphics software, such as the drawing of auto CAD, Pro/e, UG graphics software creation.Build work
Journey electronic drawing can be bitmap, be also possible to polar plot, and wherein polar plot is one kind that figure is described based on geometrical property
Technology, polar plot support electrodeless scaling and undistorted, using computer front-end technology, can carry out above mark in situ, this
It invents image storage, display and the drafting being related to and is all based on polar plot progress.Architectural engineering drawing has run through whole building
The links of engineering project, are the standard and judgments that links are implemented, and mark in situ, Neng Gouqing are carried out on engineering drawing
Clear, intuitive and accurately some point indicated in architectural engineering is qualitatively or quantitatively assessed.
Mark in situ refers in architectural engineering actual measurement actual quantities field and is labeled to some position on engineering drawing
Afterwards, the method for every measurement data of the position is recorded.Engineering position: referring to the location information of Specific construction in architectural engineering,
As in real estate project project, by stages, Lou Dong, floor and family.
Engineering quality control refers to the quality management of construction overall process, range the determining through engineering construction of management
Plan, prospecting, design, the overall process of construction check the examination of construction team and supervisor, technological document before such as constructing
(such as whether drawing is complete, and whether there is or not whether mistakes and omissions vacancy, technical standard are complete), process quality checking and control in work progress
It makes, examination, maintenance etc. after the completion of engineering belong to the scope of engineering quality control.
In civil engineering projects traditional at present, actual measurement actual quantities is the engineering activity carried out under line, and surveyor needs
After engineering site carries out field survey, the data of measurement are recorded on the table of papery, file storage again after putting in order,
The paper list that a usual construction-engineering project is related to usually has thousands of parts, and traditional actual measurement actual quantities is from checking and accepting table
Production, printing, to the actual measurement actual quantities of engineering site, the record of data to the checking of record, is classified, is filed, any one link
It is all extremely cumbersome for operator, and difficulty is very big when subsequent inspection information, entire construction quality pipe faces huge challenge.
Summary of the invention
The object of the present invention is to provide a kind of actual measurement actual quantities methods marked in situ based on engineering electronic drawing, solve above-mentioned
One in the prior art either multiple.
A kind of actual measurement actual quantities method marked in situ based on engineering electronic drawing provided by the invention, comprising the following steps:
1) the corresponding engineering drawing in each position of engineering project is imported into engineering quality control platform, engineering quality control is flat
The engineering drawing is configured actual measurement actual quantities item normal data table by platform;
2) corresponding engineering drawing is selected in engineering quality control mobile terminal, by field survey, by field survey
Data are inserted in the actual measurement actual quantities item temporary data table of the engineering drawing, and will be surveyed on actual quantities item data table by mobile network
Reach engineering quality control platform;
3) engineering quality control platform by the actual measurement actual quantities item temporary data table of upload and surveys actual quantities item normal data table
It compares, obtains the qualification rate of the configuration item purpose actual measurement.
In some embodiments, step 1) includes: creation new projects, and uploads the corresponding all kinds of engineering drawings of the new projects
Paper;Each position of the new projects is created, and uploads the corresponding engineering drawing in each position;New projects' engineering drawing is configured real
Actual quantities content is surveyed, and generates actual measurement actual quantities item normal data table.
In some embodiments, step 2) includes: to log in engineering quality control mobile terminal, and selection needs to carry out actual quantities
Actual quantities item is surveyed, load obtains the engineering drawing of the actual measurement actual quantities item;At the corresponding Construction of Engineering Projects scene of the engineering drawing
Several test points are randomly selected, field survey is carried out;It is marked out on the engineering drawing corresponding with field survey test point
Position, and will test the detection point data write-in column in actual measurement data input engineering quality control mobile terminal a little;To institute
After the completion of thering is the actual measurement data of test point to insert, the temporary data table of the actual measurement actual quantities item is generated;Temporary data table is led to
Network transmission is crossed to engineering quality control platform.
In some embodiments, step 3) includes: engineering quality control platform facing the actual measurement actual quantities item received
When tables of data and the actual measurement actual quantities item normal data table carry out comparing, the qualification rate of the actual measurement actual quantities item is calculated;
The qualification rate of each actual measurement actual quantities item is counted, obtains the qualification rate of the actual measurement actual quantities of the engineering project.
In some embodiments, temporary data table is transmitted through the network to engineering quality control platform step, also wrapped
It includes: if engineering quality control mobile terminal has connected network, being uploaded to engineering quality control platform, if engineering quality control is mobile
Not connected network is held, then temporary data table is stored in offline in engineering quality control mobile terminal, until the engineering quality control
It even connects to the Net mobile terminal.
The beneficial effects of the present invention are: improving Quality Management Data this method reduce on-site data gathering difficulty
Integrality and tightness, and ensured that Process of Engineering Construction is synchronous with data information, reduce subsequent quality assessment sum number it is investigated that
The difficulty read greatly reduces the cost of manual maintenance so that engineering quality control work is more efficient.
Specific embodiment
The invention will now be described in further detail with reference to the accompanying drawings.
A kind of actual measurement actual quantities method marked in situ based on engineering electronic drawing provided by the invention, comprising the following steps:
Step S100: the corresponding engineering drawing in each position of engineering project is imported into engineering quality control platform, engineering matter
The engineering drawing is configured actual measurement actual quantities item normal data table by buret platform.
Step S100 specifically includes the following steps:
S1_1. supervisor of construction logs in engineering quality control platform, and initializes engineering quality control platform;
S1_2. supervisor of construction has engineering project or creation newly built construction project in engineering quality control platform selecting;
S1_3. supervisor of construction uploads all kinds of drawings corresponding with the engineering project in engineering quality control platform;
S1_4. supervisor of construction creates each position of the engineering project in engineering quality control platform;
S1_5. the corresponding figure in each position of the engineering project is arranged in engineering quality control platform by supervisor of construction
Paper;
S1_6. supervisor of construction surveys actual quantities content, construction quality pipe in engineering quality control platform setting option purpose
Actual measurement actual quantities item normal data table is generated in platform.
In step S1_6, actual measurement actual quantities content includes Index for examination and criterion of acceptability.
Step S200: selecting corresponding engineering drawing in engineering quality control mobile terminal, will on the spot by field survey
The data of measurement are inserted in the actual measurement actual quantities item temporary data table of the engineering drawing, and will survey actual quantities item number by mobile network
Engineering quality control platform is uploaded to according to table.
Step S200 is specifically includes the following steps: S2_1. survey crew logs in engineering quality control mobile terminal;
S2_2. survey crew selects to carry out the actual measurement actual quantities item of actual measurement actual quantities in engineering quality control mobile terminal;
S2_3. survey crew selects to carry out the engineering position of actual measurement actual quantities in engineering quality control mobile terminal;
S2_4. the position that engineering quality control mobile terminal is selected according to survey crew should from the downloading of engineering quality control platform
The corresponding engineering drawing in position;
S2_5. the actual measurement actual quantities item that engineering quality control mobile terminal is selected according to survey crew should to server-side request inquiry
It surveys the check item that actual quantities item includes and shows survey crew;
S2_6. survey crew selects check item in engineering quality control mobile terminal;
S2_7. survey crew randomly selects several test points in the corresponding construction site of engineering drawing and is surveyed on the spot
Amount;
S2_8. survey crew finds the inspection chosen with construction site in the engineering drawing on engineering quality control mobile terminal
The corresponding position of measuring point is labeled;
S2_9. engineering quality control mobile terminal is inquired according to the check item that survey crew selects to engineering quality control platform
The corresponding Index for examination of the check item, and survey crew is showed in the form of list;
S2_10. the data that survey crew obtains according to field survey, the corresponding inspection in engineering quality control mobile terminal
The corresponding content of typing in index and criterion of acceptability, engineering quality control mobile terminal generate actual measurement actual quantities item temporary data table;
S2_11. survey crew chooses whether the actual measurement actual quantities for continuing next check item according to actual requirement, or
Person selects end, and this surveys actual quantities, if selecting to continue, turns to S2_7 and continues to execute, and otherwise executing end, this is surveyed in fact
Amount.
S2_12. after this surveys actual quantities, engineering quality control mobile terminal uploads measurement data to construction quality pipe
Platform.
In addition, in step S2_12, engineering quality control mobile terminal judges whether equipment has connected net before upload
Network uploads the actual measurement actual quantities data not uploaded if having connected network automatically, if not connecting network, the reality that will not upload
Actual quantities data are surveyed to be stored in local engineering quality control mobile terminal.
Step S300: engineering quality control platform by the actual measurement actual quantities item temporary data table of upload and actual measurement actual quantities item mark
Quasi- tables of data compares, and obtains the qualification rate of the configuration item purpose actual measurement.
Step S300 is specifically included:
S3_1. engineering quality control platform by the actual measurement actual quantities item temporary data table of each check item and surveys actual quantities item
Normal data table compares, and it is whether qualified that the point is calculated;
S3_2. group actual measurement actual quantities is calculated according to preset qualification rate calculation in engineering quality control platform
Qualification rate.
The present invention also provides a kind of actual measurement actual quantities systems marked in situ based on engineering electronic drawing, including construction quality pipe
Platform, the engineering quality control mobile terminal being connect with engineering quality control Platform communication.Engineering quality control platform also communicates
It is connected with database.
Engineering quality control platform be used for allocation project project location information, as in project it is each by stages, Lou Dong, building
Layer and family, manage the corresponding all kinds of drawings in each position, such as floor plan, plane structure chart, in situ based on engineering electronic drawing
The object of the actual measurement actual quantities method operation of mark is this kind of drawing, and the management content of drawing includes the importing of drawing, changes, deletes
The functions such as remove and check;Configuration item purpose survey actual quantities content, actual measurement actual quantities content include actual measurement actual quantities title, operation instruction with
And each check item that the actual measurement actual quantities includes, each check item include that the Index for examination of the actual measurement actual quantities and criterion of acceptability are retouched
It states.
It has been shown that, scaling and the drafting of engineering drawing are realized in engineering quality control mobile terminal, realize the figure after marking in situ
Typing items measurement data on paper.
Database for storage and management actual measurement actual quantities during record data, management content include data addition,
It deletes and updates and inquire.
The present invention is further described by specific embodiment:
S1. engineering management person uses administrator's account and code entry engineering quality control platform;
S2. engineering management person creates new projects, entitled " Shenzhen Milky Way silver of such as creation one in engineering quality control platform
The project of lake valley ";
S3. engineering management person uploads an engineering drawing to engineering quality control platform, and is named as " standard floor plan
001";
S4. engineering management person in engineering quality control platform for " Shenzhen Milky Way Silver Lake paddy " divided one it is entitled
" three phases " by stages, and has divided the building of one entitled " 6 " for this by stages, and the building Bing Weigai has divided one entitled " 2
The floor of layer ", and be the room that the floor has divided one entitled " 201 ";
S5. engineering management person is at engineering quality control platform configuration "-6-2 floor-201 of Shenzhen Milky Way Silver Lake-three phase of paddy "
The engineering drawing at position is " the standard floor plan 001 " uploaded in S3;
S6. engineering management person is "-6-2 floor-201 of Shenzhen Milky Way Silver Lake-three phase of paddy " portion in engineering quality control platform
Position is configured with the actual measurement actual quantities item of one entitled " 03 plastering engineering ", and is added to two inspections respectively for the actual measurement actual quantities item
, it is respectively as follows:
Index for examination |
Criterion of acceptability |
Calculate qualification rate mode |
Facade verticality |
Measured value≤4 |
Qualified points/measurement points |
Surface smoothness |
Measured value≤4 |
Qualified points/measurement points |
S7. survey crew logs in engineering quality control mobile terminal;
S8. survey crew selects the actual measurement actual quantities item of entitled " 03 plastering engineering " in engineering quality control mobile terminal;
S9. survey crew selects "-6-2 floor of Shenzhen Milky Way Silver Lake-three phase of paddy-in engineering quality control mobile terminal
201 " positions;
S10. " Shenzhen Milky Way Silver Lake-three phase of paddy-6-is downloaded from engineering quality control platform in engineering quality control mobile terminal
2 layer -201 " the corresponding engineering drawing in position " standard floor plan 001 ";
S11. engineering quality control mobile terminal loads out all inspections of the actual measurement actual quantities item of entitled " 03 plastering engineering "
?;
S12. survey crew selects Index for examination for the check item of " facade verticality " in engineering quality control mobile terminal;
S13. survey crew at the construction field (site) in-6-2 floor-201 of Shenzhen Milky Way Silver Lake-three phase of paddy randomly choose one
Test point and the field survey for carrying out facade verticality;
S14. survey crew finds and test point on the spot in the standard floor plan 001 that engineering quality control mobile terminal is shown
Corresponding position, the data obtained according to field survey, the survey of typing facade verticality in engineering quality control mobile terminal
Measure data;
S15. survey crew repeats S13-S14, and the measurement data until measuring to make a call to 14 different test points terminates this
Secondary measurement.
For example, survey crew measures 14 to 03 plastering engineering of Shenzhen Milky Way Silver Lake-201 position of-6-2 floor of-three phase of paddy
The measurement data of a facade verticality is as follows:
Measurement point serial number |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
Measurement data |
8 |
5 |
9 |
6 |
2 |
2 |
6 |
5 |
2 |
6 |
8 |
7 |
6 |
6 |
S16. the data that measurement obtains are uploaded to engineering quality control platform by survey crew, and are saved in the database;
S17. engineering quality control platform by the measurement data of each test point with it is preset in engineering quality control platform
- 201 03 plastering engineering of position of-6-2 floor of Shenzhen Milky Way Silver Lake-three phase of paddy-facade verticality criterion of acceptability (measured value≤4) ratio
Right, the Qualification that each checkpoint is calculated is as follows:
Measurement point serial number |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
Measurement data |
8 |
5 |
9 |
6 |
2 |
2 |
6 |
5 |
5 |
6 |
8 |
7 |
6 |
6 |
It is whether qualified |
It is no |
It is no |
It is no |
It is no |
It is |
It is |
It is no |
It is no |
It is no |
It is no |
It is no |
It is no |
It is no |
It is no |
S18. engineering quality control platform is according to-201 position-03 of-6-2 floor of preset Shenzhen Milky Way Silver Lake-three phase of paddy
Plastering engineering-facade verticality qualification rate calculation (qualified points/measurement points), is calculated Shenzhen Milky Way Silver Lake paddy-
- 201-03 plastering engineering of position of three floor of phase-6-2-facade verticality qualification rate is 14.00%.
Above-described is only some embodiments of the present invention, for those of ordinary skill in the art, not
Under the premise of being detached from the invention design, various modifications and improvements can be made, these belong to protection model of the invention
It encloses.