Background technology
Actual measurement actual quantities refers to apply survey tool, by on-the-spot test, measure and obtain can actual response product quality
A kind of method of data.Construction project actual measurement actual quantities refers to, according to correlated quality acceptance specification, construction quality error control be existed
A kind of method within specification allowed band.
Architectural engineering drawing is intended to indicate that interior of building deployment scenarios, external shape, and fits up, constructs, constructs
The relevant drawing of the contents such as requirement, such as plane structure chart, floor plan etc..It is the foundation of examination & approval construction-engineering project;Producing
During, it is the foundation got the raw materials ready and construct;When completion of works, it is the foundation of quality inspection and acceptance equally.Building work
Journey electronic drawing, is utilizing works graphics software, the drawing created such as graphics softwares such as auto CAD, Pro/e, UG.Building work
Journey electronic drawing can be bitmap, it is also possible to be vectogram, and wherein vectogram is the one describing figure based on geometrical property
Technology, vectogram supports electrodeless scaling and undistorted, utilizes computer front-end technology, can carry out above marking in situ, this
Image storage that invention relates to, show and drafting is all based on vectogram and carries out.Architectural engineering drawing has run through whole building
The links of engineering project, is the standard and judgment of links enforcement, carries out marking in situ, it is possible to clear on engineering drawing
Certain point indicated in architectural engineering clear, intuitively and exactly is qualitatively or quantitatively assessed.
Mark in situ, refers to be labeled certain position on engineering drawing in architectural engineering actual measurement actual quantities field
After, the method recording every measurement data of this position.Engineering position: refer to the positional information of Specific construction in architectural engineering,
As the project in real estate project, by stages, Lou Dong, floor and family.
Engineering quality control refers to the quality management building overall process, the scope of its management determining through engineering construction
Plan, the overall process reconnoitred, design, construct, as before construction to construction team and the examination of supervisor, the checking of technological document
(as drawing is the most complete, the most complete with or without mistakes and omissions vacancy, technical standard), the process quality checking in work progress and control
System, engineering complete after examination, maintenance etc., broadly fall into the category of engineering quality control.
In the most traditional civil engineering projects, actual measurement actual quantities is the engineering activity carried out under line, and surveyor needs
After engineering site carries out field survey, the data of measurement be recorded on the form of papery, after putting in order, file warehouse-in again,
The paper list that a usual construction-engineering project relates to generally has thousands of part, and traditional actual measurement actual quantities is from checking and accepting form
Make, print, to the actual measurement actual quantities of engineering site, the record of data, check to record, classify, file, any one link
Being all the most loaded down with trivial details for operator, and during follow-up inspection information, difficulty is very big, whole construction quality pipe faces huge challenge.
Summary of the invention
It is an object of the invention to provide a kind of actual measurement actual quantities method based on engineering electronic drawing mark in situ, solve above-mentioned
One or multiple of the prior art.
A kind of based on engineering electronic drawing mark in situ the actual measurement actual quantities method that the present invention provides, comprises the following steps:
1) engineering drawing corresponding for each for engineering project position being imported engineering quality control platform, engineering quality control is put down
Platform is by this engineering drawing configuration actual measurement actual quantities item normal data table;
2) in engineering quality control mobile terminal, corresponding engineering drawing is selected, by field survey, by field survey
Data are inserted in the actual measurement actual quantities item ephemeral data table of this engineering drawing, and will be surveyed on actual quantities item data table by mobile network
Reach engineering quality control platform;
3) engineering quality control platform is by the actual measurement actual quantities item ephemeral data table uploaded and actual measurement actual quantities item normal data table
Contrast, draw the qualification rate of the actual measurement of this configuration item purpose.
In some embodiments, step 1) including: create new projects, and upload all kinds of engineering drawings that these new projects are corresponding
Paper;Create each position of these new projects, and upload the engineering drawing that each position is corresponding;By real for new projects' engineering drawing configuration
Survey actual quantities content, and generate actual measurement actual quantities item normal data table.
In some embodiments, step 2) including: log in engineering quality control mobile terminal, select to need to carry out actual quantities
Actual measurement actual quantities item, loads the engineering drawing drawing this actual measurement actual quantities item;The Construction of Engineering Projects corresponding at this engineering drawing is on-the-spot
Randomly select some test points, carry out field survey;This engineering drawing mark out corresponding with field survey test point
Position, and the actual measurement data of test point is inputted the test point data write hurdle in engineering quality control mobile terminal;Treat institute
After the actual measurement data having test point has been inserted, generate the ephemeral data table of this actual measurement actual quantities item;Ephemeral data table is led to
Cross network to transmit to engineering quality control platform.
In some embodiments, step 3) including: engineering quality control platform faces the actual measurement actual quantities item received
Time tables of data and this actual measurement actual quantities item normal data table carry out comparing, calculate the qualification rate of this actual measurement actual quantities item;
The qualification rate of each actual measurement actual quantities item is added up, draws the qualification rate of the actual measurement actual quantities of this engineering project.
In some embodiments, ephemeral data table is transmitted through the network to engineering quality control platform step, also wraps
Include: if engineering quality control mobile terminal has connected network, be then uploaded to engineering quality control platform, if engineering quality control moves
End is not connected with network, then be stored in engineering quality control mobile terminal by ephemeral data table off-line, until this engineering quality control
Even connect to the Net in mobile terminal.
The invention has the beneficial effects as follows: this method reduce on-site data gathering difficulty, improve Quality Management Data
Integrity and tightness, and ensured that Process of Engineering Construction is Tong Bu with data message, reduce subsequent quality assessment sum and it is investigated
The difficulty read so that engineering quality control work is more efficient, greatly reduces manual maintenance cost.
Detailed description of the invention
The present invention is further detailed explanation below in conjunction with the accompanying drawings.
A kind of based on engineering electronic drawing mark in situ the actual measurement actual quantities method that the present invention provides, comprises the following steps:
Step S100: engineering drawing corresponding for each for engineering project position is imported engineering quality control platform, engineering matter
Buret platform is by this engineering drawing configuration actual measurement actual quantities item normal data table.
Step S100 specifically includes following steps:
S1_1. supervisor of construction logs in engineering quality control platform, and initializes engineering quality control platform;
S1_2. supervisor of construction in the existing engineering project of engineering quality control platform selecting or creates newly built construction project;
S1_3. supervisor of construction uploads all kinds of drawings corresponding with this engineering project at engineering quality control platform;
S1_4. supervisor of construction creates each position of this engineering project in engineering quality control platform;
S1_5. supervisor of construction arranges, at engineering quality control platform, the figure that each position of this engineering project is corresponding
Paper;
S1_6. supervisor of construction surveys actual quantities content, construction quality pipe in engineering quality control platform setting option purpose
Platform generates actual measurement actual quantities item normal data table.
In step S1_6, actual measurement actual quantities content comprises Index for examination and criterion of acceptability.
Step S200: select corresponding engineering drawing in engineering quality control mobile terminal, by field survey, will on the spot
The data measured are inserted in the actual measurement actual quantities item ephemeral data table of this engineering drawing, and will survey actual quantities item number by mobile network
It is uploaded to engineering quality control platform according to table.
Step S200 specifically includes following steps: S2_1. survey crew logs in engineering quality control mobile terminal;
S2_2. survey crew selects the actual measurement actual quantities item needing to carry out surveying actual quantities in engineering quality control mobile terminal;
S2_3. survey crew selects the engineering position needing to carry out surveying actual quantities in engineering quality control mobile terminal;
S2_4. engineering quality control mobile terminal should from the download of engineering quality control platform according to the position that survey crew selects
The engineering drawing that position is corresponding;
S2_5. engineering quality control mobile terminal should to service end requesting query according to the actual measurement actual quantities item that survey crew selects
The actual measurement check item that comprises of actual quantities item also shows survey crew;
S2_6. survey crew selects check item in engineering quality control mobile terminal;
S2_7. survey crew randomly selects some test points and surveys on the spot in the job site that engineering drawing is corresponding
Amount;
S2_8. survey crew engineering drawing on engineering quality control mobile terminal finds the inspection chosen with job site
The corresponding position of measuring point is labeled;
S2_9. the check item that engineering quality control mobile terminal selects according to survey crew is inquired about to engineering quality control platform
The Index for examination that this check item is corresponding, and show survey crew with the form of list;
S2_10. the data that survey crew obtains according to field survey, inspection corresponding in engineering quality control mobile terminal
The corresponding content of typing in index and criterion of acceptability, engineering quality control mobile terminal generates actual measurement actual quantities item ephemeral data table;
S2_11. survey crew is according to actual requirement, chooses whether to proceed the actual measurement actual quantities of next check item, or
Person selects to terminate this actual measurement actual quantities, if selecting to continue, then turns to S2_7 and continues executing with, and otherwise performs to terminate this actual measurement real
Amount.
S2_12., after this actual measurement actual quantities terminates, measurement data is uploaded to construction quality pipe in engineering quality control mobile terminal
Platform.
Additionally, in step S2_12, engineering quality control mobile terminal judged that before uploading equipment has connected net the most
Network, if having connected network, the actual measurement actual quantities data the most automatically do not uploaded, if not connecting network, then the reality will do not uploaded
Survey actual quantities data to be saved in local engineering quality control mobile terminal.
Step S300: engineering quality control platform is by the actual measurement actual quantities item ephemeral data table uploaded and the mark surveying actual quantities item
Quasi-tables of data contrasts, and draws the qualification rate of the actual measurement of this configuration item purpose.
Step S300 specifically includes:
S3_1. engineering quality control platform is by the actual measurement actual quantities item ephemeral data table of each check item and actual measurement actual quantities item
Normal data table comparison, calculates this point the most qualified;
S3_2. engineering quality control platform is according to the qualification rate calculation preset, and calculates this group actual measurement actual quantities
Qualification rate.
The present invention also provides for a kind of actual measurement actual quantities system based on engineering electronic drawing mark in situ, including construction quality pipe
The engineering quality control mobile terminal that platform is connected with engineering quality control Platform communication.Engineering quality control platform also communicates
Connect and have data base.
Engineering quality control platform for the location information of allocation project project, as each in project by stages, Lou Dong, building
Layer and family, manage all kinds of drawings that each position is corresponding, such as floor plan, plane structure chart etc., based on engineering electronic drawing in situ
The object that the actual measurement actual quantities method of mark operates is i.e. this kind of drawing, importing that the management content of drawing comprises drawing, changes, deletes
Except and the function such as check;Configuration item purpose actual measurement actual quantities content, actual measurement actual quantities content comprise actual measurement actual quantities title, operation instruction with
And each check item that this actual measurement actual quantities comprises, Index for examination and criterion of acceptability that each check item comprises this actual measurement actual quantities are retouched
State.
Engineering quality control mobile terminal realizes the display of engineering drawing, scales and draw, it is achieved the figure after mark in position
The every measurement data of typing on paper.
Data base for storage and management actual measurement actual quantities during record data, management content include data interpolation,
Delete and update and inquiry.
The present invention is further described by specific embodiment:
S1. engineering management person uses manager's account and code entry engineering quality control platform;
S2. engineering management person creates new projects at engineering quality control platform, as created entitled " Shenzhen Milky Way silver
Lake valley " project;
S3. engineering management person uploads to an engineering quality control platform and named " standard floor plan of engineering drawing
001”;
S4. engineering management person in engineering quality control platform for " Milky Way Silver Lake, Shenzhen paddy " divided one entitled
" three phases " by stages, and has divided the building of entitled " 6 " for this by stages, and Bing Weigai building has divided one entitled " 2
Layer " floor, and divided the room of entitled " 201 " for this floor;
S5. engineering management person is at engineering quality control platform configuration " Milky Way Silver Lake, Shenzhen-6-2 floor-201 of paddy-three phase "
The engineering drawing at position is " the standard floor plan 001 " uploaded in S3;
S6. engineering management person is " Milky Way Silver Lake, Shenzhen-6-2 floor-201 of paddy-three phase " portion at engineering quality control platform
Position is configured with the actual measurement actual quantities item of entitled " 03 plastering engineering ", and with the addition of two inspections respectively for this actual measurement actual quantities item
, it is respectively as follows:
Index for examination |
Criterion of acceptability |
Calculate qualification rate mode |
Facade perpendicularity |
Measured value≤4 |
Qualified/measure dot number of counting |
Surface smoothness |
Measured value≤4 |
Qualified/measure dot number of counting |
S7. survey crew logs in engineering quality control mobile terminal;
S8. survey crew selects the actual measurement actual quantities item of entitled " 03 plastering engineering " in engineering quality control mobile terminal;
S9. survey crew select in engineering quality control mobile terminal " Milky Way Silver Lake, Shenzhen-6-2 floor of paddy-three phase-
201 " position;
S10. engineering quality control mobile terminal from engineering quality control platform download " Milky Way Silver Lake, Shenzhen paddy-three phase-6-
2 layer-201 " engineering drawing " standard floor plan 001 " corresponding to position;
S11. engineering quality control mobile terminal loads out all inspections of actual measurement actual quantities item of entitled " 03 plastering engineering "
?;
S12. the check item that survey crew selects Index for examination to be " facade perpendicularity " in engineering quality control mobile terminal;
S13. survey crew at the construction field (site) in Milky Way Silver Lake, Shenzhen-6-2 floor of paddy-three phase-201 randomly choose one
Test point also carries out the field survey of facade perpendicularity;
S14. survey crew finds and test point on the spot in the standard floor plan 001 that engineering quality control mobile terminal is shown
Corresponding position, the data obtained according to field survey, the survey of typing facade perpendicularity in engineering quality control mobile terminal
Amount data;
S15. survey crew repeats S13-S14, until measuring to make a call to the measurement data of 14 different test points, terminates this
Secondary measurement.
Such as, survey crew records the 14 of paddy-three phase-6-2 floor-201 position 03, Milky Way Silver Lake, Shenzhen plastering engineering
The measurement data of individual facade perpendicularity is as follows:
Measure some sequence number |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
Measurement data |
8 |
5 |
9 |
6 |
2 |
2 |
6 |
5 |
2 |
6 |
8 |
7 |
6 |
6 |
S16. the data that measurement is obtained by survey crew upload to engineering quality control platform, and are saved in data base;
S17. engineering quality control platform by the measurement data of each test point with engineering quality control platform preset
Paddy-three phase-6-2 floor-201 position, Milky Way Silver Lake, Shenzhen 03 plastering engineering-facade perpendicularity criterion of acceptability (measured value≤4) ratio
Right, the Qualification calculating each checkpoint is as follows:
Measure some sequence number |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
Measurement data |
8 |
5 |
9 |
6 |
2 |
2 |
6 |
5 |
5 |
6 |
8 |
7 |
6 |
6 |
The most qualified |
No |
No |
No |
No |
It is |
It is |
No |
No |
No |
No |
No |
No |
No |
No |
S18. engineering quality control platform is according to paddy-three phase-6-2 floor-201 position-03, Milky Way Silver Lake, Shenzhen preset
Plastering engineering-facade perpendicularity qualification rate calculation (qualified/measure dot number of counting), calculate Milky Way Silver Lake, Shenzhen paddy-
The qualification rate of three phase-6-2 floor-201 position-03 plastering engineerings-facade perpendicularity is 14.00%.
Above-described is only some embodiments of the present invention, for the person of ordinary skill of the art, not
On the premise of departing from the invention design, it is also possible to making some deformation and improvement, these broadly fall into the protection model of the present invention
Enclose.