CN105956987A - Road traffic engineering test detection data acquisition and evaluation system - Google Patents

Road traffic engineering test detection data acquisition and evaluation system Download PDF

Info

Publication number
CN105956987A
CN105956987A CN201610290127.0A CN201610290127A CN105956987A CN 105956987 A CN105956987 A CN 105956987A CN 201610290127 A CN201610290127 A CN 201610290127A CN 105956987 A CN105956987 A CN 105956987A
Authority
CN
China
Prior art keywords
data
module
unit
report
data acquisition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610290127.0A
Other languages
Chinese (zh)
Other versions
CN105956987B (en
Inventor
钱敬之
熊纪涛
刘阳
蒋波
周强
邱杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Jing Wei Traffic Engineering Technology Co Ltd
Original Assignee
Sichuan Jing Wei Traffic Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Jing Wei Traffic Engineering Technology Co Ltd filed Critical Sichuan Jing Wei Traffic Engineering Technology Co Ltd
Priority to CN201610290127.0A priority Critical patent/CN105956987B/en
Publication of CN105956987A publication Critical patent/CN105956987A/en
Application granted granted Critical
Publication of CN105956987B publication Critical patent/CN105956987B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • G06Q50/40
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations

Abstract

The invention belongs to the traffic detection technical field, and especially relates to a road traffic engineering test detection data acquisition and evaluation system which can reduce enterprise manpower and time, and comprise a mobile terminal, a service side, a database server, and a WEB server. The mobile terminal comprises an engineering model synchronous unit, a server information management unit, a data preservation unit, a data uploading unit, a data local storage database, and a data acquisition APP; the service side comprises a business model definition module, a data receiving module, a data converting and cleaning module, a data loading module, a data processing module, a report output module and a system interface display module. The road traffic engineering test detection data acquisition and evaluation system provides a strong guarantee for reducing enterprise business enforcement costs, and improving data acquisition and processing effectiveness and accuracy.

Description

A kind of highway communication project test detection data acquisition and the system of evaluation
Technical field
The invention belongs to Vehicle Detection technical field, particularly relate to a kind of highway communication project test detection data Gather and the system of evaluation.
Background technology
Traffic acceptance test is the indispensable link in traffic construction, to the completeness of traffic construction, Effectiveness, safety etc. play the effect of checking on.Vehicle Detection mainly to friendship peace involved in road construction, The partial contents such as electromechanics detect, and gather relevant detection data and (include outward appearance, measured data, data Complete etc.), evaluate the most qualified process of traffic route and result, whether traffic route is met the requirements and has Bigger reference significance.
Along with the extensive development of domestic communication road, road quantity is continuously increased, various equipment and detection Mesh also becomes blowout to increase.Therefore, business and the workload of Vehicle Detection roll up the most therewith, thus logarithm Have higher requirement with disposal ability according to gathering.Traditional data acquisition and processing (DAP) mode is: specifying Section sends testing staff to hold papery detection form to Site Detection, fills in testing result in the table, waits entirely After portion's detection, returning to enterprise is spread-sheet data against this form by transformation of data again, then passes through After a series of heavy numerical calculation, form various statistical data, the most again by all of detection detailed data Formation examining report is collected with various statistical datas.This traditional detection mode, can bring following asking Topic: 1, data collection task is slow, often gathers data and is required for finding specific paper list and right The place answered, fills detection data.And need before testing to customize required form and printing;2, table Lattice data inputting electrical form slowly and is easily made mistakes.Need substantial amounts of manpower by data entry computer system, And easily go wrong during typing;3, various statistical datas calculate and slowly and easily make mistakes;4、 Final acceptance test report makes and slowly and easily makes mistakes.
Although every field has some data acquisition equipments to improve data acquisition efficiency, but does not also have one Overlap complete data acquisition and processing (DAP) solution complete from data acquisition, data calculate, report generation and The a series of flow processs such as printing, complete check and acceptance result report quickly, accurately and efficiently and save detection people Power and time cost.
Summary of the invention
The technical problem to be solved be to provide a kind of highway communication project test detection data acquisition and Evaluation system so that traffic acceptance test can Quick Acquisition, efficiently calculating, on-demand timely output and printing Acceptance report, saves business manpower and time cost, is greatly improved production efficiency.
The present invention solves above-mentioned technical problem and be the technical scheme is that a kind of highway communication engineering test inspection Survey data acquisition and the system of evaluation, including mobile terminal, service end, database server, WEB server;
It is single that described mobile terminal includes that engineering model lock unit, server info administrative unit, data preserve Unit, data uploading unit, data local repository, data acquisition A PP;
Described service end include business model definition module, data reception module, data conversion and cleaning module, Data loading module, data processing module, report output module, system interface display module;
Described business model definition module is used for setting Business Processing scope and data process, data report shows Mode;The conversion of described data and cleaning module for data parsing, change, screen, effectively detect, and Form business datum;Described data loading module is that business datum is loaded into database server;At data Reason module is after business datum is put in storage, by data summarization, KPI calculating, detection qualification determination, subdivisional work Partitioned project qualification rate is added up, and prepares necessary data for report output;Described report output module is according to data The data result of processing module completes the output to report.
Further, also including interior PC, outer PC, described outer PC is connected with service end by the Internet, Described interior PC is directly connected with service end.
Further, described mobile terminal also includes device authorization unit, data validation unit.
Further, described data uploading unit uses http agreement REST interface document to upload mode.
Further, the conversion of described data and cleaning module include reading and storage unit, file scan list Unit, file conversion unit;
Described reading and storage unit read out from http flows and upload data, and are saved in file, Ke Yigao The data that the effect multiple mobile terminals of reception are uploaded are without because other handling processes make to upload inefficiency;
The file that scanning has been preserved by described document scanning unit, the process state of log file, then distribute To file conversion unit;
Described file conversion unit reads file content, according to business model, data is carried out data filtering, number According to multiple operations such as packet, data type conversion, standard data format, data implication escapes so that number According to being converted into final business datum.
Further, described system interface display module have user's login, system user Password Management, Enterprise's basic information management, Vehicle Detection engineering set up and engineering bid section and with each bid section detection project alternatives, Measured data is checked and is safeguarded, data acquisition A PP upload data processing state monitoring, report information fill in and Report represents function, report is downloaded and printing function.
A kind of highway communication project test detection data acquisition and evaluation methodology, comprise the following steps:
Step S101: user carries out authority checking to mobile terminal;
Step S102: user arranges service end information by the UI interface of data acquisition A PP;
Step S103: user selects to need the engineering of synchronistic model according to practical situation, and same from service end It is saved in data local repository after step model data;
Step S104: user fills in detection data in data acquisition A PP, and verifies detection data;
Step S105: the detection data after verification store data local repository, and detection data are uploaded To service end;
Step S106: read to read out from http flows with storage unit and upload data, and be saved in file;
Step S107: the file that scanning has been preserved by document scanning unit, the process state of log file, so After be distributed to file conversion unit;
Step S108: described file conversion unit reads file content, according to business model to data number According to multiple behaviour such as filtration, packet, data type conversion, standard data format, data implication escapes Make so that data are converted into final business datum;
Step S109: above-mentioned business datum is loaded into database server by described data loading module;
Step S110: laden data summarization, KPI calculating, detection are closed by described data processing module Lattice judge, subdivisional work partitioned project qualification rate is added up and is evaluated data;
Step S111: described report output module is mainly responsible for completing report according to the data result of processing module The output accused, forms final acceptance report, provides the final score of the acceptance of work and the most qualified result, And every detection is detailed and statistical result;
Step S121: system can read out data from database server, calls the output of report generation module Report is to user.
Beneficial effects of the present invention: a kind of highway communication project test detection data acquisition of the present invention and evaluation System, for the enterprise of traffic acceptance test business, along with extensive development, the road quantity of traffic route It is continuously increased, under the overall situation that various equipment and detection project also increase in blowout formula, by using native system And scheme, effective alleviation business extends the manpower and time pressure bringing enterprise on a large scale, to saving enterprise Service implementation cost, improves the effective of data acquisition and processing (DAP) and accuracy provides sound assurance.
Accompanying drawing explanation
Fig. 1 is the system deployment schematic diagram of the present invention;
Fig. 2 is the mobile terminal application component diagram of the present invention;
Fig. 3 is the service end component diagram of the present invention.
Detailed description of the invention
With embodiment, invention is further described in detail below in conjunction with the accompanying drawings.
As it is shown in figure 1, a kind of highway communication project test detection data acquisition and the system of evaluation, including mobile Terminal, service end, database server, WEB server;It is single that described mobile terminal includes that engineering model synchronizes Unit, server info administrative unit, data saving unit, data uploading unit, data local repository, Data acquisition A PP;Described service end include business model definition module, data reception module, data conversion and Cleaning module, data loading module, data processing module, report output module, system interface display module; Described business model definition module is used for setting Business Processing scope and data process, data report display mode; The conversion of described data and cleaning module for data parsing, change, screen, effectively detect, and form industry Business data;Described data loading module is that business datum is loaded into database server;Data processing module After business datum is put in storage, by data summarization, KPI calculating, detection qualification determination, subdivisional work branch work Journey qualification rate is added up, and prepares necessary data for report output;Described report output module processes mould according to data The data result of block completes the output to report.
As it is shown in figure 1, native system also includes interior PC, outer PC, described outer PC passes through the Internet and service end Connecting, described interior PC is directly connected with service end.System uses mobile terminal to carry out data inputting, by mutually Networking the service end of incoming for data enterprises, the service end of enterprises passes through gateway accessing the Internet, And run WEB server and database server.Exterior PC is connected into the service end of enterprises by the Internet, Internal PC is directly connected into the service end of enterprises, can be carried out data and checks and report printing.It is easy to each The work at place is checked and printed report at any time.
As in figure 2 it is shown, described mobile terminal not only includes that engineering model lock unit, server info manage Unit, data saving unit, data uploading unit, data local repository, data acquisition A PP, also include Device authorization unit, data validation unit.Wherein mobile terminal application for engineering model lock unit, Server info administrative unit, data saving unit, data uploading unit, data local repository, equipment Granted unit, data validation unit etc., be applied to equipment installing mobile terminal, and user opens should With when, can carry out this equipment authorizing verification, if being verified by mandate, then by device authorization unit Application could be entered, if application then can not can not be entered by verification.So mobile terminal can only specified Equipment on use, it is ensured that data safety.Data uploading unit uses on http agreement REST interface document Biography mode.
Before user detects, need to control server info management from by the UI interface of data acquisition A PP Unit, thus service end information is set, and select to need the work of synchronistic model by engineering model lock unit Journey, from service end after synchronistic model data, is saved in data local repository.
After user fills data according to the detection specified, data can be had by data validation unit Effect property verifies, and is then saved in data local repository, to adapt to the situation temporarily without net;When with After family completes Data Detection, under conditions of having network, when selecting to upload data, data uploading unit meeting It upload the data to service end.
As it is shown on figure 3, described service end includes that business model definition module, data reception module, data turn Change and show with cleaning module, data loading module, data processing module, report output module, system interface Module.
Business model definition module processes for the Business Processing scope and data setting native system, data report Display mode, is the most crucial module of native system.System completes initial model and sets up when setting up, later stage root The most gradually expand according to service needed and enrich.Highway communication detects, and business is mainly carried out in units of engineering; After an engineering detecting terminates, the report of corresponding acceptance test can be exported;And, in different engineerings, The detection needing detection is different the most entirely different, and system needs different to different engineering installations Detection, and need different detections is arranged different evaluation criterions.
Described data reception module is for receiving the data that mobile terminal is uploaded.The conversion of described data and cleaning mould Block is mainly responsible for resolving the data of uploading received, conversion, screening, validation checking, last shape One-tenth can write the data mode of data base.Wherein, the conversion of described data and cleaning module include reading and protecting Memory cell, document scanning unit, file conversion unit;Described reading is read from http flows with storage unit Go out and upload data, and be saved in file, the data can uploaded with the multiple mobile terminal of efficient reception without because of Make to upload inefficiency for other handling processes;The file that scanning has been preserved by described document scanning unit, The process state of log file, is then distributed to file conversion unit;Described file conversion unit reads file Data are carried out data filtering, packet, data type conversion, data lattice according to business model by content The multiple operations such as formula standardization, data implication escape so that data are converted into final business datum.
Described data loading module is that the business datum of data conversion and cleaning module output is loaded into data base In server.Database structure automatically generates according to business model definition, and data loading module can basis Business data model identifies database table and structure thereof, thus batch data is loaded in database table.
Described data processing module can be after data loading, and by data summarization, KPI calculates, detection is qualified sentences Fixed, subdivisional work partitioned project qualification rate statistics etc., prepare necessary data for report output.
Described report output module is mainly responsible for completing the output to report according to the data result of processing module, Form final acceptance report, provide the final score of the acceptance of work and the most qualified result, and every Detection detail and statistical result.Acceptance report can preview online, it is also possible to downloads and prints.Wherein data Output module is drawn in strict accordance with Vehicle Detection reporting standards completion report.
System interface display module mainly provides the interactive interface of system and user, mainly checks on computers Engineering information and report preview, and report that the various functions such as download and printing present.Including: 1, Yong Hudeng Record;2, system user Password Management;3, enterprise's basic information management;4, Vehicle Detection engineering is set up, engineering Bid section and and each bid section detection project alternatives;5, measured data is checked and is safeguarded;6, count off in terminal APP According to processing condition monitoring;7, report information is filled in and report represents function;8, report is downloaded and printing function.
Native system uses the mode of mobile terminal to carry out data acquisition.Mobile terminal, equipped with data acquisition A PP, props up Hold Data Data offline storage and be submitted to server online, to adapt to the some areas situation without network.Separately Outward, APP possesses authorization function, can only use, it is ensured that data safety on the equipment specified.Data acquisition people The hand-held equipment equipped with data acquisition A PP of member, arrives and opens data acquisition A PP, from service after specifying test point End synchronizes to need engineering and the engineering detecting item of detection, obtains detection project to be carried out.At detection specified point During position, input test point position and every detection measured value of this some position, then preserve in the terminal.When When environment possesses network or collects certain phase, data in APP can be clicked on and upload menu, by data It is sent to service end.
When mobile terminal uploads detection data, first data can be stored into file, then to literary composition by system Part is changed and is cleaned, and finally writes data into database server, and after data loading, can be certainly Move and data are collected and adds up, and data are evaluated.Mobile phone users can download engineering Model and uploading detection data.Finally, when user checks data and preview report, system can be from data base Server reads out data, calls report generation module output report to user.System user of service also may be used So that system is carried out engineering model maintenance, data management, Reports Administration and Fileview etc..
Native system step during actual operation is:
Step S101: user carries out authority checking to mobile terminal;
Step S102: user arranges service end information by the UI interface of data acquisition A PP;
Step S103: user selects to need the engineering of synchronistic model according to practical situation, and same from service end It is saved in data local repository after step model data;
Step S104: user fills in detection data in data acquisition A PP, and verifies detection data;
Step S105: the detection data after verification store data local repository, and detection data are uploaded To service end;
Step S106: read to read out from http flows with storage unit and upload data, and be saved in file;
Step S107: the file that scanning has been preserved by document scanning unit, the process state of log file, so After be distributed to file conversion unit;
Step S108: described file conversion unit reads file content, according to business model to data number According to multiple behaviour such as filtration, packet, data type conversion, standard data format, data implication escapes Make so that data are converted into final business datum;
Step S109: above-mentioned business datum is loaded into database server by described data loading module;
Step S110: laden data summarization, KPI calculating, detection are closed by described data processing module Lattice judge, subdivisional work partitioned project qualification rate is added up and is evaluated data;
Step S111: described report output module is mainly responsible for completing report according to the data result of processing module The output accused, forms final acceptance report, provides the final score of the acceptance of work and the most qualified result, And every detection is detailed and statistical result;
Step S121: system can read out data from database server, calls the output of report generation module Report is to user.
A kind of highway communication project test detection data acquisition of the present invention and the system of evaluation, check and accept for traffic The enterprise of detection business, along with extensive development, the road quantity of traffic route are continuously increased, various equipment Also under the overall situation of increase, by using native system and scheme, industry is effectively alleviated in blowout formula with detection project Business extends the manpower bringing enterprise and time pressure on a large scale, to saving business event implementation cost, improves Effective and the accuracy of data acquisition and processing (DAP) provides sound assurance.

Claims (7)

1. a highway communication project test detection data acquisition and the system of evaluation, it is characterised in that include moving Dynamic terminal, service end, database server, WEB server;
It is single that described mobile terminal includes that engineering model lock unit, server info administrative unit, data preserve Unit, data uploading unit, data local repository, data acquisition A PP;
Described service end include business model definition module, data reception module, data conversion and cleaning module, Data loading module, data processing module, report output module, system interface display module;
Described business model definition module is used for setting Business Processing scope and data process, data report shows Mode;The conversion of described data and cleaning module for data parsing, change, screen, effectively detect, and Form business datum;Described data loading module is that business datum is loaded into database server;At data Reason module is after business datum is put in storage, by data summarization, KPI calculating, detection qualification determination, subdivisional work Partitioned project qualification rate is added up, and prepares necessary data for report output;Described report output module is according to data The data result of processing module completes the output to report.
A kind of highway communication project test detection data acquisition the most according to claim 1 and the system of evaluation, It is characterized in that, also include interior PC, outer PC, described outer PC is connected with service end by the Internet, described Interior PC is directly connected with service end.
A kind of highway communication project test detection data acquisition the most according to claim 2 and the system of evaluation, It is characterized in that, described mobile terminal also includes device authorization unit, data validation unit.
A kind of highway communication project test detection data acquisition the most according to claim 3 and the system of evaluation, It is characterized in that, described data uploading unit uses http agreement REST interface document to upload mode.
A kind of highway communication project test detection data acquisition the most according to claim 4 and the system of evaluation, It is characterized in that, described data conversion and cleaning module include read with storage unit, document scanning unit, File conversion unit;
Described reading and storage unit read out from http flows and upload data, and are saved in file, Ke Yigao The data that the effect multiple mobile terminals of reception are uploaded are without because other handling processes make to upload inefficiency;
The file that scanning has been preserved by described document scanning unit, the process state of log file, then distribute To file conversion unit;
Described file conversion unit reads file content, according to business model, data is carried out data filtering, number According to multiple operations such as packet, data type conversion, standard data format, data implication escapes so that number According to being converted into final business datum.
A kind of highway communication project test detection data acquisition the most according to claim 4 and the system of evaluation, It is characterized in that, described system interface display module has user's login, system user Password Management, enterprise Basic information management, Vehicle Detection engineering set up and engineering bid section and with each bid section detect project alternatives, reality Survey data are checked and are safeguarded, data acquisition A PP uploads data processing state monitoring, report information is filled in and reports Announcement represents function, report is downloaded and printing function.
7. a kind of highway communication project test detection data acquisition of any one of claim 1 to 6 and evaluation side Method, it is characterised in that: comprise the following steps:
Step S101: user carries out authority checking to mobile terminal;
Step S102: user arranges service end information by the UI interface of data acquisition A PP;
Step S103: user selects to need the engineering of synchronistic model according to practical situation, and same from service end It is saved in data local repository after step model data;
Step S104: user fills in detection data in data acquisition A PP, and verifies detection data;
Step S105: the detection data after verification store data local repository, and detection data are uploaded To service end;
Step S106: read to read out from http flows with storage unit and upload data, and be saved in file;
Step S107: the file that scanning has been preserved by document scanning unit, the process state of log file, so After be distributed to file conversion unit;
Step S108: described file conversion unit reads file content, according to business model to data number According to multiple behaviour such as filtration, packet, data type conversion, standard data format, data implication escapes Make so that data are converted into final business datum;
Step S109: above-mentioned business datum is loaded into database server by described data loading module;
Step S110: laden data summarization, KPI calculating, detection are closed by described data processing module Lattice judge, subdivisional work partitioned project qualification rate is added up and is evaluated data;
Step S111: described report output module is mainly responsible for completing report according to the data result of processing module The output accused, forms final acceptance report, provides the final score of the acceptance of work and the most qualified result, And every detection is detailed and statistical result;
Step S121: system can read out data from database server, calls the output of report generation module Report is to user.
CN201610290127.0A 2016-05-05 2016-05-05 Road traffic engineering test detection data acquisition and evaluation system Active CN105956987B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610290127.0A CN105956987B (en) 2016-05-05 2016-05-05 Road traffic engineering test detection data acquisition and evaluation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610290127.0A CN105956987B (en) 2016-05-05 2016-05-05 Road traffic engineering test detection data acquisition and evaluation system

Publications (2)

Publication Number Publication Date
CN105956987A true CN105956987A (en) 2016-09-21
CN105956987B CN105956987B (en) 2017-05-10

Family

ID=56914678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610290127.0A Active CN105956987B (en) 2016-05-05 2016-05-05 Road traffic engineering test detection data acquisition and evaluation system

Country Status (1)

Country Link
CN (1) CN105956987B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106203796A (en) * 2016-06-30 2016-12-07 深圳市深信通软件有限公司 A kind of actual measurement actual quantities method based on engineering electronic drawing mark in situ
CN106610805A (en) * 2016-12-30 2017-05-03 成都运达科技股份有限公司 Method for acquiring data information by printing
CN108897921A (en) * 2018-06-07 2018-11-27 北京航空航天大学 A kind of data management system for the analysis of circuit board product Reliability Physics comprehensive simulating
CN109614430A (en) * 2018-12-05 2019-04-12 云南大学 Configurable data acquisition and data verification system and method based on WLAN
CN109829088A (en) * 2019-01-15 2019-05-31 江西通慧科技股份有限公司 A kind of Expressway Mechanical & Electrical Project detection system
CN109889574A (en) * 2019-01-15 2019-06-14 江西通慧科技股份有限公司 A kind of Expressway Mechanical & Electrical Project APP tool and mating web services end system
CN110147391A (en) * 2019-04-08 2019-08-20 顺丰速运有限公司 Data handover method, system, equipment and storage medium
CN110516957A (en) * 2019-08-23 2019-11-29 国网河北省电力有限公司 A kind of safe evaluation method based on 2-4 model
CN110674357A (en) * 2019-10-18 2020-01-10 国网福建省电力有限公司检修分公司 Intelligent test data management system
CN115860573A (en) * 2023-02-03 2023-03-28 蜀道投资集团有限责任公司 Highway engineering detection method based on detection items, electronic equipment and readable medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101488202A (en) * 2009-02-25 2009-07-22 武汉任驰能源科技开发有限公司 Flexibly customized energy monitoring and auditing method and its synthetic integration system
CN101620698A (en) * 2009-07-27 2010-01-06 石庆生 Integrated system of test detection, management and monitoring and method
CN104731986A (en) * 2015-03-17 2015-06-24 苏交科集团股份有限公司 Handheld type terminal system for bridge information detection
CN105447681A (en) * 2015-11-22 2016-03-30 沈阳黎明航空发动机(集团)有限责任公司 Physicochemical detection control and information management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101488202A (en) * 2009-02-25 2009-07-22 武汉任驰能源科技开发有限公司 Flexibly customized energy monitoring and auditing method and its synthetic integration system
CN101620698A (en) * 2009-07-27 2010-01-06 石庆生 Integrated system of test detection, management and monitoring and method
CN104731986A (en) * 2015-03-17 2015-06-24 苏交科集团股份有限公司 Handheld type terminal system for bridge information detection
CN105447681A (en) * 2015-11-22 2016-03-30 沈阳黎明航空发动机(集团)有限责任公司 Physicochemical detection control and information management system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
龚德俊: ""公路工程试验检测与质量检验评定一体化系统研究与开发"", 《中南公路工程》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106203796A (en) * 2016-06-30 2016-12-07 深圳市深信通软件有限公司 A kind of actual measurement actual quantities method based on engineering electronic drawing mark in situ
CN106610805A (en) * 2016-12-30 2017-05-03 成都运达科技股份有限公司 Method for acquiring data information by printing
CN108897921A (en) * 2018-06-07 2018-11-27 北京航空航天大学 A kind of data management system for the analysis of circuit board product Reliability Physics comprehensive simulating
CN109614430A (en) * 2018-12-05 2019-04-12 云南大学 Configurable data acquisition and data verification system and method based on WLAN
CN109614430B (en) * 2018-12-05 2022-03-04 云南大学 Configurable data acquisition and data verification system and method based on WLAN
CN109829088A (en) * 2019-01-15 2019-05-31 江西通慧科技股份有限公司 A kind of Expressway Mechanical & Electrical Project detection system
CN109889574A (en) * 2019-01-15 2019-06-14 江西通慧科技股份有限公司 A kind of Expressway Mechanical & Electrical Project APP tool and mating web services end system
CN110147391A (en) * 2019-04-08 2019-08-20 顺丰速运有限公司 Data handover method, system, equipment and storage medium
CN110516957A (en) * 2019-08-23 2019-11-29 国网河北省电力有限公司 A kind of safe evaluation method based on 2-4 model
CN110674357A (en) * 2019-10-18 2020-01-10 国网福建省电力有限公司检修分公司 Intelligent test data management system
CN115860573A (en) * 2023-02-03 2023-03-28 蜀道投资集团有限责任公司 Highway engineering detection method based on detection items, electronic equipment and readable medium
CN115860573B (en) * 2023-02-03 2023-06-16 蜀道投资集团有限责任公司 Highway engineering detection method based on detection item, electronic equipment and readable medium

Also Published As

Publication number Publication date
CN105956987B (en) 2017-05-10

Similar Documents

Publication Publication Date Title
CN105956987A (en) Road traffic engineering test detection data acquisition and evaluation system
CN106961362B (en) Automated testing method and mobile cloud test system
CN103995715B (en) Restorative procedure, device and the server of application program
CN104717085B (en) A kind of daily record analysis method and device
CN103678124B (en) Video surveillance platform auto-test method and device based on continuous integrated environment
CN103473672A (en) System, method and platform for auditing metadata quality of enterprise-level data center
CN108809747A (en) A kind of the analogue data test system and its test method of system platform
CN103197640B (en) Production technology intelligence managing and control system and method
CN103560932A (en) Wireless sensor network remote protocol conformance testing system and method
CN111915143B (en) Complex product assembly management and control system based on intelligent contract
CN103313289A (en) Wap system automatic test system and method
CN104618502A (en) Joint debugging testing platform used for satellite data ground receiving station net
CN109672582A (en) Complete trails monitoring method, equipment, storage medium and device
CN106550038A (en) A kind of data configuration diagnostic system of Digitizing And Control Unit and method
CN109740372A (en) Based on the system and method for realizing that conceptual schematic drawing paper is divided in automatic audit room on WEB
CN109635292A (en) Work order quality detecting method and device based on machine learning algorithm
CN104199625A (en) Method, device and system for converting and outputting print data
CN112185497A (en) Occupational health supervision method and system
CN111666193B (en) Method and system for monitoring and testing terminal function based on real-time log analysis
CN107833147A (en) A kind of electronic billboard system, data processing method and device
CN116319081B (en) Electronic signature security management system based on big data cloud platform
CN104158890A (en) Method and device of consultation and feedback of e-commerce website
CN107979174B (en) Workflow operation method based on power grid operation management system
CN107292175A (en) Server apparatus method for managing security and device
CN103854139A (en) Inspection supervision and management system and method for seed products

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A data acquisition and evaluation system for highway traffic engineering test

Effective date of registration: 20201019

Granted publication date: 20170510

Pledgee: Chengdu SME financing Company Limited by Guarantee

Pledgor: SICHUAN JINGWEI TRAFFIC ENGINEERING TECHNOLOGY Co.,Ltd.

Registration number: Y2020980006888

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20210730

Granted publication date: 20170510

Pledgee: Chengdu SME financing Company Limited by Guarantee

Pledgor: SICHUAN JINGWEI TRAFFIC ENGINEERING TECHNOLOGY Co.,Ltd.

Registration number: Y2020980006888

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A data acquisition and evaluation system for test and detection of highway traffic engineering

Effective date of registration: 20210817

Granted publication date: 20170510

Pledgee: Chengdu SME financing Company Limited by Guarantee

Pledgor: SICHUAN JINGWEI TRAFFIC ENGINEERING TECHNOLOGY Co.,Ltd.

Registration number: Y2021980007819

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220801

Granted publication date: 20170510

Pledgee: Chengdu SME financing Company Limited by Guarantee

Pledgor: SICHUAN JINGWEI TRAFFIC ENGINEERING TECHNOLOGY Co.,Ltd.

Registration number: Y2021980007819

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A highway traffic engineering test data collection and evaluation system

Effective date of registration: 20220811

Granted publication date: 20170510

Pledgee: Chengdu SME financing Company Limited by Guarantee

Pledgor: SICHUAN JINGWEI TRAFFIC ENGINEERING TECHNOLOGY Co.,Ltd.

Registration number: Y2022980012279

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230828

Granted publication date: 20170510

Pledgee: Chengdu SME financing Company Limited by Guarantee

Pledgor: SICHUAN JINGWEI TRAFFIC ENGINEERING TECHNOLOGY Co.,Ltd.

Registration number: Y2022980012279

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Data Collection and Evaluation System for Highway Traffic Engineering Test and Detection

Effective date of registration: 20231113

Granted publication date: 20170510

Pledgee: Chengdu SME financing Company Limited by Guarantee

Pledgor: SICHUAN JINGWEI TRAFFIC ENGINEERING TECHNOLOGY Co.,Ltd.

Registration number: Y2023980064931