CN109750657A - A kind of slope drainage system - Google Patents

A kind of slope drainage system Download PDF

Info

Publication number
CN109750657A
CN109750657A CN201910182758.4A CN201910182758A CN109750657A CN 109750657 A CN109750657 A CN 109750657A CN 201910182758 A CN201910182758 A CN 201910182758A CN 109750657 A CN109750657 A CN 109750657A
Authority
CN
China
Prior art keywords
hole
scupper
slope
drainage system
side slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910182758.4A
Other languages
Chinese (zh)
Other versions
CN109750657B (en
Inventor
胡娟
刘昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Zhongnan Engineering Corp Ltd
Original Assignee
PowerChina Zhongnan Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Zhongnan Engineering Corp Ltd filed Critical PowerChina Zhongnan Engineering Corp Ltd
Priority to CN201910182758.4A priority Critical patent/CN109750657B/en
Publication of CN109750657A publication Critical patent/CN109750657A/en
Application granted granted Critical
Publication of CN109750657B publication Critical patent/CN109750657B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of slope drainage systems, including, along the longitudinally disposed a plurality of scupper of side slope, at least one connection hole for being sequentially communicated each scupper, the outlet in the connection hole is in communication with the outside in the rock mass stability of side slope;Scupper layering setting from top to bottom in the rock mass stability of side slope;The blind hole in a plurality of unfavorable geology body for protruding into side slope is equipped at intervals on each scupper, and every blind hole is connected to the scupper where it;The water hole of perforation is equipped on the scupper, connection hole and blind hole.The underground water of weak structural face is introduced scupper by the present invention, then the scupper between each layer is connected by contacting hole, forms effective drainage system, is discharged to the external world from connection hole, enough waters can be discharged, can effectively reduce level of ground water.It can use original traffic route, reduce costs.Whole system connects into an entirety each other and plays a role, while solving multiple technical problems.

Description

A kind of slope drainage system
Technical field
The invention belongs to engineering technology, and in particular to a kind of slope drainage system.
Background technique
In the side slope of the infrastructure development project of various large sizes, various unfavorable geologic bodies can be often encountered, such as Wriggle-changing Body, weak intercalated layer etc..Normal underground water rich in the unfavorable geologic body.If effective draining can not be established to arrange It applies, the side slope of unfavorable geologic body covering is possible to meeting unstability, and then leads to serious safety problem.
Existing technological means is usually longitudinal drainage hole successively to be laid in rock mass stability, and set in scupper hole week and be System drainage hole, locally adds drainage hole, thus lowering of watertable, and then improve the stability of side slope.In order to overhaul and monitor, Need to repair traffic route, the way of the prior art is repaired the roads along side slope, and each scupper hole is repaired.But the prior art exists such as Lower problem:
1. since the laying of drainage hole does not have specific aim usually, and displacement is limited, for the unfavorable geology of rich groundwater Enough waters usually cannot be effectively discharged in body.
2. prior art scupper is layering setting, the outlet of every scupper is only simply in communication with the outside, out Mouth is all disposed in side slope, and for the water nature lagging edge hillside fields shape of discharge toward flowing down, draining is uncontrollable, is unfavorable for stability of slope.
3. general difference has arrived in slope surface just in 45m or more since height difference is larger between each layer scupper It is very high steep, in order to which the difficulty for overhauling and monitoring repaired roads is quite big, and the synthesis slope of road than general requirement be 8% with It is interior, it is necessary to repair very long, involve great expense.
Summary of the invention
In view of the above-mentioned problems, underground can be effectively reduced the present invention is intended to provide enough waters can be discharged in one kind Water level slope drainage system.
The technical solution that the present invention solves the problems, such as is: a kind of slope drainage system, including the edge in the rock mass stability of side slope The longitudinally disposed a plurality of scupper of side slope, at least one connection hole for being sequentially communicated each scupper, the connection hole goes out Mouth is in communication with the outside;
Scupper layering setting from top to bottom in the rock mass stability of side slope;
Be equipped at intervals with the blind hole in a plurality of unfavorable geology body for protruding into side slope on each scupper, and every blind hole and its The scupper at place is connected to;
The water hole of perforation is equipped on the scupper, connection hole and blind hole.
Blind hole at least two benefits are set: first, it can drain;Second, since blind hole is formed with concrete masonry units, It, which is set in unfavorable geology body, can substitute part unfavorable geologic body, and play the role of reinforcing to unfavorable geologic body.
Above scheme introduces scupper by the way that blind hole is arranged, by the underground water of weak structural face, then by the row between each layer Water hole is connected by connection hole, forms effective drainage system, is discharged to the external world from connection hole, A distinction should be made between what is primary and what is secondary, like human vas, Enough waters can be discharged, level of ground water can be effectively reduced.
Further, the water hole is set to the keystone of scupper, connection hole and blind hole, and radial Arrangement.
Preferably, the setting of the water hole point row interval, each row are transversely arranged, and each row is by 4~5 water hole groups At 2~3m of interval between adjacent row.
Preferably, the spacing between adjacent blind hole is 20~100m.
Preferably, it is 3~5m that the length in unfavorable geologic body is protruded into the blind hole.
To be equipped with drainage groove convenient for the two sides of the bottom of draining, the scupper, connection hole and blind hole.
Further, the connection hole divides step to be arranged from top to bottom, and each step includes horizontal hole and connects with horizontal hole Logical inclination hole, the horizontal hole of next step are connected to the inclination hole of a upper step;The scupper and the intersection for contacting hole Positioned at horizontal hole section.
Preferably, it tilts and is equipped with ladder half space in hole, to facilitate walking and rest.
By the connection of connection hole between each scupper, connection hole had not only been used as drainage channel but also as overhauling and monitoring Channel.
It further, further include the external traffic roadnet for being set to side slope slope foot, the outlet in the connection hole and outer Portion's traffic route system connectivity.
Under normal circumstances, it is exactly external traffic road that side slope slope foot is adjacent, why is discharged to the draining for contacting hole outer Portion's traffic route system, first is that and being unlikely at will to be exhausted directly to side like that traditional scheme in order to enable the water of discharge is controllable On slope;Second it can use original traffic route, and no longer need to build road along side slope, reduce costs.
Remarkable result of the invention is:
1. the underground water of weak structural face is introduced scupper, then the scupper between each layer is connected by contacting hole, is formed Effective drainage system is discharged to the external world from connection hole, A distinction should be made between what is primary and what is secondary, and like human vas, enough waters can be discharged, can have The lowering of watertable of effect.
2. the water of discharge is controllable, and is unlikely at will to be exhausted directly in side slope like that traditional scheme.
3. can use original traffic route, and no longer need to build road along side slope, reduces costs.
Exactly because contacting the cooperation in hole and external traffic roadnet, plays a role, just make not as a whole With additional build along the road of side slope, but enter connection hole using original external traffic system, is directly made by connection hole The each position for entering drainage system for entrance is monitored and overhauls.Ready-made road had not only been utilized in this way, but also had solved Monitoring and maintenance issue, and contact after water can also be collected in hole and be discharged, whole system, which connects into an entirety each other and plays, to be made With, while solving multiple technical problems.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings.
Fig. 1 is the schematic top plan view of drainage system of the present invention;
Fig. 2 is the sectional view in the direction A-A in Fig. 1;
Fig. 3 is the sectional elevation of scupper or connection hole or blind hole;
Fig. 4 is the profilograph in blind hole.
In figure: 1- scupper, the blind hole 2-, 3- contact hole, 4- water hole, 5- weak intercalated layer, 6- ladder half space, outside 7- Portion's traffic route system, 8- drainage groove, 9- side slope, 31- horizontal hole, 32- tilt hole.
Specific embodiment
For ease of description, the description of the relative positional relationship (such as: horizontal, vertical) of each component is according to Figure of description Butut direction be described, restriction effect is not played to the structure of this patent.
As shown in figures 1-4, a kind of slope drainage system, including longitudinally disposed along side slope 9 in the rock mass stability of side slope 9 A plurality of scupper 1, by each scupper 1 be sequentially communicated at least one connection hole 3.
The scupper 1 layering setting from top to bottom in the rock mass stability of side slope 9.
The blind hole 2 in a plurality of unfavorable geology body for protruding into side slope 9 is equipped at intervals on each scupper 1.Every blind hole 2 It is connected to the scupper 1 where it.Spacing between adjacent blind hole 2 is 20~100m.Unfavorable geologic body is protruded into the blind hole 2 In length be 3~5m.
Unfavorable geologic body described in the present embodiment is that weak intercalated layer 5(is shown in Fig. 4).
The water hole 4 of perforation is equipped on the scupper 1, connection hole 3 and blind hole 2.The water hole 4 is set to Scupper 1, the keystone for contacting hole 3 and blind hole 2, and radial is arranged.
The water hole 4 divides the setting of row interval.Each row is transversely arranged.Each row is made of 4~5 water holes 4.Phase 2~3m is spaced between neighbour row.
The connection hole 3 divides step to be arranged from top to bottom.Each step includes horizontal hole 31 and is connected to horizontal hole 31 Tilt hole 32.The horizontal hole 31 of next step is connected to the inclination hole 32 of a upper step.The scupper 1 and the friendship for contacting hole 3 It is located at 31 sections of horizontal hole at boundary.
It tilts and is equipped with ladder half space 6 in hole 32.
The two sides of the bottom of the scupper 1, connection hole 3 and blind hole 2 are equipped with drainage groove 8.
It further include the external traffic roadnet 7 for being set to 9 slope foot of side slope.
The outlet in the connection hole 3 is connected to external traffic roadnet 7.

Claims (9)

1. a kind of slope drainage system, it is characterised in that: be included in longitudinally disposed along side slope (9) in the rock mass stability of side slope (9) A plurality of scupper (1), by each scupper (1) be sequentially communicated at least one connection hole (3), it is described connection hole (3) go out Mouth is in communication with the outside;
The scupper (1) layering setting from top to bottom in the rock mass stability of side slope (9);
The blind hole (2) in a plurality of unfavorable geology body for protruding into side slope (9), and every are equipped at intervals on each scupper (1) Blind hole (2) is connected to the scupper (1) where it;
The water hole (4) of perforation is equipped on the scupper (1), connection hole (3) and blind hole (2).
2. slope drainage system according to claim 1, it is characterised in that: the water hole (4) is set to scupper (1), the keystone of hole (3) and blind hole (2) is contacted, and radial is arranged.
3. slope drainage system according to claim 2, it is characterised in that: the water hole (4) point row interval setting, often One row is transversely arranged, and each row is made of 4~5 water holes (4), and 2~3m is spaced between adjacent row.
4. slope drainage system according to claim 1, it is characterised in that: spacing between adjacent blind hole (2) is 20~ 100m。
5. slope drainage system according to claim 1, it is characterised in that: the blind hole (2) is protruded into unfavorable geologic body Length be 3~5m.
6. slope drainage system according to claim 1, it is characterised in that: the scupper (1), connection hole (3) and The two sides of the bottom of blind hole (2) are equipped with drainage groove (8).
7. slope drainage system according to claim 1, it is characterised in that: the connection hole (3) divides step from top to bottom Setting, each step includes horizontal hole (31) and the inclination hole (32) being connected to horizontal hole (31), the horizontal hole of next step (31) it is connected to the inclination hole (32) of a upper step;The scupper (1) and the intersection for contacting hole (3) are located at horizontal hole (31) Section.
8. slope drainage system according to claim 7, it is characterised in that: be equipped with ladder half space in inclination hole (32) (6).
9. described in any item slope drainage systems according to claim 1~8, it is characterised in that: further include being set to side slope (9) The outlet of the external traffic roadnet (7) of slope foot, connection hole (3) is connected to external traffic roadnet (7).
CN201910182758.4A 2019-03-12 2019-03-12 Slope drainage system Active CN109750657B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910182758.4A CN109750657B (en) 2019-03-12 2019-03-12 Slope drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910182758.4A CN109750657B (en) 2019-03-12 2019-03-12 Slope drainage system

Publications (2)

Publication Number Publication Date
CN109750657A true CN109750657A (en) 2019-05-14
CN109750657B CN109750657B (en) 2023-11-07

Family

ID=66408450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910182758.4A Active CN109750657B (en) 2019-03-12 2019-03-12 Slope drainage system

Country Status (1)

Country Link
CN (1) CN109750657B (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01137016A (en) * 1987-11-19 1989-05-30 Sankyo Trading:Kk Setting of slope block
CN203373713U (en) * 2013-07-25 2014-01-01 广西桂海高速公路有限公司 Drainage system for reconstructed and expanded expressway soil slope shallow layer
CN103643686A (en) * 2013-12-19 2014-03-19 中南大学 Retaining structure of water-saturated landslide with gradual slope ratio and construction method
CN204825934U (en) * 2015-07-29 2015-12-02 中国电建集团西北勘测设计研究院有限公司 Side slope drainage system
CN204898695U (en) * 2015-08-28 2015-12-23 中国电建集团成都勘测设计研究院有限公司 Side slope drainage structure
JP5864013B1 (en) * 2015-06-03 2016-02-17 日工産業株式会社 Pipe set for drain pipe and installation method of drain pipe
CN206655239U (en) * 2017-04-06 2017-11-21 中铁七局集团第四工程有限公司 Steel pipe concrete bracket foundation structure
CN206941616U (en) * 2017-06-16 2018-01-30 中国电建集团贵阳勘测设计研究院有限公司 Overburden bank protection drainage structures
CN207419439U (en) * 2017-11-20 2018-05-29 中国电建集团成都勘测设计研究院有限公司 The buried anti-shear concrete structure drainage system of side slope
CN207987940U (en) * 2018-03-14 2018-10-19 深圳市恒华园林景观有限公司 A kind of slope drainage structure
JP2018165445A (en) * 2017-03-28 2018-10-25 日鐵住金建材株式会社 Temporary fixing pin of perforated pipe and method of constructing multi-stage drain pipe using the same
CN208105292U (en) * 2018-04-03 2018-11-16 贵阳锐航智能科技有限公司 A kind of water conservancy or highway engineering side slope equipped with draining with protective device
WO2019000776A1 (en) * 2017-06-30 2019-01-03 浙江大学 Side slope underground water drilling self-starting negative pressure drainage system and method
CN209703481U (en) * 2019-03-12 2019-11-29 中国电建集团中南勘测设计研究院有限公司 A kind of slope drainage system

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01137016A (en) * 1987-11-19 1989-05-30 Sankyo Trading:Kk Setting of slope block
CN203373713U (en) * 2013-07-25 2014-01-01 广西桂海高速公路有限公司 Drainage system for reconstructed and expanded expressway soil slope shallow layer
CN103643686A (en) * 2013-12-19 2014-03-19 中南大学 Retaining structure of water-saturated landslide with gradual slope ratio and construction method
JP5864013B1 (en) * 2015-06-03 2016-02-17 日工産業株式会社 Pipe set for drain pipe and installation method of drain pipe
CN204825934U (en) * 2015-07-29 2015-12-02 中国电建集团西北勘测设计研究院有限公司 Side slope drainage system
CN204898695U (en) * 2015-08-28 2015-12-23 中国电建集团成都勘测设计研究院有限公司 Side slope drainage structure
JP2018165445A (en) * 2017-03-28 2018-10-25 日鐵住金建材株式会社 Temporary fixing pin of perforated pipe and method of constructing multi-stage drain pipe using the same
CN206655239U (en) * 2017-04-06 2017-11-21 中铁七局集团第四工程有限公司 Steel pipe concrete bracket foundation structure
CN206941616U (en) * 2017-06-16 2018-01-30 中国电建集团贵阳勘测设计研究院有限公司 Overburden bank protection drainage structures
WO2019000776A1 (en) * 2017-06-30 2019-01-03 浙江大学 Side slope underground water drilling self-starting negative pressure drainage system and method
CN207419439U (en) * 2017-11-20 2018-05-29 中国电建集团成都勘测设计研究院有限公司 The buried anti-shear concrete structure drainage system of side slope
CN207987940U (en) * 2018-03-14 2018-10-19 深圳市恒华园林景观有限公司 A kind of slope drainage structure
CN208105292U (en) * 2018-04-03 2018-11-16 贵阳锐航智能科技有限公司 A kind of water conservancy or highway engineering side slope equipped with draining with protective device
CN209703481U (en) * 2019-03-12 2019-11-29 中国电建集团中南勘测设计研究院有限公司 A kind of slope drainage system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘红杰;李正华;高永红;: "排水措施对巨型滑坡稳定性的影响研究", 黄河水利职业技术学院学报, no. 02 *
汪军伟;: "排水措施对某高速公路巨型滑坡稳定性的影响", 中国新技术新产品, no. 20 *
马志峰;: "不良地质条件大断面导流洞开挖支护的施工技术", 西北水电, no. 05 *

Also Published As

Publication number Publication date
CN109750657B (en) 2023-11-07

Similar Documents

Publication Publication Date Title
CN205975275U (en) Prevent pavior brick of ponding
US9834894B1 (en) Drain channel
CN209703481U (en) A kind of slope drainage system
CN105926391A (en) Method for widening shoulder of existing railway subgrade
CN110792473A (en) Three-hole tunnel drainage system for centralized drainage by using service tunnel
CN103334371A (en) Roadbed subsidence grouting treatment structure and construction method thereof
CN205134342U (en) Large -tonnage list double -walled combines steel cofferdam
CN110373982A (en) A kind of construction method administered for tunnel road surface infiltration
KR200419504Y1 (en) Block for preventing slide of ballast
CN110306591A (en) A kind of base pit engineering exempts to set the construction method of the underground structure of temporary support
CN109750657A (en) A kind of slope drainage system
CN109555148B (en) Karst foundation treatment method for crossing larger solution cavity and combined pile plate structure thereof
US4607985A (en) Block construction for preventing outflow of ballasts
CN211474180U (en) Three-hole tunnel drainage system for centralized drainage by using service tunnel
CN212406735U (en) PBA secretly digs station transfer passage structure
CN212357853U (en) Urban road assembled permeable pavement structure
CN212376693U (en) Tunnel drainage structure with deep-buried central ditch and drainage tunnel combined
CN110847055B (en) Bridge pier of mountain-crossing highway bridge, construction method and mountain-crossing highway bridge
CN104213543B (en) A kind of for the clay filling construction method between two walls of earth and rockfill dam bottom
CN207420624U (en) A kind of intensive overall structure shaft sump system
CN110080102A (en) A kind of bridge deck drainage structure across railroad bridge
CN211947751U (en) Anti-collapse roadbed structure
CN111911160B (en) Gently inclined ore body stope arrangement system
CN219100064U (en) Foundation pit with pipeline support
CN213684132U (en) T-shaped transfer subway station jointly built with municipal tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant