CN103643686A - Retaining structure of water-saturated landslide with gradual slope ratio and construction method - Google Patents

Retaining structure of water-saturated landslide with gradual slope ratio and construction method Download PDF

Info

Publication number
CN103643686A
CN103643686A CN201310699905.8A CN201310699905A CN103643686A CN 103643686 A CN103643686 A CN 103643686A CN 201310699905 A CN201310699905 A CN 201310699905A CN 103643686 A CN103643686 A CN 103643686A
Authority
CN
China
Prior art keywords
slope
antislide pile
retaining structure
antislide
landslide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310699905.8A
Other languages
Chinese (zh)
Inventor
邹金锋
李亮
曾中林
李帅帅
童无欺
赵炼恒
但汉成
刘晖峻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201310699905.8A priority Critical patent/CN103643686A/en
Publication of CN103643686A publication Critical patent/CN103643686A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Abstract

The invention discloses a retaining structure of a water-saturated landslide with a gradual slope ratio and a construction method of the retaining structure. The retaining structure comprises a plurality of anti-slide pile mounting holes, multiple rows of anti-slide piles and drainage galleries, wherein the plurality of anti-slide pile mounting holes are vertically formed in a landslide mass, a sliding surface and a landslide bed; each row of anti-slide piles are arranged in a cross slope aspect X and consist of a plurality of anti-slide piles; tops of every two adjacent anti-slide piles are fixedly connected through a connecting beam, so that the anti-slide piles are connected to form a rigid anti-slide body; each vertically arranged anti-slide pile is arranged in the corresponding anti-slide pile mounting hole; and each whole drainage gallery is arranged in the cross slope aspect X, arranged between every two adjacent rows of anti-slide piles and located below the connecting beams of the every two adjacent rows of anti-slide piles. The retaining structure is large in rigidity, labor-saving, material-saving, easy to implement, good in effect, low in construction cost and wide in application range.

Description

Rich neatly slope retaining structure and construction method that a kind of ratio of slope is mild
Technical field
The present invention relates to a kind of ratio of slope mild rich neatly slope retaining structure and construction method thereof.
Background technology
Landslide, as a kind of natural calamity, all brings the loss of huge life and property every year to the whole world, cause the reason on landslide a lot.Landslide is conventionally accompanied by the natural calamities such as heavy rain, earthquake and occurs.Soil occurs to soften to cause paroxysmal landslide under certain underground water and stress condition.If lasting time of rainfall is long, the force of rain is large, and the slope table soil body of certain depth moves closer to saturation state, the shear strength of the soil body weakens rapidly, and may below surface, slope, form higher temporary groundwater table, cause local penetration and destroy, even whole landslide.
At present, the improvement method for rich neatly slope comprises the improvement of surface water and the improvement of underground water.Administering surface water is mainly to make catchwater around at sliding mass, makes surface water can not enter within the scope of sliding mass; Within the scope of landslide, build various gutters, surface water is discharged beyond sliding mass scope, should carry out the seepage control measure of irrigation canals and ditches simultaneously.Leveling earth's surface, the loosening ground of filling crack and compacting, carries out every infiltration layer, reduces under surface water and oozes and make it import as early as possible gutter, gets rid of gliding mass.Administer the underground water in sliding mass, for the spring of exposure and wetland etc., make gutter or sewer, water is drawn outside sliding mass; Sliding mass leading edge, groundwater table activity in Chang Yinpo body and soft, moist, causes that slope body caves in, and can make side slope sewer drainage; Note bank protection and vegetation, strengthen evaporation capacity, guarantee domatic dry.When if the water on sliding zone is pressure-bearing supply from bottom to top, adopt more Huo Ping hole, blind hole underground water is drained or dewatering below slide plane.In order to get rid of deep phreatic water, under soil layer and rock stratum operating mode, all can adopt long horizontal drilling.Inside and outside region, landslide, near the most concentrated location of underground water, collecting well can be set, for concentrating, collect on bedrock surface and near underground water.Except earth's surface and the underground water on landslide, administer, conventionally also carry out retaining structure protection.Retaining structure is being brought into play more and more important effect in the protection of landslide.Retaining structure comprises support and the anchor structures such as retaining wall, antislide pile, prestress anchorage cable, is for supporting, reinforcing landslide, prevents that it from collapsing sliding to keep stable a kind of building.
Current in the mild rich neatly slope retaining structure of ratio of slope, the rare retaining structure with integral rigidity, even if having integral rigidity, as retaining wall etc., its form of structure does not possess the feature that materials are economized yet.Therefore, be badly in need of at present a kind of easy to implement, drainage effect good, there is the mild rich neatly slope retaining structure of ratio of slope that integral rigidity and materials are saved.
Summary of the invention
Existing in the mild rich neatly slope retaining structure of ratio of slope in order to overcome, the rare retaining structure with integral rigidity, even if there is integral rigidity, as retaining wall etc., its form of structure does not possess the deficiency that materials are economized yet, the present invention aims to provide a kind of ratio of slope mild rich neatly slope retaining structure and construction method thereof, and this retaining structure and construction method thereof are easy to implement, drainage effect good, have integral rigidity and materials are saved feature.
To achieve these goals, the technical solution adopted in the present invention is:
The rich neatly slope retaining structure that a kind of ratio of slope is mild, quadrature (X is set in any position on landslide, Y, Z) cartesian coordinate system, in coordinate system, Z axis is perpendicular to horizontal plane, X-axis and Y-axis are in same level, and the plane that X-axis forms perpendicular to the length direction on Z axis and landslide, the plane that Y-axis forms perpendicular to X-axis and Z axis, the length direction on described landslide refers to from the length direction at the bottom of Ding Dao slope, slope; Its design feature is that described landslide retaining structure comprises
-a plurality of antislide pile installing holes that are vertically opened on sliding mass, slide plane and slide bed, each antislide pile installing hole passes sliding mass, slide plane simultaneously, and at the bottom of hole, is placed in slide bed;
-arrange antislide pile more, every row's antislide pile arranges to X-direction along horizontal wall inscription, every row's antislide pile is comprised of many antislide piles; The top of adjacent two antislide piles is fixedly linked by tie-beam, and makes each antislide pile be connected to form rigidity antiskid body; The vertical every antislide pile of arranging is placed in corresponding antislide pile installing hole;
-collector drain, integral body is arranged to X-direction along horizontal wall inscription, is arranged between adjacent two row's antislide piles, and below the tie-beams between adjacent two row's antislide piles.
Be below the technical scheme of further improvement of the present invention:
In order to facilitate the discharge of water, described collector drain is in tilted layout to X-direction along horizontal wall inscription, slope >=2%.
Preferably, described antislide pile is reinforced concrete pile.
In order to guarantee the stability of antislide pile, the length that described antislide pile is placed in slide bed is at least 1/3 of antislide pile length.
Preferably, the cross section perpendicular to its length direction of described collector drain, YZ cross section is the circle of rectangle or the diameter 1.5m ~ 2.5m of length of side 1.5m ~ 2.5m.
Further, in described collector drain, fill building stones, between building stones and collector drain inwall, be provided with geotechnological layer of cloth.
Another technical scheme of the present invention is to provide the construction method of the mild rich neatly slope retaining structure of a kind of the above ratio of slope, is characterized in, comprises the steps:
1), along road direction a plurality of antislide pile installing holes that spud on landslide, support formwork erection between antislide pile installing hole;
2), the reinforcing cage of antislide pile is put into each antislide pile installing hole, the end of tie-beam and reinforcing cage top are fixed;
3), to grouting in each antislide pile installing hole, form antislide pile;
4), adjacent two rows, excavate collector drain between antislide piles, and lay one deck geotextiles in collector drain inner side, then building stones are filled collector drain.
The excavation direction of described collector drain is identical with road direction, and in collector drain, 2-4 cubes of building stones of every filling once compress compacting, and then continues to fill, until fill up building stones in whole collector drain.
The concrete steps that form antislide pile to grouting in each antislide pile installing hole are: first that slurry agitation is even, sieve, at the bottom of the slurries after sieve are delivered to the hole of antislide pile installing hole, then by Di Fanchu aperture, hole, when aperture is overflowed slurries or stack and stopped exhaust, stop slip casting; Finally pour into again tie-beam.
Compared with prior art, beneficial effect of the present invention is: the present invention is by being rigidly connected tie-beam and antislide pile, therefore each is rigidly connected, therefore each antislide pile has formed rigid unitary together, can be common between each antislide pile, thus can play better the effect of side slope anti-sliding support.The end of antislide pile connects with concrete beam, and its design feature is that the large and materials of rigidity are economized, and is a kind of structure of economical rationality.
Collector drain guarantees certain slope, can guarantee that draining is unobstructed, is unlikely to occur the not smooth problem of current alluvial discharge of horizontal drainage gallery.In gallery, fill rubble and compacting, the porosity of rubble is large, is convenient to draining, and through compacting, can guarantee subgrade strength.
In a word, retaining structure of the present invention can prop up gear to landslide and reinforce, and guarantees that the water in landslide discharges in time, guarantees the stability coming down.This ruggedized construction rigidity is large, work material-saving, easy to implement, respond well, cost is low, wide accommodation.
 
Below in conjunction with drawings and Examples, the present invention is further elaborated.
Accompanying drawing explanation
Fig. 1 is the structure principle chart of one embodiment of the invention;
Fig. 2 is that the YZ of Fig. 1 is to sectional view.
In the drawings
1-collector drain; 2-sliding mass; 3-slide plane; 4-slide bed; 5-antislide pile; 6-tie-beam.
The specific embodiment
The rich neatly slope retaining structure that ratio of slope is mild, as illustrated in fig. 1 and 2, comprises antislide pile in landslide and the tie-beam between antislide pile; Described antislide pile passes successively sliding mass and slide plane from top to bottom and stretches in slide bed; Described antislide pile upper end is connected by rigid concrete beam; Between described antislide pile, be provided with collector drain.Wherein, described antislide pile is vertically poured in landslide.The length that described antislide pile stretches in slide bed is the more than 1/3 of antislide pile length.In described collector drain, be filled with building stones.Slope >=2% of described collector drain, so that the discharge of water.The cross section of collector drain is the rectangle of length of side 2m or the circle that diameter is 2m.
A construction method for above-mentioned retaining structure, comprises the steps:
1) the antislide pile installing hole that spuds on landslide along the bearing of trend X of road.Before rig is in place, the every preparation before reply boring checks, guarantees that stake position is accurate.Then use drill hole of drilling machine, hole to design elevation, hole bed rock sample, aperture, hole depth are carried out to self check, carry out hole clearly after qualified.Support formwork erection between antislide pile installing hole;
2) reinforcing cage is put into antislide pile installing hole, specifically reinforcing cage is concentrated to segmentation prefabricating on the coast, then reinforcing cage is put into hole, at aperture butt welding spreading, until design elevation; Then by the end of the reinforcing bar of tie-beam and the colligation of reinforcing cage top; Pour into again antislide pile, specifically that slurry agitation is even, sieve, with mortar pump by slurries at the bottom of madjack pipe is delivered to hole, then by Di Fanchu aperture, hole, when aperture is overflowed slurries or stack and stopped exhaust, stop slip casting; Pour into again tie-beam, specifically before template, wire-tie, then carry out concreting, after having built, carry out concrete curing;
3) between two row's antislide piles, excavate collector drain, the excavation direction of collector drain is identical with road direction, in collector drain inner side, lay one deck geotextiles immediately, use building stones to fill collector drain, after 2-4 cubes of building stones of every filling, compress compacting, and then continue to fill, until whole collector drain is filled up by building stones.
The content that above-described embodiment is illustrated should be understood to these embodiment only for being illustrated more clearly in the present invention, and be not used in, limit the scope of the invention, after having read the present invention, those skilled in the art all fall within the application's claims limited range to the modification of the various equivalent form of values of the present invention.

Claims (9)

1. the rich neatly slope retaining structure that ratio of slope is mild, quadrature (X is set in any position on landslide, Y, Z) cartesian coordinate system, in coordinate system, Z axis is perpendicular to horizontal plane, X-axis and Y-axis are in same level, and the plane that X-axis forms perpendicular to the length direction on Z axis and landslide, the plane that Y-axis forms perpendicular to X-axis and Z axis, the length direction on described landslide refers to from the length direction at the bottom of Ding Dao slope, slope; It is characterized in that, described landslide retaining structure comprises:
-a plurality of antislide pile installing holes that are vertically opened on sliding mass (2), slide plane (4) and slide bed (3), each antislide pile installing hole passes sliding mass (2), slide plane (4) simultaneously, and at the bottom of hole, is placed in slide bed (3);
-arrange antislide pile (5) more, every row's antislide pile (5) arranges to X-direction along horizontal wall inscription, every row's antislide pile (5) is comprised of many antislide piles (5); The top of adjacent two antislide piles (5) is fixedly linked by tie-beam (6), and makes each antislide pile (5) be connected to form rigidity antiskid body; The vertical every antislide pile (5) of arranging is placed in corresponding antislide pile installing hole;
-collector drain (1), integral body is arranged to X-direction along horizontal wall inscription, is arranged between adjacent two row's antislide piles (5), and is positioned at tie-beams (6) below between adjacent two row's antislide piles (5).
2. the mild rich neatly slope retaining structure of ratio of slope according to claim 1, is characterized in that, described collector drain (1) is in tilted layout to X-direction along horizontal wall inscription, slope >=2%.
3. the mild rich neatly slope retaining structure of ratio of slope according to claim 1, is characterized in that, described antislide pile (5) is reinforced concrete pile.
4. the mild rich neatly slope retaining structure of ratio of slope according to claim 1, is characterized in that, the length that described antislide pile (5) is placed in slide bed (3) is at least 1/3 of antislide pile (5) length.
5. the mild rich neatly slope retaining structure of ratio of slope according to claim 1, is characterized in that, the cross section perpendicular to its length direction of described collector drain (1), and YZ cross section is the circle of rectangle or the diameter 1.5m ~ 2.5m of length of side 1.5m ~ 2.5m.
6. the mild rich neatly slope retaining structure of ratio of slope according to claim 1, is characterized in that, fills building stones in described collector drain (1), between building stones and collector drain (1) inwall, is provided with geotechnological layer of cloth.
7. a construction method for rich neatly slope retaining structure as mild in ratio of slope as described in one of claim 1-6, is characterized in that, comprises the steps:
1), along road direction a plurality of antislide pile installing holes that spud on landslide, support formwork erection between antislide pile installing hole;
2), the reinforcing cage of antislide pile is put into each antislide pile installing hole, the end of tie-beam (6) and reinforcing cage top are fixed;
3), to grouting in each antislide pile installing hole, form antislide pile (5);
4), between adjacent two rows antislide piles (5), excavate collector drain (1), and lay one deck geotextiles in collector drain (1) inner side, then building stones are filled collector drain (1).
8. the construction method of the mild rich neatly slope retaining structure of ratio of slope according to claim 7, it is characterized in that, the excavation direction of described collector drain (1) is identical with road direction, in collector drain (1), 2-4 cubes of building stones of every filling once compress compacting, and then continue to fill, until fill up building stones in whole collector drain (1).
9. the construction method of the mild rich neatly slope retaining structure of ratio of slope according to claim 7, it is characterized in that, the concrete steps that form antislide pile (5) to grouting in each antislide pile installing hole are: first that slurry agitation is even, sieve, at the bottom of slurries after sieve are delivered to the hole of antislide pile installing hole, again by Di Fanchu aperture, hole, when aperture is overflowed slurries or stack and stopped exhaust, stop slip casting; Finally pour into again tie-beam.
CN201310699905.8A 2013-12-19 2013-12-19 Retaining structure of water-saturated landslide with gradual slope ratio and construction method Pending CN103643686A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310699905.8A CN103643686A (en) 2013-12-19 2013-12-19 Retaining structure of water-saturated landslide with gradual slope ratio and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310699905.8A CN103643686A (en) 2013-12-19 2013-12-19 Retaining structure of water-saturated landslide with gradual slope ratio and construction method

Publications (1)

Publication Number Publication Date
CN103643686A true CN103643686A (en) 2014-03-19

Family

ID=50248964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310699905.8A Pending CN103643686A (en) 2013-12-19 2013-12-19 Retaining structure of water-saturated landslide with gradual slope ratio and construction method

Country Status (1)

Country Link
CN (1) CN103643686A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133625A (en) * 2015-09-16 2015-12-09 中南大学 Reinforced structure of tunnel transversely penetrating through sliding slope and construction method
CN109750657A (en) * 2019-03-12 2019-05-14 中国电建集团中南勘测设计研究院有限公司 A kind of slope drainage system
CN114575357A (en) * 2022-03-16 2022-06-03 兰州理工大学 Self-drainage combined landslide retaining structure and construction method
CN114855774A (en) * 2022-04-24 2022-08-05 四川省公路规划勘察设计研究院有限公司 Frame type anti-slide pile and pouring device thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201148620Y (en) * 2008-01-11 2008-11-12 肖世国 Small-sized pile combined antiskid structure
CN201891121U (en) * 2010-09-21 2011-07-06 中铁二院工程集团有限责任公司 Antiskid pile combination supporting and retaining structure
RU2452816C1 (en) * 2010-10-20 2012-06-10 Федеральное государственное образовательное учреждение высшего профессионального образования "Кубанский государственный аграрный университет" Landslide protection works
CN102926389A (en) * 2012-10-15 2013-02-13 中国建筑第六工程局有限公司 Grouped pile structure for preventing and treating landslide and construction method thereof
CN103306293A (en) * 2013-07-05 2013-09-18 中南大学 Reinforcement structure and construction method for water-rich landslide

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201148620Y (en) * 2008-01-11 2008-11-12 肖世国 Small-sized pile combined antiskid structure
CN201891121U (en) * 2010-09-21 2011-07-06 中铁二院工程集团有限责任公司 Antiskid pile combination supporting and retaining structure
RU2452816C1 (en) * 2010-10-20 2012-06-10 Федеральное государственное образовательное учреждение высшего профессионального образования "Кубанский государственный аграрный университет" Landslide protection works
CN102926389A (en) * 2012-10-15 2013-02-13 中国建筑第六工程局有限公司 Grouped pile structure for preventing and treating landslide and construction method thereof
CN103306293A (en) * 2013-07-05 2013-09-18 中南大学 Reinforcement structure and construction method for water-rich landslide

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
申永江等: "锚索双排桩与钢架双排桩的对比研究", 《岩土力学》, vol. 32, no. 6, 30 June 2011 (2011-06-30), pages 1838 - 1842 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133625A (en) * 2015-09-16 2015-12-09 中南大学 Reinforced structure of tunnel transversely penetrating through sliding slope and construction method
CN109750657A (en) * 2019-03-12 2019-05-14 中国电建集团中南勘测设计研究院有限公司 A kind of slope drainage system
CN109750657B (en) * 2019-03-12 2023-11-07 中国电建集团中南勘测设计研究院有限公司 Slope drainage system
CN114575357A (en) * 2022-03-16 2022-06-03 兰州理工大学 Self-drainage combined landslide retaining structure and construction method
CN114575357B (en) * 2022-03-16 2023-10-27 兰州理工大学 Self-drainage combined landslide support structure and construction method
CN114855774A (en) * 2022-04-24 2022-08-05 四川省公路规划勘察设计研究院有限公司 Frame type anti-slide pile and pouring device thereof

Similar Documents

Publication Publication Date Title
CN101591904B (en) Method for strengthening composite pile foundation by prepressing drainage and following grouting for drainage body
CN107503257B (en) One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN105525627B (en) A kind of two-way anchor fixed board retaining wall and its construction method
CN106930321B (en) The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole
CN207109475U (en) It is close to mountain high-filled subgrade stabilization and Deformation control structure
CN109797769B (en) Collapsible loess area underground comprehensive pipe gallery foundation structure and construction method thereof
CN109183809A (en) A kind of construction method of Muddy Bottoms clay deep-foundation pit engineering composite support support replacement
CN103643686A (en) Retaining structure of water-saturated landslide with gradual slope ratio and construction method
CN211200426U (en) Anti-sliding supporting and retaining structure for miniature steel pipe pile retaining wall
CN107841908A (en) For eliminating the road structure of the high embankment lateral variation sedimentation in high-speed railway abrupt slope
CN112854260B (en) Ecological concrete rock-soil slope protection structure and construction method
CN104712341B (en) Bed shallow covering shield driving stratum consolidation system and its construction method
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN102425179B (en) Structure of reinforced soil sewer supported by bored concrete piles of mini steel tubes
CN104594371A (en) Reinforcing structure of existing foundation bottom plate and construction method thereof
CN204703189U (en) A kind of cutting barricade being applicable to crevice water, diving growth
CN209195412U (en) A kind of tunnel structure suitable for weak Facility-sliding strata
CN111424685A (en) Deep water falling hole processing structure and method for backfilling foundation in large karst depression
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN213173779U (en) Cutting slope protection structure
CN209324377U (en) Ledge method tunneling subway station arch springing ruggedized construction
CN210482331U (en) Supporting structure of side slope
CN209482313U (en) Foundation pit supporting construction
CN204626439U (en) A kind of ruggedized construction of existing sole plate
CN207405640U (en) Stake film is combined cofferdam with soil

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140319