CN103334371A - Roadbed subsidence grouting treatment structure and construction method thereof - Google Patents

Roadbed subsidence grouting treatment structure and construction method thereof Download PDF

Info

Publication number
CN103334371A
CN103334371A CN2013103128214A CN201310312821A CN103334371A CN 103334371 A CN103334371 A CN 103334371A CN 2013103128214 A CN2013103128214 A CN 2013103128214A CN 201310312821 A CN201310312821 A CN 201310312821A CN 103334371 A CN103334371 A CN 103334371A
Authority
CN
China
Prior art keywords
roadbed
grouting pipe
slip casting
grouting
tube connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103128214A
Other languages
Chinese (zh)
Other versions
CN103334371B (en
Inventor
邹金锋
童无欺
曾胜
赵炼恒
李振存
李文
刘晖峻
张淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201310312821.4A priority Critical patent/CN103334371B/en
Publication of CN103334371A publication Critical patent/CN103334371A/en
Application granted granted Critical
Publication of CN103334371B publication Critical patent/CN103334371B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a roadbed subsidence grouting treatment structure and a construction method thereof. The roadbed subsidence grouting treatment structure comprises a plurality of rows of grouting pipe groups which are arranged on both sides of a central division strip of a roadbed and inserted at the interior of the roadbed horizontally from the outer side of the roadbed, wherein each row of grouting pipe groups comprise a plurality of grouting pipes; a plurality of grouting pipes in the same row are exposed at one end of the outer side of the roadbed and are communicated with one side of a same connecting pipe; the other side of the connecting pipe is communicated with a grouting main pipe; and drainage sewers in the same direction as the grouting pipes are arranged between two adjacent rows of grouting pipe groups. The grouting effect of a plurality of grouting pipes can be ensured, and accumulated water in the roadbed is drained in time; and moreover, the construction technology is simple, and the manufacturing cost is low.

Description

A kind of roadbed settlement slip casting punishment structure and job practices
Technical field
The present invention relates to a kind of roadbed settlement slip casting punishment structure and job practices.
Background technology
Roadbed is the important structure facility of highway, also is one of important content of highway maintenance.Engineering practice shows that grouting strengthening method is one of effective ways of punishment subgrade settlement disease.Yet there are following defective in traditional roadbed settlement slip casting punishment structure and job practices: at first, when squeezing into a plurality of Grouting Pipe in the roadbed, can't carry out slip casting to a plurality of Grouting Pipe simultaneously, therefore the grouting pressure of each Grouting Pipe, slip casting duration etc. all can't guarantee identical, can cause each Grouting Pipe slip casting effect difference thus, problem such as the roadbed settlement lifting is inhomogeneous.Secondly, conventional construction method does not arrange sewer after slip casting is finished, and makes that the water in the roadbed can not in time be discharged behind the precipitation, and oozing under the precipitation can softening roadbed, influence the stable of roadbed and causes roadbed sagging.In this case, demand is a kind of urgently can make all identical job practicess of conditions such as the slip castings simultaneously of a plurality of Grouting Pipe and grouting pressure, and can guarantee the structure that the water in the roadbed can in time be discharged after slip casting simultaneously.
Summary of the invention
The present invention is intended to overcome the deficiencies in the prior art, and a kind of structure and job practices of roadbed settlement slip casting punishment is provided.
In order to achieve the above object, technical scheme provided by the invention is:
Described roadbed settlement slip casting punishment structure comprises some row's Grouting Pipe groups of being located at both sides, roadbed median strip and inserting roadbed from roadbed outside level, every row's Grouting Pipe group comprises some Grouting Pipe, the end that some Grouting Pipe of same row are exposed at the roadbed outside is communicated with same tube connector one side, and described tube connector opposite side is communicated with the slip casting house steward; Be provided with in the described roadbed and Grouting Pipe draining sewer in the same way.
Wherein, be filled with building stones in the described draining sewer.Described draining sewer tilts to the roadbed outer rim from the median strip.The slope of described draining sewer 〉=2% is preferably 10%.Described Grouting Pipe is slip casting spray of molten steel pipe; Described slip casting house steward and tube connector are steel pipe.Described every row's Grouting Pipe group comprises four Grouting Pipe.
The job practices of above-mentioned roadbed settlement slip casting punishment structure comprises the steps:
(1) set up scaffolding platform in the roadbed outer rim of both sides, median strip, adopt down-the-hole to beat into some row's Grouting Pipe groups, every row's Grouting Pipe group is made up of some Grouting Pipe; When breaking pipe, earlier Grouting Pipe is cut into 1.5~2.0m, one joint, after squeezing into a joint, next joint and a joint of having squeezed into is welded together, and then continue to squeeze into, make final section Grouting Pipe one end be exposed to the roadbed outside, the length of exposing is about 20cm;
(2) same row's some Grouting Pipe are exposed at an end and same tube connector welding in the roadbed outside, again tube connector and slip casting house steward are welded; Concrete, be earlier in the tube connector one side hole corresponding with some Grouting Pipe of same row of spudding in, again in the tube connector opposite side hole corresponding with the slip casting house steward of spudding in; An end that then same row's some Grouting Pipe is exposed at the roadbed outside connects with the eyelet welding corresponding with Grouting Pipe on the same tube connector respectively, the slip casting house steward is connect with the eyelet welding corresponding with the slip casting house steward on the tube connector again.
(3) at roadway excavation and Grouting Pipe draining sewer in the same way, the draining sewer is tilted to the roadbed outer rim from the median strip; Behind the excavation draining sewer, in the inboard one deck geotextiles of laying of draining sewer, use building stones to fill the draining sewer immediately, compress compacting behind 2-4 cubes of building stones of every filling, and then continue to fill, filled up by building stones until whole draining sewer.
Compared with prior art, beneficial effect of the present invention is:
Roadbed settlement slip casting punishment structure can guarantee simultaneously a plurality of Grouting Pipe to be carried out slip casting, and grouting pressure, slip casting duration that guarantees each Grouting Pipe etc. is all identical, thereby guarantees slip casting effect.The draining sewer is laid between two row's Grouting Pipe, and the draining sewer tilts to lay from the roadbed median strip at a certain angle, extends to outside the roadbed side slope.Can guarantee that draining is unobstructed, be unlikely to occur the not smooth problem of current alluvial discharge of horizontal drainage sewer.Fill rubble and compacting in the sewer, the porosity of rubble is big, is convenient to draining, and through compacting, can guarantee subgrade strength.Can guarantee the slip casting effect of a plurality of Grouting Pipe slip castings, in time discharge the ponding in the roadbed, and construction technology is simple, cheap.
Description of drawings
Fig. 1 is the structural representation of roadbed settlement slip casting punishment structure of the present invention;
Fig. 2 is the lateral view of roadbed settlement slip casting punishment structure of the present invention.
Among the figure: 1, slip casting house steward; 2, Grouting Pipe; 3, tube connector; 4, roadbed; 5, draining sewer; 6, median strip.
The specific embodiment
The present invention is further illustrated below in conjunction with drawings and Examples.
Embodiment 1
Referring to Fig. 1 and Fig. 2, described roadbed settlement slip casting punishment structure comprises the two rows Grouting Pipe group of being located at 6 both sides, median strip and inserting roadbed 4 from roadbed 4 outside levels, every row's Grouting Pipe group comprises some Grouting Pipe 2, the end that some Grouting Pipe of same row 2 are exposed at roadbed 4 outsides is communicated with same tube connector 3 one sides, and described tube connector 3 opposite sides are communicated with slip casting house steward 1; Be provided with between the two rows Grouting Pipe group with Grouting Pipe 2 in the same way draining sewer 5.
Wherein, be filled with building stones in the described draining sewer 5.Described draining sewer 56 tilts to roadbed 4 outer rims from the median strip.The slope of described draining sewer 5 〉=2% is preferably 10%.Described Grouting Pipe 2 is slip casting spray of molten steel pipe; Described slip casting house steward 1 and tube connector 3 are steel pipe.Described every row's Grouting Pipe group comprises four Grouting Pipe 2.
Embodiment 2
The high 8m of construction roadbed, horizontal grouting divides two to construct layer by layer vertical, namely carries out horizontal floral tube slip casting from distance roadbed end face 2m and 5m respectively, and every layer of Grouting Pipe laid four, spacing 3m.Four Grouting Pipe are drawn out to outside the side slope by a total Grouting Pipe, so that slip casting.Upper strata Grouting Pipe length is 16.9m, and lower floor's slip casting pipe range is 21.5m.Between two-layer horizontal grouting floral tube, apart from roadbed end face 3.5m place, laid a draining sewer.The sewer cross section is the circle of diameter 2m, and interior filling rubble tilts to the side slope outer rim from the median strip, and slope 10% is so that the discharge of water.
The job practices of described roadbed settlement slip casting punishment structure:
(1) puts reminder flag, cone, sign label etc. according to " highway maintenance safety regulation for operations " regulation (JTGH30-2004), construct and do the construction safety in industry district.
(2) set up scaffolding platform earlier in the roadbed outer rim of both sides, median strip, adopt down-the-hole to beat into two rows by the Grouting Pipe group, on arrange the Grouting Pipe group apart from roadbed end face 2m, following row's Grouting Pipe group is apart from roadbed end face 5m; Every row's Grouting Pipe group is that the Grouting Pipe of 3m is formed by some spacings; When breaking pipe, earlier Grouting Pipe is cut into 1.5~2.0m, one joint, after squeezing into a joint, next joint and a joint of having squeezed into is welded together, and then continue to squeeze into, make final section Grouting Pipe one end be exposed to the roadbed outside, the length of exposing is about 20cm;
(3) same row's some Grouting Pipe are exposed at an end and same tube connector welding in the roadbed outside, again tube connector and slip casting house steward are welded; Concrete, be earlier in the tube connector one side hole corresponding with some Grouting Pipe of same row of spudding in, that is, tube connector one side is bored hole with diameter 5cm every 3m, be the hole of 5cm at the tube connector opposite side diameter corresponding with the slip casting house steward that spud in again; An end that then same row's some Grouting Pipe is exposed at the roadbed outside connects with the eyelet welding corresponding with Grouting Pipe on the same tube connector respectively, the slip casting house steward is connect with the eyelet welding corresponding with the slip casting house steward on the tube connector again.The total length of tube of slip casting is 20cm; To roadbed slip casting, roadbed is carried out grouting and reinforcing from the slip casting house steward, other business gets final product with conventional grouting operation.
(4) at distance roadbed end face 3.5m place, drill diameter be the circular hole (the perhaps square hole of length of side 2m) of 2m as the draining sewer, the draining sewer excavates the median strip from the roadbed outer rim, the draining sewer tilts to the roadbed outer rim from the median strip, slope 10% is so that the discharge of water.Behind the excavation draining sewer, in the inboard one deck geotextiles of laying of draining sewer, use building stones to fill the draining sewer immediately, compress compacting behind 2-4 cubes of building stones of every filling, and then continue to fill, filled up by building stones until whole draining sewer.

Claims (10)

1. structure is punished in a roadbed settlement slip casting, it is characterized in that, described structure comprises the Grouting Pipe group of being located at (6) both sides, roadbed (4) median strip and inserting roadbed (4) from roadbed (4) outside level, every row's Grouting Pipe group comprises some Grouting Pipe (2), the end that some Grouting Pipe of same row (2) are exposed at roadbed (4) outside is communicated with same tube connector (3) one sides, and described tube connector (3) opposite side is communicated with slip casting house steward (1); Be provided with in the described roadbed (4) and Grouting Pipe (2) draining sewer (5) in the same way.
2. structure as claimed in claim 1 is characterized in that, the draining sewer is filled with building stones in (5).
3. structure as claimed in claim 1 is characterized in that, (6) tilt to the roadbed outer rim described draining sewer (5) from the median strip.
4. structure as claimed in claim 3 is characterized in that, slope 〉=2% of described draining sewer (5).
5. structure as claimed in claim 4 is characterized in that, the slope of described draining sewer (5) is 10%.
6. structure as claimed in claim 1 is characterized in that, described Grouting Pipe (2) is slip casting spray of molten steel pipe.
7. structure as claimed in claim 1 is characterized in that, described slip casting house steward (1) and tube connector (3) are steel pipe.
8. structure as claimed in claim 1 is characterized in that, described every row's Grouting Pipe group comprises four Grouting Pipe (2).
9. the job practices as claim 1 to 8 roadbed settlement slip casting punishment structure as described in each is characterized in that described method comprises the steps:
Roadbed outer rim in the both sides, median strip is set up scaffolding platform, adopts down-the-hole to beat into some row's Grouting Pipe groups, and every row's Grouting Pipe group is made up of some Grouting Pipe; When breaking pipe, earlier Grouting Pipe is cut into 1.5~2.0m, one joint, after squeezing into a joint, next joint and a joint of having squeezed into is welded together, and then continue to squeeze into, make final section Grouting Pipe one end be exposed to the roadbed outside;
Same row's some Grouting Pipe are exposed at an end and same tube connector welding in the roadbed outside, again tube connector and slip casting house steward are welded;
Excavation and Grouting Pipe draining sewer in the same way make the draining sewer tilt to the roadbed outer rim from the median strip in roadbed; Behind the excavation draining sewer, in the inboard one deck geotextiles of laying of draining sewer, use building stones to fill the draining sewer immediately, compress compacting behind 2-4 cubes of building stones of every filling, and then continue to fill, filled up by building stones until whole draining sewer.
10. method as claimed in claim 9 is characterized in that, described step (2) is earlier in the tube connector one side hole corresponding with some Grouting Pipe of same row of spudding in, again in the tube connector opposite side hole corresponding with the slip casting house steward of spudding in; An end that then same row's some Grouting Pipe is exposed at the roadbed outside connects with the eyelet welding corresponding with Grouting Pipe on the same tube connector respectively, the slip casting house steward is connect with the eyelet welding corresponding with the slip casting house steward on the tube connector again.
CN201310312821.4A 2013-07-05 2013-07-24 Roadbed subsidence grouting treatment structure and construction method thereof Active CN103334371B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310312821.4A CN103334371B (en) 2013-07-05 2013-07-24 Roadbed subsidence grouting treatment structure and construction method thereof

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201310279848 2013-07-05
CN201310279848.8 2013-07-05
CN2013102798488 2013-07-05
CN201310312821.4A CN103334371B (en) 2013-07-05 2013-07-24 Roadbed subsidence grouting treatment structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN103334371A true CN103334371A (en) 2013-10-02
CN103334371B CN103334371B (en) 2015-04-08

Family

ID=49242569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310312821.4A Active CN103334371B (en) 2013-07-05 2013-07-24 Roadbed subsidence grouting treatment structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN103334371B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074195A (en) * 2014-07-21 2014-10-01 浙江华展工程研究设计院有限公司 Method for controlling sedimentation of ground outside foundation pit through horizontal grouting
CN104532713A (en) * 2014-12-30 2015-04-22 山西省交通科学研究院 Roadbed subsidence repairing device and method
CN104594329A (en) * 2014-12-17 2015-05-06 河海大学 Device for treating differential settlement of road and bridge transition sections through load reducing and method of device
CN106368092A (en) * 2016-11-11 2017-02-01 合肥工业大学 Construction method of high-polymer grouting-reinforced antisettling widened roadbed
CN109797733A (en) * 2019-01-22 2019-05-24 中国五冶集团有限公司 Construction method is punched in the earthwork below a kind of highway ditch
CN110725168A (en) * 2019-10-31 2020-01-24 武汉比邻工程技术有限公司 Ballastless track settlement correction integral lifting method utilizing series pipeline grouting technology

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0456331A1 (en) * 1990-05-10 1991-11-13 Voorbij Groep B.V. Method for the displacement of a slab-shaped carrier, and seal therefor
JPH045323A (en) * 1990-04-23 1992-01-09 Hakko Co Ltd Widening civil engineering work method using foaming resin
JP2000087356A (en) * 1998-09-10 2000-03-28 Sekisui Chem Co Ltd Stabilizing method for soil structure on soft ground
CN2520346Y (en) * 2001-01-12 2002-11-13 北京城建地铁地基市政工程有限公司 Base course grouting reinforcing construction apparatus for airport runway
CN201843035U (en) * 2010-11-11 2011-05-25 长安大学 Longitudinal subgrade crack treatment device based on convex tenon type cement grouting geomembrane zone

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH045323A (en) * 1990-04-23 1992-01-09 Hakko Co Ltd Widening civil engineering work method using foaming resin
EP0456331A1 (en) * 1990-05-10 1991-11-13 Voorbij Groep B.V. Method for the displacement of a slab-shaped carrier, and seal therefor
JP2000087356A (en) * 1998-09-10 2000-03-28 Sekisui Chem Co Ltd Stabilizing method for soil structure on soft ground
CN2520346Y (en) * 2001-01-12 2002-11-13 北京城建地铁地基市政工程有限公司 Base course grouting reinforcing construction apparatus for airport runway
CN201843035U (en) * 2010-11-11 2011-05-25 长安大学 Longitudinal subgrade crack treatment device based on convex tenon type cement grouting geomembrane zone

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074195A (en) * 2014-07-21 2014-10-01 浙江华展工程研究设计院有限公司 Method for controlling sedimentation of ground outside foundation pit through horizontal grouting
CN104074195B (en) * 2014-07-21 2016-08-17 浙江华展工程研究设计院有限公司 A kind of method controlling the outer surface subsidence of foundation ditch by horizontal grouting
CN104594329A (en) * 2014-12-17 2015-05-06 河海大学 Device for treating differential settlement of road and bridge transition sections through load reducing and method of device
CN104532713A (en) * 2014-12-30 2015-04-22 山西省交通科学研究院 Roadbed subsidence repairing device and method
CN106368092A (en) * 2016-11-11 2017-02-01 合肥工业大学 Construction method of high-polymer grouting-reinforced antisettling widened roadbed
CN106368092B (en) * 2016-11-11 2018-07-03 合肥工业大学 A kind of construction method of high polymer grouting reinforcement anti-settling widening subgrade
CN109797733A (en) * 2019-01-22 2019-05-24 中国五冶集团有限公司 Construction method is punched in the earthwork below a kind of highway ditch
CN110725168A (en) * 2019-10-31 2020-01-24 武汉比邻工程技术有限公司 Ballastless track settlement correction integral lifting method utilizing series pipeline grouting technology

Also Published As

Publication number Publication date
CN103334371B (en) 2015-04-08

Similar Documents

Publication Publication Date Title
CN103334371B (en) Roadbed subsidence grouting treatment structure and construction method thereof
CN105927272B (en) Bottom plate anchors restricted type tunnel lining structure
CN101769154A (en) Excavation supporting method for tunnel construction
CN203034464U (en) Truss type foundation pit supporting structure
CN106522242A (en) Foundation pit supporting system for subsurface structure close to soft ground stratum and construction method of foundation pit supporting system
CN107905811B (en) Inverted arch-free lining of foundation hollow longitudinal beam bearing arch structure
CN109750571B (en) Road collapse emergency and permanent retaining integrated structure and construction method
CN103924501A (en) Reinforcing construction method in partial failure repairing of rural cement pavement
KR100834076B1 (en) None open cut tunnelling method and tunnel
CN111364486A (en) Remediation and reinforcement device and method for emergency rescue of slide-resistant pile side slope
CN101838957B (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN111021172B (en) Road construction process
CN110397050B (en) Beam-anchor type light drainage retaining wall and construction method thereof
CN109736884B (en) Treatment structure for water gushing in underground river close to tunnel and construction method of treatment structure
CN104131566B (en) A kind of basement is without the construction method of horizontal support foundation ditch
CN208280161U (en) The compound retaining wall structure of antifouling type reinforcement pervious concrete
CN108166395B (en) A kind of construction method for building beam bridge across Business Line
CN105926391A (en) Method for widening shoulder of existing railway subgrade
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN108691317A (en) The compound retaining wall of antifouling type reinforcement pervious concrete and its construction method
CN105821771B (en) Overlength case bridge jacking construction technique and its constructing structure under high roadbed city expressway
CN110725717A (en) Water plugging structure for ore body roadway
KR100509707B1 (en) None open cut tunnelling of arch type with hume pipe and con'c rib
CN105604088A (en) Micro-perturbation reinforcing structure for existing retaining wall of medium-low-speed magnetic levitation low set line
CN205530334U (en) Moderate -low speed magnetic levitation is low to be put existing barricade perturbation of circuit and moves reinforced structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant