KR200419504Y1 - Block for preventing slide of ballast - Google Patents

Block for preventing slide of ballast Download PDF

Info

Publication number
KR200419504Y1
KR200419504Y1 KR2020060009504U KR20060009504U KR200419504Y1 KR 200419504 Y1 KR200419504 Y1 KR 200419504Y1 KR 2020060009504 U KR2020060009504 U KR 2020060009504U KR 20060009504 U KR20060009504 U KR 20060009504U KR 200419504 Y1 KR200419504 Y1 KR 200419504Y1
Authority
KR
South Korea
Prior art keywords
gravel
membrane
flow prevention
hole
drainage
Prior art date
Application number
KR2020060009504U
Other languages
Korean (ko)
Inventor
김용겸
Original Assignee
(주)동명기술공단종합건축사사무소
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)동명기술공단종합건축사사무소 filed Critical (주)동명기술공단종합건축사사무소
Priority to KR2020060009504U priority Critical patent/KR200419504Y1/en
Application granted granted Critical
Publication of KR200419504Y1 publication Critical patent/KR200419504Y1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/001Track with ballast
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B1/00Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
    • E01B1/008Drainage of track
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2204/00Characteristics of the track and its foundations
    • E01B2204/07Drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Railway Tracks (AREA)

Abstract

본 고안은 자갈흐름 방지 측구에 관한 것으로서,The present invention relates to the gravel flow prevention side,

철도자갈 도상의 자갈유실을 방지하고, 눈, 비로 인한 침투수를 배수하기 위해서 철도 양측에 평행하게 설치되는 측구로서, 단면이 "U" 자형으로 형성되되, 일측 상단에 삽입홈이 형성되고, 일측 측면에는 몸체입수홀이 형성되며, 타측 상단에 연장부가 외측면으로부터 연장형성되고, 전단부에 요홈부가 형성되며, 후단부에 요철부가 형성되고, 하면에 상기 몸체입수홀로부터 입수된 침투수가 배수되는 배수홀이 형성된 측구몸체와, 일측면으로부터 연장형성된 돌출부가 상기 삽입홈에 끼워맞춤되며, 전단부에 요홈부가 형성되고, 후단부에 요철부가 형성된 측구막이와, 상기 측구몸체의 연장부와 상기 측구막이 사이에 끼워맞춤되는 측구덮개를 포함하여 구성되어,In order to prevent gravel loss on the railroad gravel and to drain the infiltration water due to snow and rain, the side openings are installed parallel to both sides of the railway. The cross section is formed in a “U” shape, and an insertion groove is formed at one upper end, and one side. A body inlet hole is formed at the side, and an extension part is formed at the upper end of the other side, a recess is formed at the front end, an uneven portion is formed at the rear end, and the infiltration water obtained from the body inlet hole is drained to the bottom surface. A side body formed with a drainage hole, a protrusion extending from one side thereof is fitted into the insertion groove, a side groove formed in a front end portion, a recessed portion is formed in a front end portion, and an uneven portion is formed in a rear end portion, an extension portion of the side body and the side opening. It consists of a side cover that the membrane is fitted between,

도상 자갈의 손실 및 비산을 방지하여 도상보충(道床補充)작업의 횟수가 경감되는 효과가 있을 뿐 아니라, 눈, 비에 의한 침투수의 배수를 쉽게 하여 노반의 침하, 노반 법면 유실 등을 방지할 수 있다.This prevents the loss and scattering of gravel and reduces the number of replenishment operations. It also facilitates the drainage of infiltration water by snow and rain, preventing settlement of roadbeds and loss of roadbed surface. Can be.

철도, 자갈, 배수, 측구 Railway, gravel, drainage, side outlet

Description

자갈흐름 방지 측구{Block for preventing slide of ballast}Block for preventing slide of ballast}

도 1은 종래 철도자갈 도상의 구성을 나타낸 단면도.1 is a cross-sectional view showing the configuration of a conventional railway gravel phase.

도 2는 종래 철도자갈 도상의 자갈막이 방호블록의 사시도.Figure 2 is a perspective view of a gravel protection block of a conventional railway gravel.

도 3은 종래 지하철궤도 중앙배수로용 고무거푸집의 사시도.Figure 3 is a perspective view of a rubber formwork for the conventional subway track central drainage.

도 4는 본 고안의 일실시예에 의한 자갈흐름 방지 측구가 설치된 철도자갈 도상의 구성을 나타낸 단면도.Figure 4 is a cross-sectional view showing the configuration of the railway gravel road is installed gravel flow prevention side opening according to an embodiment of the present invention.

도 5은 본 고안의 일실시예에 의한 자갈흐름 방지 측구의 결합사시도.Figure 5 is a perspective view of the gravel flow prevention combination according to an embodiment of the present invention.

도 6는 본 고안의 일실시예에 의한 자갈흐름 방지 측구의 분해사시도.Figure 6 is an exploded perspective view of the gravel flow prevention side according to an embodiment of the present invention.

도 7는 본 고안의 일실시예에 의한 자갈흐름 방지 측구의 측구몸체 정면도.Figure 7 is a side view body front view of the gravel flow prevention side according to an embodiment of the present invention.

도 8은 본 고안의 일실시예에 의한 자갈흐름 방지 측구의 측구막이 측면도.Figure 8 is a side view sidewall of the gravel flow prevention side sphere according to an embodiment of the present invention.

도 9은 본 고안의 일실시예에 의한 자갈흐름 방지 측구의 측구덮개 평면도.Figure 9 is a side cover top view of the gravel flow prevention side in accordance with an embodiment of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

1:지반 10:침목1: ground 10: sleeper

20:레일 30:자갈층20: rail 30: gravel floor

30A, 40A:어깨부 40:강화노반30A, 40A: Shoulder 40: Reinforced bed

50:배수층 60:차단재50: drainage layer 60: barrier material

61:저면판 62:암전단기61: bottom plate 62: female shears

63:숫전단기 64:앵커공63: male shears 64: anchor ball

65:돌기부 66:측면판65: projection 66: side plate

67:절개부 68:배수홈67: incision 68: drainage groove

70:측벽재 71:돌출부70: side wall material 71: protrusion part

72:배수홈 81:곡면72: drain groove 81: curved surface

82:평판 83:공간부82: reputation 83: space

84:몸체 85:구멍84: body 85: holes

86:연결용 홈 87:연결용 돌출부86: connecting groove 87: connecting protrusion

110:측구저판 120:측구몸체110: side base plate 120: side body

120a, 120c:몸체입수홀 120b:배수홀 120a, 120c: Body acquisition hole 120b: Drainage hole

121:배수파이프 122, 132:요홈부121: drain pipe 122, 132: groove

124, 134:요철부 126:평탄부124, 134: uneven portion 126: flat portion

127:연장부 128:삽입홈127: extension 128: insertion groove

130:측구막이 130a:막이입수홀130: side membrane 130a: membrane entry hole

136:돌출부 140:측구덮개136: protrusion 140: side cover

140a:덮개입수홀 142:분리홈140a: Cover entrance hole 142: Separation groove

본 고안은 자갈흐름 방지 측구에 관한 것으로서, 상세하게는 철도자갈 도상구간에서 자갈막이블록 및 측구를 일체형으로 설치하여 철도자갈 도상에서 자갈의 유실을 방지할 뿐 아니라, 눈, 비에 의한 침투수를 배수하여 노반의 침하를 방지할 수 있는 자갈흐름 방지 측구에 관한 것이다.The present invention relates to a gravel flow prevention side hole, and in particular, by installing the gravel block and side holes integrally in the railroad gravel road section to prevent the loss of gravel in the railroad gravel road, as well as to penetrate water by snow and rain. It relates to a gravel flow prevention side that can drain to prevent settlement of the roadbed.

도 1은 종래 철도자갈 도상의 구성을 나타낸 단면도로서, 일반적으로 철도레일 구간에는 열차 운행시 레일이나 침목을 통해 전달되는 동적하중을 노반으로 산포시켜 진동을 최소화하고, 온도 변화에 따른 레일 신축 발생시 이에 따라 침목이 이동되는 것을 도상 저항력으로 방지하며, 또한, 열차의 진동을 흡수하여 승차감을 향상시키는 동시에 빗물 배수를 용이하게 하여 잡초가 자라는 것을 방지하는 등의 다양한 기능을 수행할 수 있도록 도 1에 도시된 바와 같이, 침목(10) 및 레일(20), 자갈층(30), 강화노반(40), 배수층(50), 지반(60)이 순차적으로 구성된 철도자갈 도상이 사용된다.1 is a cross-sectional view showing a configuration of a conventional railway gravel, in general, in the railway rail section by scattering the dynamic load transmitted through the rails or sleepers to the roadbed to minimize the vibration, when the new rail occurs due to temperature changes Accordingly, the sleeper is prevented from moving by the resistance to drawing, and also, it is possible to absorb the vibration of the train to improve the riding comfort and to facilitate the drainage of rainwater to perform various functions such as preventing weeds from growing. As shown, the railroad gravel system in which the sleeper 10 and the rail 20, the gravel layer 30, the reinforced roadbed 40, the drainage layer 50, the ground 60 are sequentially formed.

상기한 바와 같은 종래의 철도자갈 도상은 건설 당시의 단면형상, 즉, 도 1과 같은 형상을 지속적으로 유지할 수 있도록 보존 및 관리되어야 하기 때문에 어깨부(30A)를 형성하여 자갈층(30)의 무너짐을 방지하는 등의 노력을 하고 있다.Conventional railway gravel as described above, because the cross-sectional shape at the time of construction, that is, it must be preserved and managed to maintain the shape as shown in FIG. 1 to form the shoulder portion (30A) to break down the gravel layer (30) We are trying to prevent it.

그러나 어깨부(30A)를 형성하였음에도 불구하고 열차운행시 진동으로 인한 도상이완 및 자갈비산, 유지보수요원의 선로내 출입으로 인한 어깨부(30A)의 단면형상 붕괴, 선로 주변의 집수구 또는 배수로 등으로의 자갈유입으로 인한 손실 등으로 지속적인 도상정리 및 자갈보충 등을 시행하여 도상단면 유지 및 저항력을 확 보토록 상시 관리하여야 하는 문제점이 있었다.However, despite the formation of the shoulder portion 30A, the loosening and gravel scattering due to the vibration during train operation, the collapse of the cross-sectional shape of the shoulder portion 30A due to the entry and exit of the maintenance personnel, the catchment or drainage around the track, etc. Due to the loss caused by the gravel inflow, there was a problem to maintain the phase of the cross section and to ensure the resistance at all times by carrying out continuous phase cleanup and gravel replenishment.

또한, 분기기가 설치되는 장침목의 경우에는 도상단면을 확보하기 위하여 불용 PC침목 또는 콘크리트벽 등을 설치하여 철도자갈 도상 단면을 유지하는 형식을 취하고 있어 침목갱환시 제거하여야 하는 번거로움 및 작업시 단면이 붕괴되는 문제점이 있었다.In addition, in the case of the long sleeper where the diverter is installed, in order to secure the cross section, an unused PC sleeper or concrete wall is installed to maintain the cross section of the railway gravel. There was a problem with this collapse.

한편, 배수시설이 미비로 인하여 배수가 원활하지 못해서 노반의 흙이 수분을 먹어 진흙탕이 되는 현상(분니현상, 噴泥現狀, Water Pump)이 발생되기도 하며, 이 같은 현상은 노반의 지지력을 감소시키는 주요원인으로 작용하여 열차안전 운행에 막대한 지장을 주는 문제점이 있었다.On the other hand, due to inadequate drainage, the soil of the roadbed eats moisture and becomes mud due to inadequate drainage (bunny phenomenon, water pump), which reduces the bearing capacity of the roadbed. There was a problem that acts as a major cause that greatly affects the safe operation of trains.

도 2는 종래 철도자갈 도상의 자갈막이 방호블록의 사시도로서, 도 2에 도시된 바와 같이, 공개특허 제10-0092495호에 기재된 '자갈도상 궤도용 자갈막이 방호블록 및 이의 시공방법'은 전체적으로 사각형상으로 수평하게 배치되는 저면판(61)과, 상기 저면판(61)의 단측단에서 내측으로 일정하게 이격된지점에서 일체로 수직상향으로 내측에 절개부(67)가 형성된 측면판(66)으로 구성되는 차단재(60)와, 상기 측면판(66)의 절개부(67)에 끼워지도록 사각형상으로 이루어짐과 동시에 중앙으로부터 일정한 크기로 외측으로 일정한 각도가 형성된 돌출부(71)를 갖는 측벽재(70)로 구성된다.FIG. 2 is a perspective view of a gravel protection block of a conventional railway gravel, and as shown in FIG. 2, a gravel protection block for a gravel road and a construction method thereof described in Korean Patent Publication No. 10-0092495 are generally rectangular. A bottom plate 61 horizontally disposed in a shape, and a side plate 66 having an incision 67 formed therein in a vertically upward direction at a point regularly spaced inwardly from a short side end of the bottom plate 61. Side wall material having a barrier member 60 and a protrusion 71 formed in a quadrangular shape so as to be fitted into the cutout portion 67 of the side plate 66 and a predetermined angle formed from the center to a predetermined size to the outside. 70).

그러나, 상기 구조의 자갈막이 방호블록은 자갈막이용으로는 용이하지만, 배수시설로서 형성된 직각형상의 배수홀이 미흡하여 배수가 원할하지 못하고, 또한, 차단재와 측벽재의 연결시 각진 부분이 조금이라도 파손되면 삽입 및 고정을 하기 흠든 문제점이 있었다.However, the gravel protection block of the above structure is easy to use for gravel, but the drainage is not desired because the rectangular drainage hole formed as a drainage system is insufficient, and even when the barrier material and the side wall material are connected, the angled part is damaged even a little. If there was a problem that the insertion and fixing impaired.

도 3은 종래 지하철궤도 중앙배수로용 고무거푸집의 사시도로서, 도 3에 도시된 바와 같이, 공고실용신안 제0119453호에 기재된 '지하철궤도 중앙배수로용 고무거푸집'은 하면이 원주상의 곡면(81)과 상면이 평판(82)으로 구성됨으로써 내부에 공간이 형성된 몸체(84)와, 이 몸체(84)를 구성하는 평판(82) 상에는 고정용 구멍(85)들이 양측단 부근으로 편재하여 대칭적으로 뚫어져 있으며 몸체(84)의 양측단에는 연결용 홈(86) 및 연결용 돌출부(87)가 각각 형성된다.3 is a perspective view of a rubber formwork for a conventional subway track central drainage, as shown in FIG. 3, the 'rubber formwork for the central railway tracks' disclosed in the high utility model No. 0119453 has a curved surface 81 of the lower surface circumferential The upper surface is composed of a flat plate 82, and the body 84 having a space formed therein, and the fixing holes 85 are symmetrically symmetrically on both sides of the fixing holes 85 on the flat plate 82 constituting the body 84. It is bored and the connecting grooves 86 and the connecting protrusions 87 are formed at both ends of the body 84, respectively.

그러나, 상기 구조의 고무거푸집은 콘크리트의 상면에 설치되기 때문에 지하철에서는 설치가 용이하지만, 국철과 같이 자갈도상에서는 설치하기가 어려울 뿐만 아니라 설치가 되더라도 고무거푸집이 자갈과 함께 유동된다는 문제점이 있었다.However, the rubber formwork of the structure is easy to install in the subway because it is installed on the upper surface of the concrete, not only difficult to install on the gravel road like the national railway, there is a problem that the rubber formwork flows with the gravel even if installed.

본 고안은 상기와 같은 문제점을 감안하여 안출한 것으로서, 철도자갈 도상구간에서 자갈막이블록 및 측구를 일체형으로 설치하여 철도자갈 도상에서 자갈의 유실을 방지할 뿐 아니라, 눈, 비에 의한 침투수를 배수하여 노반의 침하를 방지할 수 있는 자갈흐름 방지 측구를 제공하는 것을 그 목적으로 한다.The present invention has been devised in view of the above problems, and the gravel block and side openings are integrally installed in the railway gravel road section to prevent the loss of gravel in the railway gravel road as well as to prevent infiltration by snow and rain. It is an object to provide a gravel flow preventing side that can drain and prevent settlement of the roadbed.

상기와 같은 목적을 달성하기 위한 본 고안은 철도자갈 도상의 자갈유실을 방지하고, 눈, 비로 인한 침투수를 배수하기 위해서 철도 양측에 평행하게 설치되는 측구로서, 단면이 "U" 자형으로 형성되되, 일측 상단에 삽입홈이 형성되고, 일측 측면에는 몸체입수홀이 형성되며, 타측 상단에 연장부가 외측면으로부터 연장형 성되고, 전단부에 요홈부가 형성되며, 후단부에 요철부가 형성되고, 하면에 상기 몸체입수홀로부터 입수된 침투수가 배수되는 배수홀이 형성된 측구몸체와, 일측면으로부터 연장형성된 돌출부가 상기 삽입홈에 끼워맞춤되며, 전단부에 요홈부가 형성되고, 후단부에 요철부가 형성된 측구막이와, 상기 측구몸체의 연장부와 상기 측구막이 사이에 끼워맞춤되는 측구덮개를 포함하여 구성된 것을 특징으로 한다.The present invention for achieving the above object is a side port installed in parallel to both sides of the rail to prevent gravel loss on the railroad gravel and drain the infiltration water due to snow and rain, the cross section is formed in a "U" shape. , An insertion groove is formed at one upper end, a body inlet hole is formed at one side, an extension part is formed from the outer side at the other end, a recess is formed at the front end, and an irregular part is formed at the rear end. The side opening body is formed with a drain hole for draining the infiltration water obtained from the body inlet hole, and the protrusion extending from one side is fitted into the insertion groove, the groove is formed in the front end portion, the side hole is formed in the uneven portion at the rear end And a side cover which is fitted between the membrane and the extension portion of the side body and the side membrane.

보다 바람직하게, 상기 측구막이는 측면에 다수개의 막이입수홀이 형성된 것을 특징으로 한다.More preferably, the side membrane is characterized in that a plurality of membrane entrance hole is formed on the side.

보다 바람직하게, 상기 측구덮개는 상하면을 관통하는 덮개입수홀이 형성되고, 전단부와 후단부에는 분리를 쉽게하는 분리홈이 형성된 것을 특징으로 한다.More preferably, the side cover is formed through the cover entrance hole penetrating the upper and lower, characterized in that the front and rear ends are formed with a separation groove for easy separation.

보다 바람직하게, 상기 측구몸체는 타측 측면에 몸체입수홀이 더 형성된 것을 특징으로 한다.More preferably, the side opening body is characterized in that the body entrance hole is further formed on the other side.

보다 바람직하게, 상기 측구몸체의 하부 외측에 평탄부가 일체형으로 형성되고, 이 평탄부의 하측에 접촉되어 측구몸체를 수평하게 지지하는 판상의 측구저판이 더 구성된 것을 특징으로 한다.More preferably, the flat portion is formed integrally on the lower outer side of the side mouth body, characterized in that the plate-shaped side bottom plate which is in contact with the lower side of the flat body to support the side body body horizontally.

이하, 첨부된 도면을 참조하여 본 발명에 따른 바람직한 일실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 4는 본 고안의 일실시예에 의한 자갈흐름 방지 측구가 설치된 철도자갈 도상의 구성을 나타낸 단면도, 도 5은 본 고안의 일실시예에 의한 자갈흐름 방지 측구의 결합사시도, 도 6는 본 고안의 일실시예에 의한 자갈흐름 방지 측구의 분해 사시도, 도 7는 본 고안의 일실시예에 의한 자갈흐름 방지 측구의 측구몸체 정면도, 도 8은 본 고안의 일실시예에 의한 자갈흐름 방지 측구의 측구막이 측면도, 도 9은 본 고안의 일실시예에 의한 자갈흐름 방지 측구의 측구덮개 평면도이다.Figure 4 is a cross-sectional view showing the configuration of the gravel flow prevention side is installed gravel flow prevention side according to an embodiment of the present invention, Figure 5 is a perspective view of the combined gravel flow prevention side according to an embodiment of the present invention, Figure 6 Figure 7 is an exploded perspective view of the gravel flow prevention side sphere according to an embodiment of the present invention, Figure 7 is a side view body front view of the gravel flow prevention side sphere according to an embodiment of the present invention, Figure 8 is a gravel flow prevention side sphere according to an embodiment of the present invention Figure 9 is a side view of the side wall, Figure 9 is a plan view of the side cover of the gravel flow prevention side according to an embodiment of the present invention.

본 실시예의 자갈흐름 방지 측구는 크게 측구몸체(120), 측구막이(130), 측구덮개(140)로 구성된다.The gravel flow prevention side of the present embodiment is largely composed of a side door body 120, a side wall 130, side cover 140.

먼저, 침투수가 입수된 후 배수시설이나 도상 외부로 배출되게 하는 측구몸체(120)에 대하여 설명한다.First, the side body body 120 to be discharged to the drainage facility or the outside after the infiltration water is obtained will be described.

측구몸체(120)는 단면이 "U" 자형이고, 길이가 길게 형성되누 부재로서, 도 4에서와 같이 상부가 개구되도록 자갈층(30)의 양측단에 설치되며, 측구몸체(120)의 전단부에는 요홈부(122)가 형성되며, 후단부에는 요철부(124)가 형성된다.Side groove body 120 is a "U" shaped cross-section, the length is formed as a long member, as shown in Figure 4 is installed at both ends of the gravel layer 30 so as to open the upper portion, the front end of the side sphere body 120 In the groove portion 122 is formed, the rear end is formed with an uneven portion 124.

이 요홈부(122)와 요철부(124)는 도 5 내지 도 6에 도시된 바와 같이, 이웃하는 측구몸체(120)의 단면끼리 끼워맞춤결합을 하기 위한 부분으로서, 전단부에 요홈부(122)를 형성하고, 후단부에 요철부(124)를 형성하는 방식 이외에도 전단부와 후단부에 각각 요홈부 및 요철부를 모두 형성하여 끼워맞춤결합력을 더욱 강하게 할 수도 있으며, 이웃하는 측구몸체의 단면끼리 결합시키는 방식이라면 적절하게 선택하여 사용할 수 있음은 물론이다.As shown in FIGS. 5 to 6, the recess 122 and the recess 124 are parts for fitting the cross sections of neighboring side body bodies 120 to each other. ), And in addition to the method of forming the concave-convex portion 124 at the rear end, both the groove and the concave-convex portion may be formed at the front end and the rear end, respectively, to further strengthen the fit coupling force, and cross-sections of neighboring side bodies Of course, if the combination method can be used properly selected.

한편, 자갈층(30)과 강화노반(40)을 통과한 침투수가 배수층(50)을 따라서 측구몸체(120)의 일측면까지 도달된 후 측구몸체(120)의 내측으로 입수될 수 있도록 배수층(50)과 접촉되는 측구몸체(120)의 일측면에는 다수개의 몸체입수홀(120a)이 형성된다.On the other hand, the infiltration water passing through the gravel layer 30 and the reinforced roadbed 40 reaches to one side of the side opening body 120 along the draining layer 50, so that the drainage layer 50 can be obtained inside the side opening body 120. On one side of the side body 120 in contact with the plurality of body acquisition holes 120a are formed.

이러한 몸체입수홀(120a)은 PVC와 같은 재질의 파이프가 측구몸체(120)의 측면에 삽입된 형태로 형성되는 것이 바람직하며, 측구몸체(120)의 외면측보다 내면측의 높이가 낮도록 경사지게 형성되어 침투수가 몸체입수홀(120a)을 통해 측구몸체(120)의 내측으로 잘 입수되도록 한다.The body inlet hole (120a) is preferably formed in the form of a pipe made of a material such as PVC is inserted into the side of the side body 120, inclined so that the height of the inner surface side is lower than the outer surface side of the side body 120. Is formed so that the infiltration water is well received into the inside of the side opening body 120 through the body inlet hole (120a).

이 몸체입수홀(120a)의 형상은 원형으로 형성됨이 바람직하지만, 침투수가 잘 입수되도록 변형이 가능하며, 그 예로 사각이나 타원의 형상이 있으며, 직사각형의 홀로도 형성될 수도 있다.Although the shape of the body inlet hole 120a is preferably formed in a circular shape, the body can be deformed so that the infiltration water is well received. For example, the body inlet hole 120a may have a rectangular or oval shape, and may also be formed as a rectangular hole.

그리고 측구몸체(120)의 타측면에도 몸체입수홀(120c)을 더 형성하여, 측구몸체(120)의 양측에서 침투수가 입수되도록 하는 것이 바람직하다.And it is preferable to further form a body inlet hole (120c) on the other side of the side opening body 120, so that the infiltration water is obtained from both sides of the side opening body (120).

상술한 바와 같이 측구몸체(120)의 내측으로 입수된 침투수는 이웃하는 측구몸체(120)를 통해 흘러가서 배수시설(미도시)이 형성된 곳에서 일제히 배수되거나 도 7에 도시된 바와 같이, 입수된 침투수가 즉시 배출될 수 있도록 측구몸체(120)의 하면에 배수홀(120b)이 형성된다.As described above, the infiltration water obtained into the inside of the side body 120 flows through the neighboring side body 120 and is simultaneously drained at a place where a drainage system (not shown) is formed, or as shown in FIG. 7. The drainage hole 120b is formed in the lower surface of the side opening body 120 so that the penetrated water can be immediately discharged.

배수홀(120b)은 측구몸체(120)의 하면으로부터 연통되도록 PVC와 같은 재질의 파이프가 삽입된 형태로 형성되며, 도 4에서와 같이, 배수홀(120b)에 연결되도록 배수파이프가 설치되어, 침투수가 철도자갈 도상의 외부로 배출되도록 하는 것이 바람직하다.The drainage hole 120b is formed in a shape in which a pipe made of a material such as PVC is inserted to communicate with the lower surface of the side opening body 120, and as shown in FIG. 4, a drainage pipe is installed to be connected to the drainage hole 120b. It is desirable to allow the infiltration water to be discharged to the outside of the railway gravel.

이러한 배수홀(120b)도 몸체입수홀(120a, 120c)과 마찬가지로 침투수가 잘 배수되도록, 측구몸체(120)의 내측보다 외측이 높이가 낮도록 형성되는 것이 바람직하며, 배수파이프(121)도 철도자갈 도상의 외부측으로 갈수록 높이가 낮아지게 하여 침투수가 잘 배출되도록 한다.Like the drainage holes 120b, the drainage holes 120b are formed to have a lower height than the inner side of the side opening body 120 so that the infiltration water is well drained, and the drainage pipe 121 is also a railway. The height is lowered toward the outside of the gravel to allow the permeate to be discharged well.

이렇게 몸체입수홀(120a, 120c)를 통해 측구몸체(120)의 내부로 입수된 침투수가 배수홀(120b)에 연결된 배수파이프(121) 및 배수홀(120b)을 지나서 철도자갈 도상의 외부로 배출되도록 하는 것이다.In this way, the infiltration water obtained into the inside of the side opening body 120 through the body inlet holes 120a and 120c is discharged to the outside of the railroad gravel through the drain pipe 121 and the drainage hole 120b connected to the drainage hole 120b. To make it possible.

한편, 상술한 측구몸체(120)가 수평하게 설치될 수 있도록 측구몸체(120)의 하면에 평탄부(126)가 일체형으로 형성되며, 이 평탄부(126)를 지지하는 측구저판(110)이 더 구성되는 것이 바람직하다.Meanwhile, the flat part 126 is integrally formed on the lower surface of the side body 120 so that the above-described side body body 120 can be horizontally installed, and the side plate base plate 110 supporting the flat part 126 is formed. It is preferable to further constitute.

다시말하면, 도 4 내지 도 6에 도시된 바와 같이, 측구저판(110)을 설치하여 측구몸체(120)의 하면에 일체형으로 형성된 평탄부(126)를 수평하게 지지함으로써, 측구몸체(120)가 외력에 의해서 유동되지 않도록 하는 것이다.In other words, as shown in Figures 4 to 6, by installing the side plate 110 to horizontally support the flat portion 126 formed integrally on the lower surface of the side body body 120, the side body body 120 It does not flow by external force.

한편, 측구몸체(120)의 일측 상단에는 삽입홈(128)이 형성되고, 타측 상단에는 외측면으로부터 연장형성된 연장부(127)가 형성된다.On the other hand, the insertion groove 128 is formed at one upper end of the side mouth body 120, the other end is formed with an extension portion 127 extending from the outer surface.

이 삽입홈(128)과 연장부(127)는 후술하게 될 측구막이(130) 및 측구덮개(140)와 결합을 하기 위한 부분으로서, 삽입홈(128)은 일측 상단의 중앙을 따라서 소정 깊이로 형성되고, 연장부(127)는 타측의 외측면으로부터 소정 높이로 연장되도록 형성된다.The insertion groove 128 and the extension portion 127 is a portion for coupling with the side membrane 130 and the side cover 140, which will be described later, the insertion groove 128 is a predetermined depth along the center of one side top The extension part 127 is formed to extend to a predetermined height from the outer side of the other side.

다음으로, 상기 삽입홈(128)에 끼워맞춤되어 자갈층(30)의 자갈이 유실되는 것을 방지하는 측구막이(130)에 대하여 설명한다.Next, the sidewall membrane 130 is fitted to the insertion groove 128 to prevent the gravel of the gravel layer 30 from being lost.

측구막이(130)는 도 5 내지 도 6에 도시된 바와 같이, 삽입홈(128)의 폭과 높이에 맞도록 일측면으로부터 연장형성된 돌출부(136)가 측구몸체(120)에 형성된 삽입홈(128)에 삽입되어 끼워맞춤되는 판상의 부재로서, 소정의 높이로 형성되어 자갈층(30)의 자갈이 도상의 외부로 유실되지 않도록 방지한다.As shown in FIGS. 5 to 6, the side mouth membrane 130 has an insertion groove 128 formed on the side body 120 with a protrusion 136 extending from one side to fit the width and height of the insertion groove 128. As a plate-like member that is inserted into and fitted to, it is formed at a predetermined height to prevent the gravel of the gravel layer 30 from being lost to the outside of the statue.

측구막이(130)의 형성 높이는 자갈층(30)의 자갈이 도상 외부로 유실되지 않을 정도로 형성됨이 바람직하다. 이는, 측구막이(130)의 형성 높이가 너무 높아지면 철도자갈 도상의 보수나 정리를 위해 작업자가 도상 내로 진입하기가 어려워지기 때문이다.The formation height of the sidewalls 130 is preferably formed so that the gravel of the gravel layer 30 is not lost to the outside of the phase. This is because, if the formation height of the sidewall 130 is too high, it is difficult for the worker to enter the phase for repair or cleanup of the rail gravel.

한편, 도 6에 도시된 바와 같이, 측구막이(130)의 전단부에는 요홈부(132)가 형성되고, 후단부에는 요철부(134)가 형성된다.On the other hand, as shown in Figure 6, the front end portion of the side membrane 130 is formed with a groove portion 132, the rear end portion is formed with an uneven portion 134.

이 요홈부(132)와 요철부(134)는 앞서 말한 바와 마찬가지로 이웃하는 측구막이(130)의 단면끼리 서로 끼워맞춤결합을 하기 위한 부분으로서, 전단부에 요홈부(132)를 형성하고, 후단부에 요철부(132)를 형성하는 방식 이외에도 전단부와 후단부에 각각 요홈부 및 요철부를 모두 형성하여 끼워맞춤결합력을 더욱 강하게 할 수도 있으며, 이웃하는 측구막이의 단면끼리 결합시키는 방식이라면 적절하게 선택하여 사용할 수 있음은 물론이다.As described above, the recess 132 and the recess 134 are parts for fitting the cross-sections of the neighboring side membranes 130 to each other, and the recess 132 is formed at the front end thereof. In addition to forming the concave-convex portion 132 at the end, the concave-convex portion and the concave-convex portion may be formed at the front end and the rear end, respectively, to further strengthen the fit coupling force. Of course, you can use it.

그리고 측구막이(130)는 자갈층(30)의 자갈이 도상의 외부로 유실되지지 않도록 방지하는 기능 이외에도, 도 8에 도시된 바와 같이, 측면에 다수개의 막이입수홀(130a)이 형성되어 자갈층(30)의 침투수가 막이입수홀(130a)을 통해서 측구몸체(120)의 내측으로 입수될 수 있도록 한다.In addition to the function of preventing the gravel of the gravel layer 30 from being lost to the outside of the figure, the side wall membrane 130 has a gravel layer having a plurality of membrane receiving holes 130a formed in the side surface as shown in FIG. 8. The penetration water of 30 may be obtained into the inside of the side opening body 120 through the membrane entry hole 130a.

이러한 막이입수홀(130a)은 PVC와 같은 재질의 파이프가 측구막이(130)의 측면에 삽입된 형태로 형성되며, 침투수가 입수되는 측이 넓도록 형성하여 침투수가 잘 입수되도록 하는 것이 바람직하다. 또한, 측구몸체(120)와 마찬가지로 막이입수홀(130a)의 형상은 원형으로 형성됨이 바람직하지만, 침투수가 잘 입수될 수 있다면, 사각이나 타원의 형상으로 형성될 수도 있고, 직사각형의 홀로도 형성될 수도 있다.The membrane acquisition hole (130a) is formed in a form in which a pipe made of a material such as PVC is inserted into the side surface of the side membrane 130, it is preferable to form a wider side where the infiltration water is obtained so that the penetration water is well received. In addition, as in the side opening body 120, the shape of the membrane entrance hole 130a is preferably formed in a circular shape, but if the penetration can be obtained well, it may be formed in the shape of a square or an ellipse, or may be formed as a rectangular hole. It may be.

마지막으로, 상기 측구몸체(120)의 연장부(127)와 상기 측구막이(130) 사이에 끼워맞춤되는 측구덮개(140)에 대하여 설명한다.Finally, the side cover 140 that is fitted between the extension portion 127 and the side membrane 130 of the side body body 120 will be described.

측구덮개(140)는 측구몸체(120)의 연장부(127)의 내면과 삽입홈(128)에 삽입된 측구막이(130)의 측면 사이에 끼워맞춤되어 측구몸체(120)의 내부로 이물질이 누적되는 것을 방지하기 위한 것으로, 도 6에 도시된 바와 같이, 판상으로 형성되되, 연장부(127)의 형성높이와 동일한 높이로 형성되는 것이 바람직하다.The side cover 140 is fitted between the inner surface of the extension portion 127 of the side door body 120 and the side surface of the side wall membrane 130 inserted into the insertion groove 128, the foreign matter to the inside of the side body body 120 In order to prevent accumulation, as shown in FIG. 6, it is preferably formed in a plate shape, and is formed at the same height as the height of forming the extension part 127.

또한, 도 9에 도시된 바와 같이, 측구막이(130)에 형성된 막이입수홀(130a)을 통해 입수된 침투수가 측구몸체(120)로 입수되도록, 측구덮개(140)의 상하면을 관통하는 다수개의 덮개입수홀(140a)이 형성된다.In addition, as shown in Figure 9, a plurality of penetrating through the upper and lower surfaces of the side cover 140 so that the infiltration water obtained through the membrane entry hole (130a) formed in the side wall membrane 130 is obtained into the side wall body (120) The cover acquisition hole 140a is formed.

이러한 덮개입수홀(140a)은 PVC와 같은 재질의 파이프가 측구덮개(140)에 삽입된 형태로 형성되며, 그 형상도 앞서 말한 바와 같이 원형으로 형성됨이 바람직하지만, 침투수가 더 잘 입수되도록 사각이나 타원의 형상으로 형성될 수도 있고, 직사각형의 홀로도 형성될 수도 있다.The cover inlet hole 140a is formed in a shape in which a pipe made of PVC, such as a material, is inserted into the side cover 140, and the shape is preferably formed in a circular shape as described above, but the square or It may be formed in the shape of an ellipse, or may be formed as a rectangular hole.

한편, 측구몸체(120)와 측구막이(130) 사이에 끼워맞춤된 측구덮개(140)에는 분리하기 쉽도록 전단부와 후단부에 분리홈(142)이 형성된다.On the other hand, in the side cover 140, which is fitted between the side body body 120 and the side membrane 130, the separation groove 142 is formed at the front end and the rear end to facilitate the separation.

이러한 분리홈(142)은 전단부나 후단부 중 어느 일측에만 형성할 수도 있지 만, 작업자가 분리작업시 수월하게 분리할 수 있도록 양측 모두에 형성되는 것이 바람직하며, 그 크기나 모양은 충분히 변형가능하므로 한정하지 않는다.The separation groove 142 may be formed only on either side of the front end or the rear end, but is preferably formed on both sides so that the worker can easily separate during the separation operation, the size or shape is sufficiently deformable It is not limited.

상술한 측구몸체(120), 측구막이(130), 측구덮개(140)는 침투수와 접촉이 빈번하다는 점과 강도 등을 고려하여, 와이어매쉬를 포함하는 콘크리트 재질로 형성하여 충분한 강도를 유지하면서도, 침투수와 빈번한 접촉에도 문제되지 않도록 하며, 자갈층(30)에 형성된 어깨부(30A)이외에 강화노반(40)의 양단부에 어깨부(40A)를 더 형성하여 도상의 자갈유실을 더욱 방지하는 것이 바람직하다.The above-described side body 120, side membrane 130, side cover 140 is made of a concrete material including a wire mesh in consideration of the frequent contact with the infiltration water and strength, while maintaining sufficient strength In order to prevent frequent contact with the infiltrating water, and to further prevent the gravel loss on the island by forming a shoulder portion 40A at both ends of the reinforced roadbed 40 in addition to the shoulder portion 30A formed in the gravel layer 30. desirable.

한편, 본 고안의 자갈흐름 방지 측구의 내측 빈 공간에 방수처리된 철도시설을 매설할 수 있다.On the other hand, it is possible to bury the waterproofing railway facilities in the inner empty space of the gravel flow prevention side of the present invention.

예를 들면, 케이블을 내포하고 있는 PVC케이블관을 본 고안의 자갈흐름 방지 측구의 내측 빈 공간에 매설하면 미관상으로도 좋을 뿐만 아니라, PVC케이블관의 파손도 방지할 수 있으며, 케이블을 설치하기 위한 장치나 수단이 필요로 하지 않으므로 경제적이다.For example, if a PVC cable tube containing a cable is embedded in the inner empty space of the gravel flow prevention opening of the present invention, it may not only look beautiful but also prevent damage of the PVC cable tube. Economical as no devices or means are required.

이상 설명한 본 고안은 그 기술적 사상 또는 주요한 특징으로부터 벗어남이 없이 다른 여러 가지 형태로 실시될 수 있다. 따라서, 상기 실시예는 모든 점에서 단순한 예시에 지나지 않으며 한정적으로 해석되어서는 안 된다.The present invention described above can be implemented in various other forms without departing from the technical spirit or main features. Therefore, the above embodiments are merely examples in all respects and should not be interpreted limitedly.

상기와 같이 구성된 본 고안의 자갈흐름 방지 측구에 의하면, 철도자갈 도상의 자갈유실을 방지하는 자갈막이의 기능과 침투수를 배수시키는 측구의 기능을 함께 구현할 수 있으므로 경제적이다.According to the gravel flow prevention side of the present invention configured as described above, it is economical to implement the function of the gravel to prevent the gravel loss on the rail gravel and the side of draining the infiltration water.

또한, 측구몸체, 측구막이, 측구덮개에 입수홀을 형성함으로써 침투수의 배수를 원활하게 할 수 있다.In addition, by forming the inlet hole in the side body, the side membrane, the side cover can facilitate the drainage of the infiltration water.

또한, 측구덮개의 전단부와 후단부에 분리홈을 형성함으로써 측구덮개의 분리를 쉽게 할 수 있다.In addition, by forming a separation groove in the front end and the rear end of the side cover can be easily separated from the side cover.

또한, 평탄부와 측구저판을 더 구성하여 측구가 수평하게 유지될 수 있도록 할 수 있다.In addition, the flat portion and the side plate may further be configured so that the side holes may be kept horizontal.

Claims (5)

철도자갈 도상의 자갈유실을 방지하고, 눈, 비로 인한 침투수를 배수하기 위해서 철도 양측에 평행하게 설치되는 측구로서,It is a side port installed parallel to both sides of railway to prevent gravel loss on railway gravel and to drain water from snow and rain. 단면이 "U" 자형으로 형성되되, 일측 상단에 삽입홈(128)이 형성되고, 일측 측면에는 몸체입수홀(120a)이 형성되며, 타측 상단에 연장부(127)가 외측면으로부터 연장형성되고, 전단부에 요홈부(122)가 형성되며, 후단부에 요철부(124)가 형성되고, 하면에 상기 몸체입수홀(120a)로부터 입수된 침투수가 배수되는 배수홀이 형성된 측구몸체(120)와;The cross section is formed in a "U" shape, the insertion groove 128 is formed on one side top, the body inlet hole (120a) is formed on one side, the extension portion 127 is formed on the other top is extended from the outer side The groove portion 122 is formed in the front end portion, and the concave-convex portion 124 is formed in the rear end portion, and the side surface body 120 having a drainage hole through which the infiltration water obtained from the body inlet hole 120a is drained. Wow; 일측면으로부터 연장형성된 돌출부(136)가 상기 삽입홈(128)에 끼워맞춤되며, 전단부에 요홈부(132)가 형성되고, 후단부에 요철부(134)가 형성된 측구막이(130)와;A protruding portion 136 extending from one side is fitted into the insertion groove 128, a recess portion 132 is formed at a front end portion thereof, and a side mouth membrane 130 having an uneven portion 134 formed at a rear end portion thereof; 상기 측구몸체(120)의 연장부(127)와 상기 측구막이(130) 사이에 끼워맞춤되는 측구덮개(140)를 포함하여 구성된 것을 특징으로 하는 자갈흐름 방지 측구.Gravel flow prevention side mouth characterized in that it comprises a side cover 140 that is fitted between the extension portion 127 and the side membrane membrane 130 of the side body body 120. 제1항에 있어서,The method of claim 1, 상기 측구막이(130)는 측면에 다수개의 막이입수홀(130a)이 형성된 것을 특징으로 하는 자갈흐름 방지 측구.The side mouth membrane 130 is gravel flow prevention side mouth, characterized in that a plurality of membrane entry hole (130a) is formed on the side. 제1항 또는 제2항에 있어서,The method according to claim 1 or 2, 상기 측구덮개(140)는 상하면을 관통하는 덮개입수홀(140a)이 형성되고, 전단부와 후단부에는 분리를 쉽게하는 분리홈(142)이 형성된 것을 특징으로 하는 자갈흐름 방지 측구.The side cover cover 140 is a gravel flow prevention side opening, characterized in that the cover inlet hole (140a) penetrating the upper and lower surfaces, the front end and the rear end is formed with a separation groove 142 for easy separation. 제3항에 있어서,The method of claim 3, 상기 측구몸체(120)는 타측 측면에 몸체입수홀(120c)이 더 형성된 것을 특징으로 하는 자갈흐름 방지 측구.The side opening body 120 is gravel flow prevention side characterized in that the body receiving hole (120c) is further formed on the other side. 제3항에 있어서,The method of claim 3, 상기 측구몸체(120)의 하부 외측에 평탄부(126)가 일체형으로 형성되고, 이 평탄부(126)의 하측에 접촉되어 측구몸체(120)를 수평하게 지지하는 판상의 측구저판(110)이 더 구성된 것을 특징으로 하는 자갈흐름 방지 측구.The flat portion 126 is integrally formed on the lower outer side of the side body body 120, the plate-shaped side plate base plate 110 which is in contact with the lower side of the flat portion 126 to support the side body body 120 horizontally Gravel flow prevention side, characterized in that further configured.
KR2020060009504U 2006-04-10 2006-04-10 Block for preventing slide of ballast KR200419504Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020060009504U KR200419504Y1 (en) 2006-04-10 2006-04-10 Block for preventing slide of ballast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020060009504U KR200419504Y1 (en) 2006-04-10 2006-04-10 Block for preventing slide of ballast

Publications (1)

Publication Number Publication Date
KR200419504Y1 true KR200419504Y1 (en) 2006-06-20

Family

ID=41768868

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020060009504U KR200419504Y1 (en) 2006-04-10 2006-04-10 Block for preventing slide of ballast

Country Status (1)

Country Link
KR (1) KR200419504Y1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100769226B1 (en) 2007-06-01 2007-10-24 주식회사 삼안 A draining railroad crossing gate
KR100818936B1 (en) 2008-01-21 2008-04-04 (주) 선구엔지니어링 Block for preventing slide of ballast for railroad
WO2009146046A3 (en) * 2008-03-31 2010-01-21 Abt, Inc. Drainage system, apparatus, and method
KR101001110B1 (en) 2007-08-06 2010-12-15 민승기 Draining guiding apparatus for a drainpipe
CN111118969A (en) * 2020-01-16 2020-05-08 中铁第五勘察设计院集团有限公司 Roadbed slope protection device and railway roadbed
CN114687253A (en) * 2022-03-03 2022-07-01 中国土木工程集团有限公司 Ballastless track railway roadbed waterproof structure and construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100769226B1 (en) 2007-06-01 2007-10-24 주식회사 삼안 A draining railroad crossing gate
KR101001110B1 (en) 2007-08-06 2010-12-15 민승기 Draining guiding apparatus for a drainpipe
KR100818936B1 (en) 2008-01-21 2008-04-04 (주) 선구엔지니어링 Block for preventing slide of ballast for railroad
WO2009146046A3 (en) * 2008-03-31 2010-01-21 Abt, Inc. Drainage system, apparatus, and method
US8894324B2 (en) 2008-03-31 2014-11-25 Abt, Inc. Drainage system, apparatus, and method
CN111118969A (en) * 2020-01-16 2020-05-08 中铁第五勘察设计院集团有限公司 Roadbed slope protection device and railway roadbed
CN114687253A (en) * 2022-03-03 2022-07-01 中国土木工程集团有限公司 Ballastless track railway roadbed waterproof structure and construction method

Similar Documents

Publication Publication Date Title
KR200419504Y1 (en) Block for preventing slide of ballast
JP2007138707A (en) Boundary block between sidewalk and roadway for water permeable pavement and drainage structure of water permeable pavement
CN205276099U (en) Drainage formula brick that permeates water
CN210857182U (en) Roadbed drainage structure
CA2528050C (en) Track structure for railborne vehicles and method of producing same
US10364564B2 (en) Super drainage system and method for flood control
CN209457025U (en) A kind of roadbed side slope safeguard structure
KR100756664B1 (en) Method of construction for tunnel drainage
EP0819197B1 (en) A drainage installation for roads
KR101014268B1 (en) gravel protection panel for gravel ballast
CN211772506U (en) Sponge urban concrete road roadbed structure
CN110080102A (en) A kind of bridge deck drainage structure across railroad bridge
KR102051860B1 (en) Drainage trench for pavement
CN209066280U (en) A kind of bridge road structure
CN113389104A (en) Pavement drainage system and construction method thereof
KR100818936B1 (en) Block for preventing slide of ballast for railroad
CN212612530U (en) Herringbone beam slope protection structure
JP7499163B2 (en) Water storage type drain and water storage type drain equipment using the same
CN211848704U (en) Overhead support for paving sidewalk
CN219430428U (en) Roadbed slope drainage structure
KR100568935B1 (en) ballast protection block and it&#39;s construction method for ballast track
CN219430950U (en) Anti-scouring drainage system for turnup roadbed turning part of intercommunicating ramp
CN212128844U (en) Bridge deck drainage system of one-way cross slope bridge of integral road bed
CN208136651U (en) A kind of road structure for ground and overhead junction
KR100457132B1 (en) Route structures for inspecting the sloping surface of the cut ground using gutter in ridge line

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
T701 Written decision to grant on technology evaluation
FPAY Annual fee payment

Payment date: 20130523

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20140514

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20150602

Year of fee payment: 10

EXPY Expiration of term