CN204825934U - Side slope drainage system - Google Patents

Side slope drainage system Download PDF

Info

Publication number
CN204825934U
CN204825934U CN201520560155.0U CN201520560155U CN204825934U CN 204825934 U CN204825934 U CN 204825934U CN 201520560155 U CN201520560155 U CN 201520560155U CN 204825934 U CN204825934 U CN 204825934U
Authority
CN
China
Prior art keywords
hole
drainage
side slope
slope
ear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520560155.0U
Other languages
Chinese (zh)
Inventor
蔡云鹏
周晓平
陈永福
赵晓光
白兴平
谢维科
张华明
周文莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Northwest Engineering Corp Ltd
Original Assignee
PowerChina Northwest Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Northwest Engineering Corp Ltd filed Critical PowerChina Northwest Engineering Corp Ltd
Priority to CN201520560155.0U priority Critical patent/CN204825934U/en
Application granted granted Critical
Publication of CN204825934U publication Critical patent/CN204825934U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a side slope drainage system, including setting up in the inside drainage hole of side slope, be provided with the wash port on the drainage hole, the sliding surface fed through at the bottom of ear hole and side slope were passed through to the drainage hole, still was provided with the first guide hole that is used for surveying drainage hole rimrock stone thickness on the drainage hole. A side slope drainage system, is through the setting in first guide hole and ear hole, has guaranteed the country rock geological conditions of the feasibility and the drainage hole cavitation of wash port, can accurate definite drainage hole axis position, the drainage hole can be done simultaneously in the ear hole, and groundwater in the discharge slip mass improves the stability of slip mass, the monitoring hole still can be done simultaneously in the ear hole, through the installation monitoring instrument, lasts ground deep deformation monitoring, in addition, the simple structure of this system, it is with low costs, easily promote.

Description

A kind of slope drainage system
Technical field
The utility model belongs to slope project technical field, relates to a kind of slope drainage system.
Background technology
Stability of slope is the Focal point and difficult point problem often faced in engineering construction, is the key factor whether engineering constraint project is set up, and in the Large Infrastructure Projects such as water conservancy and hydropower, Rail Highway building project, is all the engineering problems needing primary study.In stability of slope, important link is the design of drainage system, and the impact of water Slope Stability is very large.If drainage measure is unsound, side slope is possibility unstability just, therefore must take rationally effective drainage system.
Existing slope drainage system is typically employed in the measure that drainage tunnel and drain hole are arranged in below side slope deep implication face, reduce the groundwater table of more than slide plane, reach the water pressure reduced on sliding surface, improve the object of sliding mass and slide plane mechanics parameter, and then improve whole slope stability.In order to ensure effective realization of drainage measure, higher requirement is proposed to the distance of drainage tunnel distance slide plane, distance is too near, and then drainage tunnel wall rock geology condition is poor, and cavitation condition is poor, stable problem is comparatively outstanding, also can bring the increase of cavern support engineering quantity simultaneously; Apart from too far away, drain hole is difficult to penetrate slide plane and enters sliding mass, does not have the object of discharging underground water in sliding mass, also can cause the waste of drain hole engineering quantity simultaneously.
Utility model content
The purpose of this utility model is to provide a kind of slope drainage system, by the setting in pilot hole and ear hole, reaches the object of discharging underground water in sliding mass.
The technical scheme that the utility model adopts is: a kind of slope drainage system, comprise the drainage tunnel being arranged on side slope inside, drainage tunnel is provided with drain hole, and drainage tunnel is communicated with sliding surface at the bottom of side slope by ear hole, drainage tunnel is also provided with the pilot hole for detecting drainage tunnel hole rimrock stone thickness.
Feature of the present utility model is also:
Drain hole axially arranges one group at interval of 2.5-3.5m along drainage tunnel, often organizes drain hole and is evenly provided with 3 along drainage tunnel circumference.
Ear hole length is 8-12m, arranges one at interval of 90-110m.
Pilot hole length is 3-10m, arranges one at interval of 9-11m.
The beneficial effects of the utility model are: a kind of slope drainage system, by the setting in pilot hole and ear hole, ensure that the feasibility of drain hole and the wall rock geology condition of drainage tunnel cavitation, can determine drainage tunnel axis direction more accurately; Drainage tunnel doublely can be done in ear hole, discharges underground water in sliding mass, improves the stability of sliding mass; Monitoring hole also doublely can be done in ear hole simultaneously, by installing monitoring instrument, carries out deep deformation monitoring constantly; In addition, this system architecture is simple, and cost is low, is easy to promote.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of slope drainage system of the present invention;
Fig. 2 is the sectional drawing in Figure 1A-A direction;
Fig. 3 is the sectional view of drainage tunnel in a kind of slope drainage system of the present invention;
Fig. 4 is the sectional drawing in a kind of slope drainage system middle ear of the present invention hole.
In figure, 1. drainage tunnel, 2. ear hole, 3. pilot hole, 4. drain hole.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in detail.
The structure of a kind of slope drainage system of the utility model, as shown in Figures 1 and 2, comprise the drainage tunnel 1 being arranged on side slope inside, drainage tunnel 1 is provided with drain hole 4, drainage tunnel 1 is also provided with the pilot hole 3 for detecting drainage tunnel hole rimrock stone thickness, drain hole 4 interval 2.5-3.5m is arranged, ear hole 2 length is 8-12m, arrange one at interval of 90-110m, pilot hole 3 length is 3-10m, arranges one at interval of 9-11m; As shown in Figure 3, drain hole 4 axially arranges one group at interval of 2.5-3.5m along drainage tunnel 1, often organizes drain hole 4 and is evenly provided with 3 along drainage tunnel 1 circumference; As shown in Figure 4, drainage tunnel 1 is communicated with sliding surface at the bottom of side slope by ear hole 2.
During use, judge the distance of sliding surface at the bottom of the thickness of drainage tunnel hole rimrock stone and drainage tunnel and side slope respectively by pilot hole 3 and ear hole 2, and then determine the position of drainage tunnel 1, the underground water in the body of slope is got rid of by drain hole 4; In addition, drainage tunnel doublely can be done in ear hole 2, discharges underground water in sliding mass.
A kind of slope drainage system of the utility model, by the setting in pilot hole and ear hole, ensure that the feasibility of drain hole and the wall rock geology condition of drainage tunnel cavitation, can determine drainage tunnel axis direction more accurately; Drainage tunnel doublely can be done in ear hole, discharges underground water in sliding mass, improves the stability of sliding mass; Monitoring hole also doublely can be done in ear hole simultaneously, by installing monitoring instrument, carries out deep deformation monitoring constantly; In addition, this system architecture is simple, and cost is low, is easy to promote.

Claims (4)

1. a slope drainage system, it is characterized in that, comprise the drainage tunnel (1) being arranged on side slope inside, drainage tunnel (1) is provided with drain hole (4), drainage tunnel (1) is communicated with sliding surface at the bottom of side slope by ear hole (2), described drainage tunnel (1) is also provided with the pilot hole (3) for detecting drainage tunnel hole rimrock stone thickness.
2. a kind of slope drainage system according to claim 1, is characterized in that, described drain hole (4) axially arranges one group at interval of 2.5-3.5m along drainage tunnel (1), often organizes drain hole (4) and is evenly provided with 3 along drainage tunnel (1) circumference.
3. a kind of slope drainage system according to claim 1, is characterized in that, described ear hole (2) length is 8-12m, arranges one at interval of 90-110m.
4. a kind of slope drainage system according to claim 1, is characterized in that, described pilot hole (3) length is 3-10m, arranges one at interval of 9-11m.
CN201520560155.0U 2015-07-29 2015-07-29 Side slope drainage system Active CN204825934U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520560155.0U CN204825934U (en) 2015-07-29 2015-07-29 Side slope drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520560155.0U CN204825934U (en) 2015-07-29 2015-07-29 Side slope drainage system

Publications (1)

Publication Number Publication Date
CN204825934U true CN204825934U (en) 2015-12-02

Family

ID=54683550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520560155.0U Active CN204825934U (en) 2015-07-29 2015-07-29 Side slope drainage system

Country Status (1)

Country Link
CN (1) CN204825934U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178345A (en) * 2015-07-29 2015-12-23 中国电建集团西北勘测设计研究院有限公司 Side slope drainage system and construction method thereof
CN109750657A (en) * 2019-03-12 2019-05-14 中国电建集团中南勘测设计研究院有限公司 A kind of slope drainage system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178345A (en) * 2015-07-29 2015-12-23 中国电建集团西北勘测设计研究院有限公司 Side slope drainage system and construction method thereof
CN109750657A (en) * 2019-03-12 2019-05-14 中国电建集团中南勘测设计研究院有限公司 A kind of slope drainage system
CN109750657B (en) * 2019-03-12 2023-11-07 中国电建集团中南勘测设计研究院有限公司 Slope drainage system

Similar Documents

Publication Publication Date Title
CN102426069B (en) Measurement method for rock mass crustal stress under extremely high stress condition
CN103410516A (en) Surrounding rock deformation early-warning construction method for small-diameter tunnel full-section excavation
CN103184871B (en) Coal pillar setting and extracting method for protecting important water body
WO2020087880A1 (en) Semi-underground pumped-storage hydroelectric power station employing open-pit mine, and method for constructing same
CN204825934U (en) Side slope drainage system
CN103266594A (en) Slide-resistant pile
Guo et al. Distribution of ground stress on Puhe coal mine
WO2020087882A1 (en) Full-underground pumped-storage power plant and formation method therefor
CN203296026U (en) Air exhausting device for locked and plugged diversion tunnel
WO2020087881A1 (en) Subsidence-area-based semi-underground pumped storage power station and forming method therefor
CN104389613B (en) Slurry balance shield passes through the construction method of jeopardously underground pipelines
CN101649606B (en) Non-negative-pressure leak-blocking method for forming lake in karst depression
CN105178345A (en) Side slope drainage system and construction method thereof
CN204163120U (en) Excavation of foundation pit space enclosing structure top deformation monitoring device
CN203321543U (en) High water pressure tunnel partition waterproof structure
CN103161447B (en) Method for conducting bedding pressure measurement by utilizing directional drilling
CN202329621U (en) Equipment for measuring crown settlement of tunnel
CN205134332U (en) Municipal administration delivery pipeline hole groove supporting construction
CN205049135U (en) Solve inclinometer card gauge head unit
CN203930083U (en) A kind of TGP probe receiver erecting equipment
CN208399335U (en) A kind of crack rock high pressure permeability properties test device
CN102877850B (en) Construction method of weak structural surface displacement of grotto surrounding rocks of underground power plant
CN205618173U (en) Slip casting pipe is backfilled to tunnel vault
CN202661017U (en) Device for measuring bolt hole distance
CN102913281B (en) Method for detecting and repairing mine distributed type underground reservoir

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant