CN109740280A - A kind of bridge hanging basket parameter calculates and emulation mode - Google Patents
A kind of bridge hanging basket parameter calculates and emulation mode Download PDFInfo
- Publication number
- CN109740280A CN109740280A CN201910032315.7A CN201910032315A CN109740280A CN 109740280 A CN109740280 A CN 109740280A CN 201910032315 A CN201910032315 A CN 201910032315A CN 109740280 A CN109740280 A CN 109740280A
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- load
- parameter
- bridge
- method described
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
A kind of bridge hanging basket parameter calculates and emulation mode, calculating and emulation for bridge hanging basket, it is characterised in that include the following steps: step 1, the three-dimensional entity model of Hanging Basket is established in d solid modeling software Midas;Step 2, the important technological parameters and design basic parameter of Hanging Basket are determined;Step 3, after determining load and boundary condition in Midas according to cradle structure computation model and relevant parameter, load calculating is carried out to all load-carrying members of Hanging Basket.The present invention can carry out the standard that construction is calculated according to the data that practice of construction environment acquires, and the engineering constructed under this parameter can be emulated, it further determines that feasibility and optimizes, human resources are not only saved, improve efficiency, and the hidden danger under uncertainty is avoided, it ensure that design and construction safety and quality.
Description
Technical field
The present invention relates to Hanging Basket fields, and in particular to a kind of bridge hanging basket parameter calculates and emulation mode.
Background technique
Bridge construction is an important ring for road traffic construction, no matter the shape or construction environment of bridge, Hanging Basket are bridges
One of key equipment of construction, Hanging Basket are the capital equipments in cantilever construction, by structure type can be divided into truss-like, cable-stayed type,
Fashioned iron formula and 4 kinds hybrid.Hanging Basket is from heavy and light, structure is simple, more stable and stronger, moves forward and is convenient to mount and dismount, has stronger weigh
Usability is answered, the features such as small is deformed after stress, and Hanging Basket down space is sufficient, it is possible to provide larger operation side is conducive to reinforcing bar
Template construction operation, thus obtain large-scale application.
China has a vast territory, with a varied topography, weather multiplicity, and the Bridge Design under varying environment is different, in bridge construction
Hanging Basket parameter need to be designed according to the actual situation to adapt to actual construction environment.It is most of to rely on designer in existing situation
The experience of member and repeatedly trial and error, not only expend a large amount of human resources, but also often obtain inaccurate result.
Summary of the invention
The problem of being proposed according to background technique, the present invention provide a kind of novel bridge Hanging Basket intelligent walking device to solve,
Next the present invention is done and is further illustrated.
A kind of bridge hanging basket parameter calculates and emulation mode, calculating and emulation for bridge hanging basket, it is characterised in that packet
Include following steps:
Step 1, the three-dimensional entity model of Hanging Basket is established in d solid modeling software Midas;
Step 2, the important technological parameters and design basic parameter of Hanging Basket are determined;
Step 3, right after determining load and boundary condition in Midas according to cradle structure computation model and relevant parameter
All load-carrying members of Hanging Basket carry out load calculating.
Further, the bridge hanging basket three-dimensional entity model that the step 1 is established include load-bearing carrier bar, preceding branch seat support,
Diamond shape frame, suspension system and anchor system, load-bearing carrier bar are arranged on bridge floor, and preceding branch seat support is arranged on load-bearing carrier bar, water chestnut
Shape frame is arranged on preceding branch seat support, and suspension system connection is arranged on diamond shape frame, and suspension system connects suspention system by sunpender
System.
Further, the material properties include Poisson's ratio, density, steel elasticity modulus, linear expansion coefficient, density.
Further, the method stated, it is characterised in that: the important technological parameters include free cantilever casting box beam beam section most
The height of weight, the biggest subsection of free cantilever casting box beam beam section, free cantilever casting beam section greatly.
Further, the design basic parameter include beam section weight concrete, crowd and equipment load, over-loading coefficient,
Impact coefficient, anti-coccidia index when the new poured concrete coefficient of impact, Hanging Basket walking.
Further, the operating position of the step 3 includes diamond shape frame, front beam, sunpender and anchor system.
The utility model has the advantages that compared with prior art, the present invention according to the data that practice of construction environment acquires can calculate
To the standard of construction, and the engineering constructed under this parameter can be emulated, further determine that feasibility and optimize,
Not only saved human resources, improved efficiency, and avoided the hidden danger under uncertainty, ensure that design and construction safety and
Quality.
Detailed description of the invention
Fig. 1: flow chart of the method for the present invention;
Fig. 2: structural schematic diagram of the invention;
Fig. 3: the structural schematic diagram of diamond shape frame;
Fig. 4: the structural schematic diagram of load-bearing carrier bar;
Fig. 5: the structural schematic diagram of suspension system;
In figure: branch seat support before 1- load-bearing carrier bar, 11- carrier bar, 2-, 3- diamond shape frame, 4- suspension system, 41- upper beam,
42- sunpender, 5- anchor system.
Specific embodiment
Next a specific embodiment of the invention is set forth in conjunction with attached drawing.
A kind of bridge hanging basket parameter calculates and emulation mode, includes the following steps:
Step 1, the three-dimensional entity model of Hanging Basket is established in d solid modeling software Midas;
Step 2, determine Hanging Basket important technological parameters and design basic parameter, such as each component needed for intensity, rigidity,
Monolithic stability and local stability;
Step 3, load and boundary condition are determined in Midas according to cradle structure computation model and relevant parameter, later
Load calculating is carried out to all load-carrying members of Hanging Basket.
In the present invention, the three-dimensional entity model for the Hanging Basket that the step 1 is established include load-bearing carrier bar 1, preceding branch seat support 2,
Diamond shape frame 3, suspension system 4 and anchor system 5, load-bearing carrier bar 1 are arranged on bridge floor, and load-bearing carrier bar 1 is passed through by many carrier bars 11
It is bolted, preceding branch seat support 2 is arranged on carrier bar 1, and diamond shape frame 3 is arranged on preceding branch seat support 2, and suspension system 4 is logical
It crosses the connection of upper beam 41 to be arranged on diamond shape frame 3, suspension system 4 is transferred in suspension system by sunpender 42 for pouring mixed mud
Formwork structure, the present apparatus also completes for Hanging Basket to be fixed on bridge by anchor system, as shown in Fig. 2.
According to the occurrence frequency of mechanical analysis and the accident of previous practice of construction process it is found that the accident frequency of Hanging Basket equipment
Sending out component is diamond shape frame, front beam, sunpender and anchor system.Therefore the present invention is mainly to Hanging Basket diamond shape frame, front beam, sunpender
And intensity, rigidity, monolithic stability and the local stability of anchor system are checked, and see whether that being able to satisfy Specification Design wants
It asks.
According to the above analysis, in step 2, determine that the important technological parameters of Hanging Basket and design basic parameter are as follows: material
Attribute includes Poisson's ratio, density, steel elasticity modulus, linear expansion coefficient, density;Important technological parameters mainly include free cantilever casting
Box beam beam section maximum weight, free cantilever casting box beam beam section the biggest subsection, free cantilever casting beam section height;Design basic parameter master
Impact when including beam section weight concrete, crowd and equipment load, over-loading coefficient, the new poured concrete coefficient of impact, Hanging Basket walking
Coefficient, anti-coccidia index.
In step 3, according to the actual situation, vectorial force is added to the connecting portion of cradle structure computation model, determines load
With boundary condition, load calculating are carried out to all load-carrying members of Hanging Basket later, in the present embodiment, each load is adjusted
Section so that the load after adjusting meets the requirement of practical maximum load safety, when adjusting by connection type connecting portion with
And the material of connecting portion is gradually adjusted, so that each related coefficient is all in a reasonable value produced or assemble.
The present invention can carry out the standard that construction is calculated according to the data that practice of construction environment acquires, and can be to this parameter
Lower obtained engineering of constructing is emulated, and is further determined that feasibility and is optimized, not only saved human resources, improves
Efficiency, and the hidden danger under uncertainty is avoided, it ensure that design and construction safety and quality.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any to repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (6)
1. a kind of bridge hanging basket parameter calculates and emulation mode, calculating and emulation for bridge hanging basket, it is characterised in that including
Following steps:
Step 1, the three-dimensional entity model of Hanging Basket is established in d solid modeling software Midas;
Step 2, the important technological parameters and design basic parameter of Hanging Basket are determined;
Step 3, after determining load and boundary condition in Midas according to cradle structure computation model and relevant parameter, to Hanging Basket
All load-carrying members carry out load calculating.
2. according to the method described in claim 1, it is characterized by: the bridge hanging basket three-dimensional entity model that the step 1 is established
Including load-bearing carrier bar, preceding branch seat support, diamond shape frame, suspension system and anchor system, load-bearing carrier bar is arranged on bridge floor, preceding support
Bracket is arranged on load-bearing carrier bar, and diamond shape frame is arranged on preceding branch seat support, and suspension system connection is arranged on diamond shape frame, suspention
System connects suspension system by sunpender.
3. according to the method described in claim 1, it is characterized by: the material properties include Poisson's ratio, density, steel elasticity
Modulus, linear expansion coefficient, density.
4. according to the method described in claim 1, it is characterized by: the important technological parameters include free cantilever casting box beam beam section
Maximum weight, the biggest subsection of free cantilever casting box beam beam section, free cantilever casting beam section height.
5. according to the method described in claim 1, it is characterized by: the design basic parameter include beam section weight concrete,
Impact coefficient, anti-coccidia index when crowd and equipment load, over-loading coefficient, the new poured concrete coefficient of impact, Hanging Basket are walked.
6. according to the method described in claim 1, it is characterized by: the operating position of the step 3 includes diamond shape frame, preceding cross
Beam, sunpender and anchor system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910032315.7A CN109740280A (en) | 2019-01-14 | 2019-01-14 | A kind of bridge hanging basket parameter calculates and emulation mode |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910032315.7A CN109740280A (en) | 2019-01-14 | 2019-01-14 | A kind of bridge hanging basket parameter calculates and emulation mode |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109740280A true CN109740280A (en) | 2019-05-10 |
Family
ID=66364705
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910032315.7A Pending CN109740280A (en) | 2019-01-14 | 2019-01-14 | A kind of bridge hanging basket parameter calculates and emulation mode |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109740280A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113642073A (en) * | 2021-08-06 | 2021-11-12 | 中国建筑第六工程局有限公司 | Design and construction method of lightweight support of cable tower beam |
CN116956445A (en) * | 2023-09-20 | 2023-10-27 | 中交第一航务工程局有限公司 | BIM-based basket design method, computer equipment and computer readable storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104166792A (en) * | 2014-08-06 | 2014-11-26 | 中国科学院工程热物理研究所 | Finite element analysis method for temperature action on prestressed reinforced concrete continuous rigid frame bridge |
CN204825651U (en) * | 2015-05-04 | 2015-12-02 | 曾凡荣 | Basket is hung in construction of chain slat type bridge |
WO2018000561A1 (en) * | 2016-06-30 | 2018-01-04 | 东南大学 | Bridge testing and evaluation method and apparatus based on impact vibration |
CN108505432A (en) * | 2018-03-30 | 2018-09-07 | 华南理工大学 | Evaluation method without diaphragm plate concrete hollow tall pier and thin wall |
-
2019
- 2019-01-14 CN CN201910032315.7A patent/CN109740280A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104166792A (en) * | 2014-08-06 | 2014-11-26 | 中国科学院工程热物理研究所 | Finite element analysis method for temperature action on prestressed reinforced concrete continuous rigid frame bridge |
CN204825651U (en) * | 2015-05-04 | 2015-12-02 | 曾凡荣 | Basket is hung in construction of chain slat type bridge |
WO2018000561A1 (en) * | 2016-06-30 | 2018-01-04 | 东南大学 | Bridge testing and evaluation method and apparatus based on impact vibration |
CN108505432A (en) * | 2018-03-30 | 2018-09-07 | 华南理工大学 | Evaluation method without diaphragm plate concrete hollow tall pier and thin wall |
Non-Patent Citations (3)
Title |
---|
石超: "连续梁桥悬臂浇筑挂篮的设计", 《四川建材》 * |
魏万征: "深水大跨不对称变宽出岔连续梁异型挂篮设计", 《铁道建筑技术》 * |
黄金等: "永蓝东路桥挂篮仿真分析", 《水利与建筑工程学报》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113642073A (en) * | 2021-08-06 | 2021-11-12 | 中国建筑第六工程局有限公司 | Design and construction method of lightweight support of cable tower beam |
CN113642073B (en) * | 2021-08-06 | 2024-03-22 | 中国建筑第六工程局有限公司 | Design and construction method of lightweight bracket of cable tower beam |
CN116956445A (en) * | 2023-09-20 | 2023-10-27 | 中交第一航务工程局有限公司 | BIM-based basket design method, computer equipment and computer readable storage medium |
CN116956445B (en) * | 2023-09-20 | 2024-01-09 | 中交第一航务工程局有限公司 | BIM-based basket design method, computer equipment and computer readable storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102493362B (en) | Construction method for midspan closure segment of longspan continuous rigid frame bridge | |
CN107905109A (en) | The loads such as the cast-in-place platform simulation of great-leap-forward bridge are segmented precompressed construction method | |
CN101781879B (en) | Construction method of single-pylon cable-stayed bridge without dorsal cables | |
CN109740280A (en) | A kind of bridge hanging basket parameter calculates and emulation mode | |
CN106869489A (en) | Super High Core Walls Structure level and vertical synchronous construction top module system and construction method | |
CN101781878B (en) | Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof | |
CN102322142A (en) | Construction method for 45-DEG-inclined long-overhanging reinforced concrete structure project | |
CN108000675A (en) | A kind of 3D printing method of skeleton growth formula concrete component | |
CN208415958U (en) | A kind of adjustable reinforced bar support tool | |
CN103215898A (en) | Variable-cross-section concrete continuous bridge construction method | |
CN110158474A (en) | A kind of segmented prefabricated binding clamping fixture of cast-in-situ box girder bottom web reinforcement and binding method | |
CN109338894A (en) | Mobile formwork pours width box girder construction method | |
CN102677624B (en) | U-shaped aqueduct simulation testing device and method | |
CN106012849A (en) | Construction method for integral binding and hoisting for linear section steel bars of cantilever beam and bridge | |
CN211596419U (en) | Integral closure device of rigid frame bridge side span | |
CN109869153A (en) | The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method | |
CN109162204A (en) | A kind of construction method of the quick spelling of bridge substructure transverse direction piecemeal | |
CN111893889A (en) | Main bridge closure section construction method | |
CN201588172U (en) | Integral single-tower non-dorsal-cord cable-stayed-bridge king tower lifting template | |
CN202323783U (en) | Hanging device for mid-span closure section hanging basket | |
CN201339320Y (en) | High-altitude overhanging hanging reinforced concrete hanging bracket | |
CN211057623U (en) | Precast bridge deck inboard cantilever pouring braced system | |
CN109610323A (en) | A kind of bridge cantilever construction Hanging Basket equipment suspension system | |
CN208702145U (en) | One kind, which being hung mould and installed, uses support device | |
CN218621890U (en) | Trackless triangular hanging basket template structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190510 |
|
WD01 | Invention patent application deemed withdrawn after publication |